Category:Legal-Exhibit
MONTHYEARML15337A3522015-11-17017 November 2015 Official Exhibit - NYS000582-00-BD01 - Diagram of Strength Vs Amplitude by Dr. Richard T. Lahey ML15337A3372015-11-11011 November 2015 Official Exhibit - ENTR00726-00-BD01 - Track 2 Hearing Exhibit List ML15337A3322015-11-0505 November 2015 Official Exhibit - ENT000726-00-BD01 - Entergy Track 2 Hearing Exhibit List ML15337A3352015-11-0505 November 2015 Official Exhibit - RIVR14001-00-BD01 - Riverkeeper Tailored Track 2 Exhibit List ML15337A3362015-11-0505 November 2015 Official Exhibit - NRCR10001-00-BD01 - NRC Staff Track 2 Exhibit List ML15337A3332015-11-0404 November 2015 Official Exhibit - NYSR25001-00-BD01 - NYS Revised Tailored Exhibits List Relevant to Track 2 Contentions ML15337A3312015-11-0303 November 2015 Official Exhibit - NRC000230-00-BD01 - Corrections to Prefiled Testimony NRC000168 and NRC000197 ML15337A3262015-10-29029 October 2015 Official Exhibit - ENT000722-00-BD01 - Supplemental Testimony of Entergy Witnesses Nelson Azevedo, Timothy Griesbach & Randy Lott ML15337A3292015-10-29029 October 2015 Official Exhibit - ENTR16001-00-BD01 - Entergy Revised Exhibit List ML15337A3242015-09-23023 September 2015 Official Exhibit - NYS000576-00-BD01 - Pre-Filed Supplemental Testimony of Richard T. Lahey Re Contentions NYS-25, NYS-26B/RK-TC-1B & NYS-38/RK-TC-5 ML15337A3072015-09-0909 September 2015 Official Exhibit - NYS000573-PUB-00-BD01 - Supplemental Reply Statement of Position of the State of New York and Riverkeeper, Inc. in Support of Contention NYS-38/RK-TC-5 (Public, Redacted) (September 9, 2015) ML15337A2962015-09-0909 September 2015 Official Exhibit - NYS000570-PUB-00-BD01 - Supplemental Reply Statement of Position of the State of New York and Riverkeeper, Inc. in Support of Contention NYS-26B/RK-TC-1B (Public, Redacted) (September 9, 2015) ML15337A2832015-09-0909 September 2015 Official Exhibit - NYS000563-00-BD01 - Pressurized Water Reactor (PWR) Systems, USNRC Technical Training Center, Reactor Concepts Manual, Pages 4-1 to 4-28 ML15337A2952015-09-0909 September 2015 Official Exhibit - NYS000569-PUB-00-BD01 - Pre-filed Supplemental Reply Testimony of Richard T. Lahey, Jr. in Support of Contention NYS-26B/RK-TC-1B (Public, Redacted) (September 9, 2015) ML15337A2942015-09-0909 September 2015 Official Exhibit - NYS000568-PUB-00-BD01 - Supplemental Reply Statement of Position of the State of New York in Support of Contention NYS-25 (Public, Redacted) (September 9, 2015) ML15337A2932015-09-0909 September 2015 Official Exhibit - NYS000567-PUB-00-BD01 - Pre-filed Supplemental Reply Testimony of Richard T. Lahey, Jr. in Support of Contention NYS-25 (Public, Redacted) (September 9, 2015) ML15337A3042015-09-0909 September 2015 Official Exhibit - NYS000571-PUB-00-BD01 - Pre-filed Supplemental Reply Testimony of David J. Duquette in Support of Contention NYS-38/RK-TC-5 (Public, Redacted) (September 9, 2015) ML15337A2972015-09-0909 September 2015 Official Exhibit - RIV000164-00-BD01 - NUREG-1740, ACRS, Voltage-Based Alternative Repair Criteria: a Report to the Advisory Committee on Reactor Safeguards by the Ad Hoc Subcommittee on a Differing Professional Opinion (2001) ML15337A3062015-09-0909 September 2015 Official Exhibit - NYS000572-PUB-00-BD01 - Pre-filed Supplemental Reply Testimony of Richard T. Lahey, Jr. in Support of Contention NYS-38/RK-TC-5 (Public, Redacted) (September 9, 2015) ML15337A2822015-09-0909 September 2015 Official Exhibit - NYS000566-00-BD01 - Figure 1 for Supplemental Reply Testimony of Dr. Richard T. Lahey ML15337A3142015-09-0404 September 2015 Official Exhibit - ENTR00615-PUB-00-BD01 - Entergy'S Statement of Position Re Contention NYS-25 (Embrittlement) - Redacted ML15334A2842015-08-10010 August 2015 Official Exhibit - ENT000687-00-BD01 - NRC, Safety Evaluation Report, Topical Report on ASME Section III Piping and Component Fatigue Analysis Utilizing the Westems Computer Code (WCAP-17577, Revision 2) (Undated) ML15335A2932015-08-10010 August 2015 Official Exhibit - NRCR00104-00-BD01 - on Yee Statement of Professional Qualifications (Revised) ML15337A2642015-08-10010 August 2015 Official Exhibit - NRC000196-PUB-00-BD01 - NRC Staff'S Initial Statement of Position on Contention NYS-25 (Reactor Vessel Internals) ML15337A3192015-08-10010 August 2015 Official Exhibit - ENT000698-PUB-00-BD01 - Entergy'S Revised Statement of Position Regarding Contention NYS-38/RK-TC-5(Safety Commitments) (Aug. 10, 2015)Redacted ML15337A3202015-08-10010 August 2015 Official Exhibit - ENT000699-PUB-00-BD01 - Redacted Revised Testimony of Entergy Witnesses Nelson Azevedo, Robert Dolansky, Alan Cox, Jack Strosnider, Timothy Griesbach, Barry Gordon, Randy Lott, and Mark Gray Regarding Contention NYS-38/RK ML15337A3172015-08-10010 August 2015 Official Exhibit - ENT000678-PUB-00-BD01 - NL-07-140, Letter from F. Dacimo, Entergy, to NRC Document Control Desk, ?Reply to Request for Additional Information Regarding License Renewal Application? (Nov. 28, 2007)Redacted ML15337A2652015-08-10010 August 2015 Official Exhibit - NRC000197-PUB-00-BD01 - NRC Staff Testimony of Dr. Allen Hiser, Jeffrey Poehler, and Gary Stevens on NYS-25 and NYS-38/RK-TC-5 ML15337A2412015-08-10010 August 2015 Official Exhibit - NRCR00147-00-BD01 - NRC Staff'S Revised Statement of Position on State of New York and Riverkeeper'S Joint Contention NYS-38/RK-TC5 (Revised) ML15335A2902015-08-10010 August 2015 Official Exhibit - NRC000222-00-BD01 - IP3 FSAR Rev. 04 Chapter 3 (2011) (Excerpt) ML15334A2632015-08-10010 August 2015 Official Exhibit - ENT000648-00-BD01 - M. Mitchell, Chief, Vessels and Internals Integrity Branch, Response to Non-Concurrence Regarding Safety Evaluation for Topical Report MRP-227 Pressurized Water Reactor Internals Inspection and Evaluat ML15337A2622015-08-10010 August 2015 Official Exhibit - NRC000228-00-BD01 - Indian Point Unit 2 Technical Specifications 3.1.4 ML15337A2452015-08-10010 August 2015 Official Exhibit - NRC000227-00-BD01 - Gary Stevens Statement of Professional Qualifications ML15337A2632015-08-10010 August 2015 Official Exhibit - NRC000229-00-BD01 - Indian Point, Unit 3 Technical Specifications 3.1.4 ML15335A2192015-08-10010 August 2015 Official Exhibit - ENTR00031-00-BD01 - Curriculum Vitae of Alan B. Cox ML15335A2112015-08-10010 August 2015 Official Exhibit - ENTR20186-00-BD01 - Curriculum Vitae of Mark A. Gray ML15337A3162015-08-10010 August 2015 Official Exhibit - ENT000616-PUB-00-BD01 - Testimony of Entergy Witnesses Nelson F. Azevedo, Robert J. Dolansky, Alan B. Cox, Jack R. Strosnider, Timothy J. Griesbach, Randy G. Lott, and Mark A. Gray Regarding Contention NYS-25 (Embrittleme ML15337A2782015-08-10010 August 2015 Official Exhibit - NRC000168-PUB-00-BD01 - NRC Staff Testimony of Dr. Allen Hiser, Dr. Ching Ng, Mr. Gary Stevens, P.E., and Mr. on Yee, Concerning Contentions NYS-26B/RK-TC-1B and NYS-38/RK-TC-5 ML15337A2712015-08-10010 August 2015 Official Exhibit - NRC000223-00-BD01 - IP3 FSAR Rev. 04 Chapter 14 (2011) ML15337A2592015-08-10010 August 2015 Official Exhibit - NRC000224-00-BD01 - IP3 FSAR Rev. 04 Chapter 16 ML15337A2442015-08-10010 August 2015 Official Exhibit - NRCR00161-00-BD01 - NRC Staff Testimony of Dr. Allen L. Hiser and Mr. Kenneth J. Karwoski Concerning Portions of State of New York and Riverkeeper, Inc. Joint Contention NYS-38/RK-TC5 (Revised) ML15334A2822015-08-10010 August 2015 Official Exhibit - ENT000680-00-BD01 - Curriculum Vitae of Barry M. Gordon ML15335A2912015-08-10010 August 2015 Official Exhibit - NRCR00118-00-BD01 - Indian Point Unit 3 Technical Specifications (Excerpt) (Revised) ML15334A2282015-08-10010 August 2015 Official Exhibit - ENT000634-00-BD01 - Entergy, IP2, FSAR Update, Revision 25 (2014) (Excerpts) ML15335A2822015-08-10010 August 2015 Official Exhibit - NRC000220-00-BD01 - Pressurized Water Reactor Owners Group (PWROG) Presentation Slides, Industry and NRC Coordination Meeting Materials Programs Technical Exchange: Clevis Insert Bolt Update, (June 2014) ML15337A2692015-08-10010 August 2015 Official Exhibit - NRC000169-00-BD01 - NRC000169 - Indian Point, Unit 2 Technical Specifications (Excerpt) ML15337A2602015-08-10010 August 2015 Official Exhibit - NRC000226-00-BD01 - Jeffrey C. Poehler Statement of Professional Qualifications ML15335A2732015-08-10010 August 2015 Official Exhibit - NRC000183-00-BD01 - NRC Inspection Manual, Inspection Procedure 71013, Site Inspection for Plants with a Timely Renewal Application (Sept. 25, 2013) ML15335A2202015-08-10010 August 2015 Official Exhibit - ENTR00184-00-BD01 - Curriculum Vitae of Jack R. Strosnider ML15335A3012015-08-10010 August 2015 Official Exhibit - NRC000206-00-BD01 - Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 25, Chapter 14 - Safety Analysis (2014) 2015-09-09
[Table view] |
Text
United States Nuclear Regulatory Commission Official Hearing Exhibit NYS000430 Entergy Nuclear Operations, Inc. Submitted: June 29, 2012 In the Matter of:
(Indian Point Nuclear Generating Units 2 and 3)
ASLBP #: 07-858-03-LR-BD01 Docket #: 05000247 l 05000286 Exhibit #: NYS000430-00-BD01 Identified: 10/15/2012 Admitted: 10/15/2012 Withdrawn:
Rejected: Stricken:
Other:
Revisions to Tables in ISR Report 13014-01-01:
Review of Indian Point Severe Accident Off Site Consequence Analysis (21 Dec 2011)
These revised tables include the following changes that account for the differences with the ISR Report:
Exclusion of compensation costs from Site Restoration and Reichmuth data (Tables 2 and 5);
Exclusion of surface water and farm area so that only nonfarm area is considered when determining CDNFRM (Tables 3-4, 7-10); and Update of conclusions as a result of these changes (Tables 11 and 13).
Table 2: Modified decontamination costs (2005 USD) for NYC using building density multiplier Luna, Survey of Site Restoration (Albuquerque) ISR Using Actual Building Densities (NYC)
Costs Area Light Moderate Heavy Building Light Moderate Heavy Land Use Fraction in (2<DF<5) (5<DF<10) (DF>10) Density (2<DF<5) (5<DF<10) (DF>10)
NYC ($M/km2) ($M/km2) ($M/km2) Multiplier ($M/km2) ($M/km2) ($M/km2)
Residential 0.287 $20.8 $38.7 $36.0 8.98 $186.7 $347.8 $323.0 Commercial 0.164 $21.4 $34.5 $57.8 8.98 $192.3 $309.8 $518.6 Industrial 0.068 $33.3 $35.3 $59.3 1 $33.3 $35.3 $59.3 Streets 0.25 $4.0 $4.6 $50.0 1 $4.0 $4.6 $50.0 Vacant land 0.238 $19.3 $20.4 $21.8 1 $19.3 $20.4 $21.8 Overall cost $98.7 $133.6 $224.8 $435.50 $717.86 $972.78
Table 3: Suggested values of CDNFRM assuming cost (cesium) = cost (plutonium) (costs in 2005 USD)
Light Decontamination (DF=3) Heavy Decontamination (DF=15)
Area Outside NYC Area Outside NYC NYC metro NYC metro Metro Area Metro Area Cost per km2 ($) from Site 4.36E+08 9.87E+07 9.73E+08 2.25E+08 Restoration /Survey of Costs Total nonfarm area within 50-mi radius 558 15441 558 15441 (km2)
Total cost for the area ($) 2.43E+11 1.52E+12 5.43E+11 3.47E+12 Total cost over 50-mi radius ($) 1.77E+12 4.01E+12 Population over 50-mi radius 19,228,712 19,228,712 CDNFRM 91,936 208,780 Per capita cost ($/person)
Table 4: Suggested values of CDNFRM assuming cost (cesium) = 2 x cost (plutonium) (costs in 2005 USD)
Light Decontamination (DF=3) Heavy Decontamination (DF=15)
Area Outside NYC Area Outside NYC NYC metro NYC metro Metro Area Metro Area Cost per km2 ($) from Site 8.71E+08 1.97E+08 1.95E+09 4.50E+08 Restoration /Survey of Costs Total nonfarm area within 50-mi radius 558 15441 558 15441 (km2)
Total cost for the area ($) 4.86E+11 3.05E+12 1.09E+12 6.94E+12 Total cost over 50-mi radius ($) 3.54E+12 8.03E+12 Population over 50-mi radius 19,228,712 19,228,712 CDNFRM 183,871 417,561 Per capita cost ($/person)
Table 7: Costs using CONDO values assuming the NYC metro area is classified as urban and the area outside the NYC metro area is classified as semi-urban (costs in 2005 USD)
Light Decontamination Heavy Decontamination (DF=3) (DF=15)
Area Outside NYC Area Outside NYC NYC metro NYC metro Metro Area Metro Area Cost per km2, ($)
2.78E+07 1.82E+07 1.31E+08 8.40E+07 (Annex C)
Total nonfarm area within 50-mi radius 558 15441 558 15441 (km2)
Total cost for the area ($) 1.55E+10 2.81E+11 7.31E+10 1.30E+12 Total cost over 50-mi radius ($) 2.97E+11 1.37E+12 Population over 50-mi radius 19,228,712 19,228,712 CDNFRM 15,422 71,255 Per capita cost ($/person)
Table 8: Costs using CONDO values assuming the NYC metro area is classified as hyper-urban and the area outside the NYC metro area is classified as urban (costs in 2005 USD)
Light Decontamination Heavy Decontamination (DF=3) (DF=15)
Area Outside NYC Area Outside NYC NYC metro NYC metro Metro Area Metro Area Cost per km2, ($)
5.61E+07 2.78E+07 2.64E+08 1.31E+08 (Annex C)
Total nonfarm area within 50-mi radius 558 15441 558 15441 (km2)
Total cost for the area ($) 3.13E+10 4.29E+11 1.47E+11 2.02E+12 Total cost over 50-mi radius ($) 4.61E+11 2.17E+12 Population over 50-mi radius 19,228,712 19,228,712 CDNFRM 23,952 112,856 Per capita cost ($/person)
Table 9: Costs using RISO values assuming the NYC metro area is classified as urban and the area outside the NYC metro area is classified as semi-urban (costs in 2005 USD)
Light Decontamination (DF=3)
Area Outside NYC NYC metro Metro Area Cost per km2 ($) (Annex C) 5.46E+07 3.34E+07 Total nonfarm area within 50-mi radius 558 15441 (km2)
Total cost for the area ($) 3.05E+10 5.16E+11 Total cost over 50-mi radius ($) 5.46E+11 Population over 50-mi radius 19,228,712 CDNFRM 28,405 Per capita cost ($/person)
Table 10: Costs using RISO values assuming the NYC metro area is classified as hyper-urban and the area outside the NYC metro area is classified as urban (costs in 2005 USD)
Light Decontamination (DF=3)
Area Outside NYC NYC metro Metro Area Cost per km2 ($)(Annex C) 1.17E+08 5.46E+07 Total nonfarm area within 50-mi radius 558 15441 (km2)
Total cost for the area ($) 6.53E+10 8.43E+11 Total cost over 50-mi radius ($) 9.08E+11 Population over 50-mi radius 19,228,712 CDNFRM 47,240 Per capita cost ($/person)
Table 5: Summary of the decontamination costs (2005 USD) based on Reichmuth's studies Target Cost per person of Total Cost of Cesium Activity Affected Area Decontamination (excl.
(population density) Restoration compensation)
NYC 1.0E+4 Ci 60 km2 $97 Billion $97,000 (10,000 persons/km2) (3.7E+14 Bq)
Vancouver 1.0E+3 Ci 6 km2 $8 Billion $150,720 (5,000 persons/km2) (3.7E+13 Bq)
Personal communication with Dr. Steven M Short and Dr. Tom Cousins, April 27, 2012
Table 11: Summary of ISRs decontamination costs CDNFRM ($/person, 2005)
Approach Reference or Source of Data Light Decontamination Heavy Decontamination
- Entergy (Sample Problem A) 5,184 13,824 A Site Restoration /Luna 91,936 - 183,871 208,780 - 417,561 B Reichmuth Not available 97,000 - 150,720 C CONDO 15,422 - 23,952 71,255 - 112,856 D RISO 28,405 - 47,240 Not available
- Aggregate 15,000 - 184,000 71,000 - 418,000
Table 13: Summary of ISR proposed inputs and calculated OECRs (costs in 2005 USD)
ISR's calculated OECR ($/yr) and Parameter Description Entergy's value ISR's proposed input value ratioa Minimum Maximum Minimum Maximum Per capita cost of nonfarm light CDNFRM (DF=3) $5,184 $15,000 $184,000 3.68E+05 1.18E+06 decontamination Per capita cost of nonfarm heavy CDNFRM (DF=15) $13,824 $71,000 $418,000 (1.74) (5.57) decontamination Time required for light TIMDEC (DF=3) 60 d 1y 15 y 4.43E+05 1.20E+06 decontamination Time required for heavy TIMDEC (DF=15) 120 d 2y 30 y (2.09) (5.66) decontamination 2.51E+05 Per capita value of nonfarm VALWNF $208,838 $284,189 wealth (2004 USD)
(1.18) 2.12E+05 DPRATE Depreciation rate 20% 20%
(1) 1.87E+05 1.95E+05 DSRATE Societal discount rate for property 12% 5% 7%
(0.88) (0.92)
Per capita cost of long-term 2.23E+05 4.41E+05 POPCST $8,640 $10,640 $49,857 relocation (1.05) (2.08)
Nonfarm wealth improvements 2.19E+05 FRNFIM 80% 90%
fraction (1.03) 6.34E+05 1.47E+06 Using all of ISRs proposed input values (2.99) (6.93) a Notes: The ratio shown in brackets is the ratio of the ISR-calculated OECR to the Entergy-calculated OECR ($2.12E+05/yr).