Part 3 Public Exit Meeting
ML13191A898
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 07/10/2013
From:
NRC/RGN-II
To:
References
Download: ML13191A898 (22)


Text

Introduction Agenda

  • Prior Inspection and Assessment Activities
  • Findings and Observations
  • Overall Assessment
  • Next Steps
  • NRC Closing Remarks
  • Public Questions 2

95003 Supplemental Inspection Unit 1 Performance Assessment

  • Multiple Repetitive Degraded Cornerstone on Agency Action Matrix(Column 4) o High safety significance finding

95003 Supplemental Inspection Supplemental Inspection

  • Inspection Procedure 95003 is required by Multiple Repetitive Degraded Cornerstone (Column 4) o Review of Programs and Processes o Safety Culture Review o Comprehensive, Intrusive, and Diagnostic

95003 Supplemental Inspection Supplemental Inspection Was Conducted In Three Parts

  • Part 3 - Comprehensive/Programmatic o Completed May 24th 5

95003 Supplemental Inspection Part 3 -Inspection Overview

  • TVA Notified NRC in February, 2013, of Readiness for the Inspection
  • NRC Assembled 23 Member Team from Regions and Headquarters o Conducted Training and In-office Inspection
  • Completed On-site Inspection May 24th 6

95003 Supplemental Inspection Summary of 95003 Inspection Scope

  • Evaluate and assess licensee:

o Corrective Actions to Improve Performance o The Long Term Plan for Improvement

  • Major Site Program Areas (all three units)
  • NRC Inspection of Safety Culture o Review of Third-party Safety Culture Assessment o Independent Safety Culture Interviews 7

95003 Supplemental Inspection Results NRC Team Found

  • Facility is Being Operated Safely
  • Gains Made Toward Improved Performance
  • There is an Improved Attitude in the Safety Culture
  • Improved Equipment Reliability and Performance o Comprehensive Processes Established o Focused Resources to Improve Performance

95003 Supplemental Inspection Results NRC Team Also Found

  • Improvement Needed in o Higher Margin in Standards of Performance o Demonstrate Site Standards while Performing Duties and Responsibilities
  • Additional Actions Needed for the Integrated Improvement Plan (IIP) to Address Effective and Sustained Safety Culture Improvement o Integrated Improvement Plan Revision

95003 Supplemental Inspection Results NRC Team Also Found Integrated Improvement Plan Revisions

  • Systematic Plan to Address Procedure Quality
  • Human Performance Verification Program Upgrade
  • Effective Organizational Focus to Drive Behaviors to Get Desired Outcome
  • Safety Culture Continuous Improvement and Sustainability

95003 Supplemental Inspection Results NRC Team Also Found Integrated Improvement Plan Implementation

  • Equipment Reliability o Work Management Processes Need Continued Improvement

95003 Supplemental Inspection Results NRC Team Found Several NRC Identified Findings o Represented in 2 Reactor Oversight Process Cornerstones o Include Several NRC Safety Culture Components o Preliminarily Assessed as Very Low Safety Significance (Green) o One Finding Assessed in Accordance With the NRC Enforcement Policy

95003 Supplemental Inspection Criteria for NRC Assessment of TVAs Performance

  • Corrective Actions Show Improving Performance
  • Performance Improving Consistent with Revised Integrated Improvement Plan (IIP)
  • Performance Capable of Improving Long-term

95003 Supplemental Inspection Results Overall Assessment Conclusions

  • Facility is Being Operated Safely
  • Gains Have Been Made Toward Improved Performance
  • Demonstrated Commitment To Implementation of the Integrated Improvement Plan
  • Closure of Two Longstanding SCCIs
  • Equipment Reliability is Improving

95003 Supplemental Inspection Results Overall Assessment Conclusions (continued)

  • Promptly Initiated Steps to Address the Integrated Improvement Plan Inspection Issues
  • Need to Achieve a Higher Margin in Standards of Performance
  • Continued Implementation of the Revised Integrated Improvement Plan Should Lead to Substantial and Sustained Performance Improvement

95003 Supplemental Inspection Results What Happens Next?

  • Licensee Actions to Address Inspection Identified Issues o Entered Issues Into Corrective Action Program o Modify Integrated Improvement Plan as Needed
  • Regulatory Actions o Issue NRC Inspection Report o Confirmatory Action Letter (CAL)

95003 Supplemental Inspection Results What Happens Next? (continued)

  • Reactor Oversight Process o Follow up Inspections o Evaluate IIP Performance Trends o Assess Inspection Results and IIP Performance per the Action Matrix

End of Presentation Nuclear Regulatory Commission Region 2

Open to the Public

  • NRC places a high priority on keeping the public and stakeholders informed of its activities
  • At www.nrc.gov, you can:

- Find public meeting dates and transcripts;

- Read NRC testimony, speeches, press releases, and policy decisions; and

- Access the agencys Electronic Reading Room to find NRC publications and documents.

19

NRC Social Media Channels

Actions in Response to the Japan Nuclear Accident

  • Mailbox for comments on staff actions:

JLD_Public.Resource@nrc.gov

  • Office of Public Affairs Point of

Contact:

OPA.resource@nrc.gov or 301-415-8200

Contacting the NRC Report an emergency

  • (301) 816-5100 (call collect)

Report a safety concern

  • (800) 695-7403
  • Allegation@nrc.gov General information or questions
  • www.nrc.gov Contact Browns Ferry Resident Inspectors
  • 256-729-6196