|
---|
Category:General FR Notice Comment Letter
MONTHYEARML15154A5052015-05-18018 May 2015 Comment (1) of Heinz J. Mueller on Behalf of Us EPA on Final Generic Supplemental Environmental Impact Statement (Fgseis)/ License Renewal of Nuclear Plants, Supplement 53 Regarding Sequoyah Nuclear Plant, Units 1 and 2 Ceq 20150079 ML13130A2442013-05-0101 May 2013 Comment (1) of Kristina Lambert, of the Blue Ridge Environmental Defense League, Opposing the Relicensing of the Sequoyah Nuclear Plant ML13130A2382013-05-0101 May 2013 Comment (13) of Yolanda Moyer on License Renewal Application for Sequoyah Nuclear Plant, Units 1 and 2, Tennessee Valley Authority ML13130A2392013-04-30030 April 2013 Comment (14) of Judith Canepa of the New York Climate Action Group Opposing the License Renewal Application for Sequoyah Nuclear Plant, Units 1 and 2, Tennessee Valley Authority ML13144A8282013-04-26026 April 2013 Comment (2) of Tom Clements on Behalf of Friends of the Earth, on the Sequoyah Nuclear Plant, Units 1 & 2 License Renewal Application Review ML13149A0082013-04-26026 April 2013 Comment (15) of Tom Clements on Behalf of Friends of the Earth on Sequoyah Nuclear Plant, Units 1 and 2, License Renewal Application Review ML13119A2032013-04-25025 April 2013 Comment (11) of Sandra Kurtz on the Scoping Regarding the Re-licensing for Sequoyah Nuclear Reactors 1 and 2 ML13116A2962013-04-19019 April 2013 Comment (6) of Eric Blevins on the License Renewal Application for Sequoyah Nuclear Plant, Units 1 and 2, Tennessee Valley Authority ML13116A2942013-04-19019 April 2013 Comment (7) of Tara Pilkinton Opposing the License Renewal Application for Sequoyah Nuclear Plant, Units 1 and 2, Tennessee Valley Authority ML13116A2932013-04-17017 April 2013 Comment (4) of Jeannie Hacker-Cerulean Opposing the License Renewal Application for Sequoyah Nuclear Plant, Units 1 and 2, Tennessee Valley Authority ML13116A2952013-04-17017 April 2013 Comment (5) of Sylvia D. Aldrich Opposing the License Renewal Application for Sequoyah Nuclear Plant, Units 1 and 2, Tennessee Valley Authority ML13116A2922013-04-16016 April 2013 Comment (3) of Adelle Wood, Opposing the Application for Renewal of Sequoyah Nuclear Plant ML13101A1172013-04-0404 April 2013 Comment (2) of David Lockbaum on Receipt and Availability of Application for Renewal of Sequoyah Nuclear Plant ML13091A0182013-03-16016 March 2013 Comment (1) of Jaak Saame Regarding Receipt and Availability of Application for Renewal of Sequoyah Nuclear Plant ML13119A1132013-03-0808 March 2013 Comment (10) of Gretel Johnston on the License Renewal Application for Sequoyah Nuclear Plant, Units 1 and 2, Tennessee Valley Authority ML13119A1112013-03-0808 March 2013 Comment (8) of Brian Paddok on Application for Renewal of Sequoyah Nuclear Plant ML11308A0302011-11-0101 November 2011 Comment (2) of Tom Clements on Behalf of Friends of the Earth, on Draft Strategic Plan About Testing of Plutonium Fuel (MOX) Made from Weapons-Grade Plutonium Required for NRC to License MOX Use in Boiling Water Reactors ML0927401602009-09-24024 September 2009 Comment (1) of Don C. Laster Opposing on Site Disposal of Contaminated Materials at the Sequoyah Fuels Site Located 2 Miles East of Gore Oklahoma ML0720803462007-07-23023 July 2007 Comment (3) of Beth A. Wetzel on Behalf of Tennessee Valley Authority Regarding Proposed Generic Communication Concerning Managing Gas Intrusion ML0636204352006-12-22022 December 2006 Comment (46) of Beth A. Wetzel, on Behalf of TVA Re Draft Regulatory Guide DG-1172, Application and Testing of Safety-Related Diesel Generators in Nuclear Power Plants, Enclosed Comments Should Be Considered ESI-EMD Owners Group and Tva'S C ML0616001982006-06-20020 June 2006 Order EA-06-137, Attachment 1-E; List of Licensees ML0604100502006-02-0202 February 2006 Comment (8) of Glenn W. Morris on Behalf of Tennessee Valley Authority Re Proposed Generic Communication; Post-Fire Safe-Shutdown Circuit Analysis Spurious Actuations. ML0415403832004-05-28028 May 2004 Comment (3) of Mark J. Burzynski on Proposed Generic Letter (GL) 2004-XX; Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors (PWR) ML0408302472004-03-17017 March 2004 Comment (2) of Mark J. Burzynski, TVA, Regarding Best Practices to Establish and Maintain a Safety-Conscious Work Environment ML0402305282004-01-14014 January 2004 Comment (134) of Mary Mastin Opposing Easing of Fire Protection Regulations That Affect Fire Barriers Protecting Electrical Cables in Nuclear Reactors ML0400807702003-12-0404 December 2003 Comment (4) of Scott Poteet Re Shell Life of GFE ML0202500892002-01-16016 January 2002 General Notice Comment Letter on Request for Hearing by NRC & Petition for Leave to Intervene in Matter of TVA Re Notice of Consideration of Issuance of Amendment to License 2015-05-18
[Table view] |
Text
Paae I of I X -As of: April 24, 2013 Received:
April 19, 2013 PUBLIC SUBMISSION Status: PendingPost PUBLC S BMISIONTracking No. ljx-84v7-twii Comments Due: May 03, 2013 Submission Type: Web Docket: NRC-2013-0037 Receipt and Availability of Application for Renewal of Sequoyah Nuclear Plant Comment On: NRC-2013-0037-0003 License Renewal Application for Sequoyah Nuclear Plant, Units 1 and 2, Tennessee Valley Authority Document:
NRC-2013-0037-DRAFT-0007 Comment on FR Doc # 2013-05491 vA =3 Submitter Information Name: Tara Pilkinton Fr-Address: --)1405 Fall River Rd 17 -X=Lawrenceburg, TN, 38464 General Comment -4 Based on the age of the SEQUOYAH NUCLEAR PLANT plant and critical safety factors including flooding, earthquake and plant design Sequoyah's license should not be extended.
TVA's Sequoyah is at risk from flooding which could result from the failure of upstream dams. The Eastern Tennessee Seismic Zone, which extends from southwest Virginia to northeast Alabama, is considered to be one of the most active seismic areas east of the Rocky Mountains.
It has the potential to produce large magnitude earthquakes.
Recent large earthquakes include a magnitude 4.6 that occurred in 1973 near Knoxville and the Fort Payne Earthquake, also a magnitude 4.6, that occurred in 2003 near Scottsboro, Alabama. The containment buildings of nuclear reactors must do two things without fail: contain radioactive emissions during an accident and prevent intrusion from outside forces such as wind driven objects and man-made missiles.
Sequoyah's nuclear reactors utilize "ice condenser" containment structures.
Ice condenser nuclear reactors utilize baskets office to reduce heat and pressure in the event of an accident, preventing damage to the containment and leaks of radioactive steam.Typical nuclear power plants have concrete containment several feet thick, but ice condenser reactors substitute a steel shell of smaller volume and less ability to withstand pressure.
Ice condenser reactors economize on concrete and are less robust because of this construction method.SUNSI Review Complete Template = ADM -013 E-RIDS= ADM -03 https://www.fdms.gov/fdms-web-agency/component/contentstreamer?objectld=090000648129dbO6&for...
04/24/2013