DCL-13-049, Independent Spent Fuel Storage Installation Revision 8 of Physical Security Plan, Training & Qualification Plan, Safeguards Contingency Plan, & Independent Spent Fuel Storage Installation Security Program for Diablo Canyon
| ML13134A016 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon (DPR-080, DPR-082, SNM-2511) |
| Issue date: | 05/09/2013 |
| From: | Allen B Pacific Gas & Electric Co |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
| References | |
| PG&E Letter DCL-13-049 | |
| Download: ML13134A016 (2) | |
Text
SAFEGUARDS INFORMATION ghd paratd from Enclosure 2, handle this document as Security-Related Information acc an Withhold From Public Disclosure Per 10 CFR 2.390 Electric Company' Barry S. Allen Diablo Canyon Power Plant Site Vice President Mail Code 104/6 P. 0. Box 56 Avila Beach, CA 93424 805.545.4888 Internal: 691.4888 Fax: 805.545.6445 May 9, 2013 PG&E Letter DCL-13-049 U.S. Nuclear Regulatory Commission 10 CFR 50.54(p)
ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Docket No.72-026, SNM 2511 Diablo Canyon Units 1 and 2 and Independent Spent Fuel Storage Installation Revision 8 of the Physical Security Plan, Training and Qualification Plan, Safe-guards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program for Diablo Canyon Power Plant
Dear Commissioners and Staff:
As required by 10 CFR 50.54(p), Pacific Gas and Electric Company (PG&E) hereby submits Revision 8 of the Diablo Canyon Power Plant (DCPP) Physical Security Plan (PSP), with the following appendices:
Appendix B: Training & Qualification Plan Appendix C: Safeguards Contingency Plan PG&E determined that changes made to the PSP and appendices do not decrease their safeguards effectiveness. Enclosure 1 contains a Table of Changes to DCPP's PSP and appendices, and a Critical Task Matrix. Enclosure 2 is Revision 8 of DCPP's PSP with appendices. Enclosure 2 contains safeguards information, which must be withheld from public disclosure under 10 CFR 73.21, "Protection of Safeguards Information: Performance Requirements."
PG&E makes no regulatory commitments (as defined by NEI 99-04) in this letter.
Should you require further information, please contact Mr. Michael Priebe, Director of Security Services at (805) 545-4510.
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Caltaway -
Comanche Peak
- Diablo Canyon -
Palo Verde
- San Onofre -
South Texas Project -
Wolf Creek SAFEGUARDS INFORMATION When separated from Enclosure 2, handle this document as Security-Related Information 4s, LI A-iJkr
SAFEGUARDS INFORMATION When separated from Enclosure 2, handle this document as Security-Related Information Withhold From Public Disclosure Per 10 CFR 2.390 Document Control Desk May 9, 2013 Page 2 Sincerely, Barry S. /lien Site Vice President wrl8/6980/50549777 Enclosures cc/enc:
Thomas R. Hi PG&E Letter DCL-13-049 Arthur T. How James T. Poli pschman, NRC Senior Resident Inspector
'ell, III, NRC Region IV (2) ckoski, NRR Project Manager cc:
A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Caltaway Comanche Peak Diablo Canyon