ML13035A078

From kanterella
Jump to navigation Jump to search
Requalification Program Inspection
ML13035A078
Person / Time
Site: Crane Constellation icon.png
Issue date: 02/04/2013
From: Diane Jackson
Operations Branch I
To: Pacilio M
Exelon Generation Co, Exelon Nuclear
Shared Package
ML12335A368 List:
References
Download: ML13035A078 (4)


Text

UNITED STATES IruCLEAR REGULATORY COMMISSION REGION I 2IOO RENAISSANCE BOTJLEVARD, SUITE IOO KING OF PRUSSTA" PENNSYLVA}{IA 19406-27 13 February 4, 2013 Mr. MichaelJ. Pacilio Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Rd.

Warrenville, lL 60555

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION THREE MILE ISLAND NUCLEAR STATION, UNIT 1

Dear Mr. Pacilio:

In a telephone conversation on January 31 2013, Mr. John Caruso, Senior Operations Engineer, Region l, and Mr. John Blair, Operations Training Manager, made arrangements for the U.S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at the Three Mile lsland Nuclear Station, Unit 1. The inspection is planned for week of March 11,2013, which coincides with your regularly scheduled requalification examination cycle.

The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.

ln accordance with Title 10 of the Code of Federal Regulations (10 CFR) 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish: 1) an index or summary of condition reports written in the past 2 years in which licensed operator errors were determined to be the root or contributing cause; 2) an index or summary of condition reports written in the past 2 years on simulator performance problems; 3) an index or summary of simulator performance test results in the past 2 years; 4) the examination schedule, sample plan, written examinations, and operating test scheduled for the week of the inspection, and

5) procedures governing the requalification program to the NRC by February 19,2013.

Mr. J. Blair has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018.

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any

M. Pacilio other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulitory commission, washington, D.c. 20s55-0001, or by Internet electronic mail to I:ryFOC9!-=L=ECT9!ONRC.GOV; and to the Desk Officer, Office of Information and Regutatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington,b.C.

20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid oMB contror number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document iioom or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.sov/readinq-rm/adams.himl (The Public Electronic Reading Room).

Thank you for your cooperation in this matter. lf you have any questions regarding this inspection, please contact Mr. John Caruso at (610) 337-S3g9.

Operations Branch Division of Reactor Safety Docket No. 50-289 License No. DPR-50 cc: Distribution via ListServ

ML13O35AO78 ADAMS PKG: ML 2335A368 ADAMS ACCESSION V

suNstReview g

Non-Sensitive n

Sensitive V

Publicly Available I

Non-PubliclyAvailable OFFICE RI/DRS/OB RI/DRS/OB NAME JCaruso DJackson DATE 2t4t13 2t4t13

M. Pacilio 3

Distribution w/encl: (via E-mail)

W. Dean, RA (RIORAMAIL Resource)

D. Lew, DRA (RIORAMAIL Resource)

D. Roberts, DRP (RIDRPMAlL Resource)

P. Wilson, DRP (Rl DRPMail Resource)

C. Miller, DRS (RlDRSMail Resource)

J. Clifford, DRS (RlDRSMail Resource)

G. Hunegs, DRP S. Barber, DRP A. Dugandzic, DRP N. Lafferty, DRP D. Werkheiser, DRP. SRI J. Heinly, DRP, Rl J. Cassidy, Rl OEDO E. Miller. NRR C. Gratton, NRR RidsNrrPMThreeMilelsland Resource RidsNrrDorlLpl 1 -2 Resource ROPReports Resource J. Caruso, DRS D. Jackson, DRS C. Bixler, DRS Master Exam File (with concurrences)