Text
December I I, 2012 NRC 2012-01 15 GL 2004-02 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Commitment Change for the NextEra Energy Point Beach, LLC
= - -
Generic Letter 2004-02 Plan for Resolution
References:
(1)
NextEra Energy Point Beach, LLC letter to NRC, dated June 25, 2012, Commitment Change for the NextEra Energy Point Beach, LLC Generic Letter 2004-02 Plan for Resolution (ML12178A292)
(2)
Nuclear Energy lnstitute letter to NRC, dated May 4, 2012, GSI-191 - Current Status and Recommended Actions for Closure (ML12142A316)
(3)
Nuclear Energy lnstitute letter to NRC, dated November 15, 201 2, GSI-191 - Revised Schedule for Licensee Submittal of Resolution Path (MLI 2325A072)
(4)
NRC letter to Nuclear Energy Institute, dated November 21, 2012, Nuclear Regulatory Commission Review of Generic Safety Issue-1 91 Nuclear Energy lnstitute Revised Schedule for Licensee Submittal of Resolution Path (ML12326A497)
Via Reference (I), NextEra Energy Point Beach, LLC (NextEra) made a Regulatory Commitment to submit a plan to achieve final resolution of Generic Safety lssue (GSI)-191, consistent with the industry guidance contained in Reference (2), by December 31,2012. The Nuclear Energy lnstitute (NEI) subsequently recommended licensees delay submittal of GSI-191 resolution plans to allow time to appropriately address the NRC direction contained in the Staff Requirements Memorandum, SECY-12-0093, and the NRC Safety Evaluation on WCAP-16793, Revision 2 (Reference 3). The NRC concurred with the proposed schedule in Reference (4).
NextEra is modifying the Regulatory Commitment to provide the NRC with a GSI-191 resolution path and schedule, consistent with industry guidance, by January 31, 2013, or 30 days following the NRC making the final safety evaluation associated with the review of WCAP-16793, Revision 2, "Evaluation of Long-Term Cooling Considering Particulate, Fibrous and Chemical Debris in the Recirculating Fluid," and the Staff Requirements Memorandum associated with SECY-12-0093, "Closure Options for Generic Safety lssue - 191, Assessment of Debris Accumulation On Pressurized-Water Reactor Sump Performance," publicly available, to align itself with the schedule proposed by NEI.
NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241
Document Control Desk Page 2 Summaw of Regulatory Commitments The Regulatory Commitment contained in Reference (1) states:
NextEra will submit a GSI-191 resolution path and schedule for PBNP, Units 1 and 2, consistent with industry guidance, by December 31, 2012 NextEra is revising the Regulatory Commitment for Units 1 and 2 to state:
NextEra will submit a GSI-191 resolution path and schedule for PBNP, Units 1 and 2, consistent with industry guidance, by January 31, 201 3, or 30 days following the NRC making the final safety evaluation associated with the review of WCAP-16793, Revision 2, "Evaluation of Long-Term Cooling Considering Particulate, Fibrous and Chemical Debris in the Recirculating Fluid," and the Staff Requirements Memorandum associated with SECY-12-0093, "Closure Options for Generic Safety Issue - 191, Assessment of Debris Accumulation On Pressurized-Water Reactor Sump Performance," publicly available, whichever is later.
If you have any questions please contact Mr. Michael Millen, Licensing Manager, at 9201755-7845.
In accordance with the provisions of 10 CFR 50.91, a copy of this submittal has been provided to the designated Wisconsin Official.
Very truly yours, NextEra Energy Point Beach, LLC Site Vice President Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW