ML13070A083
| ML13070A083 | |
| Person / Time | |
|---|---|
| Site: | Millstone, Kewaunee, Surry, North Anna, 07200002, 07200055 |
| Issue date: | 03/05/2013 |
| From: | Hartz L Dominion, Dominion Energy Kewaunee, Dominion Nuclear Connecticut, Virginia Electric & Power Co (VEPCO), Dominion Resources Services |
| To: | Document Control Desk, NRC/FSME, Office of Nuclear Reactor Regulation, Office of Nuclear Material Safety and Safeguards |
| References | |
| 13-126 | |
| Download: ML13070A083 (5) | |
Text
$' FDominion Dominion Resources Services, Inc.
Innsbrook Technical Center 5000 Dominion Boulevard, 2SE, Glen Allen, VA 23060 Safeguards Information March 5, 2013 Re:
10 CFR 50.54 10 CFR 72.186 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001 Serial No.:
NL&OS/MAE:
Docket Nos.:
13-126 RO 50-305 50-245/336/423 50-338/339 50-280/281 DOMINION ENERGY KEWAUNEE, INC.
72-2/16/47/55/56/64 DOMINION NUCLEAR CONNECTICUT, INC.
License Nos.: DPR-43 VIRGINIA ELECTRIC AND POWER COMPANY DPR-21/65 KEWAUNEE POWER STATION NPF-49 MILLSTONE POWER STATION UNITS 1, 2. AND 3 NPF-4/7 NORTH ANNA POWER STATION UNITS I AND 2 DPR-32/37 SURRY POWER STATION UNITS I AND 2 SNM-2501/2507 AND ASSOCIATED ISFSIs SUBMITTAL OF SECURITY
- PLANS, TRAINING AND QUALIFICATION
- PLANS, SAFEGUARDS CONTINGENCY PLANS, AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI) SECURITY PROGRAMS Dominion Energy Kewaunee, Inc. (DEK), Dominion Nuclear Connecticut, Inc. (DNC) and Virginia Electric and Power Company (Dominion) had previously combined their Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program (the plan) into one fleet plan. On February 25, 2013, DEK certified to the NRC that it has decided to permanently cease power operation of Kewaunee Power Station on May 7, 2013. In preparation, on February 20, 2013, DEK issued a separate plan for Kewaunee Power Station, and DNC and Dominion revised the fleet plan to address Millstone, North Anna and Surry Power Stations.
In addition, other changes were made to the plans as described in the Revision Summaries that are included with the plans.
Pursuant to 10 CFR 50.54(p)(2) and 10 CFR 72.186(b), Revision 0 of Kewaunee's Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program is provided as Enclosure 1 to this letter. Revision 16 of Millstone, North Anna and Surry's Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program is provided as Enclosure 2 to this letter.
Both of these plans became effective February 20, 2013. The changes that were made to the plans did not decrease the safeguards effectiveness of the plans.
Classified By:
__Name: Dan Criswell
Title:
COORD NUCLEAR SECURITY PROGRAMS Unauthorized Disclosure Of Safeguards Information Will Be Organization: Nuc. Protection Services/ Dominion I..
Subiect To Civil And Criminal Sanctions II Effective Date: February 18, 2013 Ii NOTE: THE ENCLOSURES TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF THE ENCLOSURE, THIS LETTER IS "DECONTROLLED."
Safeguards Information ScI2z~
Serial No.13-126 Sec., T&Q, and Conting. Plan Submittal Page 2 of 5 Safeguards Information The enclosed material contains Safeguards Information as defined by 10 CFR 73.22 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended.
If you have any questions, please contact Ms. Margaret Earle at 804-273-2768.
Sincerely, L. N. Hartz Vice President - Nuclear Support Services Dominion Energy Kewaunee, Inc.
Dominion Nuclear Connecticut, Inc.
Virginia Electric and Power Company Enclosures (Safeguards Information)
Commitments made by this letter: None cc:
U. S. Nuclear Regulatory Commission, Region I Attn.: Regional Administrator 2100 Renaissance Blvd.
Suite 100 King of Prussia, PA 19406-2713 U. S. Nuclear Regulatory Commission, Region II Attn.: Regional Administrator 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 U. S. Nuclear Regulatory Commission, Region III Attn.: Regional Administrator 2443 Warrenville Road Suite 210 Lisle, Illinois 60532-4352 NOTE: THE ENCLOSURES TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF THE ENCLOSURE, THIS LETTER IS "DECONTROLLED."
Safeguards Information
Serial No.13-126 Sec., T&Q, and Conting. Plan Submittal Page 3 of 5 Safeguards Information Director, Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Dr. P. Longmire (Without Enclosures)
NRC Project Manager U. S. Nuclear Regulatory Commission Mail Stop EBB-E3 D2M One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Mr. J. M. Goshen (Without Enclosures)
NRC Project Manager U. S. Nuclear Regulatory Commission Mail Stop EBB-E3 D2M One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Ms. J. Davis (Without Enclosures)
NRC Project Manager U. S. Nuclear Regulatory Commission Mail Stop EBB-E3 D2M One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Mr. K. D. Feintuch (Without Enclosures)
NRC Project Manager Kewaunee U. S. Nuclear Regulatory Commission Mail Stop 0-8 D15 One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 NOTE: THE ENCLOSURES TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF THE ENCLOSURE, THIS LETTER IS "DECONTROLLED.-
Safeguards Information
Serial No.13-126 Sec., T&Q, and Conting. Plan Submittal Page 4 of 5 Safeguards Information Mr. S. J. Giebel (Without Enclosures)
NRC Project Manager Millstone Unit 1 U. S. Nuclear Regulatory Commission Mail Stop T-8 F5 Two White Flint North 11545 Rockville Pike Rockville, MD 20852-2738 Mr. J. S. Kim (Without Enclosures)
NRC Project Manager Millstone Units 2 & 3 U. S. Nuclear Regulatory Commission Mail Stop 0-8-C 2A One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Ms. K. R. Cotton (Without Enclosures)
NRC Project Manager Surry U. S. Nuclear Regulatory Commission Mail Stop 0 8G-9A One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Dr. V. Sreenivas (Without Enclosures)
NRC Project Manager North Anna U. S. Nuclear Regulatory Commission Mail Stop 0 8G-9A One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Ms. L. A. Kauffman (Without Enclosures)
NRC Inspector 2100 Renaissance Blvd.
Suite 100 King of Prussia, PA 19406-2713 NRC Senior Resident Inspector (Without Enclosures)
Millstone Power Station NOTE: THE ENCLOSURES TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF THE ENCLOSURE, THIS LETTER IS "DECONTROLLED."
Safeguards Information
Serial No.13-126 Sec., T&Q, and Conting. Plan Submittal Page 5 of 5 Safeguards Information NRC Senior Resident Inspector (Without Enclosures)
Kewaunee Power Station NRC Senior Resident Inspector (Without Enclosures)
North Anna Power Station NRC Senior Resident Inspector (Without Enclosures)
Surry Power Station NOTE: THE ENCLOSURES TO THIS LETTER CONTAINS "SAFEGUARDS INFORMATION" AND MUST BE PROTECTED ACCORDINGLY. UPON SEPARATION OF THE ENCLOSURE, THIS LETTER IS "DECONTROLLED."
Safeguards Information