February 20, 2013 Mr. Mark E. Reddemann Chief, Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023)
Richland, WA 99352-0968
SUBJECT:
PLANNED INSPECTION OF TI-186 INSPECTION OF PROCEDURES AND PROCESSES FOR RESPONDING TO POTENTIAL AIRCRAFT THREATS AT COLUMBIA GENERATING STATION
Dear Mr. Reddemann:
In communications on January 21, 2013, Mr. C. Steely, Operator Licensing Branch, and Mr. Z.
Dunham, Regulatory Affairs, made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to conduct an inspection using Temporary Instruction (TI)-186, Inspection of Procedures and Processes for Responding to Potential Aircraft Threats, at Columbia Generating Station.
This inspection is planned for the week of July 22, 2013. The NRC inspectors request to observe a tabletop or control room simulator exercise, combined with plant walkthroughs with plant operators to allow inspection of TI-186 attributes. Mr. Z. Dunham has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018. The public reporting burden for this collection of information is estimated to average four hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
UNITED STATES NUCLEAR REGULATORY COMMISSION RE G IO N I V 1600 EAST LAMAR BLVD ARLINGTON, TEXAS 76011-4511
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the Electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. S. Hedger at 817-200-1556, or me at 817-200-1159.
Sincerely,
/RA/
Vince Gaddy, Chief Operations Branch Division of Reactor Safety Docket No. 50-397 License No. NPF-21 cc: Electronic Distribution for Columbia Generating Station
M. Reddemann Electronic Distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Steven.Reynolds@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
Acting DRP Deputy Director (Michael.Scott@nrc.gov)
Acting DRS Director (Tom.Blount@nrc.gov)
Acting DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Jeremy.Groom@nrc.gov)
Resident Inspector (Mahdi.Hayes@nrc.gov)
Branch Chief, DRP/A (Wayne.Walker@nrc.gov)
Senior Project Engineer, DRP/A (Matt.Young@nrc.gov)
Project Engineer, DRP/A (Jason.Dykert@nrc.gov)
Site Administrative Assistant (Crystal.Myers@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Lauren.Gibson@nrc.gov)
Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource RIV/ETA: OEDO (John.Cassidy@nrc.gov)
DRS/TSB STA (Dale.Powers@nrc.gov)
ADAMS ACCESSION NUMBER: ML13051B128 SUNSI Review Completed: __SDH__ ADAMS:
Yes No Initials: __SDH__
Publicly Available Non-Publicly Available Sensitive Non-Sensitive OE:OB C:OB SHedger VGaddy
/RA/
/RA/
2/19/2013 2/20/2013