ENOC-13-00001, ISFSI Decommissioning Funding Plans (10 CFR 72.30) - Correction Notice
| ML13010A042 | |
| Person / Time | |
|---|---|
| Site: | Palisades, Indian Point, Pilgrim, Vermont Yankee, Big Rock Point, FitzPatrick |
| Issue date: | 01/08/2013 |
| From: | Mccann J Entergy Nuclear Operations |
| To: | Document Control Desk, NRC/NMSS/SFST |
| References | |
| ENOC-13-00001, FOIA/PA-2013-0151 | |
| Download: ML13010A042 (3) | |
Text
0 En terfgy Entergy Nuclear Operations, Inc 440 Hamilton Avenue White Plains, NY 10601 Tel 914 272 3370 John F. McCann Vice President - Nuclear Safety, Emergency Planning and Licensing ENOC-13-00001 January 8, 2013 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Director, Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards 11555 Rockville Pike Rockville, MD 20852-2738
SUBJECT:
ISFSI Decommissioning Fundinq Plans (10 CFR 72.30) - Correction Notice Big Rock Point Docket No.72-043 Indian Point Nuclear Generating Stations 1, 2, & 3 Docket 72-051 Pilgrim Nuclear Power Station Docket No. 50-293 Palisades Nuclear Plant Docket No.72-007 James A. FitzPatrick Nuclear Power Plant Docket 72-012 Vermont Yankee Nuclear Power Station Docket No.72-059
REFERENCE:
Entergy letter ENOC-12-00039, John F. McCann to NRC; "ISFSI Decommissioning Funding Plans", dated December 13, 2012 (ADAMS Accession No. ML12352A126).
Dear Sir or Madam:
Entergy Nuclear Operations, Inc (Entergy) submitted ISFSI Decommissioning Funding Plans for the subject plants in accordance with 10 CFR 72.30 in the referenced letter on December 13, 2012. Entergy subsequently identified an administrative error in the summary table provided in that letter and is providing the corrected table in this letter. This correction notice does not change the Funding Plans provided in the referenced letter and does not change the certification of financial assurance as stated in that letter.
T,4
ENOC-13-00001 Page 2 of 3 The corrected summary table is:
Plant Site Trust Fund surplus DCE Big Rock Point
$ 5M *
$ 1.55M Palisades
$ 25.OM
$ 3.78M Unit 1: $ 427M
$ 3.95M Indian Point Unit 2: $ 238M (Units 1, 2 & 3)
Unit 3: $_162M (Unts1,2__3 James A. FitzPatrick
$ 422M
$ 2.88M Pilgrim
$ 563M
$ 2.75M Vermont Yankee
$ 276M
$ 2.75M
- Parent Guarantee This submittal contains no new commitments. Please address any comments or questions to Mr. Dave Mannai, Senior Manager, Nuclear Safety & Licensing at 802-380-1175.
ly, JFM / krk
ENOC-13-00001 Page 3 of 3 cc:
Mr. J. F. McCann (WPO)
Mr. T. G. Mitchell (WPO)
Mr. K. H. Bronson (WPO)
Ms. W. C. Curry (ECH)
Mr. J. A. Aluise (ENT)
Mr. L. Jager Smith (ECH)
Mr. B. F. Ford (ECH)
Mr. D. J. Mannai (WPO)
Mr. J. A. Ventosa (IPEC)
Mr. M. J. Colomb (JAF)
Mr. T. J. Vitale (PLP)
Mr. R. G. Smith (PNP)
Mr. C. J. Wamser (VTY)
USNRC Regional Administrator, Region I USNRC Regional Administrator, Region III USNRC Project Manager, Indian Point 1 USNRC Project Manager, Indian Point 2/3 USNRC Project Manager, FitzPatrick USNRC Project Manager, Big Rock Point USNRC Project Manager, Palisades USNRC Project Manager, Pilgrim USNRC Project Manager, Vermont Yankee USNRC Resident Inspector, Indian Point USNRC Resident Inspector, FitzPatrick USNRC Resident Inspector, Palisades USNRC Resident Inspector, Pilgrim USNRC Resident Inspector, Vermont Yankee State of New York State of Michigan State of Vermont