ML13073A500
| ML13073A500 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 03/01/2013 |
| From: | Clyde Osterholtz Operations Branch IV |
| To: | Entergy Operations |
| laura hurley | |
| References | |
| ES-401-2 50-313/13-002, 50-368/13-002 | |
| Download: ML13073A500 (24) | |
Text
ES-401 Record of Rejected K/As Form ES-401-4 Tier /
Group Randomly Selected K/A Reason for Rejection 2 / 1 Q 51 G2.1.25 This KA requires the interpretation of, for example, a graph or table. Because a document of this nature could not be found, a suitable question could not be constructed. Another KA was randomly selected from section G2.1 of the KA manual. (SMG) 2/1 Q 48 063 A4.02 Could not formulate a question that did not border on minutia due to the subject of the K/A - Battery Voltage Indicator. Randomly selected another K/A from the A4 section. (CDS)
SRO 1/1 Q 80 058 Gen. 2.1.19 Unable to write an acceptably-discriminating question at the SRO level for the K/A. Randomly selected another generic K/A from the list in NUREG 1021 ES-401.D.1.b (058 2.2.40) (TJF)
SRO T3 Q95 2.2.36 This is not a Multi Unit license facility.
(GWA)
RO 1/1 Q18 BE04 G2.4.20 Not able to write RO level question. (GWA)
RO T3 Q74 2.4.19 Only EOP symbol would be immediate action steps. No discriminating question. (GWA)
RO 2/1 Q39 022K2.01 ANO-1 does not have containment chillers. Changed to fan cooling units. (GWA)
RO 2/1 Q46 061K2.01 ANO-1 does not have diesel AFW pump. (GWA)
SRO 2/1 Q89 063 Gen 2.1.30 Unable to write question at the SRO level for this KA which addresses ability to operate local controls. Replaced with Generic 2.2.42 which concerns Technical Specifications and is much more appropriate for SRO. (JWC-ANO)
RO 1/1 Q5 015 AA1.02 Unable to write question at the RO level for this KA since the question would be about nuclear trivia or a reference would need to be provided causing the question to be a direct lookup. Replaced with 015 AA1.05. (JWC-ANO)
RO 1/1 Q9 027 AK2.02 This exam bank question was originally linked to AK2.03, AK2.02 is not appropriate for this question therefore this KA was replaced.
(JWC-ANO)
RO 2/2 Q 64 079 K1.01 Unit 1 no longer has a Service Air compressor. Unit 1 Service Air is supplied from Unit 2, Unit 1 simply has a Service Air header.
Replaced with Instrument Air KA 078 K1.05. (JWC-ANO)
RO 1/1 Q 3 009EA1.13 Changed from RPS to ESFAS because of B&W Design.
RO 1/2 Q 25 BA06A.G.2.4.3 Tasks in-plant more appropriate post accident for RO.