MONTHYEARIR 05000416/20240112024-10-16016 October 2024 – Fire Protection Team Inspection Report 05000416/2024011 ML24263A2712024-09-19019 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24257A0172024-09-17017 September 2024 Request for Withholding Information from Public Disclosure Unit 1 IR 05000416/20240122024-09-17017 September 2024 License Renewal Post Approval Phase 2 Inspection Report 05000416/2024012 ML24254A3602024-09-10010 September 2024 Pre-Submittal Slides for License Amendment Request, Criticality Safety Analysis, Technical Specification 4.3.1, Criticality and Technical Specification 5.5.14, Spent Fuel Storage Rack Neutron Absorber Monitoring Program IR 05000416/20244022024-09-0909 September 2024 Security Baseline Inspection Report 05000416/2024402 05000416/LER-2024-003, Feedwater Inlet Check Valve Incorrectly Determined Operable2024-08-26026 August 2024 Feedwater Inlet Check Valve Incorrectly Determined Operable ML24235A0832024-08-22022 August 2024 Evaluations Performed in Accordance with 10 CFR 50.54(q) for Changes to Emergency Planning Documents IR 05000416/20240052024-08-21021 August 2024 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2024005) ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 ML24176A1202024-07-29029 July 2024 Issuance of Amendment 234 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b ML24172A2502024-07-29029 July 2024 – Issuance of Amendment No. 233 Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors IR 05000416/20240022024-07-29029 July 2024 Integrated Inspection Report 05000416/2024002 ML24204A2432024-07-23023 July 2024 Notification of Cyber Security Baseline Inspection and Request for Information (05000416/2024403) ML24191A2432024-07-0909 July 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operations IR 05000416/20240102024-06-27027 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000416/2024010 ML24156A1762024-06-24024 June 2024 Regulatory Audit Summary in Support of License Amendment Requests to Adopt TSTF-505, Revision 2 and 10 CFR 50.69 (Epids L-2023-LLA-0081 and L-2023-LLA-0080) ML24165A1512024-06-13013 June 2024 Second Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times – RITSTF Initiative 4b and Application to Adopt 10 CFR 50.69, Risk-Informe ML24163A2652024-06-11011 June 2024 Inservice Inspection Summary Report ML24060A2192024-05-30030 May 2024 Authorization of Alternative to Use EN-RR-01 Concerning Proposed Alternative to Adopt Code Case N-752 05000416/LER-2024-002, Automatic Actuation of Reactor Protection System2024-05-28028 May 2024 Automatic Actuation of Reactor Protection System ML24130A0912024-05-0909 May 2024 Request for Information Letter License Renewal Phase 2 Inspection ML24128A1512024-05-0909 May 2024 Project Manager Assignment ML24128A0422024-05-0707 May 2024 License Amendment Request to Remove Obsolete License Conditions IR 05000416/20240012024-05-0202 May 2024 Integrated Inspection Report 05000416 2024001 ML24122C6112024-05-0101 May 2024 Supplement to License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf. ML24116A0372024-04-25025 April 2024 Report of Technical Specification Bases Changes ML24113A0972024-04-22022 April 2024 Annual Report of Individual Monitoring - NRC Form 5 for 2023 Per 1 0 CFR 20.2206 ML24113A0952024-04-22022 April 2024 Annual Radioactive Effluent Release Report for 2023 ML24107B0402024-04-16016 April 2024 Notification by Entergy Operations, Inc., of Proposed Economic Performance Incentive and Reliance on Post-Event Improvements in Plant Procedures And/Or Methods of Operation in FERC ML24107A8872024-04-16016 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) ML24101A3882024-04-10010 April 2024 Response to Request for Confirmation of Information by the Office of Nuclear Reactor Regulation Proposed Alternative Request EN-RR-22-001 Risk-Informed Categorization and Treatment for Repair ML24100A0692024-04-0909 April 2024 Report of Changes or Errors to 10 CFR 50.46 Analysis ML24094A0992024-04-0303 April 2024 (GGNS) Core Operating Limits Report (COLR) Cycle 25, Revision O ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams 05000416/LER-2024-001, High Pressure Core Spray Inoperable Due to Minimum Flow Valve Failure to Close2024-03-27027 March 2024 High Pressure Core Spray Inoperable Due to Minimum Flow Valve Failure to Close ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) IR 05000416/20230062024-02-28028 February 2024 Annual Assessment Letter for Grand Gulf Nuclear Station - Report 05000416/2023006 ML24058A3512024-02-28028 February 2024 Notification of Biennial Problem Identification and Resolution Inspection and Request for Information IR 05000416/20233012024-02-26026 February 2024 NRC Examination Report 05000416-2023301 05000416/LER-2023-002, Reactor Scram Due to Generator Stator Fault to Ground2024-02-13013 February 2024 Reactor Scram Due to Generator Stator Fault to Ground ML24043A1892024-02-12012 February 2024 Spent Fuel Storage Radioactive Effluent Release Report for 2023 ML24012A1422024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0051 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24043A0732024-01-29029 January 2024 2024-01 Post Examination Comments IR 05000416/20230042024-01-25025 January 2024 Integrated Inspection Report 5000416/2023004 IR 05000416/20234012024-01-18018 January 2024 Cyber Security Inspection Report 05000416/2023401 (Public) ML24018A0222024-01-18018 January 2024 Core Operating Limits Report (COLR) Cycle 24, Revision 2 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 – Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and 2024-09-09
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 January 31,2013 Mr. Michael Perito Vice President, Site Entergy Operations, Inc.
P. O. Box 756 Port Gibson, MS 39150
SUBJECT:
SAFETY EVALUATION REPORT RELATED TO THE LICENSE RENEWAL OF GRAND GULF NUCLEAR STATION
Dear Mr. Perito:
By letter dated October 28,2011, Entergy Operations, Inc., submitted, for the U.S. Nuclear Regulatory Commission (NRC) review, an application to renew the Grand Gulf Nuclear Station, Unit 1 (GGNS), operating license for up to an additional 20 years. The license renewal application (LRA) was submitted pursuant to Title 10 of the Code of Federal Regulations Part 54, "Requirements for Renewal of Operating Licenses for Nuclear Power Plants." The staff determined that the LRA was complete and acceptable for docketing on December 16, 2011.
The staff has reviewed the GGNS LRA and has developed the enclosed "Safety Evaluation Report With Open Items related to the License Renewal of the Grand Gulf Nuclear Station, Unit 1," hereinafter referred to as the Safety Evaluation Report (SER). This SER reflects the status of the staff's review of the LRA, requests for additional information (RAls), the applicant's responses to the staff's RAls and other questions related to the LRA through December 18, 2012, unless otherwise noted. Issuance of the enclosed SER is an important milestone for both the applicant and the staff.
The staff has identified open items in its review that must be resolved before it can make a final determination on the application. The open items are summarized in SER Section 1.5.
In accordance with the schedule for completing the review of the LRA, the applicant is requested to review the enclosed SER, verify its accuracy, and provide comments to the staff by March 29, 2013. The staff plans to review the current content and format of the SER for further improvement while incorporating the applicant's comments. Upcoming milestones for this project include an Advisory Committee on Reactor Safeguards meeting on March 6, 2013, and a final SER which is currently scheduled to be issued on or about July 31, 2013.
The staff is committed to completing the review of the GGNS LRA in a timely manner. If you have any questions regarding this matter, please contact the license renewal project manager, Nathaniel Ferrer, at 301-415-1045 or e-mail nathaniel.ferrer@nrc.gov.
Sincerely, J~~ W. Lubin k Director Oivision of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-416
Enclosure:
Safety Evaluation Report with Open Items cc w/encl: Listserv
The staff is committed to completing the review of the GGNS LRA in a timely manner. If you have any questions regarding this matter, please contact the license renewal project manager, Nathaniel Ferrer, at 301-415-1045 or e-mail nathaniel.ferrer@nrc.gov.
Sincerely, IraJ John W. Lubinski, Director Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-416
Enclosure:
Safety Evaluation Report with Open Items cc w/encl: Listserv DISTRIBUTION: See following pages ADAMS A ccesslon N0.: ML13016A044 , Enc osure: ML13032A194 *concurrence b)y emal OFFICE LA:DLR PM:DLR:RPB1 BC:DLR:RPB1 BC:DLR:RARB BC:DLR:RASB NAME YEdmonds NFerrer DMorey BPham MMarshall DATE 1/24/2013 1/28/2013 1/28/2013 1/14/2013 1/8/2013 OFFICE BC:DLR:RAPB BC:DE:EMCB BC:DE:EEEB BC:DE:ESGB BC:DE:EVIB NAME KGreen MMurphy JAndersen GKulesa SRosenberg DATE 12/7/2013 4/30/2012 8/612012 8/3/2012 12117/2012 OFFICE BC: BC:DSS:SRXB BC:DSS:SCVB~~B OGC (NLO)
NAME GCasto CJackson RDennig AKlein BMizuno DATE 8/6/2012 7/31/2012 9/4/2012 ~2012 01130/2013 OFFICE D:DE D:DSS D:DRA D:DLR NAME PHiland* TMcGinty* JGitter *~,
.1:.
JLubinski DATE 01/16/2013 01/30/2013 01/22/2013 01/31/2013 OFFICIAL RECORD COPY