|
---|
Category:Legal-Exhibit
MONTHYEARML15337A3522015-11-17017 November 2015 Official Exhibit - NYS000582-00-BD01 - Diagram of Strength Vs Amplitude by Dr. Richard T. Lahey ML15337A3372015-11-11011 November 2015 Official Exhibit - ENTR00726-00-BD01 - Track 2 Hearing Exhibit List ML15337A3322015-11-0505 November 2015 Official Exhibit - ENT000726-00-BD01 - Entergy Track 2 Hearing Exhibit List ML15337A3352015-11-0505 November 2015 Official Exhibit - RIVR14001-00-BD01 - Riverkeeper Tailored Track 2 Exhibit List ML15337A3362015-11-0505 November 2015 Official Exhibit - NRCR10001-00-BD01 - NRC Staff Track 2 Exhibit List ML15337A3332015-11-0404 November 2015 Official Exhibit - NYSR25001-00-BD01 - NYS Revised Tailored Exhibits List Relevant to Track 2 Contentions ML15337A3312015-11-0303 November 2015 Official Exhibit - NRC000230-00-BD01 - Corrections to Prefiled Testimony NRC000168 and NRC000197 ML15337A3262015-10-29029 October 2015 Official Exhibit - ENT000722-00-BD01 - Supplemental Testimony of Entergy Witnesses Nelson Azevedo, Timothy Griesbach & Randy Lott ML15337A3292015-10-29029 October 2015 Official Exhibit - ENTR16001-00-BD01 - Entergy Revised Exhibit List ML15337A3242015-09-23023 September 2015 Official Exhibit - NYS000576-00-BD01 - Pre-Filed Supplemental Testimony of Richard T. Lahey Re Contentions NYS-25, NYS-26B/RK-TC-1B & NYS-38/RK-TC-5 ML15337A3072015-09-0909 September 2015 Official Exhibit - NYS000573-PUB-00-BD01 - Supplemental Reply Statement of Position of the State of New York and Riverkeeper, Inc. in Support of Contention NYS-38/RK-TC-5 (Public, Redacted) (September 9, 2015) ML15337A2962015-09-0909 September 2015 Official Exhibit - NYS000570-PUB-00-BD01 - Supplemental Reply Statement of Position of the State of New York and Riverkeeper, Inc. in Support of Contention NYS-26B/RK-TC-1B (Public, Redacted) (September 9, 2015) ML15337A2832015-09-0909 September 2015 Official Exhibit - NYS000563-00-BD01 - Pressurized Water Reactor (PWR) Systems, USNRC Technical Training Center, Reactor Concepts Manual, Pages 4-1 to 4-28 ML15337A2952015-09-0909 September 2015 Official Exhibit - NYS000569-PUB-00-BD01 - Pre-filed Supplemental Reply Testimony of Richard T. Lahey, Jr. in Support of Contention NYS-26B/RK-TC-1B (Public, Redacted) (September 9, 2015) ML15337A2942015-09-0909 September 2015 Official Exhibit - NYS000568-PUB-00-BD01 - Supplemental Reply Statement of Position of the State of New York in Support of Contention NYS-25 (Public, Redacted) (September 9, 2015) ML15337A2932015-09-0909 September 2015 Official Exhibit - NYS000567-PUB-00-BD01 - Pre-filed Supplemental Reply Testimony of Richard T. Lahey, Jr. in Support of Contention NYS-25 (Public, Redacted) (September 9, 2015) ML15337A3042015-09-0909 September 2015 Official Exhibit - NYS000571-PUB-00-BD01 - Pre-filed Supplemental Reply Testimony of David J. Duquette in Support of Contention NYS-38/RK-TC-5 (Public, Redacted) (September 9, 2015) ML15337A2972015-09-0909 September 2015 Official Exhibit - RIV000164-00-BD01 - NUREG-1740, ACRS, Voltage-Based Alternative Repair Criteria: a Report to the Advisory Committee on Reactor Safeguards by the Ad Hoc Subcommittee on a Differing Professional Opinion (2001) ML15337A3062015-09-0909 September 2015 Official Exhibit - NYS000572-PUB-00-BD01 - Pre-filed Supplemental Reply Testimony of Richard T. Lahey, Jr. in Support of Contention NYS-38/RK-TC-5 (Public, Redacted) (September 9, 2015) ML15337A2822015-09-0909 September 2015 Official Exhibit - NYS000566-00-BD01 - Figure 1 for Supplemental Reply Testimony of Dr. Richard T. Lahey ML15337A3142015-09-0404 September 2015 Official Exhibit - ENTR00615-PUB-00-BD01 - Entergy'S Statement of Position Re Contention NYS-25 (Embrittlement) - Redacted ML15334A2842015-08-10010 August 2015 Official Exhibit - ENT000687-00-BD01 - NRC, Safety Evaluation Report, Topical Report on ASME Section III Piping and Component Fatigue Analysis Utilizing the Westems Computer Code (WCAP-17577, Revision 2) (Undated) ML15335A2932015-08-10010 August 2015 Official Exhibit - NRCR00104-00-BD01 - on Yee Statement of Professional Qualifications (Revised) ML15337A2642015-08-10010 August 2015 Official Exhibit - NRC000196-PUB-00-BD01 - NRC Staff'S Initial Statement of Position on Contention NYS-25 (Reactor Vessel Internals) ML15337A3192015-08-10010 August 2015 Official Exhibit - ENT000698-PUB-00-BD01 - Entergy'S Revised Statement of Position Regarding Contention NYS-38/RK-TC-5(Safety Commitments) (Aug. 10, 2015)Redacted ML15337A3202015-08-10010 August 2015 Official Exhibit - ENT000699-PUB-00-BD01 - Redacted Revised Testimony of Entergy Witnesses Nelson Azevedo, Robert Dolansky, Alan Cox, Jack Strosnider, Timothy Griesbach, Barry Gordon, Randy Lott, and Mark Gray Regarding Contention NYS-38/RK ML15337A3172015-08-10010 August 2015 Official Exhibit - ENT000678-PUB-00-BD01 - NL-07-140, Letter from F. Dacimo, Entergy, to NRC Document Control Desk, ?Reply to Request for Additional Information Regarding License Renewal Application? (Nov. 28, 2007)Redacted ML15337A2652015-08-10010 August 2015 Official Exhibit - NRC000197-PUB-00-BD01 - NRC Staff Testimony of Dr. Allen Hiser, Jeffrey Poehler, and Gary Stevens on NYS-25 and NYS-38/RK-TC-5 ML15337A2412015-08-10010 August 2015 Official Exhibit - NRCR00147-00-BD01 - NRC Staff'S Revised Statement of Position on State of New York and Riverkeeper'S Joint Contention NYS-38/RK-TC5 (Revised) ML15335A2902015-08-10010 August 2015 Official Exhibit - NRC000222-00-BD01 - IP3 FSAR Rev. 04 Chapter 3 (2011) (Excerpt) ML15334A2632015-08-10010 August 2015 Official Exhibit - ENT000648-00-BD01 - M. Mitchell, Chief, Vessels and Internals Integrity Branch, Response to Non-Concurrence Regarding Safety Evaluation for Topical Report MRP-227 Pressurized Water Reactor Internals Inspection and Evaluat ML15337A2622015-08-10010 August 2015 Official Exhibit - NRC000228-00-BD01 - Indian Point Unit 2 Technical Specifications 3.1.4 ML15337A2452015-08-10010 August 2015 Official Exhibit - NRC000227-00-BD01 - Gary Stevens Statement of Professional Qualifications ML15337A2632015-08-10010 August 2015 Official Exhibit - NRC000229-00-BD01 - Indian Point, Unit 3 Technical Specifications 3.1.4 ML15335A2192015-08-10010 August 2015 Official Exhibit - ENTR00031-00-BD01 - Curriculum Vitae of Alan B. Cox ML15335A2112015-08-10010 August 2015 Official Exhibit - ENTR20186-00-BD01 - Curriculum Vitae of Mark A. Gray ML15337A3162015-08-10010 August 2015 Official Exhibit - ENT000616-PUB-00-BD01 - Testimony of Entergy Witnesses Nelson F. Azevedo, Robert J. Dolansky, Alan B. Cox, Jack R. Strosnider, Timothy J. Griesbach, Randy G. Lott, and Mark A. Gray Regarding Contention NYS-25 (Embrittleme ML15337A2782015-08-10010 August 2015 Official Exhibit - NRC000168-PUB-00-BD01 - NRC Staff Testimony of Dr. Allen Hiser, Dr. Ching Ng, Mr. Gary Stevens, P.E., and Mr. on Yee, Concerning Contentions NYS-26B/RK-TC-1B and NYS-38/RK-TC-5 ML15337A2712015-08-10010 August 2015 Official Exhibit - NRC000223-00-BD01 - IP3 FSAR Rev. 04 Chapter 14 (2011) ML15337A2592015-08-10010 August 2015 Official Exhibit - NRC000224-00-BD01 - IP3 FSAR Rev. 04 Chapter 16 ML15337A2442015-08-10010 August 2015 Official Exhibit - NRCR00161-00-BD01 - NRC Staff Testimony of Dr. Allen L. Hiser and Mr. Kenneth J. Karwoski Concerning Portions of State of New York and Riverkeeper, Inc. Joint Contention NYS-38/RK-TC5 (Revised) ML15334A2822015-08-10010 August 2015 Official Exhibit - ENT000680-00-BD01 - Curriculum Vitae of Barry M. Gordon ML15335A2912015-08-10010 August 2015 Official Exhibit - NRCR00118-00-BD01 - Indian Point Unit 3 Technical Specifications (Excerpt) (Revised) ML15334A2282015-08-10010 August 2015 Official Exhibit - ENT000634-00-BD01 - Entergy, IP2, FSAR Update, Revision 25 (2014) (Excerpts) ML15335A2822015-08-10010 August 2015 Official Exhibit - NRC000220-00-BD01 - Pressurized Water Reactor Owners Group (PWROG) Presentation Slides, Industry and NRC Coordination Meeting Materials Programs Technical Exchange: Clevis Insert Bolt Update, (June 2014) ML15337A2692015-08-10010 August 2015 Official Exhibit - NRC000169-00-BD01 - NRC000169 - Indian Point, Unit 2 Technical Specifications (Excerpt) ML15337A2602015-08-10010 August 2015 Official Exhibit - NRC000226-00-BD01 - Jeffrey C. Poehler Statement of Professional Qualifications ML15335A2732015-08-10010 August 2015 Official Exhibit - NRC000183-00-BD01 - NRC Inspection Manual, Inspection Procedure 71013, Site Inspection for Plants with a Timely Renewal Application (Sept. 25, 2013) ML15335A2202015-08-10010 August 2015 Official Exhibit - ENTR00184-00-BD01 - Curriculum Vitae of Jack R. Strosnider ML15335A3012015-08-10010 August 2015 Official Exhibit - NRC000206-00-BD01 - Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 25, Chapter 14 - Safety Analysis (2014) 2015-09-09
[Table view] |
Text
United States Nuclear Regulatory Commission Official Hearing Exhibit Entergy Nuclear Operations, Inc.
In the Matter of:
(Indian Point Nuclear Generating Units 2 and 3)
ASLBP #: 07-858-03-LR-BD01 NRC000017 Docket #: 05000247 l 05000286 Submitted: March 29, 2012 Exhibit #: NRC000017-00-BD01 Identified: 10/15/2012 Admitted: 10/15/2012 Withdrawn:
Rejected: Stricken:
Other:
Statement of Professional Qualifications Kimberly J. Green, Senior Project Manager Branch 2, Division of License Renewal Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission Ms. Green is a nuclear engineer with over twenty years of experience in safety analysis, design modifications, license renewal, and radiological controls. Her expertise includes regulatory analysis and the evaluation of licensing documentation, particularly in the area of license renewal reviews. She has been a contractor to the U.S. Nuclear Regulatory Commission and the U.S. Department of Energy. Her experience in private industry has included performing safety analyses in support of steam generator replacements at commercial power plants. Ms.
Green is currently a senior mechanical engineer responsible for the technical review of aging management programs and aging management review results for auxiliary systems for license renewal applications. In addition, she is one of the senior project managers for the Indian Point Nuclear Generating Unit Nos. 2 and 3 license renewal application.
EDUCATION B.S. Engineering, University of Maryland, College Park, MD, December 1989 Major: Nuclear Engineering Minor: Mechanical Engineering EXPERIENCE From 2006-present, at the U.S. NRC, Ms. Green has been a senior mechanical engineer responsible for the NRC Staffs technical review of aging management programs and aging management review results for auxiliary and steam and power conversion systems for license renewal applications. She is also a senior project manager for the NRC Staffs environmental review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 (IP2 and IP3) license renewal application (LRA). Until April 2011, Ms. Green was the senior project manager for the NRC Staffs safety review for the IP2 and IP3 LRA the, responsible for the development and implementation of the project schedule and the safety evaluation report. She has been responsible for the issuance of requests for additional information, and the final safety evaluation report. She was also a member of the audit teams that evaluated the applicants scoping and screening methodology, aging management reviews and aging management programs. Ms. Green also served as the NRC Staffs senior project manager for the safety review of the Diablo Canyon Nuclear Power Plant license renewal application and had the same responsibilities as for the Indian Point license renewal application. As a mechanical engineer, Ms. Green was a member of the scoping and screening methodology audit team for the Wolf Creek, Susquehanna and Shearon Harris license renewal applications. As an audit team member, she evaluated the scoping and screening methodology for the plant-specific license renewal applications to determine if the applicants methodology meets the intent of 10 CFR Part 54.
From 2000 to 2006, at Information Systems Laboratories, Inc., Ms. Green was a contractor to the U.S. NRC, involved in the NRC Staffs safety review of numerous license renewal applications. In particular, she performed engineering evaluations of the main steam, feedwater, auxiliary feedwater, instrument air, emergency diesel generator, and spent fuel pool cooling systems for the Peach Bottom, St. Lucie, Ginna, Millstone, and Pilgrim license renewal
applications. In addition, she was the principal investigator for the Browns Ferry and Oyster Creek license renewal application safety reviews. Ms. Green also performed an engineering evaluation of the severe accident mitigation alternative analysis required for license renewal for the following plants: Turkey Point, North Anna, Surry, Peach Bottom, McGuire, Catawba, St.
Lucie, Fort Calhoun, H.B. Robinson 2, Ginna, V.C. Summer, Dresden, Quad Cities, Farley, ANO-2, Browns Ferry, Millstone, Nine Mile Point, Brunswick, Monticello, Oyster Creek, Pilgrim, and Vermont Yankee. She participated in the onsite scoping and screening methodology audits at ANO-2 and Browns Ferry, and the aging management program/aging management review audit for Dresden and Quad Cities. in support of license renewal. Ms. Green has performed cost and regulatory analyses, specifically in support of the resolution of Generic Issue 189, for a modification to 10 C.F.R. § 50.44, and for a potential revision to 10 C.F.R. § 50.46 and 10 C.F.R. Part 50, Appendix K. In support of an effort to risk-inform byproduct and source material regulations, Ms. Green performed 14 cost-benefit analyses. She also reviewed two Combustion Engineering (CE) Owner's Group's submittals for extending the allowed outage time of the 125 Vdc and containment isolation valves, and provided input to the technical evaluation report.
From 1996 to 2000, at Scientech, Inc., Ms. Green performed risk analyses for byproduct material systems, including dose calculations and diamond tree analysis. She reviewed and characterized methodologies and codes cited in licensees UFSARs and licenses for incorporation in an NRC database. Ms. Green also reviewed D.C. Cooks containment sump design and performance after design basis accidents (DBAs), and she reviewed and characterized documents to support expert testimony on dose assessment and reconstruction.
As a contractor to the NRC, Ms. Green analyzed licensing commitments and regulatory requirements contained in the Millstone Unit 1 docket to develop an NRC database for the plants Current Licensing Basis (CLB).
From 1994 to 1996, at Digital Systems Research, Inc., later acquired by CACI, Ms. Green provided support to the Radiological Controls Program Advisor for Environmental Management at the U.S. Department of Energy (DOE) in the areas of radiological controls and health and safety. She reviewed and provided technical assessment of facilities' radiological protection programs for adequacy and compliance with applicable regulations (10 CFR 835, DOE Radiological Control Manual - DOE/EH-0256T, and DOE Order 5480.11).
From 1990 to 1994, at Bechtel Power Corporation, Ms. Green was a safety analysis engineer on the Steam Generator Replacement Core Team. In that capacity, she originated safety evaluations under 10 C.F.R. § 50.59 for mechanical and civil design modifications that required interface with engineers from multiple disciplines. She researched and developed position papers on the applicability of relevant regulatory issues such as long-term onsite storage of low-level waste, feedwater nozzle cracking/thermal stratification, leak-before-break, elimination of arbitrary intermediate breaks, and potential blockage of emergency core coolant system (ECCS) sump screens which required interface with industry organizations and other entities. She produced a technical study on various types of insulation used in containment at nuclear power plants. She also performed and reviewed mechanical calculations and nuclear design basis calculations dealing with radiation shielding and dose. She also provided safety analysis support to nuclear power utilities in Brazil and Spain regarding mechanical design modifications and steam generator replacement.