Text
Dominion Energy Kewaunee, Inc.
S900* Dominion Boulevard, Glen Allen, VA 23060 Dominion iLý Web Address: www.dom.com January 29, 2013 U.S. Nuclear Regulatory Commission Serial No.13-009 Attention: Document Control Desk NL&OS/WDC RO Washington, DC 20555 Docket No.
50-305 License No.
DPR-43 DOMINION ENERGY KEWAUNEE, INC.
KEWAUNEE POWER STATION RESPONSE TO MARCH 12, 2012 REQUEST FOR INFORMATION ENCLOSURE 2, RECOMMENDATION 2.1, FLOODING, REQUIRED RESPONSE 1, INTEGRATED ASSESSMENT APPROACH
References:
- 1.
NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated March 12, 2012, Accession No. ML12053A340.
- 2.
NRC Japan Lessons-Learned Project Directorate, JLD-ISG-2012-05, Guidance for Performing the Integrated Assessment for External
- Flooding, Interim Staff Guidance, Revision 0, dated November 30, 2012, Accession No. ML12311A214.
- 3.
NRC Letter, D.L. Skeen (NRC) to J.E. Pollock (NEI), Trigger Conditions for Performing an Integrated Assessment and Due Date for Response, dated December 3, 2012, Accession No. ML12326A912.
On March 12, 2012, the NRC issued Reference 1 to request information associated with Near-Term Task Force (NTTF) Recommendation 2.1 for Flooding. One of the required responses in that letter directed licensees to submit an approach for developing an Integrated Assessment Report, including criteria for identifying vulnerabilities, within 60 days after issue of the NRC's guidance on the subject. On November 30, 2012, the NRC issued the Interim Staff Guidance (Reference 2).
The following is Dominion Energy Kewaunee, Inc.'s (DEK) 60-day response.
DEK will use the Reference 2 guidance as the approach for developing the NTTF 2.1 flooding Integrated Assessment Report for Kewaunee Power Station (KPS) if the reevaluated flooding hazard is not bounded by the current design basis flooding evaluation.
DEK will also use the guidance provided by Reference 3 regarding the trigger conditions and scope of any required Integrated Assessment.
Serial No.13-009 Docket No. 50-305 Page 2 of 3 On November 2, 2012, DEK informed the NRC of its plans to permanently cease power operation of KPS.
If power operations cease prior to required submittal of the Integrated Assessment Report, DEK may not complete the report for KPS.
If you have any questions regarding this information, please contact Craig Sly at (804) 273-2784.
Sincerely, David A. Heacock President and Chief Nuclear Officer Dominion Energy Kewaunee, Inc.
VCKI L. MULL 5Notary Public 1
Commonwealth of Virginia 140542 COMMONWEALTH OF VIRGINIA
)my Goesion Expires May 31. 2014 COUNTY OF HENRICO
)
The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, today by David A. Heacock, who is President and Chief Nuclear Officer of Dominion Energy Kewaunee, Inc.
He has affirmed before me that he is duly authorized to execute and file the foregoing document in behalf of that company, and that the statements in the document are true to the best of his knowledge and belief.
Acknowledged before me this,. 7 -- day of k2 My Commission Expires:
2 Notary Public Commitments made in this letter: No new regulatory commitments
Serial No.13-009 Docket No. 50-305 Page 3 of 3 cc:
U.S. Nuclear Regulatory Commission, Region III Regional Administrator 2443 Warrenville Road Suite 210 Lisle, Illinois 60532-4352 K. D. Feintuch Project Manager U.S. Nuclear Regulatory Commission One White Flint North, Mail Stop 08 H-4A 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Kewaunee Power Station