ML13070A484
| ML13070A484 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 03/12/2013 |
| From: | Walton R NRC/RGN-III/DRS/OLB |
| To: | |
| References | |
| Download: ML13070A484 (3) | |
Text
Operating Exam Comments Palisades Station Operating Test Exam Date: October 1 - October 11, 2012 Examiner Comment Facility Action/Response 1 of 3 Operating Test RO Admin JPM 1a
- 1. Why not have applicant perform steps 54.a and 54.b of EOP 5 as the initiating cue? (Not done in group setting)
- 2. Doesnt meet K/A, Ability to interpret reference materials, such as graphs, curves, tables etc. since value obtained is not on the table!
Sat as is.
JPM uses a Table.
- 1. If applicant makes marks in Technical Data Book Figure 14.1, how do we maintain exam security for subsequent applicants?
- 2. Step 5.2.3f: Must enter cue as a standard, Assume 30 minutes has elapsed.
- 3. Last step should be Step 5.2.3k. CUE: Inform candidate that SRO will review the heat balance.
This ends the JPM.
Tech Data Book pages plasticized - can be erased.
Statement included.
Statement included RO Admin 4
- 2. Need to include more administrative aspects of this JPM!
- 3. What does backup mean?
Using PPC will not cause ERDS to initiate. Using internet will activate ERDS. Use PPC, not internet or backup method!
Added having applicant initial SRO procedure, and perform step w/o guidance from examiner.
Backup - Done over internet normally, but using the plant process computer is considered Backup.
SRO Admin 2
- 1. Step 5.3.1.e: Why not include entry into TS LCO as a Critical Step also?
Parts of Step 5.3.1e are critical - parts needed for recognition and entry into TS LCO!
SRO Admin 4 1 First Step: Add, JPM Start Time: _____
2 Step SEP SUPP 1: Add the following: Time Emergency Classification Made: _____
- 3. Step EI-6.13, Att 1: End of 15 minute critical step is Items 1, 2 & 3, added to JPM.
Operating Exam Comments Palisades Station Operating Test Exam Date: October 1 - October 11, 2012 Examiner Comment Facility Action/Response 2 of 3 when SRO completes filling out notification form, last step! Not this step! Last Step: Add Time Notification Form given to examiner: ______
JPM b.
Appears to qualify for Alternate Path!
Not considered alternate path since procedures not written in RNO format.
JPM c.
Steps 2.1b & 2.2b: Why are these steps critical?
Done to prevent opening PORV. This condition has historically happened previously.
JPM e
- 1. If the task was to cooldown the plant, why doesnt the JPM end with CV-0511 throttled open?
- 2. In Alternate path, applicant should make decision after MSIVs go closed.
CV-511 is already open when JPM starts.
Applicant will make decision on what must be done during beginning of alternate path in lieu of examiner telling applicant what to do. There are only 2 choices!
JPM k Need to add note for evaluator to have examinee show evaluator where you would test ADVs in Aux building since JPM I will be done in simulator.
Done. In plant JPM k will include step to have applicant show examiner where C-33 panel is located.
Other How much time will it take if we had 3 examiners doing JPMs the second week.
No time gained since simulator will be bottle neck!
Will only need 2 examiners for second week.
Scenario 1 No comments Event 4: Add.. ~30% on POI5301 to 1st BOP bullet pg 8 of 20 for throttling P-39A valve.
Swap Events 4 & 5 for better time management during scenario. This will also remove panel alarm for Event 5. Operators must check PDIL on plant process computer.
Scenario 2 No comments ES-D-1 cover sheet: Event 3 is SRO(T) only. No credit given to BOP or RO applicants. Just a SRO TS call!
Add, Open bypass valve to >55%. to RO actions block 4 of 22.
Actions on Pg 11 of 22 are BOP actions, not RO actions.
Delete critical task on sheet 13 of 22 for tripping the reactor.
Operating Exam Comments Palisades Station Operating Test Exam Date: October 1 - October 11, 2012 Examiner Comment Facility Action/Response 3 of 3