ML13134A016

From kanterella
Jump to navigation Jump to search
Independent Spent Fuel Storage Installation Revision 8 of Physical Security Plan, Training & Qualification Plan, Safeguards Contingency Plan, & Independent Spent Fuel Storage Installation Security Program for Diablo Canyon
ML13134A016
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 05/09/2013
From: Allen B
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
PG&E Letter DCL-13-049
Download: ML13134A016 (2)


Text

SAFEGUARDS INFORMATION ghd paratd from Enclosure 2, handle this document as Security-Related Information acc an Withhold From Public Disclosure Per 10 CFR 2.390 Electric Company' Barry S. Allen Diablo Canyon Power Plant Site Vice President Mail Code 104/6 P. 0. Box 56 Avila Beach, CA 93424 805.545.4888 Internal: 691.4888 Fax: 805.545.6445 May 9, 2013 PG&E Letter DCL-13-049 U.S. Nuclear Regulatory Commission 10 CFR 50.54(p)

ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Docket No.72-026, SNM 2511 Diablo Canyon Units 1 and 2 and Independent Spent Fuel Storage Installation Revision 8 of the Physical Security Plan, Training and Qualification Plan, Safe-guards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program for Diablo Canyon Power Plant

Dear Commissioners and Staff:

As required by 10 CFR 50.54(p), Pacific Gas and Electric Company (PG&E) hereby submits Revision 8 of the Diablo Canyon Power Plant (DCPP) Physical Security Plan (PSP), with the following appendices:

  • Appendix B: Training & Qualification Plan
  • Appendix C: Safeguards Contingency Plan PG&E determined that changes made to the PSP and appendices do not decrease their safeguards effectiveness. Enclosure 1 contains a Table of Changes to DCPP's PSP and appendices, and a Critical Task Matrix. Enclosure 2 is Revision 8 of DCPP's PSP with appendices. Enclosure 2 contains safeguards information, which must be withheld from public disclosure under 10 CFR 73.21, "Protection of Safeguards Information: Performance Requirements."

PG&E makes no regulatory commitments (as defined by NEI 99-04) in this letter.

Should you require further information, please contact Mr. Michael Priebe, Director of Security Services at (805) 545-4510.

A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Caltaway - Comanche Peak

  • Diablo Canyon - Palo Verde
  • San Onofre - South Texas Project - Wolf Creek SAFEGUARDS INFORMATION When separated from Enclosure 2, handle this document as Security-Related Information 4s, LI A-iJkr

SAFEGUARDS INFORMATION When separated from Enclosure 2, handle this document as Security-Related Information Withhold From Public Disclosure Per 10 CFR 2.390 Document Control Desk PG&E Letter DCL-13-049 May 9, 2013 Page 2 Sincerely, Barry S. /lien Site Vice President wrl8/6980/50549777 Enclosures cc/enc: Thomas R. Hipschman, NRC Senior Resident Inspector Arthur T. How'ell, III, NRC Region IV (2) cc: James T. Poli ckoski, NRR Project Manager A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Caltaway . Comanche Peak . Diablo Canyon

  • Palo Verde
  • San Onofre ° South Texas Project - Wolf Creek SAFEGUARDS INFORMATION When separated from Enclosure 2, handle this document as Security-Related Information Withhold From Public Disclosure Per 10 CFR 2.390