ML13098A134
| ML13098A134 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 04/08/2013 |
| From: | Farideh Saba Plant Licensing Branch II |
| To: | James Shea Tennessee Valley Authority |
| Saba F NRR/DORL/LPL2-2 | |
| References | |
| TAC ME6615, TAC ME6616, TAC ME6617 | |
| Download: ML13098A134 (3) | |
Text
OFFICIAL USE ONLY PROPRIETARY INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 April 8, 2013 Mr. Joseph W, Shea Corporate Manager-Nuclear licensing Tennessee Valley Authority 3R Lookout Place 1101 Market Street LP 3D-C Chattanooga, TN 37402-2801
SUBJECT:
BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2, AND 3 - DRAFT REVIEW OF TENNESSEE VALLEY AUTHORITY COMMITMENT RELATED TO CORE PLATE BOLT STRESS ANALYSIS (TAC NOS. ME6615, ME6616, AND ME6617)
Dear Mr. Shea:
By letter dated June 15, 2011, the Tennessee Valley AuthOrity (TVA or the licensee), submitted a report on the plant-specific stress analysis of the Browns Ferry Nuclear Plant (BFN), Units 1, 2 and 3, core plate hold down bolts. This report was submitted in accordance with Commitment 47 in Appendix A to NUREG-1843. Supplement 1. "Safety Evaluation Report Related to the License Renewal of the Browns Ferry Nuclear Plant. Units 1. 2. and 3," whereby TVA committed to perform a plant-specific stress analysis of the BFN core plate hold down bolts. as described in Boiling Water Reactor Vessel Internals Program (BWRVIP)-25, and submit the results of this analysis 2 years prior to the period of extended operation. The licensee supplemented its June 15, 2011, submittal by letters dated October 25. 2012. and February 19,2013. in response to the NRC staff requests for additional information.
The Nuclear Regulatory Commission (NRC) staff has completed the review of the information provided by the licensee. The NRC staff's safety evaluation (SE) is enclosed.
The NRC staff has determined that its documented BE (EnClosure 1) contains proprietary information pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Section 2.390, "Public inspections, exemptions request for withholding." Accordingly, the NRC staff has prepared a redacted, nonproprietary version (Enclosure 2). However, we will delay placing the nonproprietary SE in the public document room for a period of 10 working days from the date of this letter to provide you with the opportunity to comment on any proprietary aspects. If you believe that any information in the enclosure is proprietary, please identify such information line-by-line and define the basis pursuant to the criteria of 10 CFR 2.390. After 10 working days. the nonproprietary SE will be made publicly available, Document transmitted herewith contains Sensitive Unclassified Non-Safeguard Information.
When Separated from Enclosure 1, this document is decontrolled.
OFFICIAL USE ONl¥ PROPRIIiTAR¥ INFORMATION
OFFICIAL USE ONLY PROPRIETARY INFORMATION
- 2 To facilitate the NRC staff's review of your comments, please provide a marked-up copy of the SE showing proposed changes and provide a summary table of the proposed changes.
If you have any questions, please contact me at (301) 415-1447.
Sincerely, Farideh E. Saba, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-259, 50-260, and 50-296
Enclosures:
- 1. Safety Evaluation (Proprietary Information)
- 2. Safety Evaluation (Non-Proprietary Information) cc with Enclosures 1 and 2: Addressee only cc w/o Enclosures Distribution via Listserv OFFICIAL USE ONLY PROPRIETARY INFORMATION
OFFICIAL USE ONLY PROPRIETARY INFORMATION
-2 To facilitate the NRC staff's review of your comments, please provide a marked-up copy of the SE showing proposed changes and provide a summary table of the proposed changes.
If you have any questions, please contact me at (301) 415-1447.
Sincerely, IRA!
Farideh E. Saba, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-259,50-260, and 50-296
Enclosures:
- 1. Safety Evaluation (Proprietary Information)
- 2. Safety Evaluation (Non-Proprietary Information) cc with Enclosures 1 and 2: Addressee only cc w/o Enclosures Distribution via Listserv DISTRIBUTION:
Public (No PDC/ListServ for 10 working days)
LPL2-2 R/F RidsAcrsAcnwMailCenter W. Jessup, NRR RidsNrrDoriDpr RidsNrrDorlLpl2-2 RidsNrrPMBrowns Ferry G. Cheruvenki, NRR RidsRgn2MailCenter RidsNrrLABClayton RidsNrrDeEvib RidsNrrDeEmcb ADAMS Accession No.: Proprietary L TR ML13088A259 Non-Proprietary L TR ML13098A134
- By a memorandum
)FFICE...PL2-2/PM LPL2-2/PM DE/EVIB/BC* DE/EMCB/BC(A)* LPL2-2/BC LPL2-2/PM
~AME FSaba BClayton SRosenberg AMcMurtray JQuichocho FSaba
)ATE 04/04/13
()4/03/13
()3/19/13 03/19/13 04/08/13
()4/08/13 OFFICIAL RECORD COpy OFFICIAL USE ONLY PROPRIETARY INFORMATION