United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of:

Entergy Nuclear Operations, Inc.

(Indian Point Nuclear Generating Units 2 and 3)

ASLBP #: 07-858-03-LR-BD01 Docket #: 05000247 l 05000286 Exhibit #:

Identified:

Admitted:

Withdrawn:

Rejected:

Stricken:

Other:

ENT000443-00-BD01 10/15/2012 10/15/2012 ENT000443 Submitted: March 30, 2012 Entergy CONDITION REPORT I CR-IP2-2011-06248 Originator: Lee,Robert C Originator Site Group: IP2 P&C Eng Codes Staff IP2 Originator Phone: 6612 Operability Required: N Reportability Required: N Supervisor Name: Azevedo,Nelson F Discovered Date: 12/08/20 11 12:07 Condition

Description:

Initiated Date: 12/08/2011 12:20 An As-Found visual inspections of the OD coating on excavated SW Lines 408 & 409 piping were performed under the IPEC Buried Piping Program. The excavated area is at the existing access points on the 24-inch main header, at the west side of the IP2 Turbine Building (Ref. EC 25313, WO # 279576). Various locations where the coating system had failed or possibly mis-applied were found. There were no obvious signs of piping degradation at these locations, and therefore, there are no operability concerns. Coating repairs will be performed after the piping inspections are completed.

Immediate Action

Description:

Immediate action taken.

Upon inspection by Coatings specialist, requested that SW Line 408 elbow coating be removed in its entirety, and the elbow be re-coated.

Notified PCE Code Programs supervisor, wrote CR.

Suggested Action

Description:

Piping inspection results & required coating repairs to be captured in IPEC Buried Piping & Tank Program database.

EQUIPMENT:

Tag Name LINE408 LINE409 REFERENCE ITEMS:

Type Code CR KEYWORDS KEYWORDS KEYWORDS MOD WON Tag Suffix Name Component Code Process System Code EXiSR PIPE SW EXiSR PIPE S W Item Desc IP2-2011-06250 Buried Piping Service Water Pipe Coating EC 25313 279576-02 TRENDING (For Reference Purposes Only):

Trend Type EI HEPFACTOR REPORT WEIGHT INPO BINNING KEYWORDS KEYWORDS Trend Code MAMG E

MAl KW-PIPE LINING KW-SERVICE WATER

Entergy ADMIN I CR-IP2-2011-06248 Initiated Date: 12/8/20 II 12:20 Owner Site and Group: IP2 P&C Eng Codes Mgmt IP2 Current

Contact:

Current Significance: D Closed by: Harrison,Christine B 12114/2011 14:26 Summary

Description:

An As-Found visual inspections of the OD coating on excavated SW Lines 408 & 409 piping were performed under the IPEC Buried Piping Program. The excavated area is at the existing access points on the 24-inch main header, at the west side of the IP2 Turbine Building (Ref. EC 25313, WO # 279576). Various locations where the coating system had failed or possibly mis-applied were found. There were no obvious signs of piping degradation at these locations, and therefore, there are no operability concerns. Coating repairs will be performed after the piping inspections are completed.

Remarks

Description:

Closure

Description:

12112111: Per CRG, the review of this CR will be included in the Category C Review assigned to Code Programs under CR-IP2-2011-06250.