MONTHYEARML15337A3522015-11-17017 November 2015 Official Exhibit - NYS000582-00-BD01 - Diagram of Strength Vs Amplitude by Dr. Richard T. Lahey ML15337A3372015-11-11011 November 2015 Official Exhibit - ENTR00726-00-BD01 - Track 2 Hearing Exhibit List ML15337A3322015-11-0505 November 2015 Official Exhibit - ENT000726-00-BD01 - Entergy Track 2 Hearing Exhibit List ML15337A3352015-11-0505 November 2015 Official Exhibit - RIVR14001-00-BD01 - Riverkeeper Tailored Track 2 Exhibit List ML15337A3362015-11-0505 November 2015 Official Exhibit - NRCR10001-00-BD01 - NRC Staff Track 2 Exhibit List ML15337A3332015-11-0404 November 2015 Official Exhibit - NYSR25001-00-BD01 - NYS Revised Tailored Exhibits List Relevant to Track 2 Contentions ML15337A3312015-11-0303 November 2015 Official Exhibit - NRC000230-00-BD01 - Corrections to Prefiled Testimony NRC000168 and NRC000197 ML15337A3262015-10-29029 October 2015 Official Exhibit - ENT000722-00-BD01 - Supplemental Testimony of Entergy Witnesses Nelson Azevedo, Timothy Griesbach & Randy Lott ML15337A3292015-10-29029 October 2015 Official Exhibit - ENTR16001-00-BD01 - Entergy Revised Exhibit List ML15337A3242015-09-23023 September 2015 Official Exhibit - NYS000576-00-BD01 - Pre-Filed Supplemental Testimony of Richard T. Lahey Re Contentions NYS-25, NYS-26B/RK-TC-1B & NYS-38/RK-TC-5 ML15337A3072015-09-0909 September 2015 Official Exhibit - NYS000573-PUB-00-BD01 - Supplemental Reply Statement of Position of the State of New York and Riverkeeper, Inc. in Support of Contention NYS-38/RK-TC-5 (Public, Redacted) (September 9, 2015) ML15337A2962015-09-0909 September 2015 Official Exhibit - NYS000570-PUB-00-BD01 - Supplemental Reply Statement of Position of the State of New York and Riverkeeper, Inc. in Support of Contention NYS-26B/RK-TC-1B (Public, Redacted) (September 9, 2015) ML15337A2832015-09-0909 September 2015 Official Exhibit - NYS000563-00-BD01 - Pressurized Water Reactor (PWR) Systems, USNRC Technical Training Center, Reactor Concepts Manual, Pages 4-1 to 4-28 ML15337A2952015-09-0909 September 2015 Official Exhibit - NYS000569-PUB-00-BD01 - Pre-filed Supplemental Reply Testimony of Richard T. Lahey, Jr. in Support of Contention NYS-26B/RK-TC-1B (Public, Redacted) (September 9, 2015) ML15337A2942015-09-0909 September 2015 Official Exhibit - NYS000568-PUB-00-BD01 - Supplemental Reply Statement of Position of the State of New York in Support of Contention NYS-25 (Public, Redacted) (September 9, 2015) ML15337A2932015-09-0909 September 2015 Official Exhibit - NYS000567-PUB-00-BD01 - Pre-filed Supplemental Reply Testimony of Richard T. Lahey, Jr. in Support of Contention NYS-25 (Public, Redacted) (September 9, 2015) ML15337A3042015-09-0909 September 2015 Official Exhibit - NYS000571-PUB-00-BD01 - Pre-filed Supplemental Reply Testimony of David J. Duquette in Support of Contention NYS-38/RK-TC-5 (Public, Redacted) (September 9, 2015) ML15337A2972015-09-0909 September 2015 Official Exhibit - RIV000164-00-BD01 - NUREG-1740, ACRS, Voltage-Based Alternative Repair Criteria: a Report to the Advisory Committee on Reactor Safeguards by the Ad Hoc Subcommittee on a Differing Professional Opinion (2001) ML15337A3062015-09-0909 September 2015 Official Exhibit - NYS000572-PUB-00-BD01 - Pre-filed Supplemental Reply Testimony of Richard T. Lahey, Jr. in Support of Contention NYS-38/RK-TC-5 (Public, Redacted) (September 9, 2015) ML15337A2822015-09-0909 September 2015 Official Exhibit - NYS000566-00-BD01 - Figure 1 for Supplemental Reply Testimony of Dr. Richard T. Lahey ML15337A3142015-09-0404 September 2015 Official Exhibit - ENTR00615-PUB-00-BD01 - Entergy'S Statement of Position Re Contention NYS-25 (Embrittlement) - Redacted ML15334A2842015-08-10010 August 2015 Official Exhibit - ENT000687-00-BD01 - NRC, Safety Evaluation Report, Topical Report on ASME Section III Piping and Component Fatigue Analysis Utilizing the Westems Computer Code (WCAP-17577, Revision 2) (Undated) ML15335A2932015-08-10010 August 2015 Official Exhibit - NRCR00104-00-BD01 - on Yee Statement of Professional Qualifications (Revised) ML15337A2642015-08-10010 August 2015 Official Exhibit - NRC000196-PUB-00-BD01 - NRC Staff'S Initial Statement of Position on Contention NYS-25 (Reactor Vessel Internals) ML15337A3192015-08-10010 August 2015 Official Exhibit - ENT000698-PUB-00-BD01 - Entergy'S Revised Statement of Position Regarding Contention NYS-38/RK-TC-5(Safety Commitments) (Aug. 10, 2015)Redacted ML15337A3202015-08-10010 August 2015 Official Exhibit - ENT000699-PUB-00-BD01 - Redacted Revised Testimony of Entergy Witnesses Nelson Azevedo, Robert Dolansky, Alan Cox, Jack Strosnider, Timothy Griesbach, Barry Gordon, Randy Lott, and Mark Gray Regarding Contention NYS-38/RK ML15337A3172015-08-10010 August 2015 Official Exhibit - ENT000678-PUB-00-BD01 - NL-07-140, Letter from F. Dacimo, Entergy, to NRC Document Control Desk, ?Reply to Request for Additional Information Regarding License Renewal Application? (Nov. 28, 2007)Redacted ML15337A2652015-08-10010 August 2015 Official Exhibit - NRC000197-PUB-00-BD01 - NRC Staff Testimony of Dr. Allen Hiser, Jeffrey Poehler, and Gary Stevens on NYS-25 and NYS-38/RK-TC-5 ML15337A2412015-08-10010 August 2015 Official Exhibit - NRCR00147-00-BD01 - NRC Staff'S Revised Statement of Position on State of New York and Riverkeeper'S Joint Contention NYS-38/RK-TC5 (Revised) ML15335A2902015-08-10010 August 2015 Official Exhibit - NRC000222-00-BD01 - IP3 FSAR Rev. 04 Chapter 3 (2011) (Excerpt) ML15334A2632015-08-10010 August 2015 Official Exhibit - ENT000648-00-BD01 - M. Mitchell, Chief, Vessels and Internals Integrity Branch, Response to Non-Concurrence Regarding Safety Evaluation for Topical Report MRP-227 Pressurized Water Reactor Internals Inspection and Evaluat ML15337A2622015-08-10010 August 2015 Official Exhibit - NRC000228-00-BD01 - Indian Point Unit 2 Technical Specifications 3.1.4 ML15337A2452015-08-10010 August 2015 Official Exhibit - NRC000227-00-BD01 - Gary Stevens Statement of Professional Qualifications ML15337A2632015-08-10010 August 2015 Official Exhibit - NRC000229-00-BD01 - Indian Point, Unit 3 Technical Specifications 3.1.4 ML15335A2192015-08-10010 August 2015 Official Exhibit - ENTR00031-00-BD01 - Curriculum Vitae of Alan B. Cox ML15335A2112015-08-10010 August 2015 Official Exhibit - ENTR20186-00-BD01 - Curriculum Vitae of Mark A. Gray ML15337A3162015-08-10010 August 2015 Official Exhibit - ENT000616-PUB-00-BD01 - Testimony of Entergy Witnesses Nelson F. Azevedo, Robert J. Dolansky, Alan B. Cox, Jack R. Strosnider, Timothy J. Griesbach, Randy G. Lott, and Mark A. Gray Regarding Contention NYS-25 (Embrittleme ML15337A2782015-08-10010 August 2015 Official Exhibit - NRC000168-PUB-00-BD01 - NRC Staff Testimony of Dr. Allen Hiser, Dr. Ching Ng, Mr. Gary Stevens, P.E., and Mr. on Yee, Concerning Contentions NYS-26B/RK-TC-1B and NYS-38/RK-TC-5 ML15337A2712015-08-10010 August 2015 Official Exhibit - NRC000223-00-BD01 - IP3 FSAR Rev. 04 Chapter 14 (2011) ML15337A2592015-08-10010 August 2015 Official Exhibit - NRC000224-00-BD01 - IP3 FSAR Rev. 04 Chapter 16 ML15337A2442015-08-10010 August 2015 Official Exhibit - NRCR00161-00-BD01 - NRC Staff Testimony of Dr. Allen L. Hiser and Mr. Kenneth J. Karwoski Concerning Portions of State of New York and Riverkeeper, Inc. Joint Contention NYS-38/RK-TC5 (Revised) ML15334A2822015-08-10010 August 2015 Official Exhibit - ENT000680-00-BD01 - Curriculum Vitae of Barry M. Gordon ML15335A2912015-08-10010 August 2015 Official Exhibit - NRCR00118-00-BD01 - Indian Point Unit 3 Technical Specifications (Excerpt) (Revised) ML15334A2282015-08-10010 August 2015 Official Exhibit - ENT000634-00-BD01 - Entergy, IP2, FSAR Update, Revision 25 (2014) (Excerpts) ML15335A2822015-08-10010 August 2015 Official Exhibit - NRC000220-00-BD01 - Pressurized Water Reactor Owners Group (PWROG) Presentation Slides, Industry and NRC Coordination Meeting Materials Programs Technical Exchange: Clevis Insert Bolt Update, (June 2014) ML15337A2692015-08-10010 August 2015 Official Exhibit - NRC000169-00-BD01 - NRC000169 - Indian Point, Unit 2 Technical Specifications (Excerpt) ML15337A2602015-08-10010 August 2015 Official Exhibit - NRC000226-00-BD01 - Jeffrey C. Poehler Statement of Professional Qualifications ML15335A2732015-08-10010 August 2015 Official Exhibit - NRC000183-00-BD01 - NRC Inspection Manual, Inspection Procedure 71013, Site Inspection for Plants with a Timely Renewal Application (Sept. 25, 2013) ML15335A2202015-08-10010 August 2015 Official Exhibit - ENTR00184-00-BD01 - Curriculum Vitae of Jack R. Strosnider ML15335A3012015-08-10010 August 2015 Official Exhibit - NRC000206-00-BD01 - Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 25, Chapter 14 - Safety Analysis (2014) 2015-09-09
[Table view] |
Text
United States Nuclear Regulatory Commission Official Hearing Exhibit Entergy Nuclear Operations, Inc.
In the Matter of:
(Indian Point Nuclear Generating Units 2 and 3)
ASLBP #: 07-858-03-LR-BD01 Docket #: 05000247 l 05000286 RIV000125 Exhibit #: RIV000125-00-BD01 Identified: 10/15/2012 Submitted: July 13, 2012 Admitted: 10/15/2012 Withdrawn:
Rejected: Stricken:
Other:
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD
)
In the Matter of ) Docket Nos.
) 50-247-LR Entergy Nuclear Operations, Inc. ) and 50-286-LR (Indian Point Nuclear Generating )
Units 2 and 3) ) July 13, 2012
___________________________________________ )
Declaration of Phillip Musegaas in Support of Intervenors Rebuttal to Entergys Initial Hearing Submissions Pertaining to Consolidated Contention RK-EC-3/CW-EC-1 Phillip Musegaas hereby declares under penalty of perjury that the following is true and correct:
- 1. I am currently employed by Riverkeeper, Inc., and hold the position of Hudson River Program Director.
- 2. I am co-counsel for petitioner-intervenor Riverkeeper in the above-referenced proceeding concerning the application by Entergy Nuclear Operations, Inc. (Entergy) for a renewal of the two separate operating licenses for the nuclear power generating facilities located at Indian Point on the east bank of the Hudson River in the Village of Buchanan, Westchester County, New York, for twenty years beyond their current expiration dates.
- 3. I submit this declaration in support of Riverkeeper and Hudson River Sloop Clearwater, Inc.s Consolidated Contention RK-EC-3/CW-EC-1 concerning the inadequate environmental review of spent fuel pool leaks and radiological contamination at Indian Point.
- 4. I began my employment with Riverkeeper in August, 2005.
- 5. From August 2005 - October 2006, I was a Policy Analyst for Riverkeeper.
- 6. From October 2006 - September 2008, I was a Staff Attorney for Riverkeeper, assigned to work on Riverkeepers Indian Point Campaign, which included preparing to participate in the Indian Point license renewal process before the Nuclear Regulatory Commission.
1
- 7. From September 2008 to the present, I have held the position of Hudson River Program Director.
- 8. In the course of my employment at Riverkeeper, in the spring of 2007, I was personally and directly involved in a project concerning a proposed study of the impact of radiological leaks from Indian Point on the Hudson River ecosystem.
- 9. In particular, at that time, I contacted Dr. Chris Gobler, an Associate Professor at Stony Brook University, to discuss a possible study of Hudson River sediments, fish and shellfish in the vicinity of the Indian Point nuclear power plant, to determine whether the aforementioned biota or sediment contained elevated levels of radionuclides. Riverkeepers interest in having this study conducted arose following the disclosure by Entergy of leaks of radioactively contaminated water from Indian Points spent fuel pools in 2005. At the time, I was responsible for Riverkeepers efforts to commission this study.
- 10. On August 17, 2007, Dr. Gobler submitted a study proposal to Riverkeeper, which Entergy has offered in this proceeding as Exhibit ENT000367.
- 11. Riverkeeper accepted the proposal, and Dr. Gobler began collecting samples in October 2007. Some limited collection of clam and sediment samples was performed using Riverkeepers boat, under the supervision of John Lipscomb, Riverkeepers boat captain and manager of the Boat Program. Dr. Gobler also collected samples independently, without Riverkeepers assistance.
- 12. On July 10, 2008, Dr. Gobler sent an e-mail to me and other Riverkeeper staff, describing the initial results of his analysis of samples collected during the previous year. A copy of this email was submitted into this proceeding by Entergy as Entergy Exhibit ENT000368.
- 13. As described in the email from Dr. Gobler, none of the shellfish samples he collected and analyzed had detectable levels of the radionuclides being tested for. In the same email message, Dr. Gobler expressed interest in conducting further sample collection and continuing the study.
2
- 14. As of July 2008, samples of aquatic biota and sediments in the Hudson River had only been collected during the fall of 2007, in one sampling season.
- 15. Due to staffing and resource constraints, Riverkeeper did not ask Dr. Gobler to collect additional samples of aquatic biota or Hudson River sediments subsequent to the initial 2007 sample collection effort.
- 16. Dr. Gobler was also not asked by Riverkeeper to prepare a final report summarizing his initial study, due to Riverkeepers limited resources.
- 17. In my capacity as the Riverkeeper employee responsible for this work, and based on my discussions with Dr. Gobler, I did not consider the sample collection and analysis done by Dr.
Gobler to be a complete study. For that reason, the initial results of the study, documented in Dr.
Goblers July 10, 2008 email, ENT000368, were not cited or referenced in Riverkeepers pre-filed direct testimony on Contention RK-EC-3/CW-EC-1.
- 18. Based on the incomplete nature of the work conducted by Dr. Gobler, it is my understanding that generic conclusions were not, nor could be, made based upon the sampling results obtained.
- 19. I declare under penalty of perjury that the foregoing is true and correct.
Executed on July 13, 2012.
Signed (electronically) by Phillip Musegaas Phillip Musegaas, Esq.
3