UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 April 9, 2013 Mr. Michael J. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
SUBJECT:
CLINTON POWER STATION - NOTIFICATION OF NRC INSPECTION
Dear Mr. Pacilio:
In a telephone conversation on April 5, 2013, Mr. B. Palagi, Operator Licensing Branch, and Mr. R. Frantz, Regulatory Affairs, made arrangements for the U. S. Nuclear Regulatory Commission (NRC) to conduct an inspection using Temporary Instruction (TI)-186, Inspection of Procedures and Processes for Responding to Potential Aircraft Threats, at Clinton Power Station. This inspection is planned for the week of June 10, 2013.
The NRC inspector will require a shift manager-qualified individual for a table top scenario to allow inspection of TI-186 attributes. Additionally, In order to minimize the impact to your on-site resources, and to ensure a productive inspection for both sides, please have available the procedures that would be followed to respond to an aircraft threat and any related lesson plans pertinent to the inspection.
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
M. Pacilio If there are any questions about this inspection or the material requested, please contact the lead inspector Bruce Palagi at (630) 829-9611 or me at (630) 829-9707.
Sincerely,
/RA by D. McNeil for/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-461 License No. NPF-62 cc:
Distribution via ListServ'
M. Pacilio If there are any questions about this inspection or the material requested, please contact the lead inspector Bruce Palagi at (630) 829-9611 or me at (630) 829-9707.
Sincerely,
/RA by D. McNeil for/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-461 License No. NPF-62 cc:
Distribution via ListServ' DISTRIBUTION:
Doug Huyck RidsNrrDorlLpl3-2 Resource RidsNrrPMClinton Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Allan Barker Carole Ariano Christine Lipa Linda Linn DRSIII DRPIII Patricia Buckley Tammy Tomczak DOCUMENT NAME: -Ltr 040913 Clinton 2013 002 BBP.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME BBPalagi:ls HPeterson DATE 04/09/13 04/09/13 OFFICIAL RECORD COPY