OMY-12-073 ENCLOSURE 1 DECOMMISSIONING STUDY OF THE MAINE YANKEE INDEPENDENT SPENT FUEL STORAGE INSTALLATION December 2012
Decommissioning Study of the Maine Yankee Independent Spent Fuel Storage Installation Prepared for Maine Yankee Atomic Power Company Knight Cost Engineering Services, LLC December, 2012
Knight Cost Engineering Services, LLC KCES 2012-8W, Rev. 0 TABLE OF CONTENTS
1.0 INTRODUCTION
3 2.0
SUMMARY
4 3.0 DECOMMISSIONING COST ESTIMATING METHODOLOGIES................7 4.0 ASSUMPTIONS..............................................................................
8 5.0 SCHEDULES...............................................................................
10 6.0 PROJECT MANAGEME NT...........................................................
12 6.1 UTILITY STAFF.......................................................................................
12 6.2 DECOMMISSIONING GENERAL CONTRACTOR...........................................
12 6.3 SECURITY..............................................................................................
13
7.0 REFERENCES
............................................................................. 14 APPENDIX A....................................................................................... is Page 2 of 15
Knight Cost Engineering Services, LLC KCES 2012-800, Rev. 0
1.0 INTRODUCTION
The purpose of this study is to identify the costs associated with the decommissioning of the Maine Yankee (MY) Independent Spent Fuel Storage Installation (ISFSI).
This estimate includes only the structures, systems and land within the NRC licensed area. The MY ISFSI is located within the site boundary of the former Maine Yankee nuclear power plant in the Town of Wiscasset, Maine. The site is approximately 1200 feet north of the former plant site in an area used as a vehicle parking lot. The NAC-UMS fuel storage and transport canister system chosen by MY is licensed by the NRC for both storage and transportation.
The ISFSI consists of the storage system and concrete storage pads, a Protected Area (PA) for spent fuel storage and a Security/Operations Building for equipment and staff. The PA contains 16 3 foot thick concrete pads, each 31 feet by 31 feet. There are 64 dry storage casks on the 16 pads, 60 for spent fuel and four for sections of the reactor vessel internals that are classified as Greater Than Class C (GTCC) waste. Each vertical concrete cask has a two and a half-inch steel liner surrounded by 24.25 inches of reinforced concrete.
Page 3 of 15
Knight Cost Engineering Services, LLC KCES 2012-800, Rev. 0 2.0
SUMMARY
Decommissioning is the safe removal of a facility or site from service and the reduction of radioactivity to a level that permits either the release of the property for unrestricted use and NRC license termination; or a restricted release of the property and NRC license termination.
This estimate includes all costs incurred to release the property for unrestricted use.
On June 17, 2011, the NRC published a final rule amending its regulations to improve decommissioning planning. The rule will become effective on December 17, 2012 and requires compliance by March 31, 2013. This rule will require licensees to report additional details in their decommissioning cost estimate. To assist in the implementation of the new rule, the NRC issued NUREG-1757, "Consolidated Decommissioning Guidance, Financial Assurance, Recordkeeping and Timeliness."
NUREG-1757 does not apply to licensees under 10CFR Part 50 nor does it eliminate the need to follow Regulatory Guide 1.202 or NUREG-1713.
It does provide additional information to support the development of the cost estimate. This cost estimate was prepared in accordance with the guidelines provided in RG 1.202 and NUREG-1713.
In addition, it does take into account the guidelines identified in NUREG-1757.
NUREG-1757 specifies that a contingency of 25% is to be included in the estimate. This estimate takes exception to this contingency level for two reasons.
First, the estimate is conservative in that the entire storage pad, concrete overpacks and overpack liners are assumed to be disposed of as potentially contaminated. Second, the MY site has recently been successfully decommissioned. Many of the key personnel involved in that project remain at the MY ISFSI.
The lessons learned from that project will be incorporated in the MY ISFSI decommissioning. For this reason it is felt that a 10% contingency is adequate to cover unknown and unplanned occurrences.
The total cost including contingency is $25.2 million, 20.4 million for radiological removal and
$4.8 million for non-radiological removal. Table 2-1 provides a summary of costs. Cost details are provided in Appendix A TABLE 2-1
SUMMARY
OF COSTS Non-Radiological radiological Total Cost Removal $
Removal $
Grand Total Building
$25,170,039
$20,390,710
$4,779,329 Tax on General Contractor
$0
$0
$0 General Contractor with contingency
$16,796,626
$13,607,254
$3,189,372 Page 4 of 15
Knight Cost Engineering Services, LLC KCES 2012-800, Rev. 0 Site Costs with contingency
$8,373,414
$6,783,456
$1,589,958 General Contractor
$15,269,660
$12,370,231
$2,899,429 Site Costs MY ISFSI
$7,612,194
$6,166,778
$1,445,416
$22,881,854
$18,537,009
$4,344,845
$13,641,025
$11,050,844
$2,590,181 PERIOD DEPENDENT COSTS 1.1 1.2 MY Site Costs 1.1.1 Project Management 1.1.2 Security Staff 1.1.3 Fees 1.1.4 Insurance 1.1.5 Legal 1.1.6 Property Taxes General Contractor 1.2.1 Decommissioning General Contractor 1.2.2 Waste Packaging Crew 1.2.3 Equipment & Materials
$7,612,194
$3,070,502
$2,047,193
$687,000
$604,500
$200,000
$1,003,000
$6,028,831
$3,163,249
$999,410
$1,866,172
$6,166,778
$1,445,416
$556,551
$489,717
$162,024
$812,549
$4,884,066
$130,449
$114,783
$37,976
$190,451
$1,144,765 ACTIVITIES
$9,240,829
$7,486,165
$1,754,664 1.3 1.4 1.5 1.6 1.7 Project Engineering 1.3.1 Procedure Development and Review - Offsite Preparation of QA and Safety Documents - Offsite (in 1.3.2 parallel with 1.2.1)
Site Mobilization and General Employee Training (GET) 1.4.1 Site Mobilization 1.4.2 General Employee Training 1.4.3 Site Specific Training Site Preparation - Performed by Staff 1.5.1 Initial Site Survey 1.5.2 Setup work areas 1.5.3 Decontamination Readiness Review Disconnect all utilities to work areas.
1.6.1 Electrical 1.6.2 Ventilation 1.6.3 Piping Removal inside fences 1.7.1 Remove compacted gravel 1.7.2 Remove VCCs 1.7.2.1 Exterior Concrete 1.7.2.2 Steel liner 1.7.3 Remove Concrete Pad 1.7.4 Remove Security Fence 1.7.5 Remove Light Towers Removal outside fences
$18,639
$9,319
$9,319
$15,099
$3,539
$89,816
$21,580
$62,375
$5,860
$10,916
$5,458
$2,729
$1,364
$1,364
$7,851,986
$370,409
$5,043,526
$3,195,666
$1,847,861
$2,300,975
$61,131
$75,945
$1,205,264
$72,761
$8,843
$4,422
$7,344,501
$5,043,526
$0
$2,300,975
$17,054
$2,073
$1,036
$507,484
$370,409
$0
$0
$61,131
$75,945
$1,205,264 1.8 Page 5 of 15
Knight Cost Engineering Services, LLC KCES 2012-800, Rev. 0 1.8.1 Security/Operations Building
$549,008
$549,008 1.8.2 Remove paved area inside nuisance fence
$84,637
$84,637 1.8.3 Remove nuisance fence
$67,391
$67,391 1.8.4 Miscellaneous Pads
$76,849
$76,849 1.8.5 Miscellaneous structures
$126,572
$126,572 1.8.6 Remove buried utilities
$139,868
$139,868 1.8.7 SOB electrical service
$8,021
$8,021 1.8.8 Remove road inside licensed area
$137,895
$137,895 1.8.9 Remove vehicle barriers
$15,022
$15,022 1.9 Final Site Survey Strueture gone - By DGC Staff
$25,000
$20,253
$4,747 1.9.1 Prepare Final Status Survey Plan 1.9.2 Soil Sampling 1.9.3 Direct Survey 1.9.4 Sampling Analysis 1.9.5 Prepare Final Status Survey Report 1.10 Orlse Site Release Confirmation 1.11 Outside areas
$8,712
$8,712 1.11.1 Backfill, grade and seed
$8,712
$8,712 1.12 Demolition Crew Demobilization
$15,720
$12,735
$2,985 1.13 Final Project Report -Offite
$9,319
$7,550
$1,770 Page 6 of 15
Knight Cost Engineering Services, LLC KCES 20124M, Rev. 0 3.0 DECOMMISSIONING COST ESTIMATING APPROACH Two types of costs were determined in this estimate: activity costs and level of effort costs. The activity costs were developed utilizing a unit cost factor approach. Site material quantities for concrete, steel and equipment where developed from site specific drawings. Productivity factors were applied to these quantities to determine activity durations. Labor crews were developed and applied to the material quantities to determine labor costs and person-hours. The activity durations were used to develop a project schedule.
The level of effort costs such as equipment rental and the General Contractor (GC) staff were developed based on the project schedule duration. A rental equipment file was developed for the construction effort. The GC staff is assumed to be on-site for the duration of the project. The Oversight staff cost is another level of effort cost that is included in the cost estimate.
Bulk removal of the storage pad and concrete storage casks is assumed to be performed using an excavator with a hydraulic hammer attachment. The steel liner will be segmented utilizing torch cutters. All of this waste will be trucked off-site for processing. This leads to a large disposal volume; however, at a lower rate for bulk processing than for direct burial. In addition, there will be far less characterization and iterative decontamination. Clean structures will be demolished using mechanical means and disposed of at a local landfill.
In addition to the removal labor there is a dedicated waste packaging crew included in this estimate. This crew will consolidate, package and prepare containers for transportation. The waste packaging is estimated to remain on site for the duration of the project. This crew consists of 2 laborers; 1 Health Physics Technician; 1 Equipment Operator and I Foreman.
Page 7 of 15
Knight Cost Engineering Services, LLC KCES 2012-800, Rev. 0 4.0 ASSUMPTIONS Following is a list of assumptions developed by KCES in completing this study.
These assumptions are based on the most current decommissioning methodologies and site-specific considerations.
- 1. Component quantities were developed from actual plant listings.
- 2. Concrete volumes were developed from plant drawings.
- 3. The oversight staff is assumed to be the similar size and configuration as it is currently.
- 4. The oversight staff positions and costs were supplied by the Company and represent July, 20.12 salary and benefit data.
- 5. Subcontractor base labor rates and fringe benefits were taken directly from the 2012 R. S. Means Heavy Construction Cost Data and adjusted to Maine based on the City Cost Indexes for Augusta, ME.
- 6. Activity labor costs do not include any allowance for delays between activities, nor is there any cost allowance for craft labor retained on-site while waiting for work to become available.
- 7. All skilled laborers will be supplied locally and hired by the Decommissioning General Contractor (DGC).
- 8. The cost for Utility personnel assisting the DGC to develop decommissioning activity specifications is included in the Utility Staff costs.
- 9. The separate DGC staff salaries, including overhead and profit, were determined by KCES.
- 10. Transportation costs are based on actual mileage from MY to Memphis, TN processing facility utilized in the estimate.
- 11. The ISFSI Concrete Pad, VCC exterior concrete and VCC liner steel are assumed to be Class A waste. This waste will be disposed of at the Studsvik processing facility in Tennessee. A disposal rate of $0.13 per pound has been used in this estimate and is based on information provided by Studsvik.
- 12. The following buildings are disposed of as Clean waste in local landfill. A disposal rate of $91.80 per ton has been used in this estimate and is based on information provided in the 2012 R. S. Means Building Construction Cost Data.
Compacted gravel around pads Security Fence Page 8 of 15
Knight Cost Engineering Services, LLC KCES 2012-800, Rev. 0 Light Towers Security/Operations Building Paved area inside nuisance fence Nuisance fence Miscellaneous Pads Miscellaneous structures Buried utilities SOB electrical service Road inside licensed area Vehicle barriers
- 13. All costs used in these calculations were current on July, 2012.
- 14. The costs of all required safety analyses and safety measures for the protection of the general public, the environment, and decommissioning workers are included in the cost estimates.,
- 15. It is assumed that all UMS canisters containing both spent fuel and GTCC will have been removed from site prior to the start of decommissioning.
- 16. Property taxes are included in the estimate at the current cost of $1,003,100 per year.
- 17. Fees are included in the estimate at the current cost of $687,000 per year.
- 18. Insurance costs are included in the estimate at the current cost of $604,500 per year.
- 19. Legal costs are included in the estimate at the current cost of $200,000 per year.
- 20. The decommissioning will be performed under the current regulations.
- 21. Removal of the pad and concrete overpacks will be perfbrmed in Tyvek coveralls.
Productivity rates have been adjusted to account for this.
- 22. The removal of the berm is not included in the estimate.
- 23. No subsurface material is assumed to require remediation regarding radionuclides. This assumption is justified because: 1) the ISFSI area was confirmed to be clean of radiological contaminants prior to the construction of the ISFSI; 2) the ISFSI area will be maintained clean of loose radiological contaminants during the storage period; 3) the irradiated fuel and GTCC waste are stored in sealed canisters; 4) nuclear activation of the VCCs, VCCs liners, and ISFSI pad are anticipated; the activation products will remain fixed during the storage period; and 5) if contamination of subsurface material occurs during decommissioning activities, the contamination is expected to remain below the decommissioning criteria of 25 millirem per year Total Effective Dose Equivalent Page 9 of 15
Knight Cost Engineering Services, LLC KCES 2012-8W, Rev. 0 5.0 SCHEDULE A scenario-specific schedule has been developed for estimate.
Activity durations were determined based on the unit cost factor approach. Plant material inventory quantities were developed from site specific material. Unit rates for cost, man hours and schedule hours were applied to the material quantities. From this calculation the removal or decontamination cost, total man hours and total schedule hours were determined for an activity.
The schedule hours are then entered into the schedule to determine project duration. Two work crews are assumed for the concrete pad and concrete overpacks. All other work was assumed to be performed by one crew. Work outside of the security fence will be performed in parallel with the work inside the fence. The total project duration is 16.79 months.
Figure 5-1 provides the detailed decommissioning schedule.
Page 10 of 15
Knight Cost Engineering Services, LLC KCES 2012-800, Rev. 0 Figure 5-1 Project Schedule ID Task ms I
proec awt 2
projec Enalmorl 3
preadua Oavoepemarofa
~~-
0161 4
P ".saof QA &-A Be"66 Dorenudam-Ofla S 6-1 SMMobain Sel dead EG..#
TOW PIWl*IS RT) 6 wle Uomiei~oo 7
General
&mployea Trskli 8
ume 80.dfl Tralinig Bt o
U rago-Pe/ml by ow 10-lmm
/am survey Ii 8a5 wrkar 124 Dacdooabw eeReadinessRenien 13OlsCeeOI 14 MOMMm to work MOMn 14 1ll V.416/aton 14 fale II b
nVCCS is ExldUwConciet 20 86./law 21 PRrnMS Conrleft Pad 23 Remove Semorty Fare R-5W RmvLiTIM".
24 huoeameonalied rve 25 flemoval eblide twome I
awymerm 0/,
M 19 27 Reaie paved ama daide numase lencei 26 ReNMOe Wiisam teeMO 20 miamide~oo P.40 20 AAWBNewoms lioe 31 Reiov hald les 22 006.160dr/al euvi 33 Rusmove rood ku/Ose liensed! am 34 Reamoe vehicle barr~rs 35 Field Of S/Oml 51Swate um gae f DOC Said!
36 Npamer Final Alabni Survey Pean 37 Sle SWROMy ma OedwSuvey 39 lWgrbug Auily" 46 P Was F/inl 84/sm SWysy Reprad 41 0'Oda Me1 FtAhme Ceruddasee 42 Outi~de mom 43 SafiskE Wraft md Waed 44 DeMon Crew Dea/oilkedan 46 Finla projec Report
- Cfille/
0 days Thu l/214 6 days TINA 1/2/1 5 days Thu 1/5/1 5 days Thu 1014 3 days Thu 1/*/14 S3 da Tum 1/14/14 Sday T.o 1/21/14 4 day Wd 1/2514 2 day Wed 1/2314 I day Fr 1/4/14 I day Moar 1/27/14 Idays TUo 1/314 I day TUo 1/UA14
.5O d6 y Wed 1/20/4 05 dys Wed 126/14 26722 das Thu 1W14 W6 ApS" Thu. 11MM/
e4*6 dayqs ThaIS/4 139.75 days Wed 4/30/14 46.13 days Moni 11110/14 IIL2 days Too 1/13/15 22.41 days Man
/IS I days WNd/1/1S IlSmlaps Tim I/M14 44.54 doa Thu I/*/14 6.75 days V.d4/2/14 22.7 days F 4111/i 6.43 days Tuo 5/13/14 9.62 days Tuo /7/14 44,3days Tue 6/1614 2,87 deps Fd8MIV1 4
7.S3days Wed $120M4 4.19days FP 1/20/14 23dlas Moe 2/2/
Sdays Muon Y3/5 SOais ManV 3
S30/1 3 das Morn 46/15 SOP Thu,4W/15 Sdays Thu 4/16/1 Odays Thu. 4/23/15 0). days TtWm M3 17.76 do Theu 402316S 17.71 Sdays 1// 4/2 5
2 drs Too 5/1*615
/O days Thu W/21/15
//
a TYe, 1/2/14 Wed 1/148 Wad 1//14 Wed 1//141 !
Too 121/14 Tbs 1/11/14 hMn 1/2/14 Toou 1/21/14 Man 1/37/14 lM1u 1/27/14 Fid 1/241t4 TVe 1/27/14 Wed 141 Wad I/9/141 Wed 1/2/141 Man 3/21/1 Tice 11/10/I4 Wed 4/30/14 Fad I/11/14 Mon 3/23/15 P/I 6141 Wed 4M141 Fr 1141114:i Tue 60/14 P45/15/Id UmW 61=6141 Theu 4/2/16 Thu 4/16/5 Th. 4/21/1 Thu 5/21/1 Thu0/4/i5 Figure 5-1 Project Schedule 3W Q~.1e 3/p Orsdar 41/0.saIer 66 arlmg i2odQeirw Mar
- _Apr, May Jun/
-Yi Juna C
Nv Dc Jn a~a pr My L
Page 11 of 15
Knight Cost Engineering Services, LLC KCES 2012-800, Rev. 0 6.0 PROJECT MANAGEMENT There are three components to project management during decommissioning, Oversight Staff (staff), Decommissioning General Contractor Staff (DGC) and Security. The person levels for each are identified below.
6.1 OVERSIGHT STAFF The staff size is currently at a level of 19 and is assumed to be maintained at this level and at a similar configuration during the decommissioning. In addition, one final status survey resource will be added and one licensing person will be added to assist in the decommissioning.
The staff will provide DGC oversight as well as maintain license compliance. Table 7-1 provides a summary of this staff.
TABLE 6-1 OVERSIGHT STAFF Staff Number Chief Nuclear Officer I
Cask Relicensing Project Manager I
Workers Concerns Manager I
Business Manager 1
ISFSI Manager 2
Regulatory Affairs 1
Public/Government Affairs 1
General Counsel 1
Business Administrator I
Treasurer 1
Accountant 1
Benefits Manager 1
IT Services I
ISFSI Operations Specialist 2
Program Manager 1
ISFSI Administrator 1
Licensing Engineer I
Security Manager 1
21 6.2 DECOMMISSIONING GENERAL CONTRACTOR The DGC will be responsible for all of the physical work. The staff will oversee the work crews.,
schedule work and supply HP support. The DGC will be responsible for finishing the project on time and on budget. Table 7-2 provides a summary of the DGC staff.
Page 12 of 15
Knight Cost Engineering Services, LLC KCES 2012-800, Rev. 0 TABLE 6-2 DGC STAFF 2012 Person Base Position Salary Level Project Superintendent
$148,000 1.00 QA Auditor/inspector
$70,000 1.00 Health & Safety Supervisor
$117,000 1.00 Packaging/Shipping Specialist
$70,000 1.00 Cost Control Accountant
$55,000 1.00 Scheduler II
$60,000 1.00 Demolition Specialist
$86,000 1.00 Industrial Safety
$86,000 1.00 Engineering Supervisor
$117,000 1.00 Project Supervisor
$79,000 1.00 Decontamination Tech
$55,000 2.00 Instrumentation Tech
$55,000 1.00 Tool Crib Attendant
$43,000 1.00 14.00 6.3 SECURITY Once spent fuel has been removed from the site the security force will be significantly reduced.
This estimate assumes a force of 13 guards and one manager. This will allow a security person level of 5 guards during work time and two guards all other times. The guard force was assumed to consist of various levels of guards and the rate used has been adjusted accordingly.
Page 13 of 15
Knight Cost Engineering Services, LLC KCES 2012-800, Rev. 0 7.0 References
- 1. R.S. Means, Inc, Building Construction Cost Data, Kingston, Massachusetts, 2012.
- 2. Regulatory Guide 1.202, "Standard Format and Content of Decommissioning Cost Estimates for Nuclear Power Reactors"
- 3. NUREG-1713, "Standard Review Plan for Decommissioning Cost Estimates for Nuclear Power Reactors"
- 4. NUREG-1757, "Consolidated Decommissioning Guidance, Financial Assurance, Recordkeeping and Timeliness" Page 14 of 15
Knight Cost Engineering Services, LLC KCES 2012-800, Rev. 0 APPENDIX A Page 15 of 15
U-a..
AW4-M-4 15 A644
-1 W a H~.6ý llý W-W W-I.6l 160 W ae W
W 9"0aeaclm MU.
.0 06.2*6
ý V6.01 W
2410hw" YVL4 1444515 vd-d6 7450125 L2ý-
IA 0
cm
£4a Do SM700110 a
61.01 via 64%
d T" 6.Itm 06','.
l.1 -, 0."6054 aft 6000*001 86illn6004 Io*f 456oy 0600D 151.482 s
164646.
0640 SIAN 161.4111 so so so 64,7
'6.*
'O 5.49410 07024Y10*04 84,436ANO~ W.2.71 I7
.7,kj0o 3950=.174 s
112,04111 4&1167.0%
so so
$14247.306 010,75606 30 66U?&2414
$1.133.564 $156464.6 so 37,512.1"4
$1.138M66 M.6.644 80 613,11141 57A12.194 W6 Sl13.Ml45 se476340
$12.370.231
$6105.71 stel'ST7CI 66106.544A 86.61147M6
$6 WK64372
$1.44A.410 62.50181
$1.4,3,410 POMOD"WilI642OM Is&=
1.1 87536240 10066 5160 davw14..
74,M 174
.06 II 10.776 06%010465m'66 1.61A 1*.7450 ftf 4746 ss6047ll 06545546551A*d W..,
06645cw-5 5~kaa Nw 5,550 stlvllw 416A 5,6 0464664 605625566%
PAd*A-At 6050.70 jS1 xdmp504
- kaa50~
650660606 650 1550 MM 5&Alviill 5,156416End-550666000-141 Raw 5
6 ra03. &W LA Ful7 CS 644 FTF.A I
5.035 37=
10%
6236.0 Sn0 1M 1
0.17 616.0 71W 00%
'..3 2500 1O 6 1154 3711M 60%A" S4.154 2AM5 I1m 6 5 3710 100
$"1I4 2A0.60 1.0
$210l9s 37=0 100%*
lp153 6
l.500 2.0 I
stem4 675.
600%
64604 2.0 I'm 1
5.00 310M 10M0%
IM.0 206.0 1"M 6
31654 317M IMAM% '115206 2500 1.0 I
S254 170M 1%oo
$158.4?
25.W=
1.AD I
620 31A.
1M00%
61M2.10 20 1.0 I
$4175 3160A 100%D 6125.10 26.0 1.0 I
664.7 3116.
100%
8296=
2564.0 1.0 I
$630 5716.
1600%
646.664 25064 I'm I
07A0 316.
60.00%
3"171106 206.0 10M 2
564 315.
100%
$MAN2 606.0 2.6 1
$41510 3150 10%S
- =AM6 240M 10 I
6414 316W to)=
a1m 2M.00 1.
1 651,4 316.
600%
"IN6.1 2.500 1.0 21 83515,1 642.1640 2640
$3.00.660 60.047.164 1.1 640.M6w VWAW slo0 766%,w0 1
.64 4 670M."
MA06l 1.1.5 L6.
1.14 A."T
- .Ml Raft D"rWk viae W. Flilr Cý ld.
13 0464 74.:0 I0.J0%6 316.6 666.
Isao SWA4 MA IOCIor SIO&
3t 616060J:
17O 0.06 63,467 5050 17.02 30.0 84.6 6i0560 ITh M00%611W544 600o 171 00W%
6M01.50 13 52A7.1243 6W.40.
60403A0C torn.
648704 00615 S 6130.40 604.10 65011an 5114.783 0004A
$14104
$31.576
$I==0 012.50 11101451 IPA64061 54.665404o 166.l 11.164444 64 050*2 66.566.72 54,411 U.1532" 457V deOD I 0
06f 54600606*"ft 044nssawsm44 6445o ld0600.
06 c*6.6456df 6446606o*
7*-,
64465 15
$0U27 50.0 10041% SM7.474 25450
$1110O 30W 6fa0%
01654 254664 57111A 500 600%a M7.16?
2.5640 66L24 6460 600%
96473 2I"5 6415 500 6642 61645A4 2.446 5046 50.0 100%
60103 25640 Mill4 Jl064 600%
600M 2,8460 6666,31 500 100%
S1605.4 2)50D 60317 3500 664.64 sm45
- 2546, 5047 500 100%
60a"6 2A4=5 5044t 3%,W IMAM 16644 256464 OMIT 500 164%
'60.50 25450 41642
&, Owm 645416 660410 I457 67d6 Im0 50*60 710m-d 17.33 U."
06 "P. 7461 LWOW.
545-6400 Oll0 d-0.6456 06 6456464al 2
6047 3160M t0%
6372.06 7.40 I
6410 31M IMAM 16501) 1Moo 1
$65.04 575,6 60%
34603 17.&
I W&6$
37M0 lo00%
066406A 1700
888.
(ý 1-.
4
-- d SIM.
l 8
~
1%
1858%
544 LOX 58.0 mcb J-8r W
A Vý
ý V.ý VSnc
-80 ubn cm..
LIX ccs cm roac lie 8
8 581w 58009810 18AMAD4 1.2.3 Os48n,.88 M86~
~Ie 5858,-
Fi~458~.58d.4 H----
0~88~
I----
Wa-I-
~~W88 584 Ba LU 48
$8808 S1S.m172 MAM5817
.8 on 12210 2
11.30 nz=
I SIM5 81.150
$1.233 2Ml IS 8182 843 I.
1211
$1.19 A8 so 81275 1
hl
$20.20 I
SIM8 S0.0868 I
Sm MIS I
SOARS8 S88.881 S
2Ml 11.806 12.71 02.108 WAM Sl.om 248.57 V85a.
84 Sall..7 11.43 Morth 8U..
0-0.
.m k43 3wri 2 krrd 24L57 8.1 4=22 I
580.18 -
'J."'.
245.57 d-8em 0145; 1
481.b 248.8 4"8 8.5 S,431 811t m88.tlob 24.1 43-0,50 21 b
0.5 A-Ala 3.857 8
,850 1JAG I
0.488I am618 858-2.5 28 1
nLO.
I 1188 l 1188, 375o 3w 1
8888582 CIA435 05 8
75 52 1
S0WT3 -280 cW..
338*8586 l.ma.778 5858.
25%
ima 58C 088P81858838.18058
$1.7117.184 S.DS 81437 8120 S11.741.71
$1162 11.72158 875858 13.588 3580 818.40"C ml8 82.43-5 1.3 8*
8.24 8.38 48.43 151.483 0
0 0
2.7171 0
- 0) 174,787 87.284 5872.4 so 58 S1.133= 302o Smn 1.14581 S1.7854,05 so88*7 GO 25 0 31 0
0 0
0 0
so 118528
$1 so so so 818,8 815.088
$17=
13.1 P..dl*Wn-.5 ft--O.
W, 1580 48 13D
$93818 5851 3a~
I 48 1.58 358.8 so 860dM.W I
811158 58 158 85A48 2
C.*WN.MhfhI*
f 001,09 So Coo8 0488 2
4 48 81218 t2 1.32 Ffw~IAOO
ýOfg888..8811P.,I1.ll85. i8851+/-1 W
1.11 58 130
$,318 112.18 Pl43 d885 2
Was8 58 Jog 0=.8 58 08618"*MJpr.8*
1 310158 20 1.w n.AU w
4
.8 19159 2
ft 8588 8,8*87108. 16272Eo Tm r
72 158 72 583 83757 452.7.1 888.51
$72.711 817.584 Al 8.885 24 24 312 8.43 587558 521.60D 1.4 I 04118S-*86.8 8858 V6.10, 88 I 8858888 85&
8*8*888*5885 I
spm148*8 Sa48 V*8*48*8*
I 8188*8A 5858 v6.8.8.8.868 I 886884 8548 A*8*8*
.ft I
ad*78**
585 JIM *8.8 ISMS I fi1ahfte8"*
85AC 8*8*8bd.868 I hb8.*.AS.w am3 58.5 861.180431 I 1088bAWA 60A of 8848 86,.88*44 7 L8*
is=7 43112 2 F-811.1
$15813 2
$. 71.73 110.4 27 87201 8a884..M 588A.
4 58 LA058
- 34 SI 7551 817.=65 1.42 G.."08*7,888 48 15M SIM8 155 I A8*di181 saw8 90848 881h.1148*4348
1.64 1b d
Adk Oln..
$1.06.
- 1.
I01%
Ito5%
Mt.61 6.10.. -
664.
0416 W-..
W-c So.
56
(
W 0..
60
- 6.
016 6.-
~~~~01~hm.
(2l.02l 01264.16 106616 ld=Is 660.260 0m.X2611 02616
.50106610 "6
0
&Lam 5b.QII cm1 QII cm1 06s 06.f-66.601 56 I A-IW.1Pý1 so O 5 001 0107166.56165 1
30l 06,616.5.01) 501 010616.6066 I 7666501016*. B6.d 500 660 WVM P666 6oo65ý I 006 CoU k*6.650.00 6s01 WV.W D6601..6160 I 50.4061 I00 sol 01 P
0D 06 Oool601Wo0 I 0..665..060 som ODD1 WO R.~
PWO~ 06.De00 I W."1260.
5601 6001o K=
70.6 Ptd 0
I 76016116 o-41 010 665 vm 01o65.d 2 6656laV 5
so0 11"l, 7065 I ftf58.mwi
- 70.
56.0 0101 vm176 P
0 I~~bfnt ICA600.
500 with1 PwV.7060610 2 6iO 01)0 1123.A 7.065 61.2 0531.2 2 F661-853.18 6106.0 2 C60660'W 171.711 914347 27 672.51 500.
010.568
~T.01 01116 W01~,.
616650161 I 65W6n N6606 70M L.6 201 1.66 C65 P..*"0 c-5 000 00 am_
27 516=~00 SIUDD 1350 N7 506010 63*0 515D 27 UiMO1 5)01.06 68.00 0125 27 503 O.0 57325 10.10 6D001 so 60103.0 501 55 m 6 a
1.0 801 216.2M05 1.6.3 65664W.W.Thin S&MO 66.51W 06.K Sf I P66665006 5M-
$el
.01 With 70666661066656 I CA AW-fW6
$s601 500 WV. POW6 660.5 10 I 6656165060301616*
M0 50.0 0151.W0-406511M6 I
36kx016hb 6660 5001~
01A) 706m I 06566601.0656 MAI 010 wm065 060 ISA am666 5001 0101 d
665106 6 I ~ ~ ~ ~ ~ s mm.66050 5001 011 617606606 I
26066
$ODD MW0 Wth P61666610.66 I En*6.ftB66*6-5001 500 76506 66s'0.0 I1-gu01.65*61 5001 5001 7.017Pm606510 2 6.6562601201 5001 m60 P.M 711000616 I 6011611061 2610.00 ow.0 WVM d
.6166..00.
I SOM60..
50.01 500 M65006650.6,0 2 E61601 U584D 5130. 1 7
=.65 127 S521.5 206.,1 6011 616632I 2 Cr-a1.
S71.73 51667 27 s7=1.0 is
- 68. pmmn-Pwfl655*567 521 5W51 606161.666066 I$ 6 IA2 860661616 IM2 0020.0666 IA 660.-d*656S*1*61W Iat Es 11"0.
M43 POW6 1.7 70,6*05I-1.7.1 A-6*d-1601 1*0 1601O 6.01 I
GZ01
&J00 1
t0 am0 16.01 15.016m 6
60 101 601 0
510116 s0o6le s.643 i2 o50 so so So 5Ulm_1
$V7.9 32.7a6 401
.01 "m0 24 61.356
$21.34 a
401 1.00 400 24
$1.,64 11.364 6373 4.173 3.A12 151.43 0
0 0
1.4 so
$1.714.7 36,72.6 0
50 1so s
s63 1
67.851.6
$7,31ol 57484 A
6 101 63.72
-46 o00 OL916 524.
so SM5.4422
$70.1m 6370)014 66510 0660 A
8 a
0.01 Law,6 %.1116 6*506 006616.0) 71 f-00 1.6 10 1.66.6 t-6 ILF 0501 or"10 0M.0 6326120 G.85101) 4010W%
01516 170M2 2DD I'm70 G01
&2 01165*.66316616.UOW 1301 119.22 63.7 65616.W. 06*1
- 64656.
0.066 5 Tl S
DW..
6
.6 K S4.
SL.5 01 1792n2 5001 66.25 01,17.01 M422M 501 0o0 RIM 500 5001 501o 32.25 2
3.W4 22.715 615%6 0
a 0
A t=
10M 1=02 7.175 amm) 1.721 R-VW 0
00 512nA41 S12..71A6 so so
$0
$5.03. 5 50,03 5MJ 661 215.F50.726 so S3.71.0 0.0.
W666.
4400.
AO aI 66 66956.m 6.0.00
-W
.011 8=63) 285.6 25M-01 ~
M=203) 201.01 7135 12.2.7'M mO0413342ý5Y.
O.m
ý 001,60 5
.D0 83125201 201&93 600.773.33 01)27.713.61 $1,249246.00 62.753.736)
A 2.=6 101 66220 3050 500101 b..00 A-10 4.136.
666.10.. ft~
f 10066 t-1686.66.
5 66.6506 6
3207 6.6010 3.361.792001
=20.6%
SMOG 63381 0.1ON 503216 63.3 Tam5 WOOL F 0.6 16*11161 06011C1.6 Tm6561.
ON00." s 1666 001 0.01) 5001 5001 5001 5001 366*16 3.5120101 0=32w 632 53?.M.24 5101)01 5*37=926 6077.261.2 pd A
736 101 736.01 5.101 60140
$90A1.0 2077.26 so 61.6*7.0 P60 101 2225,01 IMI6C.865.
222M.0 JIM=
=0i'73 5
52.0917 62..6
6588885115 656 1.7.
R-8 F
C'5..
1.7.5 6615L184t87 5064615166.-
1215 8*5.8 Wo406 Won5 015 W54615 068 TbW..
ebw
- 68tdd 2415 b*68001 56688 0015 0015Wý 15.155M%
Om 09192WA 128 12.
76f 5668*.8 Ch-8 006.
145.457 192 65*51546854510685 85 5--
Umw am
@150015
@415 15.
006 Fo6ý 0
8688
'm aw Rd."
M c84*
.0 1.64 mv15P4ft 0068 1255.15824 126.
5-055 0268 8*6580*1 S5668ON-0-0DM.O Cý 686856 w
RW P6 N 2
216544855 ISAS6WO 18*8 6.4.8
- -6..5 A46*8 0 d 6Um61 448%
V6. T7 -* FL MOM m tý Va5l
- 5.
5 ODD
-240"s cm 0.05 46.2&24 6.@1S.M.1
.2415%
Box 2.24U 2524
-W.16 WMAD0 1022 VO6ftk.
6 01 4n5d-C40-8.
Tr48*L. 6 5w605 5 T6aS
.W4 5*1ma 116640 11.20 762 61Ol66O11 $568G*o0 81011.572.5 A
146 I'm 546'2
.15A4 0O2 560.68 A46 04d 6,24oo oc c*
w o
c 1915D7 127 i.v-Wl df-ft.
7065A. 75.-8d.
.S s
- 714s, 1*15 18 62 156.8762O4.2 24.147 oJ o
m IV 15124 64i 353 WSW A
161 124 1152 121 5 cm 1..ft I0 A0m8 18Ft I
Lb.
61 f
.55.m a
5-120 217 DAM%
m17 029 100 LFM 1 1.;4 1
@ 24%
68.85.1 11.14
@2%
12a4 5666.
S.2 dam%
08 0
.oo 25 62 2.82
-2%
DAr 220 1
2,00 110Ld 157200 ASOMO o
can 157 1
1,24700 8 0 item 24,8862
@24%
175 1 10*
75-149,0 2.77 Vds-7804d..656 Q00-8.
15-15. S M.5 T464 6 63224 2.77 1524 57 S4=97
.65" A
126 124 12,4 7.41 0
0 8
158 115 31*.*
- 2.
0on 18668 A--&11
- 655.
FlW-.12 IN 65ý85 it.
b-5 DOD 02%
DO4 2.15 13WJ24 11511 1 O 7124,00 l4 4
304DS 01523:2D moo 25.00 m. dj*.V 801.00 Imo24 245%
I155I==
2724 25.00 m804680 I4166824 7524M 162WA 182.1 2512.1 w,568 1461572 251.75 V044 180.04550418 C55bk.1. 3 755.
5mgN s7656 s
TA
,w25024*
521.75 152 INAGI-31 PM4WI-MINI.O1I 0202 14 I'24 DUO 32415 78656 A65%5 65.856ft 6*58.21 5-ft
- 50518.
651 62447 6806.0.65 C.2W@
70-t 5-I Cho 6
56ý 1I2$7,0" 16m 2424 1548*
67755 3506=477 6
115 I'm 18161 1*1 DOD L5887t L
6 5~m. 51-5R1 ft A Lm12 5-a5715 81 t63 502462 000%
W584,0 1*
64 8
37*
6QO 24 6
6.4 805
.W MA 56.82 4*
am
.1 52 08 1424*
72m a
75 624 75.4 462 2.24 65615.
R."
60 804d "6.d6 665685 65870.5 1ft 5-Sbb 5-
-A 65 b5.5 6
8*124O a*1zoo MO54%
5 25.00 24.5-1066 2152 38.684
.10.00%
252240 724 25.00
- @606.65 tam4 16.1152 MAO24 1
Om4 2524D Wid 15782 26.1 27424 2626 15.2 97125=
84212525
$51.11625 cMO am am1 IMO 124 1524 a
77 12 76245 415 DIM A-t,%fk6561LVL be ft.
846446 80 1515 70.07%
2700.00 2.2 2151524 545188 am 00 4506815 2415%
30.24 I25 WO24 186426 1215 71100%
3152 046 2012415 @46288 I'm 7516 448.00 520 2012424 em0.
1am4 7MM 2CMO 2424 251824 5576
-MOO 2ACD 68OD.O
.2mm 2GO15
~ 625 25240 18706 17.3*2 SO 1I4 22M 2082 R1 5
ý 020 41 13A2715 1O 100O e2LO 124 11825 I"
52
.15 om 57524 so 15242 MA5O6 moo81 PFt 124 DOM 2012 65OM 522 055.102100 1,00 16.8 2012 665-83242516. 3 DO 124t 2*D 2O12 RDAim 3123 23.14 302 I124 154OO 68 0
0 3.756911 0
0 so 982"m5 so SO so 97793996 $1*12052
$120524 2.886 1121257 SO
@657471 01,065.856*
124jO 2.24 2512L8582525.521*252M 1
86.204 M 62012815515M 2415.47 MD.22222556"1
- d.. 1146* I.. W:
846o666 654.
hý t.065681.117 ft1a6868156.f I'M 168.7 2D12 -.
30.02 41 1 1W.31524 35529 W.-5 C6
.5
.65 1.6W40 DIM
.54 Cs.61%
16.68%
W-W**
52.8 6
-0 1.5888 W
511 615 W-kw..Md 701814 78*1ý 1.5-M
£5-Mb Lt.224 7S Q97 QM6 QM5 IC.72 655 60563 P,5 135 MW2 552511.5112~26601.1*6806.0*764161.,001*5b1525621116 7MOD 52.71 101.021 1237.00 100 15.67 2012 R& U-2 4113.17 MM I.42 1.00 27*1 2581@66ý054I111700 14 7724 66M mm*
681,410 so Se822=
184,27 884637 1425 157*1 247.31 6256575 151118 86.4 7.4 2A4p 2520 124251 61 6115.321 w77.57 612.57 569 124 3M 2012 M
. 30,2 415 1.10,1324I I
3M U..215216580242411 2.254.25,6.6.88151860816b46754.410167487857627750416 124 0.48 2D12 M8DO 15 2
- 51 II.1321524 124 5M4 2D1258@s.2414 75.1225 I
62&M 544 12 M15 Lt241260-SD511.C25I13-3425.~
80 0,6 0 o..
l0..4 A1.0010%
I&M A4-10 Be.W 2ý 120 50 a
C a
WA.W W-We 40 agg abl02 ad=
WA MIA r~..Y4I4 00Y~
y.b24 YANA 2m ghU Y0o0
- ggbgg, 22m.
QM.
2Qgs go 12 000 Rv0..W 0244 0.005 32nm 205 70305 0-.
4"7O12 35015.1 5BUB MOO5 14I32275 $01707.42 5112121.1?
Wu.Iw:t fw Ow a
- lm cOD w MO 100$
BOO~i S MrOD CI A-r 012 o
0.01 3
5 3M 00103 300
%0.10 506A Fo5.
05040 AM M IL 4010 R7
.LO 15 ft Vk.2 R.
b-ftP Cl 0 060 l040 1 14.040 0%
0.M0 030 201 MI VJ%
1.00 22.13 o012309205iiB3123210,1015 05 r d 20.0 101 0212 MX 2110.01 322 as L. FA 1ADO 241.45 2012 r¶.noo3,220S0.102t10 5.w 14.040 CAM 012D 0OOw
.22
,1,00 3.51 012M2 R0 I41021322143420 0
E0 0r4.,1 o40*GA 0.0,4 010 200 m02 dJdW0 A.)
G35.
2012 RIS lir 31 13 01 5
00O0 Ch WW d-3090Ila 49111 221 A
2002 0.27 L1 L.
I01 112 SWUM 3012
=12M2 222 22 0 &10 2210o e.2o 0S1 0A 0O42
- 0.
1030
=
. FA 1
1.38 2012RD 010-31 2230.143020 04h03 0.01ý D4 (20.016 02 012 1.0 1w.44 112 2,00 0120050222210 050
.. 01410 2120 42 elm 2&W 01 a
.3 2
.1.
'm2 21 CO1261 R
I no 022 CAM 125a 0.10 421 hi ID 41 21 317.73 4.0 200.0 012D 357.3 4.A2 0.30
$1.21400
$7.20159 11M,2.
Oo4o5 01
,001 0am 301 3012 0012 001 IA7 08013 d
rd.
0 223
¶10 22.0 I13 012 30 506305xM~l 710 0260 0005.5 005o~7 00418 0 246
- 0 5080.
05 0
RF u d*v 10 2
- R ot32 1
22l 0050.
dora 240 01 0
0 0.10 11 L F14 2I1 19.2 2012 o0M 22050.102tGI 5005 2.130 012 012 0,10 Is 0v.0 112 0.310 20120 1 3M 23 23.14 3MO 2050457 0.10 22.02 1S013
$1130L1
".519
$0 m201 0.011 SOWIl Wa*
005 20054.04 0001.
¶022010106 0002o.*
1S -
Tr.050 3S 704.S MOO 54.7 0.10 3O.0 513,71 072.01 0100124 O0 01 S
2O 1
SO 0117 0000140 Number VfttIm A-11,
.Vd 0,5R.
50f0 Wk, a
b0o 2.175.21 20.0110 1400112
-3012%
12240120 0105 420 5.0.40 ima451 00A 1SA24 V11.277 SO 110,51 1107,805 I27120 112I 010 201120B05101411 SO70 030 0100 011 01 01 BOB(
0 a4
¶I2m 21 101 10
$11.A33 130
$10.022
$11.0 00040 Ai*060 00 052630 F.0 0152 845.
000. 0* 2 01.2.
0 0..,
- 2.
4J5hftP 0
4 102230 70.o,4.¶.4012204370.72
.0112%L 0512 0.10010112
- 02101001, 141022l050112, Wa3..
V04I l0,.ll4r12l0 I.06r ls.
11on 24ld052540 l6
,1 ll50 I510 U00 l11300n10 r10 1
l0r O0w0r06023 h1250l210
.3ll40130l 0"
144 20 012 0OO n
1,021 001 4
L 1W0W Us 16
.. IL 1-2201 43,10 G.
Ao.D 01SO 0.13 0M1 0n5 hw 130 1
052M20.0 Ch a
am.3 2420012
.301016 23.42 0.71 225 A8.40 OL212 Ll 0512M M02041 ¶13 3240125.v.-M.01
"¶4020005041 1M400 2."
1d5f 000 ft.1405 k5000000*m34064 Ca
.5 aA*72OOW 0*0 OBO
- 0.
amO~ P0 too
.OO W
2201 tam53014 25420
-]M 0.1 Z02M 0.1 25MO o.02.05 1
2.0 U0701.0504 11333 25 M
05-0124 ff 24 so0ai%
00.00 04
¶12
?.
L0 C
130
¶
-0005 F
2210 06443 130 10 012%
BAD 001I 0.1 0
5 212 1012O B.. 222 05 71035 1,4.00 27.23012 149,%
012 040 25012 04 A.1 I
112 U.30126-.66.
02041130.242401.01.1.3040 0250*0510001 d10.
4,0506600.1.00013 05-050206 ft01 01%CA 03.0 0.0 412 0
21 412D a6hd 50.70
¶2 33311 wo005 30054.0 01,0 55.owN~
ow02.Wa yhpw.0.
1 s52. Watod s
710 05, 51.2322 40 75 1.0 sl moo 30oo
$"7735 03.1.7 0,.0*
MOD4 012 001 0300
-MOO 012 12O Sam IS9 704050.0100240030,0.5¶ 0100412 2120 184102 0a1.1 0002 0.4 325.000
$2,5 "To7
¶1.2. 71.050501.02 1.9.2 ad8504.0 1.4.
0503020.
1.4 Amlight 14.0A Fh $Wk04 5.o
-0 M020o 2.30 055005 0Wa00mollo 1060520,4010000050 30000 300
- h.
5 0
40-5 0
05ý 0
dm.
3 gm.
24
- 0.
3 d-3 10 dm.
0
.05 0
m -8 ft5815.0 1.62A 21.¶4,2 0..004 10 46m0 00 in 5
05.-0" 1205052.08IA 004 22 800512
-..010 so
-w 051 IA4 SO SO 1.12,l otol 5 A
14212 I¶O 142.25 m0 0.00 012 001 01 012 0.30 01 MD.712 s0 08 08 SO 0S S.712 08&712 10550 A
Wa1s 112 14AI225 on W512 08.712 08.712 b..N- ~
~
~
~
01400 VA444 00201.f,044m tbdr Vb-L m5 0,001 OM am am Wftrd6 10 11 00 5
M S 1nLW00 0104 291.,30 0.%
0120 012D BA 30201 112 11S
.A5I0100A1 022 RM r322 130110 0.44E 01201 001 012 012 30130 300300
¶wdr 12 08 051 2
M 23019,13 1,01 1OO 0.00 1402 05~
A-IL
- 0.
gd=$
505020 0.044 587 0.4.SW.07V40...o valf~d 0050 0
7
S..WD."
A-AA l4b.
5d W
W-W-
Cii IA W
W Wa S
1114 4050
=710 SL1.7120 20ll05Ub.,.0210.1351 S".4 8050 2511150051310510,l5003.=632l 2Mllggl 10712.00 sftd.4150.1 26120505 1.12 005a0lwCl..00a051 le 1e 20 "DOD
$11.720 1115.20
$12'rm 82M05 Ilhf 5aoWMsýl I L40-~
2 F -
2 C 'Wl -
27 GWW.d.bm.
TWW -10 Tdca.d Tk..og.
1.13 PoOW Po050-.
sm915 p5b*91-I'm A-14 n 110 f05f0 S
501C.
U.t 10M0 With A91100.5 00 WOO5 YAMNO Ow 0510 WOOh P1405 COO0 So5G05 k
9P101dw 705
-lVA PW15050 8704 "M0 PWW40-500 M705 With 75.14d D09190ca
$050 WllfttO 7511 00005 SOW5 With 751109o 59 So0
'O I 79-P.M 0.. dw-51010 51305 Im2 SMIr in"1 05051 17112 SIXLA7 l72211 4
111 4
1.
II IV 1710.5
$11.72D.17 8A m I
W10 14.5 W504-0051 A
0510 IM mm0 12D ffi10 Rod5 0,9-n 1.7ý 0-d 09-2 11705
'D 105D 95=5 0
I
$1011 20 I'm vim5 20 1
101AD I5 AD5 12.0 2) 4 05 wmq1 520 30.2" 60351
$7.?
5,1g.7
OMY-12-073 ENCLOSURE 2 CERTIFICATION OF FINANCIAL ASSURANCE December 2012
CERTIFICATION OF FINANCIAL ASSURANCE NRC Licensee:
Maine Yankee Atomic Power Company Maine Yankee Independent Spent Fuel Storage Installation NRC License No. DPR-36 (NRC Docket Nos. 50-309 and 72-30) 321 Old Ferry Road Wiscasset, ME 04578-4922 Issued to: U.S. Nuclear Regulatory Commission Certification:
I hereby certify that Maine Yankee Atomic Power Company is the licensee for the Maine Yankee Independent Spent Fuel Storage Installation (Maine Yankee ISFSI) and that I, the undersigned, am authorized to provide this Certification of Financial Assurance with respect to the radiological decommissioning of the Maine Yankee ISFSI.
During the operation of this ISFSI, spent nuclear fuel and Greater than Class C waste will be stored at the Maine Yankee ISFSI in storage casks licensed under 10 CFR 72. Pursuant to contracts with the Department of Energy the spent fuel and associated casks will ultimately be removed from the ISFSI location, and Maine Yankee will dispose of other radiological waste in accordance with NRC regulations, at which time the Maine Yankee ISFSI will be decommissioned in accordance with NRC regulations.
I further certify that financial assurance in an amount sufficient to fund Maine Yankee ISFSI radiological decommissioning at the time of such decommissioning has been provided, pursuant to 10 CFR 72.30, as described in Enclosure 1 to the letter to which this Certification is attached. That radiological decommissioning funding assurance is premised on a site-specific decommissioning cost estimate and funding methodology described therein, in the amount of:
$ 20.4 million (inclusive of contingency)
On December 17, 2012, during the final review of this letter and the third-party DCE, a discrepancy in the assumption utilized regarding the thickness of the concrete of the Vertical Concrete Casks (VCCs) was identified. A Condition Report (12-176) was generated to investigate the issue. MY will submit a revised decommissioning funding plan, including a revised DCE, by January 9, 2013.
Carla M. Pizzella I
Maine Yankee Atomic Po r Company Vice President, Chief Financial Officer, and Treasurer Phone (860) 267-6426 x304 Corporate Seal Date
OMY-12-073 ENCLOSURE 3 TOTAL COSTS ASSOCIATED WITH THE MAINE YANKEE ISFSI, INCLUDING COST ESTIMATE FOR MANAGING IRRADIATED FUEL AND GTCC WASTE December 2012
Maine Yankee Atomic Power Company Irradiated Fuel & GTCC Waste Management and ISFSI Decom Estimate Represented in 2013 Dollars Data FERC Summary Sum of 2013 Sum of 2014 Sum of 2015 Sum of 2016 Sum of 2017 Sum of 2018 Sum of 2019 Sum of 2020 Sum of 2021 Sum of 2022 Sum of 2023 Contingency
$429,920
$404,170
$411,670
$437,270
$436,670
$387,920
$411,670
$405,770
$1,252,363
$0
$409,020 Insurance
$464,500
$464,500
$464,500
$464,500
$464,500
$464,500
$464,500
$464,500
$464,500
$0
$791,100 Labor - Non-Manual
$1,712,250
$1,712,250
$1,712,250
$1,712,250
$1,712,250
$1,712,250
$1,712,250
$1,712,250
$1,757,250
$0
$629,500 Labor - Security
$2,111,000
$2,111,000
$2,111,000
$2,111,000
$2,111,000
$2,111,000
$2,111,000
$2,111,000
$2,111,000
$0
$0 Materials & Supplies
$112,547
$85,547
$85,547
$97,547
$88,547
$85,547
$85,547
$97,547
$85,547
$0
$17,500 Miscellaneous
$105,000
$105,000
$105,000
$105,000
$105,000
$105,000
$105,000
$105,000
$105,000
$0
$54,000 Outside Services - A&G
$570,000
$520,000
$520,000
$520,000
$520,000
$520,000
$520,000
$520,000
$520,000
$0
$410,000 Outside Services - Fuel Loading
$0
$0
$0
$0
$0
$0
$0
$0
$2,880,000
$0
$0 Outside Services - ISFSI OP's
$743,000
$1,005,000
$905,000
$1,655,000
$1,655,000
$680,000
$655,000
$775,000
$655,000
$0
$75,000 Outside Services - Legal
$900,000
$200,000
$450,000
$200,000
$200,000
$200,000
$700,000
$450,000
$200,000
$0
$1,300,000 Outside Services - NON-RAD D&D of ISFSI
$0
$0
$0
$0
$0
$0
$0
$0
$4,898,812
$0 Outside Services - RAD D&D of ISFSI
$0
$0
$0
$0
$0
$0
$0
$0
$7,175,000
$13,725,478
$0 Property Taxes
$1,003,100
$1,003,100
$1,003,100
$1,003,100
$1,003,100
$1,003,100
$1,003,100
$1,003,100
$1,003,100
$0
$203,100 Regulatory Fees
$767,000
$767,000
$767,000
$767,000
$767,000
$767,000
$767,000
$767,000
$1,222,000
$0
$585,000 Utilities
$110,000
$110,000
$110,000
$110,000
$110,000
$110,000
$110,000
$110,000
$150,000
$0
$25,000 Grand Total
$9,028,317
$8,487,567
$8,645,067
$9,182,667
$9,170,067
$8,146,317
$8,645,067
$8,521,167
$19,580,760
$18,624,290
$4,499,220 Note 1: The cost of management of irradiated fuel and GTCC waste is calculated as follows:
$112,530,505 Grand Total from Above
($4,898,812) Non-Rad D&D ISFSI
($2090478 Rad D&D ISFSI
$86,731,215 Management of Irradiated Fuel and GTCC Waste Note 2: The cost of RAD and NON-RAD D&D of the ISFSI in 2013 dollars as provided in the columns labeled "Sum of 2021" and "Sum of 2022" is derived by escalating the value of the cost estimates provided in Enclosure 1 by 2.5%.
2013-2023
$4,986,442
$4,971,600
$16,084,750
$18,999,000
$838,423
$999,000
$5,140,000
$2,880,000
$8,803,000
$4,800,000
$4,898,812
$20,900,478
$9,231,000
$7,943,000
$1,055,000
$112,530,505