Summary of Changes to Scenarios Scenario 1 Added procedure step numbers where appropriate.
Event 1-Updated component designator from FWS to FWL Event 2-Removed reference to A & B components. Previously read FWS-MOV27A(B)(C), now reads FWS-MOV27C.
Event 3-Added applicant actions for continuous withdrawl of control rods. Initially only notch withdrawal steps were provided. Either may be performed.
Event 4 - Added an additional alarm to the CUE.
Event 5 - Corrected alarm window location designator from insert 71 to 71A.
Event 6 - Changed the range of operation on TME-PIEPR from 10-14 inches to 16-18 inches to match recent procedure change.
Event 6 - Corrected alarm window location designator from insert 54 to 54A.
Event 7 - Added Enclosure 12 to SRO actions and Enclosures 10, 12, and 14 to BOP actions.
Scenario 2 Added procedure step numbers where appropriate.
D1 - Added noun name to STP-402-0201 Event 2 - Added noun name to STP-402-0201 Event 2 - Added noun names to HVC air operated dampers Event 3 - Change role play to notify a rise in power in the vicinity of LPRM string 30-07 versus control rod 28-09.
Event 4 - Updated alarm location designator from P680 to P601.
Event 6 - Added SRO action to direct injection with Standby Liquid Control and Maximizing Control Rod Drive. Also added performance of these actions to the BOP.
Scenario 3 Updated turnover sheet to state that Section 7.5 of STP-204-6302 will not be performed.
Updated turnover sheet to state that Suppression Pool Cooling is desired Added procedure step numbers where appropriate.
Event 2 - Added noun name to STP-204-6302.
Event 2 - Added the word Throttle to BOP actions for E12-F068B Event 3 - Include mismatch limit of 5% in ATC actions.
Event 5 - Added CRS action to reference AOP-0007.
Event 5 - -Removed the verbiage Attempt to from ATC actions for taking control of FWR-FV2A.
Event 6 - Removed the word makeup from CRS and BOP actions.
Event 7 - Added noun name to AOP-0003.
Event 7 - Added (Automatic Scram on MSIV Isolation Fails) after Critical Task: Place the Mode Switch in Shutdown
Scenario 4 Added procedure step numbers where appropriate.
End of comments