Response to NRC Notice of Violation and NRC Inspection Report 05000275-13-008, 05000323-13-008, and 07200026-13-001 - Diablo Canyon Power Plant
ML13193A325
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 07/10/2013
From: Spitzberg D
NRC/RGN-IV/DNMS/RSFSB
To: Halpin E
Pacific Gas & Electric Co
Lee Brookhart
References
EA-13-090 IR-13-001, IR-13-008
Download: ML13193A325 (3)


See also: IR 05000275/2013008

Text

July 10, 2013

Mr. Edward D. Halpin

Senior Vice President

and Chief Nuclear Officer

Pacific Gas and Electric Company

Diablo Canyon Power Plant

P.O. Box 56, Mail Code 104/6

Avila Beach, CA 93424

SUBJECT:

RESPONSE TO NRC NOTICE OF VIOLATION AND NRC INSPECTION

REPORT 05000275/2013008, 05000323/2013008, AND 07200026/2013001

Dear Mr. Halpin:

On May 20, 2013, the U.S. Nuclear Regulatory Commission (NRC) cited Pacific Gas and Electric

Company for Diablo Canyon Power Plants failure to perform an adequate safety review of

operations Procedure HPP-1073-300 as required by Title 10 of the Code of Federal Regulations

(CFR) 72.48. This procedure allowed the licensee to take steps that were not consistent with

Chapter 5 of the Final Safety Analysis Report (FSAR) and resulted in the isolation of the canister,

while filled with water, which created the possibility of an accident not evaluated in the FSAR.

The Notice of Violation, enclosed with Inspection Report 05000275/ 2013008, 05000323/

2013008, and 07200026/2013001 (ML13140A430), required you to respond in writing within

30 days. You responded by letter dated June 17, 2013 (ML13169A079).

After reviewing the information you provided in your response to the Notice, we have concluded

that your completed and proposed actions appear to adequately address the regulatory

noncompliance described in the Notice of Violation. We will review your implementation of

these corrective actions during a future inspection to determine whether full compliance has

been restored and whether compliance will be maintained.

In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter will be made

available electronically for public inspection in the NRC Public Document Room or from the NRC's

Agencywide Document Access Management System (ADAMS), accessible from the NRC Web site

at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

D. Blair Spitzberg, Ph.D., Chief

Repository & Spent Fuel Safety Branch

Division of Nuclear Materials Safety

Dockets: 50-275, 50-323, 72-26

Licenses: DPR-80, DPR-82, SNM-2511

UNITED STATES

NUCLEAR REGULATORY COMMI SSION

RE G IO N I V

1600 EAST LAMAR BLVD

ARLINGTON, TEXAS 76011-4511

Mr. Edward D. Halpin

Senior Vice President

and Chief Nuclear Officer

Pacific Gas and Electric Company

Diablo Canyon Power Plant

P.O. Box 56, Mail Code 104/6

Avila Beach, CA 93424

SUBJECT:

RESPONSE TO NRC NOTICE OF VIOLATION AND NRC INSPECTION

REPORT 05000275/2013008, 05000323/2013008, AND 07200026/2013001

Dear Mr. Halpin:

On May 20, 2013, the U.S. Nuclear Regulatory Commission (NRC) cited Pacific Gas and Electric

Company for Diablo Canyon Power Plants failure to perform an adequate safety review of

operations Procedure HPP-1073-300 as required by Title 10 of the Code of Federal Regulations

(CFR) 72.48. This procedure allowed the licensee to take steps that were not consistent with

Chapter 5 of the Final Safety Analysis Report (FSAR) and resulted in the isolation of the canister,

while filled with water, which created the possibility of an accident not evaluated in the FSAR.

The Notice of Violation, enclosed with Inspection Report 05000275/ 2013008, 05000323/

2013008, and 07200026/2013001 (ML13140A430), required you to respond in writing within

30 days. You responded by letter dated June 17, 2013 (ML13169A079).

After reviewing the information you provided in your response to the Notice, we have concluded

that your completed and proposed actions appear to adequately address the regulatory

noncompliance described in the Notice of Violation. We will review your implementation of

these corrective actions during a future inspection to determine whether full compliance has

been restored and whether compliance will be maintained.

In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter will be made

available electronically for public inspection in the NRC Public Document Room or from the NRC's

Agencywide Document Access Management System (ADAMS), accessible from the NRC Web site

at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

D. Blair Spitzberg, Ph.D., Chief

Repository & Spent Fuel Safety Branch

Division of Nuclear Materials Safety

Dockets: 50-275, 50-323, 72-26

Licenses: DPR-80, DPR-82, SNM-2511

DISTRIBUTION: See next page

S:\\DNMS\\!RSFS\\brookhart\\Diablo 2013\\Reports\\Acknowledgement of DC Response to Violation.docx

SUNSI Rev Compl.

Yes No

ADAMS

Yes No

Reviewer Initials

LEB

Publicly Avail.

Yes No

Sensitive

Yes No

Sens. Type Initials

LEB

DNMS/RSFS

C:DNMS/RSFS

LEBrookhart

DBSpitzberg

/RA/

/RA/

07/10/2013

07/10/2013

OFFICIAL RECORD COPY

Letter to Edward D. Halpin from D. Blair Spitzberg dated July 10, 2013

SUBJECT:

RESPONSE TO NRC NOTICE OF VIOLATION AND NRC INSPECTION

REPORT 05000275/2013008, 05000323/2013008, AND 07200026/2013001

DISTRIBUTION:

DNMS Director (Anton.Vegel@nrc.gov)

DNMS Deputy Director (Roberto.Torres@nrc.gov)

RSFS Branch Chief (Blair.Spitzberg@nrc.gov)

DRP/B Branch Chief (Neil.Okeefe@nrc.gov)

Senior Resident Inspector (Thomas.Hipschman@nrc.gov)

Resident Inspector (Laura.Micewski@nrc.gov)

DC Administrative Assistant (Madeleine.Arel-Davis@nrc.gov)

Senior Project Engineer, DRP/B (Michael.Bloodgood@nrc.gov)

Project Engineer, DRP/B (David.You@nrc.gov)

RSFS Inspector (Lee.Brookhart@nrc.gov)

RSFS Inspector (Eric.Simpson@nrc.gov)

Project Manager (Joseph.Sebrosky@nrc.gov)

Project Manager, SFST (William.Allen@nrc.gov)

RIV Office of Enforcement ACES (Rachel.Browder@nrc.gov)

RIV Office of Enforcement ACES (Christi.Maier@nrc.gov)

RIV Office of Enforcement ACES (Heather.Gepford@nrc.gov)