UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
245 PEACHTREE CENTER AVENUE NE, SUITE 1200
ATLANTA, GEORGIA 30303-1257
June 13, 2013
Mr. Dennis R. Madison
Vice President
Southern Nuclear Operating Company, Inc.
Edwin I. Hatch Nuclear Plant
11028 Hatch Parkway North
Baxley, GA 31513
SUBJECT: EDWIN I. HATCH - NOTIFICATION OF LICENSED OPERATOR INITIAL
EXAMINATION 05000321/2013301 AND 05000366/2013301
Dear Mr. Madison:
In a telephone conversation June 10, 2013, between Mr. Anthony Ball, Plant Operations
Instructor, and Mr. Edwin Lea, Senior Operations Engineer, arrangements were made for the
administration of licensing examinations at Edwin I. Hatch Nuclear Plant. The operating test is
scheduled to be administered during the weeks of September 2 and 9, 2013. The written
examination is scheduled to be administered the week of September 16, 2013. The on-site
preparatory week is scheduled for the week of August 12, 2013.
As agreed during the telephone conversation, your staff will prepare both the operating test and
written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,
"Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory
Commission (NRC) regional office will discuss with your staff any changes that might be
necessary before the examinations are administered. Your staff has also agreed to make
copies of all examination materials that are necessary for administering the examination.
To meet the above schedule, it will be necessary for your staff to furnish the operating test
outline by June 21, 2013. Mr. Lea provided a written examination outline to your staff in
December 2012. The operating test, written examination, and the supporting reference
materials identified in Attachment 3 to ES-201 will be due by July 8, 2013. Pursuant to Title 10,
Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized
representative of the facility licensee shall approve the outline, examination, and test before
they are submitted to the NRC for review and approval. All materials shall be complete and
ready-to-use.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in
your response be contained in a separate enclosure and appropriately marked. Any delay in
receiving the required examination and reference materials, or the submittal of inadequate or
incomplete materials, may cause the examinations to be rescheduled.
D. Madison 2
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications, medical certifications, and waiver
requests (if any) at least 30 days before the first examination date. If the applications are not
received at least 30 days before the examination date, a postponement may be necessary.
Signed applications certifying that all training has been completed should be submitted at least
14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget (OMB) under approval number 3150-0018, which expires on April 30,
2016. The public reporting burden for this collection of information is estimated to average 500
hours per response, including the time for reviewing instructions, gathering and maintaining the
data needed, and completing and reviewing the collection of information. Send comments on
any aspect of this collection of information, including suggestions for reducing the burden, to the
Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov;
and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-
0018), Office of Management and Budget, Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosures will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of the NRCs document
system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-
rm.adams.html (the Public Electronic Reading Room).
D. Madison 3
Thank you for your cooperation in this matter. Mr. Ball has been advised of the policies and
guidelines referenced in this letter. If you have any questions regarding the NRC's examination
procedures and guidelines, please contact Mr. Lea at (404) 997-4567, (Internet E-mail:
Edwin.Lea@nrc.gov), or me at (404) 997-4436, (Internet E-mail: Mark.Franke@nrc.gov).
Sincerely,
/RA/
Mark E. Franke, Chief
Operations Branch 2
Division of Reactor Safety
Docket Nos. 50-321, 50-366
cc: (See page 4)
_________________________ x SUNSI REVIEW COMPLETE FORM 665 ATTACHED
OFFICE RII:DRS RII:DRS
NAME LEA FRANKE
DATE 6/12/2013 6/13/2013 6/ /2013 6/ /2013 6/ /2013 6/ /2013 6/ /2013
E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO
D. Madison 4
cc: T. E. Tynan
C. Russ Dedrickson Site Vice President
Fleet Support Supervisor Vogtle Electric Generating Plant
Southern Nuclear Operating Company, Inc. Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution Electronic Mail Distribution
David R. Vineyard C. R. Pierce
Plant Manager Nuclear Licensing Director
Edwin I. Hatch Nuclear Plant Southern Nuclear Operating Company, Inc.
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
Electronic Mail Distribution
B. D. McKinney, Jr.
Mr. C. R. Pierce Regulatory Response Manager
Regulatory Affairs Director Southern Nuclear Operating Company, Inc.
Southern Nuclear Operating Company Electronic Mail Distribution
Electronic Mail Distribution
D. W. Daughhetee
S. Kuczynski Licensing Engineer
Chairman, President and CEO Southern Nuclear Operating Company, Inc.
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
Electronic Mail Distribution
T. D. Honeycutt
Todd L. Youngblood Regulatory Response Supervisor
Vice President Southern Nuclear Operating Company, Inc.
Fleet Oversight Electronic Mail Distribution
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution Bradley J. Adams
Vice President
Leigh Perry Fleet Operations Support
SVP & General Counsel-Ops & SNC Southern Nuclear Operating Company, Inc.
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
Electronic Mail Distribution
N. J. Stringfellow
D. G. Bost Licensing Manager
Chief Nuclear Officer Southern Nuclear Operating Company, Inc.
Southern Nuclear Operating Company, Inc. Electronic Mail Distribution
Electronic Mail Distribution
L. P. Hill
Paula Marino Licensing Supervisor
Vice President Southern Nuclear Operating Company, Inc.
Engineering Electronic Mail Distribution
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution L. L. Crumpton
Administrative Assistant, Sr.
T. A. Lynch Southern Nuclear Operating Company, Inc.
Vice President Electronic Mail Distribution
Joseph M. Farley Nuclear Plant
Southern Nuclear Operating Company, Inc.
Electronic Mail Distribution
(cc contd - See page 5)
D. Madison 5
(cc contd) Chuck Mueller
Steven B. Tipps Manager
Hatch Principal Engineer - Licensing Policy and Radiation Program
Edwin I. Hatch Nuclear Plant Georgia Department of Natural Resources
Electronic Mail Distribution Electronic Mail Distribution
W. E. Duvall Cynthia A. Sanders
Site Support Manager Radioactive Materials Program Manager
Edwin I. Hatch Nuclear Plant Environmental Protection Division
Electronic Mail Distribution Georgia Department of Natural Resources
Electronic Mail Distribution
Senior Resident Inspector
U.S. Nuclear Regulatory Commission Mr. Steven M. Jackson
Edwin I. Hatch Nuclear Plant Senior Engineer - Power Supply
U.S. NRC Municipal Electric Authority of Georgia
11030 Hatch Parkway N Electronic Mail Distribution
Baxley, GA 31513
Reece McAlister
Mr. Ken Rosanski Executive Secretary
Resident Manager Georgia Public Service Commission
Edwin I. Hatch Nuclear Plant Electronic Mail Distribution
Oglethorpe Power Corporation
Electronic Mail Distribution Chairman
Appling County Commissioners
Mark Williams County Courthouse
Commissioner 69 Tippins Street, Suite 201
Georgia Department of Natural Resources Baxley, GA 31513
Electronic Mail Distribution
Amy Whaley
Jerry Ranalli Resident Manager
Municipal Electric Authority of Georgia Electronic Mail Distribution
Power
Electronic Mail Distribution Southern Nuclear Operating Company, Inc.
ATTN: Mr. Steve Grantham
Lee Foley Training Manager
Manager of Contracts Generation Hatch Nuclear Plant
Oglethorpe Power Corporation 11028 Hatch Parkway North
Electronic Mail Distribution Baxley, GA 31513
Arthur H. Domby, Esq.
Troutman Sanders
Electronic Mail Distribution
James C. Hardeman
Environmental Radiation Program Manager
Environmental Protection Division
Georgia Department of Natural Resources
Electronic Mail Distribution
Letter to Dennis R. Madison from Mark E. Franke dated June 13, 2013.
SUBJECT: EDWIN I. HATCH - NOTIFICATION OF LICENSED OPERATOR INITIAL
EXAMINATION 05000321/2013301 AND 05000366/2013301
DISTRIBUTION:
C. Evans, RII EICS (Part 72 Only)
L. Douglas, RII EICS (Linda Douglas)
OE Mail (email address if applicable)
RIDSNRRDIRS
PUBLIC
RidsNrrPMHatch Resource