NRC Security Inspection Report 05000244-13-202
ML13128A205
Person / Time
Site: Ginna 
Issue date: 06/13/2013
From: Rachel Johnson
NRC/NSIR/DSO/DDSO/SPEB
To: Joseph Pacher
Constellation Energy Nuclear Group
Negrete P (301) 415-5822
References
IR-13-202
Download: ML13128A205 (4)


See also: IR 05000244/2013202

Text

SAFEGUARDS INFORMATION

SAFEGUARDS INFORMATION

June 13, 2013

Mr. Joseph E. Pacher, Vice President

R. E. Ginna Nuclear Power Plant, LLC

Constellation Energy Nuclear Group

1503 Lake Road

Ontario, NY 14519

SUBJECT:

R. E. GINNA NUCLEAR POWER PLANT - NRC SECURITY INSPECTION

REPORT 05000244/2013202

Dear Mr. Pacher:

On April 30, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at

your R.E. Ginna Nuclear Power Plant. The inspection covered one or more of the key attributes

of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection

report documents the inspection results, which were discussed on April 30, 2013, with you and

other members of your staff.

NRC inspectors examined activities conducted under your license as they relate to security and

compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed

personnel.

One NRC-identified finding of very low security significance (i.e., Green as determined by the

Physical Protection Security Significance Determination Process) was identified during this

inspection. The deficiency was promptly corrected or compensated for, and the plant was in

compliance with applicable physical protection and security requirements within the scope of

this inspection before the inspectors left the area.

This finding was determined to involve a violation of NRC requirements. However, the NRC is

treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the NRC

Enforcement Policy.

If you contest the violation or significance of this NCV, you should provide a response within

30 days of the date of this inspection report, with the basis for your denial, to the U. S. Nuclear

Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with

The enclosure transmitted herewith contains Safeguards Information. When separated from

the enclosure, this transmittal document is decontrolled.

SAFEGUARDS INFORMATION

J. Pacher

- 2 -

SAFEGUARDS INFORMATION

copies to the Regional Administrator, Region I; the Director, Office of Enforcement, U. S.

Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident

Inspector at the R.E. Ginna Nuclear Power Plant.

One cross-cutting aspect was assigned to this finding in the area of Human Performance

because the licensee failed to conduct effectiveness reviews of security-significant decisions to

verify the validity of the underlying assumptions and identify possible unintended consequences.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a

response within 30 days of the date of this inspection report with the basis for your

disagreement, to the Director, Office of Nuclear Security and Incident Response (NSIR); and to

the Branch Chief, Security Performance Evaluation Branch, Division of Security Operations,

NSIR.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs

Rules of Practice, a copy of this letter will be available electronically for public inspection in the

NRC Public Document Room or from the Publicly Available Records (PARS) component of

NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is

accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public

Electronic Reading Room).

However, the material enclosed herewith contains Safeguards Information as defined by

10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by Section 147 of the

Atomic Energy Act of 1954, as amended. Therefore, the material in the enclosure will not be

made available electronically for public inspection in the NRC Public Document Room or from

the PARS component of NRCs ADAMS. If you choose to provide a response and Safeguards

Information is necessary to provide an acceptable response, please provide the level of

protection described in 10 CFR 73.21. Otherwise, if security-related information is necessary to

provide an acceptable response, please mark your entire response Security-Related

Information - Withhold from Public Disclosure under 10 CFR 2.390 in accordance

SAFEGUARDS INFORMATION

J. Pacher

- 3 -

SAFEGUARDS INFORMATION

with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In

accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your

response.

Sincerely,

/RA/

Robert C. Johnson, Chief

Security Performance Evaluation Branch

Division of Security Operations

Office of Nuclear Security and Incident Response

Docket No. 50-244

License No. DPR-18

Nonpublic Enclosure: Inspection Report 05000244/2013202

w/Attachments: Supplemental Information

cc w/enclosure: E. Palmer, R. E. Ginna Nuclear Power Plant

ML13128A205

OFFICE

NSIR/DSO/SPEB

NSIR/DSO

NSIR/DSO/SPEB

RI

NSIR/DSO/SPEB

NAME

P. Negrete

J. Curry

J. Berry

A. Dimitriadis

C. Johnson

DATE

5/8/13

5/8/13

5/13/13

6/11/13

6/13/13