Response to March 12, 2012 Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 1, Integrated Assessment Approach
ML13037A304
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 01/29/2013
From: Heacock D
Dominion, Dominion Nuclear Connecticut
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML13037A304 (3)


Text

Dominion Nuclear Connecticut, Inc.

5000 Dominion Boulevard, Glen Allen, VA 23060 m@N'ini@N

ýWeb Address: www.dom.com January 29, 2013 U.S. Nuclear Regulatory Commission Serial No.13-008 Attention: Document Control Desk NL&OS/WDC RO Washington, DC 20555 Docket Nos.

50-336/423 License Nos.

DPR-65 NPF-49 DOMINION NUCLEAR CONNECTICUT, INC.

MILLSTONE POWER STATION UNITS 2 AND 3 RESPONSE TO MARCH 12, 2012 REQUEST FOR INFORMATION ENCLOSURE 2, RECOMMENDATION 2.1, FLOODING, REQUIRED RESPONSE 1, INTEGRATED ASSESSMENT APPROACH

References:

1.

NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated March 12, 2012, Accession No. ML12053A340.

2.

NRC Japan Lessons-Learned Project Directorate, JLD-ISG-2012-05, Guidance for Performing the Integrated Assessment for External Flooding, Interim Staff Guidance, Revision 0, dated November 30, 2012, Accession No. ML12311A214.

3.

NRC Letter, D.L. Skeen (NRC) to J.E. Pollock (NEI), Trigger Conditions for Performing an Integrated Assessment and Due Date for Response, dated December 3, 2012, Accession No. ML12326A912.

On March 12, 2012, the NRC issued Reference 1 to request information associated with Near-Term Task Force (NTTF) Recommendation 2.1 for Flooding. One of the required responses in that letter directed licensees to submit an approach for developing an Integrated Assessment Report, including criteria for identifying vulnerabilities, within 60 days after issue of the NRC's guidance on the subject. On November 30, 2012, the NRC issued the Interim Staff Guidance (Reference 2).

The following is Dominion Nuclear Connecticut, Inc.'s (DNC) 60-day response.

DNC will use the Reference 2 guidance as the approach for developing the NTTF 2.1 flooding Integrated Assessment Report for Millstone Power Station Units 2 and 3 if the reevaluated flooding hazard is not bounded by the current design basis flooding evaluation.

Serial No.13-008 Docket Nos. 50-336/423 Page 2 of 3 DNC will also use the guidance provided by Reference 3 regarding the trigger conditions and scope of any required Integrated Assessment.

If you have any questions regarding this information, please contact Wanda Craft at (804) 273-4687.

Sincerely, David A. Heacock President and Chief Nuclear Officer Dominion Nuclear Connecticut, Inc.

VCKI L. HULL

j.

Notary Public

]

Commonwealth of Virginia L

140542 COMp Commission Expirs May 31. 2014 COMMONWEALTH OF VIRGINIA

)

v-*4

_ _ _,__v___

COUNTY OF HENRICO

)

The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by David A. Heacock, who is President and Chief Nuclear Officer of Dominion Nuclear Connecticut, Inc.

He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that company, and that the statements in the document are true to the best of his knowledge and belief.

Acknowledged before me this del

'--_day of 12013.

My Commission Expires:, _ lift 4

Commitments made in this letter: No new regulatory commitments

Serial No.13-008 Docket Nos. 50-336/423 Page 3 of 3 cc:

U.S. Nuclear Regulatory Commission Region I 2100 Renaissance Blvd.

Suite 100 King of Prussia, PA 19406-2713 J. S. Kim Project Manager U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08 C2A 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station