ML13121A399
| ML13121A399 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 04/29/2013 |
| From: | Buerger B Connecticut Yankee Atomic Power Co |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards |
| References | |
| CY-13-025 | |
| Download: ML13121A399 (3) | |
Text
CONNECTICUT YANKEE ATOMIC POWER COMPANY HADDAM NECK PLANT 362 INJUN HOLLOW ROAD
- EAST HAMPTON, CT 06424-3099 April 29, 2013 CY-13-025 10 CFR 50.4 and 10 CFR 50.36a(2)
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 - 0001 Connecticut Yankee Atomic Power Company Haddam Neck Plant Independent Spent Fuel Storage Installation NRC License No. DPR-61 (NRC Docket Nos. 50-213 and 72-39)
Subject:
Annual Radiological Environmental Operating Report and Annual Radioactive Effluent Release Report for 2012 In accordance with 10 CFR 50.36a(2) and Section F.2 of the Off-Site Dose Calculation Manual (ODCM) for the Haddam Neck Independent Spent Fuel Storage Installation (ISFSI), Connecticut Yankee Atomic Power Company is required to submit to the Annual Radioactive Effluent Release Report. In addition, Section F. 1 of ODCM for the Haddam Neck ISFSI requires the submittal of an Annual Radiological Environmental Operating Report. Enclosures 1 and 2, respectively, provide the Haddam Neck ISFSI Annual Radiological Environmental Operating Report and Annual Radioactive Effluent Release Report for 2012.
There were no changes made to the ODCM for the Haddam Neck ISFSI in 2012.
If you have any questions regarding this submittal, please do not hesitate to contact me at (860) 267-6426 ext. 303, or at bbuerger@3yankees.com.
Respectfully, *aL 6.r-cy
,'4 Brantley Buerger, P.E.
ISFSI Manager
Connecticut Yankee Atomic Power Company CY-13-025/April 29, 2013/Page 2
Enclosures:
- 1. Haddam Neck Independent Spent Fuel Storage Installation, Annual Radiological Environmental Operating Report, January - December 2012.
- 2. Haddam Neck Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report, January - December 2012.
cc:
W. M. Dean, NRC Region I Administrator M. S. Ferdas, Chief, Decommissioning Branch, NRC, Region 1 J. Goshen, NRC Project Manager, Haddam Neck E. L. Wilds, Jr., Director, CT DEEP, Radiation Division
CY-1 3-025 ENCLOSURE 1 HADDAM NECK INDEPENDENT SPENT FUEL STORAGE INSTALLATION ANNUAL RADIOLOGICAL ENVIRONMENTAL OPERATING REPORT JANUARY - DECEMBER 2012 April 2013