ML12340A775
| ML12340A775 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 12/09/2011 |
| From: | Entergy Nuclear Operations, GZA GeoEnvironmental |
| To: | Atomic Safety and Licensing Board Panel |
| SECY RAS | |
| References | |
| RAS 23571, 50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01 | |
| Download: ML12340A775 (171) | |
Text
ENT00575I Submitted: October 2, 2012 United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of:
Entergy Nuclear Operations, Inc.
(Indian Point Nuclear Generating Units 2 and 3)
ASLBP #: 07-858-03-LR-BD01 Docket #: 05000247 l 05000286 Exhibit #:
Identified:
Admitted:
Withdrawn:
Rejected:
Stricken:
Other:
ENT00575I-00-BD01 10/15/2012 10/15/2012 CLIENT:
Entergy - !PEC SITE:
Buchanan, NY WEATHER:
Sw.",,y y) 4 1) ~
GZA GeoEnvironmental of New York Waterloo Sampling Data Sheet PROJECT NO:
DATE:
SAMPLER(S):
SAMPLING INTERVAL (depth in ft below top of casing)
TOTAL VOLUME PURGED:
IB,~
to WELL ID: MW !IfL - R SAMPLE ID: orr 01.0017J!69*Z I ZloCf 1/
/. '].5" gal PURGE RATE:
variable (gal/min)
SAMPLING PORT PURGE METHOD:
Double Valve Pump b
WATER QUALITY:
- specifIc Dissolved Turbidity Time Purged Volume Temp (0C)
Conductivity Oxygen (mg/I) pH (SU) ORP (mlVolts)
(NTU)
Drive/Vent Drive Pressure (gal)
(mS/m)
Cycle (seconds)
(psi)
(3%)
(3%)
(10%)
(+/- 0.1)
(+/- 10)
(10%)
IJnid 0
PUMP ON
~'5/9 It:?
{ Ii 0.15 14 * )(g l.eU.?1 2*50 1/). qt(
~ 25'- 0 C/*(;5 i IIIJ
- n. 2~
14.%('
').tfOv
- 1. ~OJ
/d.g4
~)".,';
- 2. ~ oS 121 (9,LlO
/'1. 10
').~'l 2*3'0
.." '3l.
~ 1'2*.?J 2.(' 3 1"'20
()*lJ5'
- 14../ '0 1. Jf'11 2.,1-'-1
~ 0"1
-J 2* 2 I, ( 1 1 51 b.kf)
/4. - b
"). &1.5
~' bl 1.0/
-'I.4 I /~ g' I I~
1.05 14.~ IG 2, R~5
'2. /'1
-,.()v
-.:::./J
/. 1 11 3f>
rt:;.
~ A-rvIP ~G L.OU Gc.-n ~J\\I 1150 enID SI11 irJ P U; I'..IJL 16r.., -ru::w :., v.z:vt;(
117 UIY1 f o.rt I-'"
Equipment Used Equipment Identification #
YSI 556 MPS Reader and 5563 Sonde a
turbidity meter 2<<>, () 12 c;tt NOTES AND OBSERVATIONS:
Measured Well Depth N/A (feet from top of casing)
Well Vault Condition
FINAL QUARTERLY LONG-TERM GROUNDWATER MONITORING REPORT Q1 THROUGH Q4 2011 (REPORT NO. 13)
APPENDIX E: 2011 MID-QUARTER SAMPLING DATA SHEETS
FINAL QUARTERLY LONG-TERM GROUNDWATER MONITORING REPORT Q1 THROUGH Q4 2011 (REPORT NO. 13)
APPENDIX E: Q1-2011 MID-QUARTER SAMPLING DATA SHEETS
FINAL QUARTERLY LONG-TERM GROUNDWATER MONITORING REPORT Q1 THROUGH Q4 2011 (REPORT NO. 13)
APPENDIX E: Q2-2011 MID-QUARTER SAMPLING DATA SHEETS
FINAL QUARTERLY LONG-TERM GROUNDWATER MONITORING REPORT Q1 THROUGH Q4 2011 (REPORT NO. 13)
APPENDIX E: Q3-2011 MID-QUARTER SAMPLING DATA SHEETS