Email from Ed Miller to Jim Riley NEI Public Meeting Slides on Dam Failure
ML13155A523
Person / Time
Issue date: 05/23/2013
From: Geoffrey Miller
Containment and Balance of Plant Branch
To: Jeffrey Riley
Nuclear Energy Institute
Miller E, NRR/JLD, 415-2481
References
Download: ML13155A523 (5)


Text

From:

Miller, Ed To:

RILEY, Jim

Subject:

Slides from meeting yesterday Date:

Thursday, May 23, 2013 8:56:00 AM Attachments:

NEI Public Meeting 5-22-13 NRC Dam Failure ISG Slides_WithMtngComments.pptx

Jim, Chris and Ken edited the slides from yesterdays public meeting based on the discussion from the meeting. Well plan on including this in the meeting summary as well.

Ed

Public Meeting on with NEI draft FRN version Dam Failure ISG 1

May 22, 2013 Changes in red represent meeting comments taken but not implemented on the screen due to computer issues

2 Revised / New Position DRAFT Statements Staff Revised Position:

The dam should be assumed to fail if cannot withstand its PMF, with associated effects.

Staff Revised Position:

Xu and Zhang (2009) breach methodology alone is not recommended will not be accepted for the 2.1 hazard re-analysis.

  • Several technical questions exist
  • See pg 78 regarding use of multiple methods

3 Revised / New Position Draft Statements Staff Revised Position:

Licensees are required should to perform a sunny day breach analysis on all critical dams assuming dams withstand hydrologic event Staff Revised Position:

ANS/ANSI 2.8 (modified with 10-4 motion) will be used in lieu of previous probabilistic methods i.e. 10-4 ground motion with 25 year flood (Alt 1),

1/2 of 10-4 ground motion with 1/2-PMF or 500 year flood, whichever is less (Alt 2)

4 Revised / New Position DRAFT Statements Staff Revised Position:

Staff position regarding crediting of temporary structures position in development.