Thomas G. Mogren Manager - Engineering Services CENG a joint venture of COnSteliimln eDF 0 Energy*
ý R.E. Ginna Nuclear Power Plant, LLC 1503 Lake Road Ontario, New York 14519-9364 585.771.5208 585.771.3392 Fax Thomas.Moq ren*,cenqllc.com February 11, 2013 U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 ATTENTION:
SUBJECT:
Document Control Desk R.E. Ginna Nuclear Power Plant Docket No. 50-244 Transmittal of 2012 Owner's Activity Report for the R. E. Ginna Nuclear Power Plant Enclosed is a copy of the R. E. Ginna Nuclear Power Plant Owner's Activity Report for the refueling outage conducted in 2012. This report is submitted as specified by ASME Code Section Xl.
There are no regulatory commitments contained in this letter. Should you have questions regarding this matter, please contact Thomas Harding (585) 771-5219 or Thomas. HardingJr@cengllc.com.
Very truly yours, A-Aý Thomas G. Mog n
Enclosure:
(1) FIFTH INSERVICE INSPECTION (ISI) INTERVAL and SECOND CONTAINMENT INSPECTION INTERVAL, FIRST INSPECTION PERIOD, 2012 OWNER'S ACTIVITY REPORT FOR RFO-36 INSERVICE EXAMINATIONS (October 20, 2012 through November 21, 2012) cc:
M. C. Thadani, NRC Ginna Resident Inspector, NRC W. M. Dean, NRC - Region 1 If-7
ATTACHMENT 1 FIFTH INSERVICE INSPECTION (ISI) INTERVAL and SECOND CONTAINMENT INSPECTION INTERVAL FIRST INSPECTION PERIOD 2012 OWNER'S ACTIVITY REPORT FOR RFO-36 INSERVICE EXAMINATIONS (October 20, 2012 through November 21, 2012)
R.E. Ginna Nuclear Power Plant, LLC February 11, 2013
CaEN a joint -.- tureof FIFTH INSERVICE INSPECTION (IS!) INTERVAL and:
SECOND CONTAINMENT INSPECTION INTERVAL FIRST INSPECTION PERIOD 2012 OWNER'S ACTIVITY REPORT FOR RFO-36 INSERVICE EXAMINATIONS (October 20, 2012 through November 21, 2012)
For R. E. Ginna Nuclear Power.Plant 1503 Lake Road Ontado, NY 14519 Commercial Service Date-NRC Docket Number:
Revision Number:
June 1, 197.0 50-244 00 Date:
January 22, 2013 Prepared by:
W/3 Frank A Klepacki - Site ISl Peogram Owner - R E Ginna Reviewed by; -7X: I i
/Z Z~i, Bernie C. Rudell -! Principal Englineer - CENG Fleet Engineering Programs Approved by:
ý UId&/b32,013 Jav y
W I -jeneral Supervisor - Engineerin Prog-ms 17R E Ginna
R. E. Ginna Nuclear Power Plant, Unit 1I r
F:rE NJe 5t Interval Inservice inspection and Rev.
00
-. N G 2nd Interval Containment Inservice a i*nt,venture 6f Date: 1/22/2013 S
202 Inspection 2012 OWNER'S ACTIVITY REPORT Page i-2 of i -8 FOR INSERVICE EXAMINATIONS TABLE -OF CONTENTS Table of Contents.....................................................
.......................... i-2 A b s tra c t...........................................
i-3 Form OAR-1 Owner's Activity Report for Fifth Interval Inservice Inspection PIan...........................
i-5 Form OAR-1 Owner's Activity Report fo& Containment Second Interval Inservice Inspection Plan... i-6 Table 1 Items with Flaws or Relevant Conditions that Require Evaluation for Continued Service..... i-7 Table 2 Abstract of Repair/Replacement Activities Required for Continued Service.......................
i-8
R. E. Ginna Nuclear Power Plant-, Unit i 5h Interval Inservice Inspection and Rev.
00 2 nd Interval Containment Inservice a jint ventuh9 of Inspection Date: 112212013 0 *,4tt>,
eDF 2012 OWNER'S. ACTIVITY REPORT Page i-3of i-8 FOR INSERVICE EXAMINATIONS ABSTRACT This Owner's Activity Report (OAR) summarizes the results of the R. E. Ginna Nuclear Power Plant (GNPP),
.Unit 1, -American Society of Mechanical Engineers (ASME)Section XI Inservice Inspection (ISI)
Examinations and Repair/Replacement activities performed during this reporting cycle from June 10, 2011 through November 21, 2012. The 2012 Refueling Outage (RFO) started October 20, 2012 and ended November 21,2012. This OAR is for the Fifth Interval Inservice Inspection Program, First Period and the Second Interval Containment lhservice Inspection Program, First Period. Associated iSI examinations were performed in accordance with ASME Section XI Code, 2004 Edition, No Addenda. The First Interval Containmentl nservice Inspection Program was extended to align with the ISI Program interval in accordance With the Fourth Interval Inservice Inspection Program Relief Request Number 22, The 5t1 Interval Inservice Inspection and the 2 nd Interval Containment Inservice, Inspection interval are al.igned.
As an alternate to the requirements of the ASME, Boiler and Pressure Vessel Code (B&PVC), Section Xl, Article IWA-6000, GNPP has implemented ASME Code Case N-532-4, "Alternative Requirements to Repair and Replacement. Documentation Requirements and Inservice Summary Report Preparation and Submission as Required by IWA-4000 and !WA-6000, Section X1, Division 1".. ASME Code Case N-532-4 is approved for use in Regulatory Guide 1.47. This Report complies with the requirements of Code Case N-532-4.
OWNER'S ACTIVITY REPORTS - FORM OAR-I OWner's Activity Reports Form OAR-I's were prepared and certified upon completion of the GNPP Unit 1,.
2012 refueling outage RFO-36 examination activity in accordance with the following inspection plans and schedules:
" Inservice Inspection Program Plan(s) for the Fifth Inspection Interval for GNPP Unit 1 Long Term Plan for GNPP, Unit 1 ISI Program Plan ASME XI, IWE/IWL Second Inspection Interval In addition to the Owner's Activity Report, Form OAR-i, the following.Tables are also included:
- a.
Items with Flaws or Relevant Conditions that Require Evaluation for Continued Service, Table 1, provides a listing of item(s) with inservice flaws or relevant conditions that required evaluation to determine, acceptability for continued service, whether or not the flaw or relevant condition was discovered during a scheduled examination or test, and provides such information as Examination Category, Examination Item Number, Item Description, Flaw Characterization (as required by IWA-3300).
- b.
Abstract of Repairs, Replacements or Corrective Measures Required for Continued Service, Table 2, identifies those items containing flaws or relevant conditions that exceeded the ASME Section XI acceptance criteria. (IWX-3000) or in the case of supports,IWF-3000 acceptance criteria; even though the discovery of the flaw or relevant condition that necessitated the repair, replacement or corrective measure, may not have resulted from an examination or test required by Section XI, and provides such information as Code Class, whether the item is a repair, replacement or corrective action, item description, description of work, if the flaw or relevant condition was found, during a scheduled Section XI Examination or test, date completed and the repair replacement plan number.
R. E. Ginna Nuclear Power Plant, Unit I C E N G 5;nInterval Inservice Inspection and Rev.
00 nt 2tu o"d Interval Containment Inservice a joint venture ofInspection Date: 1/22/2013 0
- `
'eDF 2012 OWNER'S ACTIVITY REPORT Page i-4of i-8 FOR INSERVICE EXAMINATIONS FORM OAR-1 OWNER'S ACTIVITY REPORT As required by the provisions of the ASME Code Case N-532-4 Report Number GNPP-OAR-ISI-2012 Plant R. E. Ginna Nuclear Power Plant, 1503 Lake Road, Ontario, New York 14519 (Name and Address of Plant)
Unit No.
1 Commercial Service Date June 1, 1970 Refueling Outage Number RFO-36 Current Inspection Interval Fifth Inservice Inspection Interval - January 1, 2010 to December 31, 2019.
(1st, 2nd, 3rd, 4th, Other)
Current Inspection Period First Inservice Inspection Period -
January 1, 2010 to December 31, 2012 (1st, 2nd, 3rd)
Edition and Addenda of Section XI applicable to the Inspection Plan 2004 Edition, No Addenda Date and Revision of Inspection Plan 12 December 2011. Revision 2 Edition and Addenda of ASME-Section.Xl applicable to repairs/replacements,. if different than the Inspection Plan N/A Code Cases used:
N-532-4, N-706, N-716, N-722, N-729-1 CERTIFICATE OF CONFORMANCE, I certify that.(a) the statements:made in-this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting completion of 2012 RFO (RFO-36) conform to the requirements of Section XI.
Certificate of Authorization No.
5RinnprI Frnnk A Kl~nn'.ki N/A f
a Expiration Date NIA Date
/
/./
zo/_,
Sinned Frank A Klenacki (Site ISI Program Owner)
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of New York and employed by Hartford Steam Boiler (HSBCT) of Hartford, Connecticut have inspected the items described in this Owner's Activity Report, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any rsonal injury Opproperty damage or a loss of any kind arising from or connected with this inspection.
Bruce Sawyer A IOUAI4.
Commissions NB10496K A, N. I: New York 4077 Inspector's Signature National Board, Stateý Province, and Endorsements Date_______________
R. E. Ginna Nuclear Power Plant, Unit 1 5 Interval Inservice Inspection and Rev.
00 2 "d Interval Containment Inservice a joint venture of Inspection Date: 112212013 0 n*
- '*eDF 2012 OWNER'S ACTIVITY REPORT Page i -5 of i -8 FOR INSERVICE EXAMINATIONS FORM OAR-1 OWNER'S ACTIVITY REPORT As required by the provisions of the ASME Code Case N-532-4 Report Number GNPP-OAR-IWE/L-2012 Plant R E Ginna Nuclear Power Plant, 1503 Lake'Road, Ontario, New York 14519 (Name and Address of Plant).
Unit No.
i Commercial Service Date June 1, 1970 Refueling Outage Number RFO-36 Current Inspection Interval Second Containment Inspection Interval - January 1, 2010 to December 31, 2019 (1sti 2nd, 3rd, 4th, Other)
Current Inspection Period First'lnservice Inspection Period - January 1.2010 to December 31, 2012 (1st, 2nd, 3rd)
Edition and Addenda of Section XI applicable to the Inspection Plans 2004 Edition, No Addenda Date and Revision of Inspection Plans 29 December 2009, Revision 0 Edition and Addenda of ASME Section Xl applicable to repairs/replacements, if different than the Inspection Plan N/A Code Cases used:
N-532-4, N-686. N-739, N-753, (if applicable)
CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting completion of 2012 RFO (RFO-36) conform to the requirements of Section Xl.
Certificate of Authorization No.
Signed Frank A Klepacki NIA (if applcable)
Expiration Date N/A Date
/
(Site ISI Program Owner)
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of New York and employed by Hartford Steam Boiler (HSBCT) of Hartford, Connecticut have inspected the items described in this Owner's Activity Report, and state that to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the inspector nor his employer shail be liable in any manner for anyersonal injury, r property damage or a loss of any kind arising from or connected with this inspection.
Bruce Sawyer
=4e&*,a.'r--
Commissions NB10496. A, N, I: New York 4077 Inspector's Signature
'National Board, State, Province, and Endorsements Date 11-1-Z70,3
R. E. Ginna Nuclear Power Plant, Unit I E* E[\\
-*3 5th Interval Inservice Inspection and Rev.
00 2 nd Interval Containment Inservice a jr ventufe o Inspection Date: 1/22/2013 lef co1vtltion 202 Inpcto ebF 2012 OWNER'S ACTIVITY REPORT FOR Page i-6of i-8 FOR INSERVICE EXAMINATIONS TABLE I ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRE EVALUATION FOR CONTINUED SERVICE As reauired by the provisions of the ASME Code. Case N-532-4 EXAMINATION ITEM EVALUATION DESCCRIPTION CATEGORY AND ITEM NUMBER DESCRIPTION There were no items With flaws or relevant conditions that require evaluation for continued service:,.
I t
i i
R. E. Ginna Nuclear Power Plant, Unit 1 5 th Interval Inservice Inspection and Rev.
00 v E N G
-i 2 nd Interval Containment Inservice a joint vnture o Inspection Date: 1/22/2013 0
,*'*'=
':'eDF 2012 OWNER'S ACTIVITY REPORT Page i-7 of i-8 FOR INSERVICE EXAMINATIONS TABLE 2 ABSTRACT OF REPAIRIREPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE As required by the provisions of the ASME Code Case N-532-4 CODE ITEM DESCRIPTION DATE REPAIR/REPLACEMENT CLASS DESCRIPTION OF WORK COMPLETED PLAN NUMBER
- 2 FWU-8, Mechahical Snubber Functional Test Nov.
Snubber, PSA-10 Failure - Replaced Mechanical 2012 Work Order C92063997 Snubber oncomponent support (GORR 36-081)
FWU-8.
2 MSU-78, Mechanical Snubber Functional Test Nov.
Wr re 9068 Snubber, PSA-10 Failure - Replaced Mechanical 2012
'Snubber on component support MSU-78. (Swap.out with one previously installed) 3 Component Cooling Small leak identified in the half-Aug./Sept.
Work Orders Water System, 1" half-coupling fillet weld. ASME 2012 C91934625 coupling fillet weld Section X1 2004 Edition C91984183 associated with Mandatory Appendix'IX was Temperature Element used to design, build and install TE-621 a mechanical clamp, over the leak area. Relief Request ISI-09 was developed and submitted to the NRC dated 9/6/2012.
Approved NRC SER was obtained on 10/16/2012.
.9-1 t
+
I t
1-
+
I
+
I
+/-
+
I
+
R. E. Ginna Nuclear Power Plant, Unit I DEI\\
5* Interval Inservice Inspection and Rev.
00 aktENt 2 nd Interval Containment Inservice a oInt venture of Inspection Date: 1122/2013 2012 OWNER'S ACTIVITY REPORT Page i-8of i-8 FOR INSERVICE EXAMINATIONS END OF FIRST INSPECTION PERIOD 2012 INSERVICE INSPECTION OWNER'S ACTIVITY REPORT