PLA-7026, Response to Request for Additional Information on Overall Integrated Plan in Response to Order EA-12-051, Reliable Spent Fuel Pool Instrumentation.

From kanterella
(Redirected from ML13186A052)
Jump to navigation Jump to search

Response to Request for Additional Information on Overall Integrated Plan in Response to Order EA-12-051, Reliable Spent Fuel Pool Instrumentation.
ML13186A052
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 07/03/2013
From: Rausch T
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML131860270 List:
References
EA-12-051, PLA-7026
Download: ML13186A052 (2)


Text

Timothy S. Rausch Senior Vice President & Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Boulevard Berwick, PA 18603 I

',*\***/

I I I I

I ppl .~~~:

Tel. 570.542.3345 Fax 570.542 .1504 tsrausch@pplweb.com JUL 03 Z013 ' TM U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-001 SUSQUEHANNA STEAM ELECTRIC STATION RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION ON OVERALL INTEGRATED PLAN IN RESPONSE TO ORDER EA-12-051, "RELIABLE SPENT FUEL POOL INSTRUMENTATION" Docket No. 50-387 PLA-7026 and No. 50-388

References:

1. NRC Order Number EA-12-051, Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation, dated March 12, 2012.
2. PPL Letter (PLA-6980) titled, "Overall Integrated Plan in Response to March 12, 2012 Commission Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (NRC Order EA-12-051), "dated February 28, 2013.
3. NRC Letter titled, "Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)

(TAC NOS. MF0890 AND MF0891), "dated June 17, 2013 By letter dated February 28, 2013 (Reference 2), PPL Susquehanna, LLC (PPL) submitted an Overall Integrated Plan (OIP) in response to the March 12, 2012, U.S.

Nuclear Regulatory Commission (NRC), Commission Order modifying licenses with regard to requirements for Reliable Spent Fuel Pool (SFP) Instrumentation (Order Number EA-12-051 (Reference 1) for Susquehanna Steam Electric Station Units 1 and 2.

The NRC staff endorsed Nuclear Energy Institute (NEI) 12-02, "Industry Guidance for Compliance with NRC Order EA-12-051, to Modify Licenses with Regard to Reliable SFP Instrumentation," Revision 1, dated August 20 12, with exceptions as documented in Interim Staff Guidance (ISG) 2012-03, "Compliance with Order EA-12-051, Reliable SFP Instrumentation," Revision 0, dated August 29, 2012.

The purpose of this letter is to provide PPL Susquehanna, LLC 's (PPL) responses to the NRC's request for additional information dated June 17, 2013 (Reference 3). PPL requests that Enclosure 1 to this letter be withheld from public disclosure. The information represents Security-Related information as defined by 10 CFR 2.390.

This letter does not contain any regulatory commitments.

Document Control Desk PLA-7026 If you have any questions or require additional information, please contact Mr. John L. Tripoli, Manager- Nuclear Regulatory Affairs (570) 542-3100.

I declare under penalty of perjury that the foregoing is true and correct.

T. S. Rausch

Enclosure:

PPL's response to the NRC's Request for Additional Information regarding Susquehanna's Spent Fuel Pool Instrumentation (SFPI) Overall Integrated Plan developed in response to NRC Order EA-12-051 -Security-Related Information- Withhold from Public Notice in Accordance with 10 CPR 2.390 Copy: NRC Region I Mr. P. W. Finney, NRC Sr. Resident Inspector Ms. S. Perkins-Grew, NEI Mr. J. A. Whited, NRC Project Manager Mr. L. J. Winker, PA DEP/BRP