|
---|
Category:Legal-Exhibit
MONTHYEARML15337A3522015-11-17017 November 2015 Official Exhibit - NYS000582-00-BD01 - Diagram of Strength Vs Amplitude by Dr. Richard T. Lahey ML15337A3372015-11-11011 November 2015 Official Exhibit - ENTR00726-00-BD01 - Track 2 Hearing Exhibit List ML15337A3322015-11-0505 November 2015 Official Exhibit - ENT000726-00-BD01 - Entergy Track 2 Hearing Exhibit List ML15337A3352015-11-0505 November 2015 Official Exhibit - RIVR14001-00-BD01 - Riverkeeper Tailored Track 2 Exhibit List ML15337A3362015-11-0505 November 2015 Official Exhibit - NRCR10001-00-BD01 - NRC Staff Track 2 Exhibit List ML15337A3332015-11-0404 November 2015 Official Exhibit - NYSR25001-00-BD01 - NYS Revised Tailored Exhibits List Relevant to Track 2 Contentions ML15337A3312015-11-0303 November 2015 Official Exhibit - NRC000230-00-BD01 - Corrections to Prefiled Testimony NRC000168 and NRC000197 ML15337A3262015-10-29029 October 2015 Official Exhibit - ENT000722-00-BD01 - Supplemental Testimony of Entergy Witnesses Nelson Azevedo, Timothy Griesbach & Randy Lott ML15337A3292015-10-29029 October 2015 Official Exhibit - ENTR16001-00-BD01 - Entergy Revised Exhibit List ML15337A3242015-09-23023 September 2015 Official Exhibit - NYS000576-00-BD01 - Pre-Filed Supplemental Testimony of Richard T. Lahey Re Contentions NYS-25, NYS-26B/RK-TC-1B & NYS-38/RK-TC-5 ML15337A3072015-09-0909 September 2015 Official Exhibit - NYS000573-PUB-00-BD01 - Supplemental Reply Statement of Position of the State of New York and Riverkeeper, Inc. in Support of Contention NYS-38/RK-TC-5 (Public, Redacted) (September 9, 2015) ML15337A2962015-09-0909 September 2015 Official Exhibit - NYS000570-PUB-00-BD01 - Supplemental Reply Statement of Position of the State of New York and Riverkeeper, Inc. in Support of Contention NYS-26B/RK-TC-1B (Public, Redacted) (September 9, 2015) ML15337A2832015-09-0909 September 2015 Official Exhibit - NYS000563-00-BD01 - Pressurized Water Reactor (PWR) Systems, USNRC Technical Training Center, Reactor Concepts Manual, Pages 4-1 to 4-28 ML15337A2952015-09-0909 September 2015 Official Exhibit - NYS000569-PUB-00-BD01 - Pre-filed Supplemental Reply Testimony of Richard T. Lahey, Jr. in Support of Contention NYS-26B/RK-TC-1B (Public, Redacted) (September 9, 2015) ML15337A2942015-09-0909 September 2015 Official Exhibit - NYS000568-PUB-00-BD01 - Supplemental Reply Statement of Position of the State of New York in Support of Contention NYS-25 (Public, Redacted) (September 9, 2015) ML15337A2932015-09-0909 September 2015 Official Exhibit - NYS000567-PUB-00-BD01 - Pre-filed Supplemental Reply Testimony of Richard T. Lahey, Jr. in Support of Contention NYS-25 (Public, Redacted) (September 9, 2015) ML15337A3042015-09-0909 September 2015 Official Exhibit - NYS000571-PUB-00-BD01 - Pre-filed Supplemental Reply Testimony of David J. Duquette in Support of Contention NYS-38/RK-TC-5 (Public, Redacted) (September 9, 2015) ML15337A2972015-09-0909 September 2015 Official Exhibit - RIV000164-00-BD01 - NUREG-1740, ACRS, Voltage-Based Alternative Repair Criteria: a Report to the Advisory Committee on Reactor Safeguards by the Ad Hoc Subcommittee on a Differing Professional Opinion (2001) ML15337A3062015-09-0909 September 2015 Official Exhibit - NYS000572-PUB-00-BD01 - Pre-filed Supplemental Reply Testimony of Richard T. Lahey, Jr. in Support of Contention NYS-38/RK-TC-5 (Public, Redacted) (September 9, 2015) ML15337A2822015-09-0909 September 2015 Official Exhibit - NYS000566-00-BD01 - Figure 1 for Supplemental Reply Testimony of Dr. Richard T. Lahey ML15337A3142015-09-0404 September 2015 Official Exhibit - ENTR00615-PUB-00-BD01 - Entergy'S Statement of Position Re Contention NYS-25 (Embrittlement) - Redacted ML15334A2842015-08-10010 August 2015 Official Exhibit - ENT000687-00-BD01 - NRC, Safety Evaluation Report, Topical Report on ASME Section III Piping and Component Fatigue Analysis Utilizing the Westems Computer Code (WCAP-17577, Revision 2) (Undated) ML15335A2932015-08-10010 August 2015 Official Exhibit - NRCR00104-00-BD01 - on Yee Statement of Professional Qualifications (Revised) ML15337A2642015-08-10010 August 2015 Official Exhibit - NRC000196-PUB-00-BD01 - NRC Staff'S Initial Statement of Position on Contention NYS-25 (Reactor Vessel Internals) ML15337A3192015-08-10010 August 2015 Official Exhibit - ENT000698-PUB-00-BD01 - Entergy'S Revised Statement of Position Regarding Contention NYS-38/RK-TC-5(Safety Commitments) (Aug. 10, 2015)Redacted ML15337A3202015-08-10010 August 2015 Official Exhibit - ENT000699-PUB-00-BD01 - Redacted Revised Testimony of Entergy Witnesses Nelson Azevedo, Robert Dolansky, Alan Cox, Jack Strosnider, Timothy Griesbach, Barry Gordon, Randy Lott, and Mark Gray Regarding Contention NYS-38/RK ML15337A3172015-08-10010 August 2015 Official Exhibit - ENT000678-PUB-00-BD01 - NL-07-140, Letter from F. Dacimo, Entergy, to NRC Document Control Desk, ?Reply to Request for Additional Information Regarding License Renewal Application? (Nov. 28, 2007)Redacted ML15337A2652015-08-10010 August 2015 Official Exhibit - NRC000197-PUB-00-BD01 - NRC Staff Testimony of Dr. Allen Hiser, Jeffrey Poehler, and Gary Stevens on NYS-25 and NYS-38/RK-TC-5 ML15337A2412015-08-10010 August 2015 Official Exhibit - NRCR00147-00-BD01 - NRC Staff'S Revised Statement of Position on State of New York and Riverkeeper'S Joint Contention NYS-38/RK-TC5 (Revised) ML15335A2902015-08-10010 August 2015 Official Exhibit - NRC000222-00-BD01 - IP3 FSAR Rev. 04 Chapter 3 (2011) (Excerpt) ML15334A2632015-08-10010 August 2015 Official Exhibit - ENT000648-00-BD01 - M. Mitchell, Chief, Vessels and Internals Integrity Branch, Response to Non-Concurrence Regarding Safety Evaluation for Topical Report MRP-227 Pressurized Water Reactor Internals Inspection and Evaluat ML15337A2622015-08-10010 August 2015 Official Exhibit - NRC000228-00-BD01 - Indian Point Unit 2 Technical Specifications 3.1.4 ML15337A2452015-08-10010 August 2015 Official Exhibit - NRC000227-00-BD01 - Gary Stevens Statement of Professional Qualifications ML15337A2632015-08-10010 August 2015 Official Exhibit - NRC000229-00-BD01 - Indian Point, Unit 3 Technical Specifications 3.1.4 ML15335A2192015-08-10010 August 2015 Official Exhibit - ENTR00031-00-BD01 - Curriculum Vitae of Alan B. Cox ML15335A2112015-08-10010 August 2015 Official Exhibit - ENTR20186-00-BD01 - Curriculum Vitae of Mark A. Gray ML15337A3162015-08-10010 August 2015 Official Exhibit - ENT000616-PUB-00-BD01 - Testimony of Entergy Witnesses Nelson F. Azevedo, Robert J. Dolansky, Alan B. Cox, Jack R. Strosnider, Timothy J. Griesbach, Randy G. Lott, and Mark A. Gray Regarding Contention NYS-25 (Embrittleme ML15337A2782015-08-10010 August 2015 Official Exhibit - NRC000168-PUB-00-BD01 - NRC Staff Testimony of Dr. Allen Hiser, Dr. Ching Ng, Mr. Gary Stevens, P.E., and Mr. on Yee, Concerning Contentions NYS-26B/RK-TC-1B and NYS-38/RK-TC-5 ML15337A2712015-08-10010 August 2015 Official Exhibit - NRC000223-00-BD01 - IP3 FSAR Rev. 04 Chapter 14 (2011) ML15337A2592015-08-10010 August 2015 Official Exhibit - NRC000224-00-BD01 - IP3 FSAR Rev. 04 Chapter 16 ML15337A2442015-08-10010 August 2015 Official Exhibit - NRCR00161-00-BD01 - NRC Staff Testimony of Dr. Allen L. Hiser and Mr. Kenneth J. Karwoski Concerning Portions of State of New York and Riverkeeper, Inc. Joint Contention NYS-38/RK-TC5 (Revised) ML15334A2822015-08-10010 August 2015 Official Exhibit - ENT000680-00-BD01 - Curriculum Vitae of Barry M. Gordon ML15335A2912015-08-10010 August 2015 Official Exhibit - NRCR00118-00-BD01 - Indian Point Unit 3 Technical Specifications (Excerpt) (Revised) ML15334A2282015-08-10010 August 2015 Official Exhibit - ENT000634-00-BD01 - Entergy, IP2, FSAR Update, Revision 25 (2014) (Excerpts) ML15335A2822015-08-10010 August 2015 Official Exhibit - NRC000220-00-BD01 - Pressurized Water Reactor Owners Group (PWROG) Presentation Slides, Industry and NRC Coordination Meeting Materials Programs Technical Exchange: Clevis Insert Bolt Update, (June 2014) ML15337A2692015-08-10010 August 2015 Official Exhibit - NRC000169-00-BD01 - NRC000169 - Indian Point, Unit 2 Technical Specifications (Excerpt) ML15337A2602015-08-10010 August 2015 Official Exhibit - NRC000226-00-BD01 - Jeffrey C. Poehler Statement of Professional Qualifications ML15335A2732015-08-10010 August 2015 Official Exhibit - NRC000183-00-BD01 - NRC Inspection Manual, Inspection Procedure 71013, Site Inspection for Plants with a Timely Renewal Application (Sept. 25, 2013) ML15335A2202015-08-10010 August 2015 Official Exhibit - ENTR00184-00-BD01 - Curriculum Vitae of Jack R. Strosnider ML15335A3012015-08-10010 August 2015 Official Exhibit - NRC000206-00-BD01 - Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 25, Chapter 14 - Safety Analysis (2014) 2015-09-09
[Table view] |
Text
United States Nuclear Regulatory Commission Official Hearing Exhibit RIV000130 Entergy Nuclear Operations, Inc.
In the Matter of: Submitted: October 11, 2012 (Indian Point Nuclear Generating Units 2 and 3)
ASLBP #: 07-858-03-LR-BD01 Docket #: 05000247 l 05000286 Exhibit #: RIV000130-00-BD01 Identified: 10/15/2012 Admitted: 10/15/2012 Withdrawn:
Rejected: Stricken:
Other:
log on now www.epriweb.com
~ b'ntergy - ultrasonic cxamlnallon I'(epon:
r IPEC Unit# 3 Report No.: 03UT081 Page_i_of S Sys.1 Compo 10: Main Feedwater 1 FW-02.4-15E Exam Item: FW*02.4-15E 1 Pipe, Elbow, Pipe DWG No. or Sketch: 9321*F-20193 Rev. 56 WRiMod: IP3*02-24705 QA Category: Non Cat ASME XI Class: N/A Cat: N/A Procedure: NDEP 9.4-12(1) Rev.: 4 Component Configuration: Pipe to Elbow to Pipe.
Orientation: 0 Degree Type of Material: Carbon Steel Angle: 0° Mode: Longitudinal Size: 30" Thickness: 1.260" Equipment Instrument: 002144201 Panametrics 36DL+ Due: 3/16/2004 Vertical linearity Check Attenuator linearity Check Sianal1 1100 I 90 I 80 I 70 I 60 I so I 40 I 30 I 20 I 10 I Signal 2 I N/A I NJA I N/A I N/A I N/A I N/A N/A N/A I N/A I N/A I I
SO%* 6 db ISO% *12 db I 40% + 6 db N/A . NfA .N/A 120%~/r db I (Signal 2 shall equal 50% of signal 1
- 5% offull scale.) (32 to 4S) (16 to 24) (64*96) (64-96)
Transducer: 502080 Panametrics 5 Mhz 0.312" Round 07911 Dual Element Wedge: N/A Search Unit Cable: 6' Self-Cont. Wedge Meas. Angle: N/A ° Exit Point-Front: N/A" Couplant: 00245 Sonotech I Sono 600 Gel Thermometer: 103284 Due: 3/11/2004 Temperature Calibration Block: 103309 Step Wedge T= .75"*1.5" Material: Carbon Steel 90 OF Simulator Block: N/A N/A OF Reference Block: A13082 IIW*2 T= N/A Material: CARBON STEEL 78 OF Entry Surface: OD Component: 98 OF Distance Amplitude Curve Instrument Settings Each Major Screen Division = 0.5" 100 -J- il r- r- .- Reflector Orient. ..... .
FSH Pos. dB Range (in.):
Thick Cal:
5.0" 2-PT I r---uJOO"- i
-.-,,-.~~
90 11 I Step 80 2.0 N/A Velocity (in.lfls): 2332 80 "!' 1- TI'I f----. ! 1.500" Step 80 3.0 N/A Sensitivity (dB): 58 70 '! I 4.000" Step 80 8.0 N/A Scan Sensitivity 80%
60 . 1 I Frequency (mHz): 5 50 I i Reject: Off Filter: Full 40 i Pulse Length: Fixed
'------f-------.-..-... -...+ .. ***************+********************-1****************.....
30 +***1**** 1*****+*****1 201f---4--f---+~~f---+-+-~-r~1
- ........*......._.. I Damping: Fixed Mode Select: Dual 10 11--+--ii--!--i---l1--+ i i' -+--l--!---ll Calibration Times: Rep. Rate: Fixed 0~~4-~~~~~~~~
I 0945 I 1030 I 1150 I I DEC/Gate: On 1 2 3 4 5 6 7 8 9 10 Jacks: TIR Acceptance Standard: 87.5% of nominal as per AP-49 requirements.
Recordable Indication(s): Yes Recording Level: N/A % DAC Evaluation Level: N/A% DAC 100 % Complete Limitations: Integral Attachment Remarks: Recordable Indications reference page 2 & 4 of 5.
Obstruction due to Integral Attachment reference page 2 of 5.
Reference page 4 of 5 for Lamination.
Examiner: ____~
C# . ct:Z-----.
_ _ _ _ _ _ _ _ _ _ _--"'C:.:.:h""ri""_st~o:..cP""h""e:...rJ~.o...:Daa"-'-n!_"s"'o~n'-=Le...v.....e""'I:'-'I.:.:IL=___ Date: 3/31/2003 Examiner. J!ltdkL~ 11 Michael W Julisoo Leyel' ilL Date: 3/3112003 Reviewed by: I '~< Level '"J:J?t.. Date:
ANI! Review: _ _ _ _ _ _ _ r.---4L'---+..:.-_______________ Date: _ __
IPEC00020854
IPEC00020855
'1J NDEP 9.4* ---II Rev.4 m nent 2
()
o " -oJe 1 of 1 o
o I\.)
o Report No.: 03UT081
())
CJ'I ~Entergy Page 0') 2 of 5 Sys. 1 Compo 10: Main Feedwater I FW-02.4-1SE Material: Carbon Steel High Reading: 1.625" Exam Item: Piee, Elbow,Pipe Size: 30" Low Reading: 0.513" DWG No.: 9321-F-20193 rev. 56 Thickness: 1.260" Grid Size: 6" WR/Mod: IP3-02-24705 Configuration: See drawing below Datum Point: Outside Radius of Elbow QA Category: Non Cat. 1 ASME XI Class: N/A Cat: N/A Acceptance Standard: 1.103" Procedure: NDEP 9.4-12!Q Rev.: 4 FW-02.4-1SE 6" Grid Spacing
[11m! J1 C( I{ ~ '71 FW-02.4-1SE-02
-' Integral Attachment 7 17 A1 11 13 12 11 EW::Il2 '-l§E::Il2 ~
~
FW-02.4-1SE Min: 0.513" Max: 1.625" FW-02.4-16P-03
~
- - 10 i
LOW READING Looking DIS __ 0.496" I
A1 9 r-- ~
ElIll::Q2 '-l liE::Il2 6
' - - fW-02.4-16P.oo Min: 1.348"
/
l~
Obstruction due to FW-02,4-14P-01 ~ Max: 1.401" Integral
Attachment:
Min: 1.379" 8
AOS, A09 & A10 Max: 1.399" FW-02.4-14P-01 1° A1 7 I 6
A B C 0 E Remarks:
All thickness readin s above are in thousandths of an inch. Examiner: 6hristoeher J. Danson Level: ilL Date: 3/31/2003 For Min. & Max. Readings reference above Sketch.
Low readings due to lamination. Examiner: ichael W. Julison Level: ilL Date: 3131/2003 Obstruction due to Integral Attachment see above.
Reviewed by: Level: TTf' Date: tr/Ll03 ANII Review: Date:
!Method Used: Grid Point Readin s ~~~-~ --~-
REA1-01
lJ m
(")
8 File NC)me,:' ;...... ~~ ..*** ~.~" .... "" '.' - -_*.A"'~_.
2 Fil~type':
ex> File'D~scripiib~'i o ', ' .... . .... :....... .
~ L()cat.i()!1~ r-J?te :
Inspector ID:
!iiiiil~=lI T" . . " ......,.... ,.:. '.: J.
I
- uht1erJ?~~.. . :". . . ' .':'.
- .': ::':":":>:::'--~~'~"~~;~"::'~'~~:~~~~~'
?;::r ft$...
"'):>.
'1}:. ~j
~.
- w. o
~ ..
-f.}.:
.~ ... ~.
\:i.
~
R:epotl .Oi'lte:~/41.).2003
'"0 .*Winplus.Dar"~~rid
~ f\i'.I:02:ljA.",,,,
o .... . . .' .... ......
o F i l e N a m e : S u r Y e y . O a t " o ; '.' .
.. ~..~ .... .
.~~~""
0 " "", . .. .. , *... '.'.'" .,.."",' *. .....
I'V File Type : Er~e Protection:
~ Fi!e Q~s~!ip\i~n: .' ~@, ~.~~~0~L,~
0"1 Lqc.;ltionNo,le:. .MaxA~dit:lg:
00 .* . ':"."'", '. "......... ,." .' "
Inspec;t()f'IO~::." " ,
~~.
~.
~
V)
'"U WmPlusDatp*,.qrid m
()
8~F~ile~N~a~m~e~:~~~~.-.~*~AM~ ..*.0,"O~2~.4~;1~bP~<O=3~"'~~~~~~~~~~~~~~~~S~U~N*~~;D~'~~te~<~"~~~~~~~~~~~~~~~----~~----~~~~
2 File'rype: ., ""zD'i3riti'" Eri;i{pidfeJtioh';
~Fil~Desct,iet19~.: f~9*:"p,ipK.. .. . . ........'. ,. .,.; ..Hjh*,~~cif!ih~L:_* ., .,
~ LF.J~(1\io!'1l'Jg.t,e: tH~A!E;F:1 DRAJ~" ..~fl~*.~~!F~~a~~~~qi~:* .
.Ih~~\o,rlp:
8 7 5 D @
REFERENCEDRAWXNGS, fLOW,QIAGRA!l, '
PIPIIlG, ARRGMT * -PLAN, PIPlNG, ,'ARRGHT,' 'Pt:AN PIPlNG:ARRGMT;-SECT.
ItG.~r'o ".'lfNDIANPDINT
~ . *"-"-ERDSIONCORROSION NO.3 NUyLE I
A ""~~'**:~*'*" 1*~H~tH~~~E~O~~~~NI
,r---'-"'---'--t..",=ru"-,.;p:;;;.::O;;P.OV~,c""'-/':
'., FROM 30)" HEADER .T!
~ UPDATED AS ,PERENGINEEIlINGREOl.l<;$cT j'l " --'" ...... ~~It~RL~~lfEDf~GA\.J,
, iUP[)ATED AS PERENGINf:ERING' REQUEsT
~
- ,;,;,I ...OoED .INSPm'rqN pOINTS. """"- NewYorkPower *fDwG*f OA n
- : IDE$CRIP"(~ON-
"'" AlJthorlty r-ic 8
~r r
TRAVELER PACKAGE CHECKLIST
- 1. PreinspeClion briefing given by Erosion/Corrosion Engineer ~~~_~~EtC ng. 0 e ::;/
~
UTTech UTTeCh._ )t.TTTech UTTech
- 2. Traveler package contents ~ ~
UT Tech E/C Eng.
- a. Copy of procedure NOEP 9.4-12
- b. Calibration sheet
- c. Drawing with point highlighted
- d. Data sheet
- e. EtC Engineers phone number ~(-2{(:,' *'Z.
- 3. Location verified against drawing: ~..
2 UTTech
- 4. Preinspection point setup per procedure NDEP-9.4-12:
(If grid ding is used) UTTech
- a. Correct grld size used
- b. Grid correctly laid out
- c. Grid lettered and numbered correctly
- d. Grid low stress stamped correctly
- e. Area up/downstream of component prop y laid out
- 5. Data Logger UTTech
- a. Inspection point used as file name
- b. Operators 10 correct
- c. Instrument 10 correct
- 6. Data Sheet
- a. Flow direction correct
- b. Sketch drawn correctly 7.
- c. Component number verified Calibration Sheet correct 01
- 8. Daily review complete g . ~7 03 t
,~
E/C Eng.
NOTE:
- UT Technician sign-off is required prior to start of inspeCtion activity.
- Engineering sign-off is required after verification of activity.
R12 Traveler IPEC00020861
INDIAN POINT 3 R012 Inspection Point FW-02.4-15E Work Order IP3-02-24 705 Pipe Size, inches 30 Tnom 1.260 Screen (87.5% Tnom) 1.103 Screen (70% Tnom) 0.882 Grid Size, in. 6" Pipe Class 8-1 Pipe Spec, Grade A-672 Gr. 870 Class 21 Fitting Spec, Grade A-234 WPC Schedule N/A Design Pressure, psi 1440 Design Temperature of 450 Allowable Stress, psi 17500 IPEC00020862