January 7, 2013 LTR:

BYRON 2013-0005 FILE:

1.10.0101 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Byron Station, Unit 1 Facility Operating License No. NPF-37 NRC Docket No. STN 50-454

SUBJECT:

Byron Station Unit 1 90-Day Inservice Inspection Report for Interval 3, Period 2, (B1R18)

The subject 90-Day Inservice Inspection Report for the Byron Station Unit 1, Refueling Outage Eighteen (B1R18) is being submitted pursuant to the requirements of Article IWA-6000, "Records and Reports" of Section XI, "Rules for Inservice inspection of Nuclear Power Plant Components," of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code 2001 Edition through the 2003 Addenda. The report covers the inservice inspections conducted prior to and during the Unit 1 Fall 2012 refueling outage.

If there are any questions regarding this matter, please contact Dave Gudger, Regulatory Assurance Manager, at (815)-406-2800.

Respectfully, I/

y J. Tulon

e President Generating Station TJT/RGM/TLH/cy

Attachment:

B1R18 Inservice Inspection Summary Report - Fall 2012 outage