MONTHYEARRS-12-151, Fifth Interval Lnservice Inspection Program Plan and Relief Requests2012-09-28028 September 2012 Fifth Interval Lnservice Inspection Program Plan and Relief Requests Project stage: Request RS-12-150, Fifth Interval Inservice Inspection Program Plan and Relief Requests2012-09-28028 September 2012 Fifth Interval Inservice Inspection Program Plan and Relief Requests Project stage: Request RS-12-202, Supplement to the Dresden Nuclear Power Station Fifth Inservice Inspection Interval Relief Request I5R-012012-11-19019 November 2012 Supplement to the Dresden Nuclear Power Station Fifth Inservice Inspection Interval Relief Request I5R-01 Project stage: Supplement ML12331A2772012-11-28028 November 2012 Supplemental Information Needed for Acceptance of RLA, I5R-02 Project stage: Acceptance Review RS-12-203, Supplement to Quad Cities Nuclear Power Station Fifth Inservice Inspection Interval Relief Request I5R-012012-11-28028 November 2012 Supplement to Quad Cities Nuclear Power Station Fifth Inservice Inspection Interval Relief Request I5R-01 Project stage: Supplement RS-12-205, Supplement to Fifth Inservice Inspection Interval Relief Request I5R-022012-11-28028 November 2012 Supplement to Fifth Inservice Inspection Interval Relief Request I5R-02 Project stage: Supplement ML12348A8302012-12-13013 December 2012 NRR E-mail Capture - Acceptance Review of Dresden, Units 2 and 3, Relief Request I5R-02 Project stage: Acceptance Review ML12348A4272012-12-21021 December 2012 Request for Additional Information Related to the Request for Alternative I5R-03 Project stage: RAI RS-13-005, Supplemental to Dresden and Quad Cities Fifth Inservice Inspection Interval Relief Request I5R-032013-01-10010 January 2013 Supplemental to Dresden and Quad Cities Fifth Inservice Inspection Interval Relief Request I5R-03 Project stage: Supplement RS-13-040, Supplement to the Dresden Nuclear Power Station Fifth Inservice Inspection Interval Relief Request I5R-042013-01-24024 January 2013 Supplement to the Dresden Nuclear Power Station Fifth Inservice Inspection Interval Relief Request I5R-04 Project stage: Supplement ML13099A2802013-04-0909 April 2013 NRR E-mail Capture - Finalized Dresden RAI I5R-01 I5R-02 and I5R-07 Project stage: RAI ML13110A0072013-04-19019 April 2013 NRR E-mail Capture - RAI for Dresden Units 2 and 3 Exelon Generation Company, LLC Relief Request Nos. I5R-01, I5R-02, and I5R-07 Docket Numbers 50-237 and 50-249 TAC Nos. ME9682-83, ME9684-85, and ME9692-93 Project stage: RAI ML13115A2322013-04-24024 April 2013 NRR E-mail Capture - Quad Cities Relief Request Nos. I5R-01, I5R-02, and I5R-06 - Request for Additional Information Project stage: RAI ML13123A0852013-05-0202 May 2013 NRR E-mail Capture - Dresden Relief Request No. I5R-02 - Request for Additional Information Project stage: RAI RS-13-147, Additional Information Supporting Fifth Inservice Inspection Interval Relief Requests I5R-01, I5R-02, and I5R-062013-05-30030 May 2013 Additional Information Supporting Fifth Inservice Inspection Interval Relief Requests I5R-01, I5R-02, and I5R-06 Project stage: Request RS-13-107, Supplement to Fifth Inservice Inspection Interval Relief Requests I5R-01, I5R-02, and I5R-072013-06-0303 June 2013 Supplement to Fifth Inservice Inspection Interval Relief Requests I5R-01, I5R-02, and I5R-07 Project stage: Supplement ML13258A0032013-09-30030 September 2013 Safety Evaluation for the Fifth 10-Year Interval Inservice Inspection Relief Request for Exelon Generation Boiling Water Reactor (TAC Nos. ME9682, ME9683, ME9684, ME9685, ME9686, ME9687, ME9688, Etc.) Project stage: Approval ML13260A5852013-09-30030 September 2013 Cover Letter -Safety Evaluation in Support of Request for Relief Associated with the Fifth 10-Year Interval Inservice Inspection Program (TAC Nos. ME9682, ME9683, ME9684, ME9685, ME9686, ME9687, ME9688, Etc Project stage: Approval ML13267A0972013-09-30030 September 2013 Safety Evaluation in Support of Request for Relief Associated with the Fifth 10 Year Interval Inservice Inspection Program Project stage: Approval 2013-01-24
[Table View] |
|
---|
Category:Letter type:RS
MONTHYEARRS-23-121, Sixth Ten-Year Interval Inservice Testing Program2023-11-30030 November 2023 Sixth Ten-Year Interval Inservice Testing Program RS-23-119, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information RS-23-107, Relief Request I5R-22, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval2023-11-0808 November 2023 Relief Request I5R-22, Inservice Inspection Program Relief Request Regarding Examination Coverage for the Fifth Inservice Inspection Interval RS-23-102, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-16016 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-071, Application to Adopt TSTF-564, Safety Limit MCPR2023-08-30030 August 2023 Application to Adopt TSTF-564, Safety Limit MCPR RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs RS-23-078, Supplement to License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times2023-06-16016 June 2023 Supplement to License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling RS-23-070, Supplement to License Amendment Request Regarding Transition to GNF3 Fuel2023-05-16016 May 2023 Supplement to License Amendment Request Regarding Transition to GNF3 Fuel RS-23-057, Supplement to License Amendment Request Regarding Transition to GNF3 Fuel2023-04-17017 April 2023 Supplement to License Amendment Request Regarding Transition to GNF3 Fuel RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations RS-23-041, Response to Request for Additional Information for Alternative Request RV-23H2023-03-14014 March 2023 Response to Request for Additional Information for Alternative Request RV-23H RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 RS-23-004, Response to Request for Additional Information Regarding Transition to GNF3 Fuel License Amendment Request2023-01-23023 January 2023 Response to Request for Additional Information Regarding Transition to GNF3 Fuel License Amendment Request RS-22-126, Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2022-11-30030 November 2022 Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI RS-22-121, Notice of Intent to Pursue Subsequent License Renewal Applications2022-11-0909 November 2022 Notice of Intent to Pursue Subsequent License Renewal Applications RS-22-117, Response to Request for Additional Information License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies2022-11-0303 November 2022 Response to Request for Additional Information License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies RS-22-116, Submittal of Relief Requests Associated with the Sixth Inservice Testing Interval2022-11-0101 November 2022 Submittal of Relief Requests Associated with the Sixth Inservice Testing Interval RS-22-115, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors2022-10-19019 October 2022 Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration RS-22-066, License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times2022-08-25025 August 2022 License Amendment Request to Revise Technical Specification 3.1.4, Control Rod Scram Times RS-22-065, License Amendment Request Regarding Transition to GNF3 Fuel2022-08-18018 August 2022 License Amendment Request Regarding Transition to GNF3 Fuel RS-22-093, Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans2022-08-18018 August 2022 Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans RS-22-101, Response to Request for Additional Information Related to Relief Request I6R-01 Associated with the Sixth Inservice Inspection Interval2022-08-10010 August 2022 Response to Request for Additional Information Related to Relief Request I6R-01 Associated with the Sixth Inservice Inspection Interval RS-22-099, Submittal of Upcoming Sixth Inservice Inspection Interval Relief Requests I6R-09 and I6R-102022-07-19019 July 2022 Submittal of Upcoming Sixth Inservice Inspection Interval Relief Requests I6R-09 and I6R-10 RS-22-082, Defueled Safety Analysis Report Update, Revision 112022-06-22022 June 2022 Defueled Safety Analysis Report Update, Revision 11 RS-22-080, Withdrawal and Proposed Alternative I6R-08 Associated with Code Case N-921 for Sixth Inservice Inspection Intervals2022-06-0909 June 2022 Withdrawal and Proposed Alternative I6R-08 Associated with Code Case N-921 for Sixth Inservice Inspection Intervals RS-22-064, License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies with Proposed Change to Technical Specifications Section 4.3.12022-06-0808 June 2022 License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies with Proposed Change to Technical Specifications Section 4.3.1 RS-22-051, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-04-12012 April 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-049, Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for2022-04-0404 April 2022 Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for V RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations RS-22-046, Relief Requests Associated with the Sixth Inservice Inspection Interval2022-03-25025 March 2022 Relief Requests Associated with the Sixth Inservice Inspection Interval RS-22-042, Report on Status of Decommissioning Funding for Shutdown Reactors2022-03-23023 March 2022 Report on Status of Decommissioning Funding for Shutdown Reactors RS-22-023, Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement2022-02-23023 February 2022 Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement RS-22-027, Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated2022-02-23023 February 2022 Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated P RS-22-019, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-02-16016 February 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-015, Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC2022-02-0101 February 2022 Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC RS-21-009, Proposed Relief Request Associated with Code Case N-9212022-01-18018 January 2022 Proposed Relief Request Associated with Code Case N-921 RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-01-0404 January 2022 Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RS-21-121, Proposed Changes to Decommissioning Trust Agreements and Master Terms2021-12-15015 December 2021 Proposed Changes to Decommissioning Trust Agreements and Master Terms RS-21-114, Request for Exemption from 10 CFR 2.109(b)2021-10-28028 October 2021 Request for Exemption from 10 CFR 2.109(b) RS-21-110, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors2021-10-19019 October 2021 Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors RS-21-103, Updated Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations for Byron Station and Dresden Nuclear Power Station2021-09-28028 September 2021 Updated Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations for Byron Station and Dresden Nuclear Power Station RS-21-097, Withdrawal of Certification of Permanent Cessation of Power Operations for Dresden Nuclear Power Station, Units 2 and 3, and Previously Submitted Licensing Actions in Support of Decommissioning2021-09-15015 September 2021 Withdrawal of Certification of Permanent Cessation of Power Operations for Dresden Nuclear Power Station, Units 2 and 3, and Previously Submitted Licensing Actions in Support of Decommissioning RS-21-091, Implementation of Insider Threat Program Requirements Associated with the Voluntary Security Clearance Program and Advisement of Leadership Changes2021-09-13013 September 2021 Implementation of Insider Threat Program Requirements Associated with the Voluntary Security Clearance Program and Advisement of Leadership Changes RS-21-086, Supplement to Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR 50, Appendix E2021-08-23023 August 2021 Supplement to Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR 50, Appendix E RS-21-078, Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel2021-08-19019 August 2021 Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel 2023-08-30
[Table view] |
Text
1 RS-13-040 RS-13-040 10 10 CFR CFR SO.SSa 50.55a January 24, 2013 U. S. Nuclear U. Nuclear Regulatory Regulatory Commission Commission ATTN: Document Control Control Desk Washington, D.C.
Washington, D.C. 20555-0001 20SSS-0001 Dresden Nuclear Power Station, Dresden Station, Units 22 and 3 Renewed Facility Renewed Facility Operating Operating License License Nos.
Nos. DPR-19 and DPR-25 DPR-2S NRC Docket Nos. 50-237 SO-237 and 50-249 SO-249
Subject:
Supplement to the Dresden Nuclear Power Station Fifth Inservice Inspection Inspection Interval Interval Relief Request Request 15R-04 ISR-04
Reference:
Letter from from D.D. M.
M. Gullott Gullott(Exelon (Exelon Generation Generation Company, Company, LLC LLC (EGC))
(EGC>> to to U.
U. S.
S. NRC, NRC, "Dresden Nuclear Power Power Station, Station, Units Units 22 and and3, 3,Fifth Fifth Interval Inservice Inspection Intervallnservice Inspection Program Plan Program Plan and Relief Requests," dated September Relief Requests," September 28, 28, 2012 2012 In the In the referenced letter, EGC submitted relief requests associated relief requests associatedwith withthe thefifth fifth inservice inservice inspection inspection (ISI) intervalfor (lSI) interval forDresden Dresden Nuclear Nuclear Power Station (DNPS), Units 2 and 3. 3. Following Following discussions discussionswithwith the NRC, it became apparent that additional clarification is required for the NRC, it became apparent that additional clarification is required for the NRC to complete its NRC to complete its review of of Relief Relief Request Request ISR-04.
15R-04. Therefore, EGC requests requests to to supersede supersedethe theversion versionofof15R-04 ISR-04inin the referenced referenced letterletter with with the version version in in the attachment attachmentto to this this letter letter in in its its entirety.
entirety.
EGC continues to request approval approval ofof this relief request by September relief request September 28, 28, 2013, 2013, to to support support examination of components componentsduring during the theDNPS, DNPS,Unit Unit 22Fall Fall 2013 2013refueling refueling outage outagewhichwhichfalls falls within the fifth fifth 10-year 10-year ISIlSI interval.
interval.
There There areareno noregulatory regulatorycommitments commitmentscontained containedwithin withinthis thisletter.
letter.
Should you have have anyany questions questionsconcerning concerningthis thisletter, letter,please pleasecontact contactMr. Mr.Mitchel MitchelA. A. Mathews Mathews at at (630) 657-2819.
6S7-2819.
Sin Patrick R. Simpson Manager - Licensing Exelon Generation Generation Company, LLC LLC
Attachment:
Attachment:
10 CFR CFR 50.55a SO.SSa Request Request Number Number 15R-04, ISR-04, Revision Revision 11
ATTACHMENT 10 CFR SO.SSa 50 .55a Request Number Number 15R-04,ISR-04, Revision 11 Proposed Alternative In Accordance with 10 Proposed 10 CFR SO.SSa(a)(3)(ii) 50.55a(a)(3)(ii)
--Hardship or Unusual Difficulty without Compensating Increase in Level Level of Quality and Safety--
- 1. ASME Code Component(s)
Component(s) Affected:
Affected:
Code Class: 3
Reference:
IWD-2500, Table IWD-2500-1 IWD-2500-1 Examination Category: D-B Item Number: B2.10
Description:
Testing Frequency for Isolation Condenser Condenser Shell Shell Side Side and Associated Piping Component Number:
Unit No. Drawing Test Block No.
2 M-28, M-39 21CO1, 21C02 21C01, 3 M-359, M-369 31CO1, 31C02 31C01,
- 2. Code Applicable Edition Applicable Code and EditionAddenda:
and Addenda:
The Inservice Inspection (ISI) (lSI) Program is based based on on the theAmerican American Society Societyof of Mechanical Mechanical Engineers (ASME) Boiler and (ASME) Boiler and Pressure Vessel(B&PV)
Pressure Vessel (B&PV) Code, Code, Section SectionXI, XI, 2007 2007 Edition Edition through the 2008 Addenda.
Addenda.
- 3. Applicable Applicable Code Requirements:
Table IWD-2500-Table IWD-2500-1, 1, "Examination "Examination Categories," Examination Examination Category Category D- D-B, B, Item Item Number D2.10, requires 02.10, requires all allClass Class 33 pressure retaining retaining components components be subject to to a system leakage leakage test with test with aa VT-2 examination in VT-2 visual examination in accordance accordance with with IWD-5220, IWD-5220, "System "System Leakage Test."
Leakage Test."
This system leakage test is is to be be conducted conducted once each inspection period. period.
IWD-5221, IWD-5221,"Pressure,"
"Pressure,"states states that that system system leakage test shall shall be conducted conducted at at the the system system pressureobtained pressure obtainedwhile while the thesystem, system,ororportion portionof ofthe thesystem, system,isisininservice serviceperforming performingits its normal operating function function or oratat the the system system pressure developedduring pressure developed during aatest testconducted conductedto to verify system verify operability (e.g.,
system operability (e.g., to demonstrate demonstrate systemsystemsafety safetyfunction functionororsatisfy satisfytechnical technical specification surveillance requirements).
requirements).
Reason 4. for Request:
Reason for Request:
Pursuant to Pursuant to 10 10 CFR CFR 50.55a(a)(3)(ii),
50.55a(a)(3)(ii), relief relief is is requested requested on on the the basis basisthat thatconformance conformancewith with Code requirements the Code requirements impose imposehardship hardshipwithout without aacompensating compensatingincrease increaseininthe thelevel levelofof quality and safety.
Isolation Condenser The Isolation Condenserisisnot notnormally normallyin in service; service; itit is is normally normally in a standby standby alignment alignment with its with its shell shell side side vented vented toto the the atmosphere through aa non-isolable atmosphere through non-isolable vent vent line.
line. ForFor inservice inservice purposes, each inspection purposes, eachunit's unit'sIsolation IsolationCondenser Condenserisisdivideddividedinto intotwo twotest testblocks blocks Page 11 of of 5S
ATTACHMENT 50.55a Request 10 CFR SO.SSa Request NumberNumber15R-04, ISR-04, Revision Revision 11 Proposed Alternative In Accordance with 10 CFR 50.55a(a)(3)(ii)
Proposed SO.SSa(a){3)(ii)
--Hardship or Unusual Difficulty without Compensating Increase in Increase in Level Level of of Quality Quality and and Safety-Safety-(e.g., 21C01 21C01 and and 21C02 21C02for forthe the Unit Unit22Isolation IsolationCondenser Condenser upper upper and and lower lower portions, portions, respectively). For example, the respectively). For the DNPS, DNPS, Unit Unit 2 upper and and lowerlower system leakage leakagetest testblocks blocks are represented representedininFigures Figures15R-04.01 ISR-04.01 and and15R-04.02 ISR-04.02 below, below, respectively.
respectively.
,/
./
./".
,:~:t ISOLA7iCN CO WE SE' 2--133 2 Figure Figure15R-04.1:
ISR-04.1: Unit Unit 22 Isolation IsolationCondenser CondenserTest TestBlock BlockNo. No.21C01 21C01 Page 2 of 5 ofS
ATTACHMENT ATTACHMENT 10 CFR 10 CFR 50.55a RequestRequest NumberNumber15R -04, Revision 11 15R-04, Proposed Alternative Proposed Alternative In In Accordance with 10 CFR 50.55a(a)(3)(ii) 50.55a{a){3){ii)
--Hardship or Unusual Difficulty without Compensating
--Hardship Increase in Increase in Level Level of Quality and Safety--
4SOLA I: N CUND SER 2-?382 Figure Figure15R-04.2:
15R-04.2: Unit Unit 22 Isolation IsolationCondenser CondenserTest TestBlock BlockNo.
No.21C02 21C02 The system The system isisnormally normally aligned aligned with with the Isolation Condenser shell side Condenser shell side water waterlevel level greater greater than or equal to six (6) than or equal to six (6) feet in accordance with Dresden Nuclear Power Station (DNPS),
in accordance with Dresden Nuclear Power Station (DNPS),
and 33 Technical Units 2 and Technical Specifications Specifications (TS); (TS); however, however, the theshell shellside sidewater waterlevel levelofofthe the Isolation Condenser Condenser isis administratively administratively maintained between between 77 feet feet and and7.4 7.4feet feetinin accordance accordancewithwith plant plant procedures.
procedures.
Page Page 33 of 5 of5
ATTACHMENT ATTACHMENT 10 CFR 10 CFR SO.SSa 50.55a Request Request NumberNumber15R-04, ISR-04, Revision Revision 11 Proposed Alternative Proposed Alternative In In Accordance with 10 CFR SO.SSa{a){3){ii) 50.55a(a)(3)(ii)
--Hardship or Unusual Difficulty without Compensating
--Hardship Increase in Increase in Level Level of Quality and and Safety--
Isolation IsolationCondenser Condenser system system operability operability is is verified verified through performance performance of of TS TS Surveillance Surveillance Requirement (SR) 3.5.3.4, "Isolation Requirement "Isolation Condenser Condenser System System Heat HeatRemoval RemovalCapability Capability Verification VerificationTest," every60 Test,"every 60 months months (Le.,
(i.e., during during two twoof ofthe thethree three inspection inspection periods for DNPSs DNPSs fifthfifthlSIISIinterval).
interval).The Thesystem system pressures pressures developeddevelopedduring duringthe theperformance performanceofofthis this TS surveillance meet the Code Code requirements requirementsof ofIWD-5221; IWD-5221; however, the the 60-month 60-month frequency does does not not meet meetthe theTable TableIWD-2500-1 IWD-2500-1 examinationexamination frequency frequency requirement requirement of of once perper inspection period. period.
Performance of an additional Isolation Isolation Condenser Condenser heat heatremoval removal capability capability testtest solely solely forfor the purposes of performing performing aa system leakage leakage testtest requires requires aaminimum minimum of of aa 25%
25% reduction reduction in in reactor power power to to perform performthe theexamination.
examination. This This presents presents an unnecessary unnecessarytransient transient on on the the affected DNPS reactor and aa challenge challenge to to station station operators.
operators. Additionally, Additionally, as as previously previously stated, the isolation isolation condenser condenser shell shell cannot cannotbe beisolated isolatedand andpressurized pressurizedtotomeet meetIWD-5221 IWD-5221 examination examination pressure pressure requirements when in a standby alignment. ItIt would be an abnormal activityto activity tofill fillthetheIsolation IsolationCondenser Condenserto tothe thetop top simply simplytotoachieve achieve aa slight slight increase increase in static head for the additional additional system leakage test.
system leakage test. As Asan anadditional additionalcomplication, complication, any any water water added added to to the the isolation isolation condenser condensershell shelltotoraise raiselevel levelabove abovethe thenormal normaloperating operatinglevel levelwould would subsequently have to be drained and processed processed by by radwaste.
radwaste.
In In summary, summary, imposing imposing aa largelarge transient transient on on the reactor plant to to accommodate the performance of the Isolation Condenser Condenser heat heatremoval removal capability capability verification verification at at a greater frequency than required required by by DNPS DNPS TS TS and andfilling filling thethe Isolation Isolation Condenser Condenser to the top to perform perform aa third third system system leakage test, present presenthardshiphardshipwithout without aa compensating compensating increase increaseinin and safety.
quality and 5.
S. Proposed Alternative and Basis for Use: Use:
As an alternative, Exelon Exelon Generation Generation Company, Company, LLC LLC (EGC) proposes proposes the the performance performanceof ofaa system leakage system leakagetest testusing usingaaVT-2 VT-2visual visualexamination examinationof of all all DNPS DNPS UnitsUnits 22 and and 33Isolation Isolation CondenserTest Condenser TestBlocks Blocks(i.e.,
(Le., Test TestBlocks Blocks 2(3)IC01 2(3)IC01 and and 2(3)IC02) 2(3)IC02) every 60 months months during during the performance of TS SR 3.5.3.4 versus once once per per inspection inspection periodperiod as as discussed discussedininTable Table IWD-2500-1.
IWD-2500-1.
discussedinin the As discussed theprevious previousparagraph, paragraph,during duringthe theDNPS DNPSfifth fifth ISI lSI interval interval EGC proposes proposes the leakage that the leakagetest testofofIsolation Isolation Condenser CondenserTest TestBlocks Blocks2(3)IC01 2(3)IC01 (i.e.,(Le., the theupper upperportion portionof of the Isolation the Isolation Condenser Condenserand andassociated associatedpiping)piping)will will only only be be performed performed once onceeveryevery60 60 months during months during the performance of TS SR 3.5.3.4 3.5.3.4 versusversus once onceper perinspection inspectionperiodperiodas as discussed discussedininTable TableIWD-2500-1.
IWD-2500-1.
During inspection periods where TS SR During SR 3.5.3.4 3.5.3.4 isis not not performed performed on on aaunit's unit'sIsolation Isolation Condenser,an Condenser, anadditional additionalVT-2 VT-2examination examinationwill will bebeperformed performedfor forTest TestBlocks Blocks2(3)IC02 2(3)IC02 (Le., the lower portion (i.e., portionof ofthetheIsolation IsolationCondensers Condensers and and associated piping). This associated piping). This leakage leakage will be performed with test will test with Isolation IsolationCondenser Condenser shell shell side water level at the normal standby standby level versus versus at at the the normal normal pressure pressurewhen whenthe thesystem systemisisininservice serviceperforming performingitsitsnormal normal operating function operating function or at the system pressure pressuredeveloped developedduring duringaatest testconducted conductedtotoverify verify system system operability operability as as discussed discussedininIWD-5221.
IWD-5221.
Page Page 44 of ofS 5
ATTACHMENT ATTACHMENT 10 CFR 50.55a 10 CFR SO.SSa Request Number Number 15R-04, ISR-04, Revision 11 Proposed Alternative Proposed Alternative In In Accordance with with 10 CFR SO.SSa{a){3){ii) 50.55a(a)(3)(ii)
--Hardship or Unusual Difficulty
--Hardship Difficulty without without Compensating Compensating Increase in Level Increase Level ofof Quality Quality and Safety--
Safety--
The proposed alternative The alternative isis based based on the hardship hardship imposed imposed by by the the performance performance of of the heat heat removal capability verification test at a greater frequency than required removal capability verification test at a greater frequency than required by DNPS TS by DNPS TS and fillingthe filling theIsolation IsolationCondenser Condenserto tothe thetop toptotoperform performaathirdthirdsystem system leakage leakage test without a compensating increase compensating increase in in quality quality and safety.
6.
Duration 6.
of Proposed Duration of Proposed Alternative:
Alternative:
Relief isis requested Relief requested for the Fifth Ten-Year Inspection Interval Fifth Ten-Year for DNPS, Interval for DNPS, Units Units 22 and and 3.
Precedents:
- 7. Precedents:
DNPS, Units DNPS, Units 2 and 3 fourth inspection intervalinterval Relief Request Request 14R-06 14R-06 was authorized authorized in in an NRC safety evaluation evaluation (SE) dated September 4, 2003. The fifth inspection September 4, 2003. The fifth inspection interval interval relief request relief request (i.e.,
(Le., 15R-04, Revision 1)
ISR-04, Revision 1) utilizes utilizes aa similar similar approach approach that was previously previously approved.
Page Page 5S of of 5S