MONTHYEARML22335A2802022-11-0404 November 2022 11-4-2022 Email Transmitting Draft Questions Pertaining to Pilgrim ISFSI Exemption Request ML22270A0422022-09-26026 September 2022 Acknowledgement Email for Holtec'S Request for Reporting Exemption with Regards to the Pilgrim ISFSI Annual Radioactive Effluent Release Report (Docket No. 05000293) ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22007A2602021-12-0606 December 2021 E-mail from P. O'Brien, Holtec, to A. Snyder, NRC, on Pilgrim Effluent Discharge ML21287A6192021-10-14014 October 2021 E-mail from S. Phillips, MEMA, to A. Snyder, NRC, Pilgrim Nuclear Power Station, Commonwealth of Massachusetts Consultation Response to Amendment Review for Emergency Preparedness ML21266A2512021-09-23023 September 2021 Consultation with Commonwealth of Massachusetts Regarding Proposed Amendment Application for Emergency Plan and Emergency Action Levels ML21266A2772021-09-23023 September 2021 HDI Clarification of Exemption Requested from 10 CFR 20, Appendix G, Section Iii.E ML21267A0012021-09-23023 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E Acceptance Review ML21257A3832021-09-15015 September 2021 E-mail from A. Snyder, NRC, to A. Sterdis, Holtec, - Pilgrim Nuclear Power Station - Follow-on Request Re Request for Additional Information 2 Pilgrim - License Amendment Request Independent Spent Fuel Storage Installation Only Emergency Pl ML21211A5912021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21211A5162021-07-22022 July 2021 Consultation Response from Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Physical Security Plan ML21200A2352021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim ISFSI Only Technical Specifications ML21200A1522021-07-13013 July 2021 Consultation Request to Commonwealth of Massachusetts Regarding Proposed Pilgrim Isfi Only Physical Security Plan ML21176A1842021-06-25025 June 2021 Email from HDI Regarding Pilgrim Nuclear Power Station Training ML21180A0582021-06-17017 June 2021 Email from Region I Regarding Pilgrim Nuclear Power Station Inspection - EA-13-132 ML21097A0402021-04-0606 April 2021 E-Mail Consult with Commonwealth of Mass Re - Amendment Application - Physical Security Plan for the Pilgrim Nuclear Power Station L-20-092, Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B,2020-12-10010 December 2020 Email Pilgrim Nuclear Power Station-Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR Part 73, Appendix B, L-20-096, Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 20102020-12-10010 December 2020 Supplemental Information to Support Physical Security Plan Revision and License Amendment Request to Incorporate Alternate Measures - Holtec Email Dated December 10, 2010 ML20328A2982020-11-16016 November 2020 Response from Commonwealth of Massachusetts on No Significant Hazard for Pilgrim ISFSI Amendment to Address ISFSI II Dated November 16, 2020 ML20297A2372020-10-22022 October 2020 Request for Additional Information - HDI Fleet Decommissioning Quality Assurance Program ML20266G4032020-09-22022 September 2020 Acceptance Review Email - Request for Approval of HDI Fleet Decommissioning Quality Assurance Program, Revision 0 ML20163A6802020-06-11011 June 2020 Confirmation of the Scope of the Requested Regulatory Relief for Pilgrim Security Qualifications ML20280A1912020-04-17017 April 2020 Request for Additional Information- Clarifying Information for Pilgrim ISFSI Physical Security Amendment Application ML20269A3542020-03-0505 March 2020 CFR 26.717 Reports 2019 Transmittal Email ML19336A0302019-11-27027 November 2019 OEDO-15-00479 - Re 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding ML19336A0332019-11-26026 November 2019 OEDO-15-00479 - E-mail to Petitioner - 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding (CAC No. MF6460; EPID L-2015-CRS-0002)- Issuance of Final Director'S Decision ML19331A1952019-11-21021 November 2019 NRR E-mail Capture - (External_Sender) Pilgrim Nuclear Power Station - Commonwealth Consultation Response - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1732019-11-12012 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Cyber Security Plan ML19331A1642019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Amendment Regarding Site Emergency Plan and Emergency Action Level Scheme ML19331A1792019-11-0505 November 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Emergency Planning Exemption CY-19-007, LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station2019-11-0404 November 2019 LTR-19-0441 Henrietta Cosentino, E-mail SECY-19-0078 Request by Entergy Nuclear Operations Inc. for Exemptions from Certain Emergency Planning Requirements for the Pilgrim Nuclear Power Station ML19275H1962019-09-24024 September 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Consult with Commonwealth - Amendment Regarding Permanently Defueled Technical Specifications (PDTS) ML19239A0372019-08-26026 August 2019 E-mail from Entergy Dated August 26, 2019, Notification of Pilgrim License Transfer ML19239A0262019-08-23023 August 2019 LTR-19-0330 Janet Azarovitz, E-mail a Plea for More Time and Reasonable Discussion Including the Citizens of the Commonwealth in the Sale of the Pilgrim Nuclear Power Station ML19234A2072019-08-20020 August 2019 LTR-19-0328 Lawrence Delafield, President, Six Ponds Improv Assoc., Plymouth, Ma, Ltr Requests NRC to Postpone Consideration of Transferring the Licenses for the Pilgrim Nuclear Power Until the NRC Has Answered Concerns by Pilgrim Watch, Se ML19232A4032019-08-20020 August 2019 LTR-19-0322 Diane Turco, Director, Cape Downwinders, Massachusetts, Letter/E-mail Requests Suspension of the Pilgrim License Transfer from Entergy to Holtec Until the Adjudicatory Hearing Is Held and Raised Contentions Are Resolved ML19308A9942019-08-19019 August 2019 Entergy Nuclear Operations, Inc. Confirmatory Order Rescission Supplemental Information ML19226A3912019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - EA and Fonsi for Pilgrim Decommissioning Trust Fund Exemption (Holtec) ML19226A3962019-08-14014 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station -Consult with Commonwealth - Conforming Amendment in Support of Pilgrim License Transfer Application ML19226A1212019-08-13013 August 2019 OEDO-15-00479-2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Status (CAC No. MF6460; EPID L-2015-CRS-0002) ML19227A1032019-08-0707 August 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Draft Wording for Potential Condition of License Transfer Order ML19207B3662019-07-26026 July 2019 NRR E-mail Capture - Pilgrim - RAI Direct and Indirect Transfer of Lic.; Conforming Lic. Amend.; Req. for Exemption 10 CFR 50.82(A)(8)(I)(A) for Holtec Decom. International, Llc ML19176A3452019-06-25025 June 2019 2.206 Petition Regarding Pilgrim Nuclear Power Station'S Current Licensing Basis for Flooding - Information (OEDO-15-00479) (CAC No. MF6460; EPID L-2015-CRS-0002) ML19154A0652019-06-0303 June 2019 NRR E-mail Capture - Pilgrim - Permanent Cessation of Power Operations ML19154A5242019-06-0303 June 2019 NRR E-mail Capture - RAI - Pilgrim Post-Decommissioning Technical Specifications (PDTS) License Amendment Request (LAR) ML19161A2122019-05-20020 May 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of License Amendment Request to Remove Cyber Security Plan Requirements ML19123A0332019-05-0101 May 2019 NRR E-mail Capture - Logbook Entry: 05/01/2019 Endangered Species Report Regarding a Confirmed Sighting of North Atlantic Right Whale(S) (Balaena Glacialis) ML19122A4912019-04-29029 April 2019 NRR E-mail Capture - Logbook Entry: 04/29/2019 Regarding the Confirmed Sighting of Ten North Atlantic Right Whales (Balaena Glacialis) ML19108A2372019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 50.54(w)(1) - On-Site Property Damage Insurance ML19108A2362019-04-18018 April 2019 NRR E-mail Capture - Pilgrim Nuclear Power Station - Acceptance of Requested Licensing Action, Proposed Exemptions from 10 CFR 140.11(a)(4) - Primary and Secondary Liability Insurance 2022-09-26
[Table view] |
Text
Craver, Patti From: Egan, Joseph Uegan1@entergy.com] ,6, Sent: Monday, April 16, 2012 4:11 PM IL To: Balsam, Briana
Subject:
RE: FW: Pilgrim question I concur with your reply.
From: Balsam, Briana [1] (J (u Sent: Monday, April 16, 2012 4:00 PM To: Julie Crocker Cc: Logan, Dennis; Smith, Maxwell; Susco, Jeremy; Egan, Joseph
Subject:
RE: FW: Pilgrim question
- Julie, I don't think I am going to be able to shed any more light on those figures than what you might be able to come up with yourself. I think the best way to characterize the surface plume is going to be to rely on Table 5.1-2 of the 316 Demonstration since the MIT study doesn't give any specific numbers.
Briana From: Julie Crocker [2] N-,*j "
Sent: Monday, April 16, 2012 3:31 PM To: Balsam, Briana Cc: Logan, Dennis; Smith, Maxwell; Susco, Jeremy; Egan, Joseph
Subject:
Re: FW: Pilgrim question Thanks! Looking at plate 3.44 and 3.45 it seems like the plume out to a delta T of 3C extends about 4,000 feet from the discharge canal and is about 5,000 feet wide. The width seems to be similar to the length - if the maximum size of the plume is 3,000 acres that would mean at its biggest it extends about 7,000 feet from the discharge canal which seems to be in line with what the plates are showing. Does this seem reasonable to you?
Julie On Mon, Apr 16, 2012 at 3:00 PM, Balsam, Briana <Briana.Balsam(nanrc.gov> wrote:
- Julie, I am forwarding you an email from Joe Egan at Entergy. He was able to get a copy of the MIT study from a former Entergy employee and copied a large number of pages from the study (attached). I am unsure if this will help you, though, because it doesn't specifically characterize the plume in terms of acres or number of meters extending from the discharge. The MIT study was the last study that had the possibility of answering your question, so the best description seems to be in Table 5.1-2 of the 316 Demonstration, as you suggested. And yes--the area of 3,000 acres for the delta T of 1C would represent the worst case scenario.
,'oe alsd provided some additional information on biocides in an email earlier today. I highlighted it in the email chain below.
Briana Briana A. Balsam Biologist Division of License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 301-415-1042 briana.balsam @nrc.gov From: Egan, Joseph [3]
Sent: Monday, April 16, 2012 2:44 PM To: Balsam, Briana
Subject:
RE: Pilgrim question
- Julie, Enclosed is a representative excerpt of the MIT study. I copied/scanned almost a third of the pages and tried to be sure I got as many figures and plume survey maps as possible to demonstrate the scope of the document. As the "List of Plates" on pages 7 + 8 shows, there are almost fifty ISOTHERMS in the report.
Possibly because [1] it's from MIT, and [2] it was written in the 70's; I found it difficult to understand ifthis is what NMFS is looking for.
2
Let me know if there's anything else I can do.
- Thanks, Joe From: Balsam, Briana [4]
Sent: Monday, April 16, 2012 1:35 PM To: Egan, Joseph
Subject:
RE: Pilgrim question
- Joe, I left you a message earlier, but I wanted to put it in an email, too, so that you don't go to the effort of printing that whole study if you don't need to. The information that Julie is specifically looking for is a characterization of the geographic extent of the thermal plume at the surface under the worst-case scenario (i.e., when the plume is the largest). If the MIT report summarizes this or provides any figures or isotherm maps that show this, just those few pages may be enough to answer the question. Below, I copied and pasted the last email I got from Julie asking about the thermal plume so you can see her specific words.
I will forward on what you wrote about biocides to Julie. Thanks for that extra info.
Briana From: Julie Crocker [5]
Sent: Monday, April 16, 2012 11:50 AM To: Balsam, Briana
Subject:
Re: pilgrim question Thanks - that info is helpful. Since there does not seem to be a description of the geographic area (i.e.,
extending X meters from the discharge canal and being X meters wide) occupied by the plume when it is at its largest, I'd like to be able to describe its maximum size. I seem to have what I need to describe the benthic 3
plume but am still struggling with the surface plume -- do you recommend that I use the info from table 5.1-2 in the 3 16b study which states an area of 3,000 acres for the delta T of IC? Do you consider that to represent the "worst case scenario"?
Julie From: Egan, Joseph [mallto:ieganl entergy.com]
Sent: Monday, April 16, 2012 12:00 PM To: Balsam, Briana
Subject:
RE: Pilgrim question
- Briana, I have two comments to offer:
1] Chlorine is the only biocide used in the operating systems at Pilgrim, About 10 years ago, we got permission lrom EPA to perform a pilot scale test of a non-oxidizing biocide (Mexel) which lasted a few months. This was the only time a biocide other than chlorine (sodium hypochlorite) was used, at Pilgrim.
2] We have Located a bound hard copy of the MIT study (Pagenkoff et al. 1974 -- Oceanographic Studies ... of Condenser Water Discharge). It has not been scanned and that may take several hours since it is tightly bound and the owner does not want his only copy ripped apart.
Please let me know if I can be of assistance.
- Thanks, Joe 4
From: Balsam, Briana [6]
Sent: Monday, April 16, 2012 10:25 AM To: Julie Crocker Cc: Logan, Dennis; Susco, Jeremy; Smith, Maxwell; Egan, Joseph
Subject:
RE: pilgrim question
- Julie, In additional to chlorine, Entergy also adds sodium thiosulfate to neutralize chlorine in discharged water.
Occasionally and with prior approval from the EPA or Commonwealth of MA, Entergy also adds molluscicides.
Entergy's 2006 Environmental Report for license renewal states the following:
During spring, summer, and fall, the circulating water system is chlorinated for up to two hours per day, one hour each pump, to control nuisance biological growth. Total residual chlorine cannot exceed 0.10 parts per million (ppm) in the cooling water discharge.
Continuous chlorination of the service water system can be used to control nuisance biological organisms with a maximum daily concentration of 1.0 ppm and an average monthly concentration of 0.5 ppm in the service water discharge. During chlorination, the screens are operated, and sodium thiosulfate is added to the wash water to remove chlorine and protect organisms returned to the intake canal. Molluscicides are not permitted without the prior approval of the EPA and the Commonwealth.
To follow up on your question from Thursday's phone conversation about the geographic extent of the surface thermal plume, I was not able to locate specific details on the geographic extent of the thermal plume beyond what I had already provided you because all of the available studies (which I sent you last week) refer back to the 1974 MIT study. NRC does not seem to have a copy of this study, nor was my contact at Entergy able to readily locate a copy.
For the 1974 study, MIT collected temperature data over a range of tidal and climatic conditions to characterize the surface plume in June, August, and November of 1973. I am not sure ifthis study would include maps of the geographic extent of the plume, but this is the only remaining study that might include this information. If you think you need the information contained in this report, it might be best for you to request a copy directly from the MIT Civil Engineering Department. This would be faster than NRC requesting it and then transmitting it to you. Here is a link to the MIT Library catalog record for the study.
Pagenkoff, J.R., D.F. Harieman, A.T. Ippen and B.R. Pearce. 1974. Oceanographic Studies at Pilgrim Nuclear Power Station to Determine Characteristics of Condenser Water Discharge. Massachusetts Institute of Technology. Parsons Laboratory for Water Resources and Hydrodynamics. Cambridge, MA. 156 p.
5
Briana Briana A. Balsam Biologist Division of License Renewal Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 301-415-1042 briana.balsamc@nrc.gov From: Julie Crocker [7]
Sent: Monday, April 16, 2012 9:26 AM To: Balsam, Brlana
Subject:
pilgrim question Are there any other biocides besides chlorine used at Pilgrim?
- Thanks, Julie 6
J ulic (C.rocker r ision I'rotcCted Rcsourccs Di Northe&Lst Regiona ()I'[ice Natioafl Nairi c I isherics Serv ce 55 Gre~a Repuhl ic l)ri \e hilotester. A01930
,'\
Julie Crocker Protected Resources Division Northeast Regional Office National Marine Fisheries Service 55 Great Republic Drive Gloucester, MA 01930 7