Er 05000458-14-301, 05/30/2013, River Bend Station - Notificaiton of NRC Initial Operator
ML13172A190
Person / Time
Site: River Bend Entergy icon.png
Issue date: 06/21/2013
From: Vincent Gaddy
Operations Branch IV
To: Olson E
Entergy Operations
References
50-458/14-301
Download: ML13172A190 (3)


See also: IR 05000458/2014301

Text

June 21, 2013

Mr. Eric W. Olson

Site Vice President

Entergy Operations, Inc.

River Bend Station

5485 US Highway 61N

St. Francisville, LA 70775

SUBJECT:

RIVER BEND STATION - NOTIFICATION OF NRC INITIAL OPERATOR

LICENSING EXAMINATION 05000458/2014301

Dear Mr. Olson:

In a telephone conversation on May 30, 2013, between Ms. Angie Orgeron, Operations Senior

Staff Instructor, and Theresa Buchanan, Chief Examiner, arrangements were made for the

administration of licensing examinations at River Bend Station during the week of March 24,

2014.

As agreed during the telephone conversation, the NRC will provide the written examination

outlines and your staff will prepare the examinations based on the guidelines in NUREG-1021,

Operator Licensing Examination Standards for Power Reactors, Revision 9, Supplement 1,

and NUREG-1123, Knowledge and Abilities Catalog for Nuclear Power Plant Operators,

Revision 2, Supplement 1. The NRCs regional office will discuss with your staff any changes

that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the Operating Test

outlines by January 3, 2014. The written examinations, operating tests and supporting

reference materials identified in Attachment 3 to ES-201 will be due by January 31, 2014.

Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations

(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the

outlines, examinations, and tests before they are submitted to the NRC for review and approval.

All materials shall be complete and ready to use. We request that any personal, proprietary,

sensitive unclassified, or safeguards information in your response be contained in a separate

enclosure and appropriately marked. Any delay in receiving the required examinations and

reference materials, or the submittal of inadequate or incomplete materials, may cause the

examinations to be rescheduled. In addition, your support for on-site validation of the

examinations is required during the week of February 24, 2014.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

UNITED STATES

NUCLEAR REGULATORY COMMISSION

RE G IO N I V

1600 EAST LAMAR BLVD

ARLINGTON, TEXAS 76011-4511

E. Olson

- 2 -

results are final.

Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary operator and

senior operator license applications (Office of Management and Budget (OMB) approval number

3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if

any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If

the applications are not received at least 30 days before the examination date, a postponement

may be necessary. Signed applications certifying that all training has been completed should

be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under

approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for

this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time

for reviewing instructions, gathering and maintaining the data needed, and completing and

reviewing the collection of information. Send comments regarding this burden estimate or any

other aspect of these information collections, including suggestions for reducing the burden, to

the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory

Commission, Washington, DC 20555-0001, or by Internet electronic mail to

INFOCOLLECTS@NRC.GOV.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be

available electronically for public inspection in the NRCs Public Document Room or from the

Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access

and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room

page of the NRCs public Website at http://www.nrc.gov/reading-rm/adams.html.

Thank you for your cooperation in this matter. Ms. Orgeron has been advised of the policies

and guidelines referenced in this letter. If you have any questions regarding the NRCs

examination procedures and guidelines, please contact Ms. Buchanan at 817-200-1503, or

myself at 817-200-1159.

Sincerely,

/RA/

Vincent G. Gaddy, Chief

Operations Branch

Division of Reactor Safety

Docket: 50-458

License: NPF-47

cc: Electronic Distribution for River Bend Station

E. Olson

- 3 -

Electronic distribution by RIV:

Regional Administrator (Art.Howell@nrc.gov)

Acting Deputy Regional Administrator (Robert.Lewis@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRS Director (Tom.Blount@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Grant.Larkin@nrc.gov)

Resident Inspector (Andy.Barrett@nrc.gov)

RBS Administrative Assistant (Lisa.Day@nrc.gov)

Acting Branch Chief, DRP/C (Bob.Hagar@nrc.gov)

Project Engineer, DRP/C (Rayomand.Kumana@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Alan.Wang@nrc.gov)

Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV/ETA: OEDO (Vivian.Campbell@nrc.gov)

S:\\DRS\\REPORTS\\Reports Drafts\\RBS 2014 Corporate Notification Letter.docx

ML13172A190

ADAMS: No Yes

SUNSI Review Complete

Reviewer Initials: TB

Publicly Available

Non-Sensitive

Category A.

Non-publicly Available

Sensitive

KEYWORD: SUNSI Review Complete

OE:OB

SOE:OB

C:OB

TBuchanan

SGarchow

VGaddy/COsterholtz for

/RA/

/RA/

/RA/

6/19/2013

6/21/2013

6/21/2013

OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax