MONTHYEARIR 05000255/20203012020-08-13013 August 2020 NRC Initial License Examination Report 05000255/2020301 ML20268A0732020-07-0606 July 2020 2020 Palisades Ile Form ES-401-4 PNP 2020-003, 2020 Palisades Ile Proposed Exam Submittal Letter2020-07-0606 July 2020 2020 Palisades Ile Proposed Exam Submittal Letter ML20267A3102020-07-0606 July 2020 2020 Palisades Ile Form ES-301-3 ML20267A3212020-07-0606 July 2020 2020 Palisades Ile Form ES-301-4 ML20267A3322020-07-0606 July 2020 2020 Palisades Ile Form ES-301-6 - Rev 0 ML20267A5882020-07-0606 July 2020 2020 Palisades Ile Form ES-403-1 ML20267A5822020-07-0606 July 2020 2020 Palisades Ile Form ES-201-1 ML20268A1502020-07-0606 July 2020 2020 Palisades Ile Administered Written Exam with Answer Key - Redacted ML20268A1312020-07-0606 July 2020 2020 Palisades Ile Administered Walkthrough JPMs ML20267A3592020-07-0606 July 2020 2020 Palisades Ile Proposed Written Exam with Answer Key - Redacted ML20267A3492020-07-0606 July 2020 2020 Palisades Ile Proposed Scenarios ML20268A0842020-07-0606 July 2020 2020 Palisades Ile Op Test Outline Review Comments ML20267A3442020-07-0606 July 2020 2020 Palisades Ile Proposed RO Admin JPMs ML20267A3432020-07-0606 July 2020 2020 Palisades Ile Form ES-401-6 ML20268A0762020-07-0606 July 2020 2020 Palisades Ile Form ES-401-9 ML20268A1092020-07-0606 July 2020 2020 Palisades Ile Administered Scenarios ML20268A1632020-07-0606 July 2020 2020 Palisades Ile Administered Written Exam - Redacted ML20267A5922020-07-0606 July 2020 2020 Palisades Post-Examination Submittal Letter ML20267A3342020-07-0606 July 2020 2020 Palisades Ile Form ES-301-6 - Rev 1 ML20268A0792020-07-0606 July 2020 2020 Palisades Ile Post-Exam Comments - Redacted ML20268A1012020-07-0606 July 2020 2020 Palisades Ile Administered RO Admin JPMs ML20267A5852020-07-0606 July 2020 2020 Palisades Ile Form ES-201-3 ML20268A1112020-07-0606 July 2020 2020 Palisades Ile Administered SRO Admin JPMs ML20267A3522020-07-0606 July 2020 2020 Palisades Ile Proposed SRO Admin JPMs ML20268A0712020-07-0606 July 2020 2020 Palisades Ile Form ES-301-7 ML20267A3562020-07-0606 July 2020 2020 Palisades Ile Proposed Walkthrough JPMs ML20099D2832020-04-0808 April 2020 Operator Licensing Examination Approval ML20072L2192020-03-12012 March 2020 Response to Regulatory Issue Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations PNP 2019-038, 2020 Palisades Ile Outline Submittal Letter2019-11-0707 November 2019 2020 Palisades Ile Outline Submittal Letter ML19234A0332019-08-22022 August 2019 Confirmation of Initial License Examination (Bab) ML19135A6642019-05-15015 May 2019 Units 2 & 3; River Bend, and Waterford 3 - Response to RIS 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19009A2502019-01-0808 January 2019 GFE Annual Registration Letter - 2019 Examinations, Region III ML18284A1822018-09-27027 September 2018 Gfes Results, September 2018 PNP 2018-030, Voluntary Response to NRC Regulatory Issue Summary 2018-02: Preparation and Scheduling of Operator Licensing Examinations2018-06-0606 June 2018 Voluntary Response to NRC Regulatory Issue Summary 2018-02: Preparation and Scheduling of Operator Licensing Examinations ML17361A0302017-12-26026 December 2017 GFE Annual Registration Letter - 2018 Examinations - Region III ML22145A5972017-08-14014 August 2017 2017 Palisades Retake Outline and Operating Test Comments (ES-301-7) ML22145A5962017-08-14014 August 2017 2017 Palisades Retake ES-201-3 ML22145A5952017-08-14014 August 2017 2017 Palisades Retake ES-201-1 PNP 2017-051, 2017 Palisades Retake Post Exam Submittal Letter2017-08-0909 August 2017 2017 Palisades Retake Post Exam Submittal Letter ML22146A0172017-08-0808 August 2017 JPM 1a ML22146A0242017-08-0808 August 2017 JPM 3 ML22146A0192017-08-0808 August 2017 JPM 1b ML22146A0232017-08-0808 August 2017 JPM 2 ML22146A0262017-08-0808 August 2017 JPM 4 ML17222A1812017-08-0707 August 2017 Operator Licensing Reexamination Approval ML22146A0502017-08-0101 August 2017 2017 Palisades Retake ES-201-2 ML22146A0542017-08-0101 August 2017 2017 Palisades Retake ES-301-1 ML22146A0292017-07-24024 July 2017 2017 Palisades Retake ES-301-3 ML22146A0322017-07-24024 July 2017 2017 Palisades Retake Proposed Admin JPMs 2020-08-13
[Table view] Category:Part 55 Examination Related Material
[Table view] Category:Letter
MONTHYEARML24022A1172024-01-23023 January 2024 Acceptance of Requested Licensing Action Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations ML24012A2422024-01-16016 January 2024 Acceptance of Requested Licensing Action License Transfer Request ML23236A0042023-12-27027 December 2023 Issuance of Amendment 274 Re Changes to Perm Defueled Emergency Plan and Perm Defueled Emergency Action Level Scheme ML23355A1242023-12-26026 December 2023 Withdrawal of an Amendment Request Re License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML23192A0772023-12-26026 December 2023 Letter Exemption from the Requirements of 10 CFR 140.11(a)(4) Concerning Offsite Primary and Secondary Liability Insurance ML23191A5222023-12-22022 December 2023 Exemption Letter from the Requirements of 10 CFR 50.54(W)(1) Concerning Onsite Property Damage Insurance (EPID - L-2022-LLE-0032) ML23263A9772023-12-22022 December 2023 Exemption from Certain Emergency Planning Requirements and Related Safety Evaluation ML23354A2602023-12-21021 December 2023 Reference Simulator Inspection Request for Information L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 PNP 2023-030, License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations2023-12-14014 December 2023 License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations PNP 2023-035, Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements2023-12-12012 December 2023 Withdrawal of License Amendment Request - Revise License Condition to Eliminate Cyber Security Plan Requirements PNP 2023-028, Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments2023-12-0606 December 2023 Application for Order Consenting to Transfer of Control of License and Approving Conforming License Amendments L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23291A4402023-11-0303 November 2023 Acceptance of Requested Licensing Action Request for Exemption from 10 CFR 50.82(a)(2) to Support Reauthorization of Power Operations IR 05000255/20230032023-10-0404 October 2023 NRC Inspection Report No. 05000255/2023003(DRSS)-Holtec Decommissioning International, LLC, Palisades Nuclear Plant ML23275A0012023-10-0202 October 2023 Request for Withholding Information from Public Disclosure for Palisades Nuclear Plant PNP 2023-025, Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.822023-09-28028 September 2023 Request for Exemption from Certain Termination of License Requirements of 10 CFR 50.82 PNP 2023-026, Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations2023-09-28028 September 2023 Pre-Submittal Meeting Presentation - Palisades Nuclear Plant License Transfer Application to Support Resumption of Power Operations PNP 2023-023, Special Report High Range Noble Gas Monitor Inoperable2023-08-0909 August 2023 Special Report High Range Noble Gas Monitor Inoperable ML23215A2302023-08-0303 August 2023 Notice of Organization Change - Chief Nuclear Officer IR 05000255/20230022023-07-19019 July 2023 NRC Inspection Report 05000255/2023002 DRSS-Holtec Decommissioning International, LLC, Palisades Nuclear Plant ML23087A0362023-05-0202 May 2023 PSDAR Review Letter ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment PNP 2023-018, 2022 Annual Non-Radiological Environmental Operating Report2023-04-25025 April 2023 2022 Annual Non-Radiological Environmental Operating Report L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 PNP 2023-007, and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports2023-04-19019 April 2023 and Big Rock Point, 2022 Annual Radioactive Effluent Release and Waste Disposal Reports PNP 2023-008, 2022 Radiological Environmental Operating Report2023-04-18018 April 2023 2022 Radiological Environmental Operating Report L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations PNP 2023-002, 6 to Updated Final Safety Analysis Report2023-03-31031 March 2023 6 to Updated Final Safety Analysis Report ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance PNP 2023-006, Report of Changes to Security Plan, Revision 202023-03-29029 March 2023 Report of Changes to Security Plan, Revision 20 PNP 2023-012, Presentation on Regulatory Path to Reauthorize Power Operations2023-03-16016 March 2023 Presentation on Regulatory Path to Reauthorize Power Operations ML23038A0982023-03-15015 March 2023 Request for Withholding Information from Public Disclosure ML23095A0642023-03-14014 March 2023 American Nuclear Insurers, Notice of Cancellation Rescinded PNP 2023-001, Regulatory Path to Reauthorize Power Operations2023-03-13013 March 2023 Regulatory Path to Reauthorize Power Operations PNP 2023-004, Report of Changes to Palisades Nuclear Plant Technical Specification Bases2023-03-0808 March 2023 Report of Changes to Palisades Nuclear Plant Technical Specification Bases PNP 2023-005, Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report2023-03-0101 March 2023 Response to Palisades Nuclear Plant - Request for Additional Information Related to the Post-Shutdown Decommissioning Activities Report ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23052A1092023-02-17017 February 2023 FEMA Letter to NRC, Proposed Commission Paper Language for Palisades Nuclear Plant Emergency Plan Decommissioning Exemption Request ML23032A3992023-02-0101 February 2023 Regulatory Path to Reauthorize Power Operations IR 05000255/20220032022-12-28028 December 2022 NRC Inspection Report No. 05000255/2022003(DRSS); 07200007/2022001 (Drss) Holtec Decommissioning International, LLC, Palisades Nuclear Plant L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 PNP 2022-037, Report of Changes to Security Plan, Revision 192022-12-14014 December 2022 Report of Changes to Security Plan, Revision 19 ML22321A2852022-11-17017 November 2022 LLC Master Decommissioning Trust Agreement for Palisades Nuclear Plant IR 05000255/20224012022-11-0909 November 2022 Decommissioning Palisades Nuclear Plant - Decommissioning Security Inspection Report 05000255/2022401 PNP 2022-036, Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme2022-11-0808 November 2022 Response to Request for Additional Information Regarding License Amendment Request for Proposed Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme PNP 2022-035, International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations2022-11-0202 November 2022 International - Notification of Commitment Cancellations for Remaining Activities Related to Beyond-Design-Basis Seismic Hazard Reevaluations PNP 2022-024, Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance PNP 2022-026, Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance2022-10-26026 October 2022 Request for Exemption from 10 CFR 50.54(w)(1) Concerning Onsite Property Damage Insurance ML22292A2572022-10-25025 October 2022 Permanently Defueled Emergency Plan License Amendment RAI Letter 2024-01-23
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 December 13, 2012 Mr. Anthony Vitale Vice-President, Operations Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9530
SUBJECT:
PALISADES NUCLEAR PLANT - NRC INITIAL LICENSE EXAMINATION WRITTEN RETAKE EXAMINATION - 05000255/2013301
Dear Mr. Vitale:
In a telephone conversation on December 10, 2012, between Mr. H. Nixon, Palisades Nuclear Plant Training Manager, and Mr. D. McNeil, U.S. Nuclear Regulatory Commission (NRC)
Senior Operations Engineer, arrangements were made for the administration of a written retake examination for an individual who failed the written examination during the initial license examination administered during the month of October 2012. The retake written examination is scheduled to be administered during the week of February 25, 2013.
As agreed during the telephone conversation, your staff will prepare the examination based on the guidelines in Revision 9 of NUREG-1021, AOperator Licensing Examination Standards for Power Reactors.@ The NRC=s regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination outline by December 31, 2012. The proposed written examination and supporting reference materials identified in Attachment 2 to ES-201 will be due by February 11, 2013. Pursuant to 10 CFR 55.40(b)(3), an authorized representative of the facility licensee shall approve the outline and proposed examination before they are submitted to the NRC for review and approval. The proposed examination shall be complete and ready to administer. We request that any personal, proprietary, sensitive unclassified, or safeguards information in your submission be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examination and reference materials, or the submission of inadequate or incomplete materials, may cause the examination to be rescheduled.
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examination is being administered.
A. Vitale To permit timely NRC review and evaluation, your staff should submit a preliminary reactor operator license application (Office of Management and Budget (OMB) approval number 3150-0090), medical certification (OMB approval number 3150-0024), and waiver requests (OMB approval number 3150-0090) at least 30 days before the examination date. If the application is not received at least 30 days before the examination date, a postponement may be necessary. A signed application certifying that all training and/or retraining has been completed should be submitted by February 15, 2013.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018. The public reporting burden for this collection is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. Mr. Nixon has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC=s examination procedures and guidelines, please contact Mr. D. McNeil of my staff at (630) 829-9737, or me at (630) 829-9707.
Sincerely,
/RA/ By Michael E. Bielby Acting For/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-255 License No. DPR-20 cc: Distribution via ListServTM
A. Vitale To permit timely NRC review and evaluation, your staff should submit a preliminary reactor operator license application (Office of Management and Budget (OMB) approval number 3150-0090), medical certification (OMB approval number 3150-0024), and waiver requests (OMB approval number 3150-0090) at least 30 days before the examination date. If the application is not received at least 30 days before the examination date, a postponement may be necessary. A signed application certifying that all training and/or retraining has been completed should be submitted by February 15, 2013.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018. The public reporting burden for this collection is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS
@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. Mr. Nixon has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC=s examination procedures and guidelines, please contact Mr. D. McNeil of my staff at (630) 829-9737, or me at (630) 829-9707.
Sincerely,
/RA/ By Michael E. Bielby Acting For/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-255 License No. DPR-20 cc: Distribution via ListServTM DISTRIBUTION:
See next page DOCUMENT NAME: Ltr 121312 Palisades Written Retake Exam.docx Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII N RIII N RIII RIII NAME DMcNeil:cs MBielby for HPeterson DATE 12/13/12 12/13/12 OFFICIAL RECORD COPY
Letter to Mr. Anthony Vitale from Mr. Hironori Peterson dated December 13, 2012.
SUBJECT:
PALISADES NUCLEAR PLANT - NRC INITIAL LICENSE EXAMINATION WRITTEN RETAKE EXAMINATION - 05000255/2013301 DISTRIBIUTION:
Cayetano Santos RidsNrrPMPalisades Resource RidsNrrDorlLpl3-1 Resource RidsNrrDirsIrib Resource Chuck Casto Cynthia Pederson Steven Orth Jared Heck Allan Barker Christine Lipa Carole Ariano Linda Linn DRPIII DRSIII Tammy Tomczak John McHale, NRR Janet Kweiser, DRS