|
---|
Category:Regulatory Guide
MONTHYEARML24038A3102024-04-30030 April 2024 Rev 1 Dedication of Commercial-Grade Items for Use in Nuclear Power Plants ML23263A9972024-02-0202 February 2024 Watermarked - DG-5072 - Rev 0 of RG 5.90 - Guidance for Alternative Physical Security Requirements for Small Modular Reactors and Non-Light-Water Reactors ML23286A2512024-02-0202 February 2024 Watermarked DG-5073 - Fitness for Duty Program for Part 53 - 10-13-23 ML23286A2682024-02-0202 February 2024 Watermarked - DG-5074 - Access Authorization - Econcurrence Version Clean (02-03-23) ML23286A2862024-02-0202 February 2024 Watermarked - DG-5078, Fatigue Management for Nuclear Power Plant Personnel -10-13-23 ML23286A2822024-02-0202 February 2024 Watermarked - DG-5076 - Physical Protection for Part 53 - 10-13-23 ML23286A2782024-02-0202 February 2024 Watermarked - DG-5075 - Cyber Security 10-13-23 ML23194A1942023-08-31031 August 2023 Draft Regulatory Guide DG-1404, Revision 1 (RG 1.253 Rev 0) Guidance on Ticap for Non-LWRs ML22165A0722023-02-28028 February 2023 DG-4027, Draft Regulatory Guide 4.2 Supplement 1, Preparation of Environmental Reports for Nuclear Power Plant License Renewal Applications, Revision 2 ML23012A2422023-02-28028 February 2023 DG-1374 RG 1.152 Rev 4 Criteria for Programmable Digital Devices in Safety-Related Systems of Nuclear Power Plants ML23018A2932023-02-16016 February 2023 Draft Regulatory Guide DG-1418 (RG 1.212 Rev 2), Sizing Large Lead-Acid Storage Batteries. (ACRS Copy) Regulatory Guide 5.892022-11-0101 November 2022 Rev.0, Fitness-for-Duty Programs for Commercial Power Reactor and Category I Special Nuclear Material Licensees ML22067A0142022-03-31031 March 2022 Rev 3 ACRS Spent Fuel Heat Generation in an ISFSI ML22048B8222022-02-18018 February 2022 DG-1389 (ACRS Version for 3-16-22 Meeting) - Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors ML22040A0822021-10-30030 October 2021 Document to Support ACRS Subcommittee Meeting - Redline RG 1.57, Rev 3, Design Limits and Loading Combinations for Metal Primary Reactor Containment System Components ML21167A3512021-06-0101 June 2021 Rev 5 Final Watermarked for ACRS ML21092A1512021-05-0505 May 2021 Rev. 4 ACRS Version ML21092A1342021-05-0505 May 2021 Rev. 2 ACRS Version ML21181A2492021-04-30030 April 2021 Watermark for ACRS Fc Meeting RG 1.9 Rev 5 ML21006A3372021-04-0101 April 2021 Regulatory Analysis - DG 1381 - Control of Heavy Loads for Nuclear Facilities ML21006A3352021-04-0101 April 2021 DG 1381 for Rev 0 of RG 1.244 - Control of Heavy Loads for Nuclear Facilities ML20168A8832021-04-0101 April 2021 DG-1371, Proposed Rev 6 of RG 1.26, Quality Group Classifications and Standards for Water-, Steam-, and Radioactive-Waste-Containing Components of Nuclear Power Plants ML21083A2892021-02-28028 February 2021 Draft for Acrs Review ML21048A4482021-02-17017 February 2021 Rev. 2 ML21011A2312021-01-31031 January 2021 Rev 4 (Draft for ACRS Fc Review on 2-3-21) ML20120A6312021-01-31031 January 2021 Inservice Inspection Code Case Acceptability, ASME Section XI, Division 1, Revision 20, (DG-1367) ML20120A6292021-01-31031 January 2021 Operation and Maintenance Code Case Acceptability, ASME OM Code, Revision 4, (DG-1368) ML20120A6332021-01-31031 January 2021 Design, Fabrication, and Materials Code Case Acceptability, ASME Section III, Revision 39, (DG-1366) ML20120A6272021-01-31031 January 2021 ASME Code Cases Not Approved for Use, Revision 7 (DG-1369) ML21012A1972021-01-12012 January 2021 a Performance-Based Approach to Define the Site-Specific Earthquake Ground Motion, RG 1.208, Revision 0 ML20183A4232020-12-31031 December 2020 Draft Regulatory Guide DG-1361 (Proposed Rev. 2 to Reg. Guide 1.89), Environmental Qualification of Certain Electrical Equipment Important to Safety for Nuclear Power Plants Regulatory Guide 1.200, Acceptability of Probabilistic Risk Assessment Results for Risk-Informed Activities2020-12-31031 December 2020 Acceptability of Probabilistic Risk Assessment Results for Risk-Informed Activities ML20238B8732020-12-29029 December 2020 Public Comment Resolutions on DG-1362 for RG 1.200, Acceptability of Probabilistic Risk Assessment Results for Risk-Informed Activities ML20282A2992020-12-0404 December 2020 Regulatory Analysis for DG-3055, Rev 0, Regulatory Guide (RG) 3.76, Implementation of Aging Management Requirements for Spent Fuel Storage Renewals ML20282A2982020-12-0404 December 2020 DG-3055, Rev 0, Regulatory Guide (RG) 3.76, Implementation of Aging Management Requirements for Spent Fuel Storage Renewals ML20210M0472020-12-0101 December 2020 Draft Regulation Guide DG-1288: Plant-Specific, Risk-Informed Decisionmaking for Inservice Inspections of Piping ML20231A8352020-11-30030 November 2020 Draft Regulatory Guide DG-1359, Fire Protection for Nuclear Power Plants ML20231A8562020-11-30030 November 2020 Draft Regulatory Guide DG-1360, Risk-Informed, Performance-Based Fire Protection for Existing Light-Water Nuclear Power Plants ML20307A0462020-11-0202 November 2020 Draft for ACRS Public Meeting, RG 1.200, R3, Acceptability of Probabilistic Risk Assessment Results for Risk-Informed Activities ML20210M0442020-10-28028 October 2020 Regulatory Analysis: Draft Regulatory Guide DG-1288 - an Approach for Plant-Specific, Risk-Informed Decisionmaking for Inservice Inspection of Piping (Proposed Revision 2 of Regulatory Guide 1.178, Dated September 2003) ML20154K5842020-09-17017 September 2020 Results of Periodic Review of Regulatory Guide (RG) 1.78 ML20182A7882020-08-31031 August 2020 DG 1373 for RG 1.240 - Fresh and Spent Fuel Pool Criticality Analyses ML20055G8232020-08-0707 August 2020 DG 1363 for Proposed Rev 4 to Regulatory Guide (RG) 1.105 - Setpoints for Safety-Related Instrumentation Regulatory Guide 3.152020-07-31031 July 2020 Regulatory Guide 3.15. Rev 2, Standard Format and Content of License Applications for Receipt and Storage of Unirradiated Power Reactor Fuel and Associated Radioactive Material at a Nuclear Power Plant Regulatory Guide 1.2362020-07-30030 July 2020 Draft for ACRS Review ML20119A6142020-04-28028 April 2020 Response to Comments for RG 1.236 for ACRS ML20105A4672020-04-14014 April 2020 Memo to OCA - for Revision 1 of Regulatory Guide 8.39, Release of Patients Administered Radioactive Material ML20099F0262020-04-0707 April 2020 Public Comment Resolution Table for DG 1341 (Regulatory Guide (RG) 1.188, Standard Format and Content for Applications to Renew Nuclear Power Plant Operating Licenses, Rev. 2 ML19206A4892020-02-0606 February 2020 Draft Regulatory Guide DG-1287, an Approach for Plant-Specific, risk-Informed Decisionmaking: Technical Specifications ML19116A0772019-08-31031 August 2019 Draft Regulatory Guide DG-5040, Urine Specimen Collection and Test Results Review Under 10 CFR Part 26, Fitness for Duty Programs. 2024-04-30
[Table view]Some use of "" in your query was not closed by a matching "". |
Revision I
U.S. NUCLEAR REGULATORY COMMISSION June 1975 REGULATORY GUIDE
OFFICE OF STANDARDS DEVELOPMENT
REGULATORY GUIDE 5.29 NUCLEAR MATERIAL CONTROL SYSTEMS
FOR NUCLEAR POWER PLANTS
A. INTRODUCTION
NI5 on Methods of Nuclear Material Control has developed a standard. ANSI N15.8, which provides Paragraph 70.51(c) of 10 CFR Part 70 requires each guidelines on nuclear material control systems for licensee who is authorized to possess at any one time nuclear power plants.
special nuclear material in a quantity exceeding one effective kilogram to establish, maintain, and follow
C. REGULATORY POSITION
written material control and accounting procedures that are sufficient to enable.the licensee to account for The guidelines set forth in ANSI N]5.8-1974,l the special nuclear material in his possession under "Nuclear Material Control Systems for Nuclear Power license. While other paragraphs and sections of Part 70 Plants,"' are generally acceptable to the NRC staff andi provide specific requirements for nuclear material con provide an adequate basis for systems for the control trol systems for fuel cycle plants, such detailed require and accounting for special nuclear material at a nuclear ments are not included for nuclear power reactors. This power plant.
guide identifies elements acceptable to the NRC staff for a nuclear material control system for nuclear power
D. IMPLEMENTATION
reactors.
The purpose of this section is to provide information
B. DISCUSSION
to licensees regarding the NRC staffs plans for utilizing this regulatory guide.
Control and accounting for special nuclear material at This guide reflects current regulatory practice.
a nuclear power reactor is considerably less complex Therefore, except in those cases in which the licensee than at other fuel cycle facilities because the material is proposes an altefnative method for complying with in the form of identifiable fuel assemblies that can be specified portions of the Commission's regulations, the controlled on an item basis. Nevertheless, control is method described herein will be used in the evaluation necessary to ensure that 'the material is properly of a licensee's performance in connection with nuclear accounted for and to provide continuity of control for material control systems for nuclear power plants after the total fuel cycle. Subcommittee INMM-l on Material this guide is issued.
Control Systems of the Nuclear Standards Committee Copies may be obtained from the American National Standards
"*Linesindicate substanlivc changes from previous issue. Institute. Inc., 1430 Broadway. New York, New York. 10018.
USNRC REGULATORY GUIDES Comments should be sent to the Secretary of the Commission. U S Nuclear Regulatory Commission. Washington. D C 20555. Attention Docketing and Regulatory Gu-deý are issued to describe and make available to the public Service Section methods acceptable to the NRC stalf of implementing specific parns of the Commission s regulations, to delineate techniques used by the staff in evalu The guides are issued in the following ten broad divisions atinq specilic problems or postulated accidents. or to provide guidance to appli cants Regulatory Guides are not substitutes for regulations. and compliance 1. PowerReactors 6 Products with them is not required Methods and solutions different from those set out in 2 Research and Test Reactors 7 Transportation the guides will be acceptable it they provide a basis for the findings requisite to 3 Fuels and Materials Facilities & Occupational Health the issuance or continuance of a permit or license by the Commission 4. Environmental and Siting 9 Antitrust Review Comments and suggestions for improvements in these guides are encouraged 5 Materials and Plant Protection 10 General at all timet, and guides will be revised, as appropriate, to accommodate com ments and to reflect new information or experience However. comments on Copies of published guides may be obtained by written request indicating the this guide, if received within about two months after its issuance, will be par divisions desired to the U.S Nuclear Regulatory Commission. Washington. O.C
hicularly useful in evaluating the need for an early revision 2055. Attention Director. Office of Standards Development