ML13071A235
Jump to navigation
Jump to search
| ML13071A235 | |
| Person / Time | |
|---|---|
| Site: | 05523694 |
| Issue date: | 03/12/2013 |
| From: | NRC/RGN-II |
| To: | |
| References | |
| 55-23694-SP | |
| Download: ML13071A235 (6) | |
Text
1 AP 1000 Critical Task List The bounding condition is described below each critical task.
- 1. Manually trip the reactor, step in E-0 If not completed until after completion of Safeguards step in E-0 would be a failure of the task
- 2. Manually isolate steam flow/stop steam flow to the turbine, in E-0, RNO steps Prior to meeting the entry conditions for Subcriticality or Integrity FRP red/orange path
- 3. Manually actuate safeguards when required, in E-0, RNO steps, ensure at least 2 of 4 divisions are actuated Prior to meeting entry conditions of E-1, E-2, E-3 or any FRP red/orange path or completion of safeguards actuation E-0 step
- 4. Manually isolate main feedwater, in E excessive cooldown or uncontrolled filling of S/G Prior to reaching Wide Range level of 100%
- 5. Manually actuate Core Makeup Tanks (CMTs) following a small break LOCA, in E provides RCS make up and boration Prior to exiting E-0
- 6. Failure to trip reactor coolant pumps after CMT actuation, in E-0, RCP flow will impede CMT flow Prior to exiting E-0
- 7. Manually actuate PRHR, in E-0, it is the safety related heat sink Prior to transitioning to FR-H-1
- 8. Manually actuate containment isolation (T signal), at least one valve closed in each containment penetration, in E-0 Prior to exiting the scenario
- 9. Manually actuate RNS isolation when required, in E valves are closed - RNS valves gets different signal Prior to exiting the scenario
- 10. Manually actuate main steam isolation, in E-0 Prior to orange path for Subcriticality or Integrity FRP
2
- 12. Manually actuate Passive Containment Cooling System, in E-0 Prior to transitioning from E-0
- 13. Manually isolate SFW on low Tcold signal - in E ensuring the valves are closed is critical to prevent an overcooling event Prior to reaching Wide Range level of 100%
- 14. Manually establish required feedwater flow to S/G, in E-0 Critical only if PRHR HX is required but not available - Prior to transitioning to FR-H-1
- 15. Establish secondary heat sink if PRHR flow <770 gpm, in E-0 Failure to implement FR-H.1 based on conditions is a failure of the critical task
- 16. Manually actuate Automatic Depressurization System Stages 1-3 if required, in E-1 Prior to exiting E-1
- 17. Manually actuate ADS Stage 4 when required, in E-1 Prior to exiting E-1
- 18. Manually actuate IRWST injection, in E-1 Prior to exiting E-1
- 20. Isolate the faulted SG before transition out of E-2, in E-2 Prior to exiting E-2
- 21. Isolate feed flow to and from the FAULTED steam generator prior to transitioning out of E-2, in E-2 Prior to exiting E-2
- 22. Isolate feedwater flow to the ruptured SG when greater than required level, in E-3 Prior to exiting E-3
3
- 23. Isolate potential release path from ruptured S/G in E-3, in E-3 If isolated below the level at which the u-tubes are covered and as a result it complicates the mitigation strategy
- 24. Actuate ADS if required, in E-3 Prior to reaching Wide Range level of 100%
- 25. Manually align CVS in the auxiliary spray mode or ADS in JOG MODE to depressurize the RCS, in E-3 Prior to exceeding 97% in the ruptured S/G
- 32. Manually initiate IRWST recirculation, in FR-C.1 Prior to exiting FR-C.1
- 33. Trip reactor coolant pumps after CMT actuation, in FR-C.1, CMTs are needed for core cooling and RCPs stopped to ensure CMT flow Prior to exiting FR-C.1
- 34. Manually actuate PRHR when requiring, in FR-C.1 Prior to exiting FR-C.1
4
- 35. Manually actuate containment isolation (T signal), at least one valve closed in each containment penetration, in FR-C.1 Prior to the end of the scenario
- 36. Manually initiate RCS Makeup, in FR-C.1 Prior to exiting FR-C.1
- 37. Manually actuate ADS when required, in FR-C.1 Prior to exiting FR-C.1
- 38. Manually initiate IRWST injection when required, in FR-C.1 Prior to exiting FR-C.1
- 39. Open RCS vent valves, in FR-C.1 Prior to exiting FR-C.1
- 40. Manually initiate IRWST recirculation, in FR-C.1 Prior to exiting FR-C.1
- 41. Manually actuate Passive Containment Cooling System if required, in FR-C.1 Prior to exiting FR-C.1
- 42. Depressurize the SGs to atmospheric pressure to establish RNS flow, in FR-C.1 Prior to exiting FR-C.1
- 43. Manually actuate Core Makeup Tanks (CMTs), in FR-C-2 Prior to exiting FR-C.2
- 44. Manually trip reactor coolant pumps after CMT actuation, in FR-C.2 Prior to exiting FR-C.2
- 45. Manually actuate containment isolation (T signal), at least one valve closed in each containment penetration, in FR-C.2 Prior to exiting the scenario
- 46. Manually initiate RCS Makeup, in FR-C.2 Prior to exiting FR-C.2
5
- 47. Manually actuate PRHR when required, in FR-C.2 Prior to exiting FR-C.2
- 49. Manually initiate IRWST recirculation, step 9 in FR-C.2 Prior to exiting FR-C.2
- 50. Depressurize the SGs to atmospheric pressure to establish RNS flow, in FR-C.2 Prior to exiting FR-C.2
- 51. Manually actuate Passive Containment Cooling System if required, in FR-C.2 Prior to exiting FR-C.2
- 52. Manually stop RCPs, in FR-H.1 Prior to establishing feed and bleed
- 53. Manually actuate PRHR before feed and bleed is required, in FR-H.1 Prior to establishing feed and bleed
- 54. Depressurize using the ADS valves to get less than 1970, in FR-H.1 Prior to establishing feed and bleed
- 55. Establish startup feedwater flow into at least one SG before RCS bleed and feed is required, in FR-H.1 Prior to establishing feed and bleed
- 56. Establish main feedwater flow into at least one SG before RCS bleed and feed is required, in FR-H.1 Prior to establishing feed and bleed
- 57. Establish bleed and feed prior to getting an Orange path on Core Cooling, in FR-H.1 Prior to getting an Orange path on Core Cooling
- 58. Failure to get at least one containment isolation valve closed in each containment penetration prior to exiting FR-H.1, in FR-H-1 Prior to exiting the scenario
6
- 59. Manually actuate Passive Containment Cooling System, in FR-H.1 Prior to exiting FR-H.1
- 60. Stop the cooldown, in FR-P.1 Prior to Red Path challenge to the Integrity CSF
- 61. Stop CMT injection, in FR-P.1 Prior to Red Path challenge to the Integrity CSF
- 62. Manually trip the reactor or shutdown the reactor, in FR-S.1 Prior to exiting FR-S.1
- 63. Manually isolate steam flow/stop steam flow to the turbine, in FR-S.1 Prior to reactivity insertion check from uncontrolled system cooldown in FR-S.1
- 64. Manually actuate the CMT during an ATWS, in FR-S.1 Prior to recheck of reactor trip step in FR-S.1
- 65. Manually actuate PRHR, in FR-S.1 Prior to exiting FR-S.1
- 66. Establish secondary heat sink if PRHR flow < 770 gpm, in FR-S.1 If systems to mitigate are available and not used and entry into FR-H.1 is entered this is a failure of the critical task
- 67. Trip reactor coolant pumps after CMT actuation, in FR-S.1, impedes driving head of CMT Prior to recheck of reactor trip step in FR-S.1
- 68. Manually initiate Passive Containment Cooling System, inFR-Z.1 Prior to exiting to FR-Z.1
- 69. Isolate flow to and from the FAULTED steam generator, in FR-Z.1 Prior to exiting FR-Z.1