ML13170A155
| ML13170A155 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 05/30/2013 |
| From: | Marilyn Evans - No Known Affiliation |
| To: | Rules, Announcements, and Directives Branch |
| References | |
| NRC-2013-0063, 78FR26662 00071 | |
| Download: ML13170A155 (1) | |
Text
Page 1 of 1 RULES AND DIRECTIVES BRANCH U-SNRC As of: June 11, 2013 Received: May 30, 2013 Status: PendingPost PUBLIC ju I P 3: 4 Tracking No. ljx-85m6-918h Comments Due: June 03, 201 Submission Type: Web Docket: NRC-2013-0063 REOFIVFp Draft Environmental Assessment and Finding of No Significant Impa Comment On: NRC-2013-0063-0002 Entergy Nuclear Operations, Inc., Indian Point Nuclear Generating Unit No. 3; Extension of Public Comment Period Document: NRC-2013-0063-DRAFT-0060 Comment on FR Doc # 2013-10792 3
Submitter Information 3ý /,-
-2~'L Name: Michael W Evans Address:
3731 S Sepulveda Blvd Apt I Los Angeles, CA, 90034-6888 General Comment The NRC should deny the exemption and require Entergy to comply with the regulations, which were written to protect the plant and the public from the very real risk of a fire that could lead to a meltdown at Indian Point.
The NRC failed to do an Environmental Impact Study (EIS) of the risks and impacts of granting the exemption, including looking at alternatives, such as replacing the insulation. At a minimum the NRC must conduct a full EIS, look at all alternatives and allow time for public comment.
The NRC should hold a public hearing in the vicinity of Indian Point to fully explain its exemption process, and take public input on Entergy's failure to comply with fire safety regulations that were established over 20 years ago.
SUNSI Review Complete Template = ADM - 013 E-RIDS= ADM-03 Add= D. Pickett (dvpl) https://www.fdms.gov/fdms-web-agency/component/contentstreamer?objectId=090000648130035 5&for... 06/11/2013