June 13, 2013

Mr. Joseph E. Pacher, Vice President R. E. Ginna Nuclear Power Plant, LLC Constellation Energy Nuclear Group 1503 Lake Road Ontario, NY 14519

SUBJECT: R. E. GINNA NUCLEAR POWER PLANT - NRC SECURITY INSPECTION REPORT 05000244/2013202

Dear Mr. Pacher:

On April 30, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your R.E. Ginna Nuclear Power Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on April 30, 2013, with you and other members of your staff.

NRC inspectors examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

One NRC-identified finding of very low security significance (i.e., Green as determined by the Physical Protection Security Significance Determination Process) was identified during this inspection. The deficiency was promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspectors left the area.

This finding was determined to involve a violation of NRC requirements. However, the NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the NRC Enforcement Policy.

If you contest the violation or significance of this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U. S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement, U. S.

Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the R.E. Ginna Nuclear Power Plant.

One cross-cutting aspect was assigned to this finding in the area of Human Performance because the licensee failed to conduct effectiveness reviews of security-significant decisions to verify the validity of the underlying assumptions and identify possible unintended consequences.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report with the basis for your disagreement, to the Director, Office of Nuclear Security and Incident Response (NSIR); and to the Branch Chief, Security Performance Evaluation Branch, Division of Security Operations, NSIR.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, if security-related information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,/RA/ Robert C. Johnson, Chief Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response Docket No. 50-244 License No. DPR-18 Nonpublic

Enclosure:

Inspection Report 05000244/2013202

w/Attachments:

Supplemental Information cc w/enclosure: E. Palmer, R. E. Ginna Nuclear Power Plant