ML12339A516

From kanterella
Jump to navigation Jump to search
Official Exhibit - ENT000410-00-BD01 - LRA City Water Diagram (Jan. 2012), Aerial Photo
ML12339A516
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 01/09/2012
From:
Entergy Corp, Indian Point
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 22156, 50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01
Download: ML12339A516 (1)


Text

United States Nuclear Regulatory Commission Official Hearing Exhibit Entergy Nuclear Operations, Inc. LRA City Water ENT000410 Submitted: March 30, 2012 In the Matter of:

(Indian Point Nuclear Generating Units 2 and 3)

Generation Support Bldg. IP2 Simulator Bldg.

+/-

ASLBP #: 07-858-03-LR-BD01 3" City Water 6 16" City Water 3 Docket #: 05000247 l 05000286 Energy Education Center (EEC)

Security Bldg. Contractor Exhibit #: ENT000410-00-BD01 Identified: 10/15/2012 Station Security Bldg. Con Ed 3" City Water 1 3" City Water 5 City Water Storage Tank Admitted: 10/15/2012 Withdrawn:

10" City Water 1 6" City Water 4 16" City Water 4 8" City Water 5 Diesel Fire Pump House Rejected: Stricken:

Fire Protection Pump House Fuel Handling Bldg.

Other:

Nuclear Service Chemical System Bldg.

Boric Acid Evaporation Bldg.

4" City Water 1 (FP 88 I) 2" City Water 3 Containment Bldg. Unit No. 1 Radioactive Machine Shop Maintenance & Outage Bldg.

Diesel Generator Bldg.

Fuel Storage Bldg. Primary Aux. Bldg. 12" City Water 7 Fuel Storage Bldg. Primary Aux. Bldg.

Maintenance Storage Bldg. Nuclear Service Bldg.

Fan House Outage Support Bldg.

Fan House 1.5" City Water 1 16" City Water 1 1" City Water 1 16" City Water 2 Containment Bldg. Unit No 2 8" City Water 4 Containment Bldg. 2" City Water 5 2" City Water 6 1.5" City Water 2 8" City Water 3 Control Bldg. Unit 3 Super Heater Bldg. Service Boiler Bldg. Aux. Feedwater Bldg. U3 Smoke Stack Diesel Generator Bldg.

Aux. Feedwater Bldg. U2 Feed Reg Valve Annex U3 Turbine No. 1 2" City Water 4 Feed Reg Valve Annex U2 12" City Water 2 (Pipe Tunnel) Overhead Pipe Bridge Overhead Pipe Bridge 3" City Water 3 2" City Water 2 Sewage Pumping Station 4" City Water 5 House Service Boiler Bldg.

Unit No 2 Turbine Bldg. Turbine Bldg.

8" City Water 6 Tech Support/Service Admin. Bldg.

8" City Water 7 Heater Bay Service Bldg. 8" City Water 8 Heater Bay U3 Sewage Treatment Bldg.

12" City Water 1 (Pipe Tunnel) 4" City Water 6 (Potable Water) 1 1/9/2012 LRA Reviewed and Validated SI JP SB AA 3" City Water 2 No Date Revision DRFTRCHK'D ENGR VER Power Conversion Equipment (PCE) Building Indian Security Bldg. Point Energy Center Receiving Warehouse 8" City Water 1 12" City Water 6 (H.P) 12" City Water 3 Westchester, NY Unit No 2 Screenwell Structure Unit No 1 Screenwell House Condensate Polisher Facility Buried Piping Integrity Management Program Intake Structure Enclosure Bldg.

12" City Water 4 LRA City Water 0 25 50 100 150 200 www.structint.com Feet (303) 792-0077