Union Electric Co. Facility Operating License NPF-30 Date Correction to RAI Set 22, Enclosure 1 Related to the Callaway LRA
ML13086A567
Person / Time
Site: Callaway 
(NPF-030)
Issue date: 03/26/2013
From: Kanuckel L
Ameren Missouri
To:
Office of Nuclear Reactor Regulation, Document Control Desk
Shared Package
ML130860643 List:
References
ULNRC-05972
Download: ML13086A567 (4)


Text

~~

WAmeren MISSOURI Callaway Plant March 26, 20 13 ULNRC-05972 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Ladies and Gentlemen:

10 CFR 2.101 10 CFR 2.109(b) 10 CFR 50.4 10 CFR 50.30 10 CFR 51.53(c) 10 CFR 54 DOCKET NUMBER 50-483 CALLA WAY PLANT UNIT 1 UNION ELECTRIC CO.

FACILITY OPERATING LICENSE NPF -30 DATE CORRECTION TO RAI SET #22, ENCLOSURE 1 RELATED TO THE CALLAWAY LRA

References:

1) ULNRC-05830 dated December 15, 2011
2) ULNRC-05963 dated February 28,2013 (Accession Number ML13063A476)

By the Reference 1 letter, Union Electric Company (Ameren Missouri) submitted a license renewal application (LRA) for Callaway Plant Unit 1. Reference 2 dated February 28,2013 transmitted responses to the twenty-second Request for Additional Information (RAI) related to our application. (Accession Number ML13063A478) to Reference 2 contained an error in the date in the header. The date should have been February 28, 20U rather than February 28, 2012_. A corrected is attached to this letter. There are no other changes in the letter enclosure.

We apologize for any inconvenience this error may have caused.

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

PO Box 620 Fulton, MO 65251 AmerenMissouri.com

ULNRC-05972 March 26, 2013 Page 2 If you have any questions, please contact me at (573) 823-9286 or Ms. Sarah Kovaleski at (314) 225-1134.

I declare under penalty of perjury that the foregoing is true and correct.

Sincerely, Executedon: M(Arc.h ZC,) 2013 Les H. Kanuckel Director Engineering Design DS/SGK/nls

Enclosures:

1) Request for Additional Information (RAJ) Set #22 Responses (With header correction to Accession Number ML13063A478)

ULNRC-05972 March 26, 20 13 Page 3 cc:

U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Mr. Elmo E. Collins Regional Administrator U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Samuel Cuadrado De Jesus Project Branch 1 Division of License Renewal Office ofNuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-11F1 Washington, DC 20555 Mr. Fred Lyon Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 0-8B 1 Washington, DC 20555-2738 Mr. Gregory A. Pick U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511

ULNRC-05972 March 26, 2013 Page4 Index and send hardcopy to QA File A160.0761 Hardcopy:

Certrec Corporation 4150 International Plaza Suite 820 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)

Electronic distribution for the following can be made via Tech Spec ULNRC Distribution:

A. C. Heflin F. M. Diya C. 0. Reasoner III D. W. Neterer L. H. Graessle J. S. Geyer S. A. Maglio R. Holmes-Bobo NSRB Secretary L. H. Kanuckel G. S. Kremer S. G. Kovaleski T. B. Elwood G. G. Yates E. Blocher (STARS PAM COB)

Mr. Mike Westman (WCNOC)

Mr. Tim Hope (Luminant Power)

Mr. Ron Barnes (APS)

Mr. Tom Baldwin (PG&E)

Mr. Mike Murray (STPNOC)

Mr. Mark Morgan (SCE)

Mr. John O'Neill (Pillsbury Winthrop Shaw Pittman LLP)

Missouri Public Service Commission Mr. Dru Buntin (DNR)