ML13133A379

From kanterella
Jump to navigation Jump to search
4/18/2013 Summary of Public Meeting with Peach Bottom to Discuss Assessment of Safety Performance for 2012
ML13133A379
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 05/13/2013
From: Mel Gray
Reactor Projects Region 1 Branch 4
To:
gray, mel
References
Download: ML13133A379 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 May 13, 2013 MEETING

SUMMARY

LICENSEE:

EXELON GENERATION CO., LLC.

FACILITY:

PEACH BOTTOM ATOMIC POWER STATION, UNITS 1 AND 2

SUBJECT:

SUMMARY

OF PUBLIC MEETING On April 18, 2013, at 6:00 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public open-house at the Peach Bottom Inn in Peach in Delta, PA. The NRC conducted the Annual Assessment Meeting to discuss its assessment of the safety performance at Peach Bottom Atomic Power Station for 2012.

A notice of the open-house was issued on March 18, and was posted on the NRCs external (public) Web page. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML13077A439. ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html.

The NRC presented poster boards and handouts and met with members of the public to discuss its assessment of the safety performance of Peach Bottom Units 1 and 2 for the period of January 1 through December 31, 2012, as documented in our letter dated March 4, 2013 (ADAMS Accession No. ML13059A032. The NRC poster boards presented included background on the Reactor Oversight Process (ROP). Additional information relative to the NRC's Annual Assessment Process and the safety performance of Peach Bottom Units 1 and 2 can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Members of the public and State officials, attended the open-house and were offered the opportunity to question the NRC regarding Peach Bottoms performance and the role of the agency in ensuring safe plant operations.

/RA/

Mel Gray, Chief Projects Branch 4 Division of Reactor Projects

Enclosures:

Attendee List (ML13133A148)

ML13059A032. The NRC poster boards presented included background on the Reactor Oversight Process (ROP). Additional information relative to the NRC's Annual Assessment Process and the safety performance of Peach Bottom Units 1 and 2 can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

Members of the public and State officials, attended the open-house and were offered the opportunity to question the NRC regarding Peach Bottoms performance and the role of the agency in ensuring safe plant operations.

/RA/

Mel Gray, Chief Projects Branch 4 Division of Reactor Projects

Enclosures:

Attendee List (ML13133A148)

Distribution: (via email)

M. Gray, DRP S. Barber, DRP J. Ayala, DRP A. Turilin, DRP S. Hansell, DRP, SRI A. Ziedonis, DRP, RI S. Schmitt, DRP, OA DOC NAME: G:\\DRP\\BRANCH4\\Communications\\Public Meetings\\2012 PB AAM\\PB 2012 AAM Mtg Summary.docx ADAMS Accession No.: ML13133A379 SUNSI Review Non-Sensitive Sensitive

Publicly Available

Non-Publicly Available OFFICE RI/DRP RI/DRP NAME ATurilin/ AT MGray/ MG DATE 05/ 13 /13 05/13 /13