Text
Pa e 1 of 1 RULES AND DIRECTIVES B3RANCH tJSNPC*"
As of: June 11, 2013 Received: May 29, 2013 PUBLIC SUBM ISSION2013 JuN I I P11 4L1 Status: PendingPost Tracking No. ljx-85m2-ju2c Comments Due: June 03, 20 Submission Type: Web Docket: NRC-2013-0063 RECRVED Draft Environmental Assessment and Finding of No Significant Impact Comment On: NRC-2013-0063-0002 Entergy Nuclear Operations, Inc., Indian Point Nuclear Generating Unit No. 3; Extension of Public Comment Period Document: NRC-2013-0063-DRAFT-0054 Comment on FR Doc # 2013-10792 V*
A 13 Submitter Information Name: Lourdes Sabio Address:
30 Paulding Ave Cold Spring, NY, 10516
/ý3 General Comment The NRC should deny the exemption and require Entergy to comply with the regulations, which were written to protect the plant and the public from the very real risk of a fire that could lead to a meltdown at Indian Point.
The NRC failed to do an Environmental Impact Study (EIS) of the risks and impacts of granting the exemption, including looking at alternatives, such as replacing the insulation. At a minimum the NRC must conduct a full EIS, look at all alternatives and allow time for public comment.
SUNSI Review Complete Template = ADM - 013 E-RIDS= ADM-03 Add= D. Pickett (dvpl) https://www.fdms.gov/fdms-web-agency/component/contentstreamer?objectld=09000064813001 b7&for... 06/11/2013