ML13015A637

From kanterella
Jump to navigation Jump to search
From Mel Gray to Matt Jennerich: Branch 2 Summary of Changes April 2012
ML13015A637
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 03/15/2012
From: Mel Gray
Reactor Projects Region 1 Branch 4
To: Jennerich M
Reactor Projects Branch 3
References
FOIA/PA-2013-0010
Download: ML13015A637 (1)


Text

Rao, Ami From:

Gray, Mel Sent:

Thursday, March 15, 2012 1:46 PM To:

Jennerich, Matthew Cc:

Bickett, Brice

Subject:

RE: Branch 2 Summary of Changes April 2012.docx FitzPatrick nuclear plant is a GE Mark 1 BWR. The current licensing bases does not require the plant to have a primary containment torus air space hardened vent systems as part of the Mark 1 containment improvement program. The current licensed configuration is a hard pipe from the primary containment to the suction of the standby gas treatment system, which is located outside the reactor building in an adjacent building at ground level. The NRC will monitor Entergy's response to the Fukishima Orders and 10 CFR 50.54f letter issued on March 9, 2011.

I believe we will do more than "monitor." Would we not review for acceptability and "take appropriate next steps to ensure compliance to regulatory requirements"? I don't think "monitor" captures our next steps.

From: Jennerich, Matthew Sent: Thursday, March 15, 2012 10:21 AM To: Gray, Mel

Subject:

Branch 2 Summary of Changes April 2012.docx

Mel, I reviewed the EOC packages to determine if any changes have occurred to the information we provided.

Attached are the changes that I would provide for the RAs Summary of Changes. I sent them to Brice and he looked them over.

Matt