ML13085A147

From kanterella
Jump to navigation Jump to search
Generic Fundamentals Examination Results
ML13085A147
Person / Time
Site: Palo Verde, Cooper, Diablo Canyon, Callaway, Waterford, Comanche Peak  Pacific Gas & Electric icon.png
Issue date: 03/26/2013
From: Vincent Gaddy
Operations Branch IV
To:
Laura Hurley
References
Download: ML13085A147 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 EAST LAMAR BLVD ARLINGTON, TEXAS 76011*4511 March 26, 2013 Cooper Nuclear Station, Docket No.: 50-298 Comanche Peak Nuclear Power Plant, Units 1 and 2, Docket Nos.: 50-445; 50-446 Callaway Plant, Docket No.: 50-483 Diablo Canyon Nuclear Power Plant, Units 1 and 2, Docket Nos.: 50-275; 50-323 Palo Verde Nuclear Generating Station, Units 1,2, and 3, Docket Nos.: 50-528; 50-529; 50-530 Waterford Steam Electric Station, Unit 3, Docket No.: 50-382

SUBJECT:

GENERIC FUNDAMENTALS EXAMINATION RESULTS On March 6, 2013, the U.S. Nuclear Regulatory Commission (NRC) administered the generic fundamentals examination (GFE) section of the written operator licensing examination to employees of your facility. Enclosed with this letter are copies of both forms of the examination, including answer keys, the grading results for your facility, and copies of the individual answer sheets for each of your employees. Please forward the results to the individuals along with the copies of their respective answer sheets. A "P" in the GRADE column indicates that the individual achieved a passing grade of 80 percent or better on the GFE, while an "F" indicates that the individual failed the examination.

If you have any questions concerning this examination, please contact Larry Vick at (301) 415-3181.

~::jbJkr Vincent Gaddy, Chief Operations Branch Division of Reactor Safety

Enclosures:

As stated cc w/enclosures:

Juan Cortez, Manager Operations Training Union Electric Company P.O. Box 620 Fulton, MO 65251 Bill Moore, Director Nuclear Training Luminant Generation Company LLC P.O. Box 1002 Glen Rose, TX 76043-1147 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 EAST LAMAR BLVD ARLINGTON, TEXAS 76011*4511 March 26, 2013 Cooper Nuclear Station, Docket No.: 50-298 Comanche Peak Nuclear Power Plant, Units 1 and 2, Docket Nos.: 50-445; 50-446 Callaway Plant, Docket No.: 50-483 Diablo Canyon Nuclear Power Plant, Units 1 and 2, Docket Nos.: 50-275; 50-323 Palo Verde Nuclear Generating Station, Units 1,2, and 3, Docket Nos.: 50-528; 50-529; 50-530 Waterford Steam Electric Station, Unit 3, Docket No.: 50-382

SUBJECT:

GENERIC FUNDAMENTALS EXAMINATION RESULTS On March 6, 2013, the U.S. Nuclear Regulatory Commission (NRC) administered the generic fundamentals examination (GFE) section of the written operator licensing examination to employees of your facility. Enclosed with this letter are copies of both forms of the examination, including answer keys, the grading results for your facility, and copies of the individual answer sheets for each of your employees. Please forward the results to the individuals along with the copies of their respective answer sheets. A "P" in the GRADE column indicates that the individual achieved a passing grade of 80 percent or better on the GFE, while an "F" indicates that the individual failed the examination.

If you have any questions concerning this examination, please contact Larry Vick at (301) 415-3181.

Enclosures:

As stated cc w/enclosures:

Juan Cortez, Manager Operations Training Union Electric Company P.O. Box 620 Fulton, MO 65251 Bill Moore, Director Nuclear Training Luminant Generation Company LLC P.O. Box 1002 Glen Rose, TX 76043-1147

~::jbJkr Vincent Gaddy, Chief Operations Branch Division of Reactor Safety

Reactor 50 Dockets John Austin, Manager Nuclear Training Nebraska Public Power District 72676-648A Avenue Brownville, NE 68321 Dennis Petersen, Director Learning Services Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Rick Lange, Department Lead Operations Training Arizona Public Service Company Mail Station 7894 P.O. Box 52034 Phoenix, AZ 85072 Manager, Licensing Waterford 3 Entergy Operations, Inc.

17265 River Road Killona, LA 70057-3093 cc wlo enclosures:

Distribution via ListServ for:

Callaway Comanche Peak Cooper Diablo Canyon Palo Verde Waterford

- 2 Reactor 50 Dockets John Austin, Manager Nuclear Training Nebraska Public Power District 72676-648A Avenue Brownville, NE 68321 Dennis Petersen, Director Learning Services Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56 Avila Beach, CA 93424 Rick Lange, Department Lead Operations Training Arizona Public Service Company Mail Station 7894 P.O. Box 52034 Phoenix, AZ 85072 Manager, Licensing Waterford 3 Entergy Operations, Inc.

17265 River Road Killona, LA 70057-3093 cc wlo enclosures:

Distribution via ListServ for:

Callaway Comanche Peak Cooper Diablo Canyon Palo Verde Waterford