March 12, 2013
Mr. Edward Senior Vice President and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56, Mail Code 104/6 Avila Beach, CA 93424
SUBJECT: DIABLO CANYON POWER PLANT, UNITS 1 AND 2 - NRC EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT 05000275/2012501 AND 05000323/2012501
Dear Mr. Halpin:
On December 31, 2012, the Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Diablo Canyon Power Plant, Units 1 and 2. This inspection began on January 1, 2012. Issuance of this letter closes NRC Inspection Report 05000275/2012501 and 05000323/2012501. The inspection results associated with the 2012-501 and 2012-503 reports are documented in integrated Resident Inspector Reports 2012-002, 2012-003, 2012-004, and 2012-005
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,/RA/ Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety
Dockets: 50-275; 50-323 Licenses: DPR-80; DPR-82 cc: Electronic Distribution Diablo Canyon Power Plant ADAMS ACCESSION NUMBER: ML13075A021 ADAMS: No x Yes x SUNSI Review Complete Reviewer Initials: MSH x Publicly Available x Non-Sensitive Non-publicly Available Sensitive C:PSB-1 MSHaire /RA/ 3/12/2013 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax