ML13037A627
| ML13037A627 | |
| Person / Time | |
|---|---|
| Site: | Millstone, Kewaunee, Surry, North Anna, 07200002, 07200055 |
| Issue date: | 12/18/2012 |
| From: | Hartz L Dominion Resources Services, Dominion, Dominion Energy Kewaunee, Dominion Nuclear Connecticut, Virginia Electric & Power Co (VEPCO) |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
| References | |
| 12-727 | |
| Download: ML13037A627 (3) | |
Text
Dominion Resources Services, Inc.
Innsbrook Technical Center 5000 Dominion Boulevard, 2SE, Glen Allen, VA 23060 December 18, 2012 United States Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555-0001 SlDominion Serial No.12-727 NLOS/TJS Rev. 0 Docket Nos. 50-280, 281 50-338, 339 50-245, 336, 423 50-305 72-16,56,2,55,47,64 License Nos. DPR-32, 37 NPF-4, 7 DPR-21, 65 NPF-49 DPR-43 SNM-2507,2501 VIRGINIA ELECTRIC AND POWER COMPANY DOMINION NUCLEAR CONNECTICUT, INC.
DOMINION ENERGY KEWAUNEE, INC.
SURRY POWER STATION UNITS 1 AND 2 and ISFSIs NORTH ANNA POWER STATION UNITS 1 AND 2 and ISFSIs MILLSTONE POWER STATION UNITS 1, 2 AND 3 and ISFS1 KEWAUNEE POWER STATION and ISFSI 10 CFR 50, APPENDIX E EVACUATION TIME ESTIMATES Pursuant to Part 50.4 of Title 10 of the Code of Federal Regulation (CFR), Virginia Electric and Power Company, Dominion Nuclear Connecticut, Inc. and Dominion Energy Kewaunee, Inc. (in sum, Dominion) submits the enclosed evacuation time estimate (ETE) studies for Surry, North Anna, Millstone and Kewaunee Power Stations.
The ETE studies are enclosed on a compact disk (CD) which was formatted consistent with "Guidance for Electronic Submissions to the NRC", Revision 5, dated June 25, 2009.
Please contact Mr. David A. Sommers at (804) 273-2823 if you have any questions or require additional information.
Sincerely, Leslie N. Hartz Vice President - Nuclear Support Services Virginia Electric and Power Company Dominion Nuclear Connecticut, Inc.
Dominion Energy Kewaunee, Inc.
Serial No.12-727 Evacuation Time Estimates Page 2 of 3
Enclosure:
Surry Power Station Evacuation Time Estimate Study (CD)
North Anna Power Station Evacuation Time Estimate Study (CD)
Millstone Power Station Evacuation Time Estimate Study (CD)
Kewaunee Power Station Evacuation Time Estimate Study (CD)
Commitments made in this letter: None cc:
U.S. Nuclear Regulatory Commission, Region I (w/o enclosures) 2100 Renaissance Blvd Suite 100 King of Prussia, PA 19406-2713 U.S. Nuclear Regulatory Commission, Region II (w/o enclosures)
Marquis One Tower 245 Peachtree Center Avenue, NE Suite 1200 Atlanta, GA 30303-1257 U.S. Nuclear Regulatory Commission, Region III (w/o enclosures) 2443 Warrenville Road Suite 210 Lisle, IL 60532-4352 Director, Division of Spent Fuel Storage and Transportation (w/o enclosures)
Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Dr. V. Sreenivas (w/o enclosures)
NRC Project Manager North Anna / Surry U.S. Nuclear Regulatory Commission, Mail Stop 08 G-9A One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Ms. K. R. Cotton (w/o enclosures)
NRC Project Manager North Anna / Surry U.S. Nuclear Regulatory Commission, Mail Stop 08 G-9A One White Flint North 11555 Rockville Pike Rockville, MD 20852-27.38
Serial No.12-727 Evacuation Time Estimates Page 3 of 3 Mr. J. S. Kim (w/o enclosures)
NRC Project Manager (MPS Units 2 and 3)
U.S. Nuclear Regulatory Commission, Mail Stop 08 C-2A One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Mr. S. J. Giebel (MPS Unit 1) (w/o enclosures)
Two White Flint North Mail Stop T-8 F5 11555 Rockville Pike Rockville, MD 20852-2738 Mr. K. D. Feintuch (w/o enclosures)
NRC Project Manager (Kewaunee)
U.S. Nuclear Regulatory Commission, Mail Stop 08 H-4A One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Ms. J. Davis (w/o enclosures)
NRC Senior Project Manager U. S. Nuclear Regulatory Commission, Mail Stop EBB-E3-D2M One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector (w/o enclosures)
North Anna Power Station NRC Senior Resident Inspector (w/o enclosures)
Surry Power Station NRC Senior Resident Inspector (w/o enclosures)
Millstone Power Station NRC Senior Resident Inspector (w/o enclosures)
Kewaunee Power Station