ML13190A468

From kanterella
Jump to navigation Jump to search
Island Independent Spent Fuel Storage Installation and Monticello, Submittal of an Update to Changes in Foreign Ownership, Control or Influence
ML13190A468
Person / Time
Site: Monticello, Prairie Island  Xcel Energy icon.png
Issue date: 06/19/2013
From: Murphy M
Northern States Power Co, Xcel Energy
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
L-XE-13-007
Download: ML13190A468 (2)


Text

WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390(a)(6) joXcelEnergys 414 Nicollet Mall - MP4 Minneapolis, MN 55401 June 19, 2013 L-XE-1 3-007 10 CFR 95.17(a)(1)

ATTN: Document Control Desk Director, Division of Security Operations Office of Nuclear Security and Incident Response U.S Nuclear Regulatory Commission Washington, DC 20555-0001 Prairie Island Nuclear Generating Plant, Units 1 and 2 Dockets 50-282, 50-306 Renewed License Nos. DPR-42 and DPR-60 Prairie Island Independent Spent Fuel Storage Installation Docket 72-10 Materials License No. SNM-2506 Changes in Foreign Ownership, Control or Influence Monticello Nuclear Generating Plant Docket 50-263 Renewed License No. DPR-22 In accordance with 10 CFR 95.17(a)(1), this letter submits an update to foreign ownership, control, or influence (FOCI) information for Northern States Power Company, a Minnesota corporation (NSPM) d/b/a Xcel Energy and its parent Xcel Energy Inc. reflecting a recent change in the lists of Owners, Officers, Directors, and Executive Personnel (OODEP).

The enclosed information includes OODEP forms for NSPM and Xcel Energy.

Please note that the enclosure contains personally identifiable information. NSPM hereby requests that information in Enclosure 1 be withheld from public disclosure in accordance with the provisions of 10 CFR 2.390.

If you have any questions or require additional information, please contact Leonard Sueper at (612) 330-6917.

D

WITHHOLD FROM PUBLIC DISCLOSURE UNDER 10 CFR 2.390(a)(6)

Office of Nuclear Security and Incident Response Page 2 Summary of Commitments This letter makes no new commitments and no revisions to existing commitments.

~atin ýCMurphy/

j Director, Nuclear Licensing and Regulatory Affairs Northern States Power Company-Minnesota Enclosure