ML12338A435
ML12338A435 | |
Person / Time | |
---|---|
Site: | Indian Point |
Issue date: | 10/13/2011 |
From: | Doremus R CSI Technologies |
To: | Entergy Nuclear Indian Point 2, Atomic Safety and Licensing Board Panel |
SECY RAS | |
References | |
RAS 22102, 50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01 | |
Download: ML12338A435 (261) | |
Text
United States Nuclear Regulatory Commission Official Hearing Exhibit Entergy Nuclear Operations, Inc.
In the Matter of:
(Indian Point Nuclear Generating Units 2 and 3)
ASLBP #: 07-858-03-LR-BD01 Docket #: 05000247 l 05000286 Exhibit #: ENT000052-00-BD01 Identified: 10/15/2012 Admitted: 10/15/2012 Withdrawn:
Rejected: Stricken:
Other: ENT000052 (S I TECHNOLOGIES, INC.
Submitted: March 28, 2012 Consulting Engineers REPORT APPROVAL COVER SHEET Document
Title:
Indian Point Energy Center Unit 2 FAC Susceptible Non-Modeled (SNM) Program Document No.: 0700.104-03 Client: Entergy Nuclear Project No.: 0705.111 This report has been prepared in accordance with Section 4.4 of the CSI Quality System Manual, Revision 2.
Revision: 2 (For-Use) 256 pages prepared:~ yano:ooremus (CSI)
Date: IcLl3/f{
Verified: --=-~~"------:-~-:--7"7--------- Date: /O/'-!1/"
Approved: ~~:::;..~~~~:;:::::;::..._ _ _ _ _ _ __ Date: 10/1'4/1(
Approved: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ Date:
Ian D. Mew (lPEC)
(S I TECHNOLOGIES, INC.
Consulting Engineers Revision Control Sheet Project Number: 0705.111 Project Name: IPEC FAC Support 2011 Client: Entergy Nuclear Document
Title:
Indian Point Energy Center Unit 2 FAC Susceptible Non-Modeled (SNM) Program Document Number: 0700.104-03 Rev. Date Description of Changes CSI Client Approval Approval 0 1211112009 Initial Issue-For Use B. Trudeau I. Mew 1 112212010 Revision to incorporate new system list - For Use B. Trudeau I. Mew 2 1011412011 Revision to incorporate replacement history - For Use I!. l)o~.>
Indian Point Energy Center Unit 2 FAC Susceptible Non-Modeled (SNM)
Program Report No. 0700.104-03 Revision 2 Issued For-Use October 14, 2011 prepared for:
Entergy Nuclear Indian Point Energy Center 450 Broadway Buchanan, NY 10511 prepared by:
CSI TECHNOLOGIES, INC.
1 Douglas Ave., Suite 300 Elgin, IL 60120
Copyright © 2011 CSI Technologies, Inc. All rights reserved.
The information in this document belongs to CSI Technologies, Inc. It may not be used, reproduced, or disclosed without the written approval of CSI Technologies, Inc.
Disclaimer and Limitation of Liability CSI Technologies, Inc. (CSI) has made efforts to ensure the accuracy and completeness of the information in this document. However, CSI makes no warranties of any kind (whether express, implied, or statutory) with respect to the information contained herein. CSI assumes no liability to any party for any loss or damage (whether direct or indirect) caused by any errors, omissions, or statements of any kind contained in this document.
Further, CSI assumes no liability arising from the application or use of the product, service, or results described herein and specifically disclaims any representation that the products, services, or results described herein do not infringe upon any existing or future intellectual property rights. Nothing herein grants the reader any license to make, use, or sell equipment or products constructed in accordance with this document. Finally, all rights and privileges related to any intellectual property right described herein are vested in the patent, trademark, or service mark owner, and no other person may exercise such rights without express permission, authority, or license secured from the patent, trademark, or service mark owner.
Trademarks CSI Technologies, Inc., the CSI logo, and other trademarks, service marks, and logos are registered or unregistered trademarks of CSI and its subsidiaries in the United States and in foreign countries. Other trademarks and service marks in this document are the property of their respective owners.
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Table of Contents
- 1. INTRODUCTION ...............................................................................................................................................2
- 2. PURPOSE ............................................................................................................................................................3
- 3. SCOPE ..................................................................................................................................................................4
- 4. ASSUMPTIONS ..................................................................................................................................................5 4.1. GENERAL ........................................................................................................................................................5 4.2. INFREQUENTLY ACCESSED AREAS .................................................................................................................5 4.3. BURN THRESHOLD..........................................................................................................................................5 4.4. CONDENSER LINES .........................................................................................................................................5 4.5. OPERATING PARAMETERS ..............................................................................................................................6
- 5. METHODOLOGY ..............................................................................................................................................7 5.1. CONSEQUENCE OF FAILURE ............................................................................................................................9 5.2. RELATIVE LEVEL OF FAC SUSCEPTIBILITY .................................................................................................. 10
- 6. RESULTS ........................................................................................................................................................... 14 6.1. LINE SNM ANALYSIS RESULTS TABLE ...................................................................................................... 14 6.2. COLOR-CODED FLOW DIAGRAMS............................................................................................................... 16 6.3. INSPECTION FREQUENCY (PRIORITY).......................................................................................................... 16 6.4. CHECWORKS PARAMETRIC ANALYSIS ................................................................................................... 17
- 7. REFERENCES .................................................................................................................................................. 18 APPENDIX A: SNM PROGRAM LINES APPENDIX B: SNM PROGRAM LINES SORTED BY SUSCEPTIBILITY - HIGH CONSEQUENCE OF FAILURE -
HIGH SUSCEPTIBILITY APPENDIX C: SNM PROGRAM LINES SORTED BY SUSCEPTIBILITY - HIGH CONSEQUENCE OF FAILURE -
MODERATE SUSCEPTIBILITY APPENDIX D: SNM PROGRAM LINES SORTED BY SUSCEPTIBILITY - HIGH CONSEQUENCE OF FAILURE -
LOW SUSCEPTIBILITY APPENDIX E: SNM PROGRAM LINES SORTED BY SUSCEPTIBILITY - LOW CONSEQUENCE OF FAILURE APPENDIX F: REVISION HISTORY ATTACHMENT A: CHECWORKS PARAMETRIC ANALYSIS ATTACHMENT B: REFERENCED CORRESPONDENCE AND COMMUNICATIONS ATTACHMENT C: INDUSTRY FAC EXPERIENCE TABLE ATTACHMENT D: SNM SMALL BORE INSPECTIONS ATTACHMENT E: SNM LARGE BORE INSPECTIONS Report No. 0700.104-03, Revision 2 Page 1 of 20
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program
- 1. Introduction Flow-Accelerated Corrosion (FAC) is a form of material degradation that results in thinning of the inside pipe wall in carbon steel piping and fittings under certain flow and chemistry conditions. If undetected, FAC may result in piping rupture and subsequent fatalities, injuries, equipment damage, unplanned plant shutdown, and transients that pose undesirable challenges to plant operators. Consequently, all US nuclear plants, including Indian Point, have FAC programs in place to detect and mitigate FAC before piping failure, in accordance with Generic Letter 89-08 [7.1].
As methods to predict and monitor FAC in high-energy large-bore piping have improved over the past several years, attention is now turning towards small-bore piping. Failures in small-bore piping generally pose less of a hazard than failures in large-bore piping.
However, a small-bore piping failure still has the potential to injure plant personnel or force a plant shutdown. Moreover, as plants age, failures in small-bore lines due to FAC are occurring more frequently. Therefore, a method to address FAC in small-bore piping becomes increasingly valuable in improving plant reliability and safety.
Susceptible Non-Modeled (SNM) lines include small-bore and some large-bore piping that is not suitable for predictive modeling. Small-bore piping is not suitable for CHECWORKS modeling primarily due to the random nature of the fit-up gap between the pipe and socket-weld fittings. In addition, the extremely large linear footage of small-bore lines and the often-unknown thermodynamic conditions combine to make detailed modeling of small-bore piping inefficient and sometimes inaccurate.
In addition to small-bore piping, some large-bore FAC susceptible piping is unsuitable for CHECWORKS modeling because of uncertain operating conditions. For example, steam trap and drain lines may combine in a header before draining to the condenser.
The flow rates in such a manifold are difficult to determine, and therefore, an analytical model would be of limited value. Lines that are visually inspected, such as the turbine crossunder piping, are not typically modeled. Lines which are only susceptible at a particular location (e.g. at a nozzle or downstream of a flow element) are not usually modeled in CHECWORKS. Lines that have operating conditions outside of CHECWORKS modeling capabilities such as vent lines with entrained moisture are not modeled.
Since quantitative methods are not available for evaluating SNM piping, a qualitative method is used. This method addresses both the failure consequence and relative FAC susceptibility to develop a prioritized ranking of lines that can be used as input to the inspection planning process.
Report No. 0700.104-03, Revision 2 Page 2 of 20
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program
- 2. Purpose The purpose of this document is to produce a prioritized ranking of all of the Indian Point Flow Accelerated Corrosion (FAC) Susceptible Non-Modeled (SNM) piping. These rankings are in accordance with Appendix A of NSAC 202L [7.2]. For lines established as SNM in the Indian Point System Susceptibility Evaluation (SSE) [7.3], this document determines the consequence of failure, the level of FAC susceptibility, and establishes the methodology used to perform the evaluation. The results of this document are to be used as input to inspection planning and selection of inspection locations and/or as a guide for a proactive small-bore replacement plan.
Report No. 0700.104-03, Revision 2 Page 3 of 20
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program
- 3. Scope The scope of this SNM Program is defined as all conventional piping designated Susceptible Non-Modeled in the Indian Point System Susceptibility Evaluation (SSE)
[7.3]. This document reflects the current operating status of the plant. Periodically, it should be reviewed and updated as necessary to reflect changes in plant configuration, operating conditions, related plant experience, and industry experience as recommended by EPRIS Recommendations for an Effective Flow-Accelerated Corrosion Program, NSAC 202L [7.2].
Section 4 of this document contains a record of all assumptions made. Section 5 describes the methodology employed in this analysis. The results obtained are documented in Section 6 and in the Appendices. Finally, Section 7 includes a list of all references used in this analysis.
Report No. 0700.104-03, Revision 2 Page 4 of 20
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program
- 4. Assumptions 4.1. General 4.1.1. Piping with nominal pipe size less than or equal to 2 is assumed to be socket welded. Likewise, lines over 2 in diameter are assumed butt-welded.
4.2. Infrequently Accessed Areas 4.2.1. An SNM line is not considered to pose a hazard to personnel upon failure if it is located in an inaccessible or infrequently accessed (low traffic) area during normal plant operation. Restricted areas, inaccessible areas, or infrequently accessed areas are considered not to pose a personnel hazard upon failure. The following general locations are considered to be low traffic, infrequently accessed areas:
- Inside containment
- Inside the condensers
- Locked rooms
- Equipment rooms that are not normally accessed except by operators on rounds 4.3. Burn Threshold 4.3.1. It is conservatively assumed that 112°F is the threshold point for burn injuries due to piping failure.
4.4. Condenser Lines 4.4.1. It is assumed that the plant can not withstand an FAC-related failure which leads to a rupture of an SNM line connected directly to the condenser. A rupture would cause a loss or decrease in condenser vacuum and thus require plant shutdown. However, the following situations can downgrade an SNM classification to Category 2 (see Section 5 for a definition of Category 2):
- The SNM line is in a low traffic area and
- The SNM line is non-safety-related and
- A small-bore line is connected to a larger header before entering the condenser, in which case the header would feedback through the small-bore leak and condenser vacuum would not be affected or
- The SNM line is low pressure and could be assumed to have a leak before a break, in which case the leak would be discovered during operator rounds and repaired.
Report No. 0700.104-03, Revision 2 Page 5 of 20
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program 4.5. Operating Parameters 4.5.1. If design and operating parameters such as flow rates, temperatures and pressures are not available from the Indian Point PEPSE Model [7.4], pipe spec [7.5], or system descriptions [7.5], operating conditions are approximated in these SNM lines, using engineering judgment wherever necessary.
Report No. 0700.104-03, Revision 2 Page 6 of 20
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program
- 5. Methodology A ranking method was used to evaluate the lines designated as Susceptible Non-Modeled (SNM) from the System Susceptibility Evaluation report [7.3]. The SNM lines were first categorized based on consequence of failure and were designated either High Consequence of Failure or Low Consequence of Failure - Category 1 or Category 2, respectively. Lines that are 2-inch nominal pipe size (NPS) or less (small-bore) and could be demonstrated to have minimal consequences of failure were designated Category 2. Category 1 lines were defined to consist of the remaining piping (potentially high consequences of failure). Category 1 lines were further evaluated for level of FAC susceptibility (high, moderate, or low) based on industry experience [7.7], plant experience/maintenance history [7.8], and operating conditions [7.4]. The methodology employed in this analysis consisted of a number of successive steps. Each step is explained in detail in the following sections. A flowchart of the methodology used is included in Figure 5.1.
Report No. 0700.104-03, Revision 2 Page 7 of 20
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Figure 5.1 SNM Analysis Methodology SNM Lines No NPS 2" or Less? Yes Large Bore Small Bore Category 1 Category 2 Meets Yes Category 1 No High Consequence of Low Consequence of Criteria?
Failure Failure Category 1 Criteria
- Safety Related
- Non-Isolable
- Shutdown or Trip
- Personnel Safety Industry Experience Determine Level of FAC Plant Maintenance History Susceptibility Operating Conditions Highly Moderately Minimally Susceptible Susceptible Susceptible S1 S2 S3 Report No. 0700.104-03, Revision 2 Page 8 of 20
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program The following sections provide a detailed description of the evaluation method.
5.1. Consequence of Failure The criteria used to evaluate consequence of failure are based on Appendix A of NSAC 202L [7.2], the safety classification, the potential for injury to plant personnel, and the potential for forced shutdown as described below:
5.1.1. Size All large-bore piping (NPS of greater than 2) was designated Category 1.
5.1.2. Safety-Related Piping All SNM Safety-Related lines were designated Category 1. All ASME Code Class 1, 2, or 3 piping, based on pipe class, was considered Safety-Related in addition to lines designated as Safety-Related on the P&IDs.
5.1.3. Plant Personnel Safety Any line whose failure would likely result in injury to plant personnel was designated Category 1. The likelihood of injury to plant personnel was taken as a function of the lines accessibility and operating temperature.
5.1.3.1. Accessibility Piping located in inaccessible or infrequently accessed areas was considered unlikely to cause injury upon failure (see Assumption 4.2).
5.1.3.2. Operating Temperature It was conservatively assumed that a person in the area of failure of a line with an operating temperature greater than or equal to 112°F would be injured (see Assumption 4.3).
5.1.4. Forced Shutdown Any line whose failure would likely result in a forced plant shutdown was designated Category 1. A plant trip or shutdown required to repair an un-isolable leak are both considered a forced shutdown.
5.1.4.1. Trip Any line whose failure is likely to cause a plant trip was considered to force a shutdown upon failure. For example, a failure in a vent line near the condenser may result in a loss of condenser vacuum and a consequent trip.
5.1.4.2. Non-Isolable Leak Any line whose failure is likely to cause an un-isolable leak was considered to force a shutdown upon failure.
Some isolable leaks may require the plant to operate at reduced power. Any SNM line whose isolation due to failure would likely Report No. 0700.104-03, Revision 2 Page 9 of 20
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program force the plant to operate at reduced power was designated Category 1.
Table 5.1 provides a summary of the Consequence of Failure criteria discussed in this section as well as the abbreviation used for each criterion.
Table 5.1 Consequence of Failure Criteria Abbreviation Description FI High Consequence of Failure: non-Isolable line FL High Consequence of Failure: Large Bore line FP High Consequence of Failure: Personnel safety issue (frequently accessed location)
FS High Consequence of Failure: Safety-Related line FT High Consequence of Failure: Shutdown or Trip upon failure 5.1.5. Category 2 All lines that do not meet any of the Category 1 criteria discussed above are considered Category 2, Low Consequence of Failure.
5.2. Relative Level of FAC Susceptibility An FAC susceptibility analysis was performed for all the Category 1 SNM lines.
This analysis provides a relative ranking of lines with respect to FAC susceptibility and aids in the inspection planning process. Industry experience, maintenance history, and operating conditions were considered in determining FAC susceptibility. Based on these factors, each line was evaluated as having:
high susceptibility (S1), moderate susceptibility (S2), or low susceptibility (S3).
The following guidelines were used to determine the relative level of FAC susceptibility of each line:
5.2.1. Industry Experience (IE)
Certain lines, such as operating vents, have a history of leaking. The CHECWORKS Users Group (CHUG) Plant Experience Database [7.7]
provides a listing of FAC related wall thinning and through-wall failures at other plants. EPRIs Flow-Accelerated Corrosion in Power Plants provides historical data on FAC failures [7.9]. Finally, FACnet is an electronic forum used by FAC Coordinators and Program Owners throughout the industry to discuss imminent issues.
The Indian Point SNM lines which are similar in function and operating conditions to lines at other plants that have experienced wall thinning or failures were considered to have a relatively high susceptibility. These lines were generally ranked High for susceptibility level.
5.2.2. Plant Experience or Maintenance History (PE)
The Indian Point outage reports provided information regarding the history of FAC events/failures [7.8]. These lines were considered to have a Report No. 0700.104-03, Revision 2 Page 10 of 20
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program relatively high susceptibility, and were generally ranked High for susceptibility level.
5.2.3. Operating Conditions Steam quality, operating temperature, flow rate, and frequency of operation were also considered in determining the relative FAC susceptibility of each line. The relationships between predicted FAC wear rate and these parameters are well established and are presented in EPRIs Flow-Accelerated Corrosion in Power Plants [7.9]. For example, FAC wear rates are generally higher for two-phase flow or for operating temperatures between 250-400°F. Although FAC is caused by a complex interaction of several parameters, an approximate susceptibility ranking can be achieved through consideration of these parameters along with field experience and sound engineering judgment.
Operating conditions were determined through review of the plant PEPSE Model [7.4], flow diagrams [7.10], and system design manuals [7.5].
Where operating conditions are known only upstream of flow elements, orifices, and control valves, thermodynamic conditions change significantly downstream if there is a large pressure drop. In these cases, the downstream operating conditions were estimated based on the known thermodynamic data and steam tables.
The following guidelines were used in determining relative FAC susceptibility:
5.2.3.1. Steam Quality (Q)
Lines operating with two-phase flow are generally more susceptible to FAC than single-phase lines. The predicted rate of FAC as a function of steam quality is highest for wet steam and drops off as the quality approaches either all water or all steam
[7.2]. For the purposes of this document, steam quality was divided into three ranges based on FAC Effect as shown in Table 5.2.
Since the steam quality for SNM lines is usually not known exactly, these ranges provide a means of categorizing the steam quality of a line for determining the FAC susceptibility ranking.
Lines operating with a quality between 30 and 99.5 percent were considered to be more susceptible than lines outside that range.
If the steam quality was in the highly susceptible range, the line was generally ranked 1, depending on the other conditions such as temperature, operating frequency, and flow rate (see Sections 5.2.3.2. through 5.2.3.4). If the steam quality was outside of this range, it was generally ranked 2 depending on temperature, operating frequency, and flow rate. If flashing was present, the line was generally ranked High in terms of susceptibility.
Report No. 0700.104-03, Revision 2 Page 11 of 20
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Table 5.2 Steam Quality FAC Effect Steam Quality FAC Effect 30% Q < 99.5% or Flashing Steam 1 (High) 0% (Water) Q < 30% 2 (Moderate) 99.5% Q < 100% 3 (Low) 5.2.3.2. Operating Temperature (T)
Based on EPRIs Flow-Accelerated Corrosion in Power Plants
[7.9], the predicted rate of FAC as a function of operating temperature is highest for temperatures in the range of 250°F -
400°F with higher or lower temperatures being relatively less susceptible. As with steam quality, the operating temperatures of SNM lines cannot always be determined exactly. Therefore, operating temperature was divided into three ranges based on FAC Effect as shown in Table 5.3.
Lines with operating temperatures in the high range were considered more susceptible than lines operating in the low range. Operating temperature alone cannot be used to determine FAC susceptibility but was considered along with the other parameters discussed in this section to determine a relative ranking.
Table 5.3 Temperature FAC Effect Temperature Range ( °F) FAC Effect 250 T 350 1 (High) 350 < T 400 2 (Moderate)
T < 250, T > 400 3 (Low) 5.2.3.3. Operating Time or Frequency of Operation (O)
Lines that operate frequently tend to have more wall loss over time than those lines that operate less frequently. However, it is also true that many lines that operate only during startup or testing experience especially severe conditions while in service.
Therefore, operating frequency alone is not a good indication of the likelihood of wall thinning.
For the purposes of this document, lines which operate infrequently were considered less susceptible relative only to lines of similar function and with similar operating conditions that operate more frequently. If a line is frequently operated and, based on industry and/or plant experience, encounters severe conditions during operation, it was ranked 1. If a line is infrequently operated and does not experience severe conditions during operation, it was generally ranked 2.
Report No. 0700.104-03, Revision 2 Page 12 of 20
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Operating frequency was ranked with a FAC Effect of 1 or 2 according to Table 5.4.
Table 5.4 Operating Time FAC Effect Operation FAC Effect Lines operating frequently (or w/ severe 1 (High) conditions)
Lines operating infrequently 2 (Low) 5.2.3.4. Flow Rate Higher flow rates resulting in high fluid velocities tend to result in higher FAC wear rates. Flow rates in SNM lines are often unknown. Where this information was available, those lines with higher flow rates were considered more susceptible. Flow Rate was ranked with a FAC Effect of C or L according to Table 5.5.
Choking, also called critical or sonic flow, occurs when maximum flow through a restriction is reached. If a line experiences choked flow, it was ranked High for susceptibility.
If the flow rate was known to be extremely low or if the line is a gravity drain, it was generally ranked Low for susceptibility.
Flow rates were based on engineering judgment (see Section 5).
In cases where flow rate played a major role in determining the FAC susceptibility, a note is provided in the Comments field.
Table 5.5 Flow FAC Effect Operation FAC Effect Lines with Choked flow C (High)
Lines with Low flow L (Low)
Report No. 0700.104-03, Revision 2 Page 13 of 20
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program
- 6. Results This report further categorized the susceptibility level for lines categorized SNM in the Indian Point SSE. For each line designated SNM, a corresponding Consequence of Failure designation and susceptibility level has been assigned. Table 6.1 provides a summary of the results of the SNM analysis.
Table 6.1 Results of SNM Analysis Indicating the Number of Lines for Each Susceptibility Level Consequence of Failure Susceptibility Level Quantity Category 1 S1 154 Category 1 S2 303 Category 1 S3 99 Category 2 N/A 146
- There are a total of 702 lines categorized as SNM.
6.1. Line SNM Analysis Results Table The appendices of this document contain the results of the SNM line analysis for Indian Point Energy Center. The appendices are sorted by pipe size (large bore or small bore) and by susceptibility level (see Table 6.1). The following fields appear in these reports:
6.1.1. System The system appears on the first line of each section within Appendix A.
This is a two-digit code defined in the Indian Point SSE [7.3].
6.1.2. Subsystem Number The subsystem number is provided above its associated group of lines.
6.1.3. Subsystem Description A short description of the subsystem boundary is provided after the subsystem number.
6.1.4. Line Number Indian Point Energy Center does not maintain a complete piping line list.
Therefore, line names needed to be created. The majority of main piping lines, depending on susceptibility, were assigned a unique Line Number.
The naming convention follows a format which includes unit number, system abbreviation, a sequential number, and, if necessary, a section designator used either for parts of the same line with different susceptibility characteristics or specifications or for preventing duplicate line names:
Report No. 0700.104-03, Revision 2 Page 14 of 20
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program A-BBBB-CCC-D A Unit Number BBBB System Abbreviation CCC Sequential Number D Section Designator Examples: 2-1EST-014, 2-AS-082-B 6.1.5. Size The diameter of the line in inches is listed here. For lines with multiple sizes, the largest diameter is listed in the Size field.
6.1.6. Consequence of Failure (F)
Lines are classified as either Category 1 (potentially High Consequence of Failure) or Category 2 (Low Consequence of Failure) as described in Section 5.1. Category 1 lines are designated 1 in the table and Category 2 lines are designated 2.
6.1.7. Level of Susceptibility (S)
SNM Category 1 lines are ranked for FAC susceptibility as follows: 1 =
High, 2 = Moderate, and 3 = Low susceptibility.
6.1.8. Consequence of Failure Criteria (F Crit)
The Consequence of Failure criteria as defined in Section 5.1 (see Table 5.1).
6.1.9. Operating Parameters 6.1.9.1. Op. Quality (Q)
The FAC Effect ranking based on operating steam quality as defined in section 5.2.3.1 (see Table 5.2).
6.1.9.2. Op. Temp (T)
The FAC Effect ranking based on the operating temperature as defined in section 5.2.3.2 (see Table 5.3).
6.1.9.3. Op. Time (O)
The FAC Effect ranking based on the percentage of time that the line actually operates as defined in Section 5.2.3.3 (see Table 5.4).
6.1.9.4. Op. Flow (Fl)
The FAC Effect ranking based on flow conditions as defined in Section 5.2.3.4 (see Table 5.5). This field is populated for lines that experience choked flow or low flow conditions. Otherwise, Report No. 0700.104-03, Revision 2 Page 15 of 20
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program the field is blank. In all cases at Indian Point, this field was left blank, so this column was omitted from the results table.
6.1.10. Priority SNM lines are ranked for FAC priority as follows: 1 = High, 2 =
Moderate, and 3 = Low priority.
6.1.11. Plant Experience (Plant Exp.)
If there is a plant event associated with a line then a Y appears in this column, otherwise N appears.
6.1.12. Industry Experience (Ind. Exp.)
If there is an industry event associated with a similar line, then Y appears in this column, otherwise N appears.
6.1.13. Comments The Comments field contains any information pertinent to the line function as well as to its prioritization.
6.1.14. Flow Diagram (P&ID)
This field lists the flow diagram on which the line is found.
6.1.15. Reference The Reference field documents the source of information used to categorize and/or prioritize the line. This field was generally left blank if only a standard resource such as a PEPSE Model [7.4] was used.
6.1.16. Line Description This field contains a short description of the line function and/or line boundaries.
6.2. Color-Coded Flow Diagrams The Color-Coded Flow Diagrams document contains Piping and Instrumentation Diagrams (P&IDs) of all FAC susceptible systems addressed in this document as well as in the System Susceptibility Evaluation (SSE). The P&IDs are color-coded based upon FAC susceptibility category. Line names were added to the flow diagrams when needed. See the Color-Coded Flow Diagrams Document 0700.104-04 for the color-coding convention.
6.3. Inspection Frequency (Priority)
SNM piping inspections should be prioritized based on ongoing plant and industry experience as well as susceptibility ranking. For example, a line categorized as highly susceptible may be inspected more frequently than a Moderate or Low Susceptibility line. This relationship between priority and susceptibility can be seen in the results table in Appendix A. As an alternative or Report No. 0700.104-03, Revision 2 Page 16 of 20
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program a supplement to inspections, a small-bore piping replacement program can be implemented.
6.4. Revision History Changes made for each revision of this report are documented in Appendix F.
6.5. CHECWORKS Parametric Analysis Each line to be inspected will contain a variety of geometry types. Attachment A contains a parametric analysis of various component geometries. CHECWORKS was used to rank various components based upon their geometric configuration and operating conditions. These rankings should be used when selecting components for inspection in the SNM Program.
Report No. 0700.104-03, Revision 2 Page 17 of 20
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program
- 7. References 7.1. Erosion/Corrosion-Induced Pipe Wall Thinning, Generic Letter 89-08, U.S.
Nuclear Regulatory Commission (NRC), May 2, 1989.
7.2. Recommendations for an Effective Flow-Accelerated Corrosion Program, EPRI NSAC 202L-R3, 1011838, May 2006.
7.3. Indian Point Energy Center Unit 2 System Susceptibility Evaluation (SSE),
Report No. 0700.104-02 Rev. 2A, dated 9/8/2011.
7.4. Indian Point Uprate PEPSE Model with New HP Turbine High Pressure Turbine Expansion, Run Date 10/26/06.
7.5. Entergy Nuclear Northeast Indian Point Energy Center - Unit No. 2:
Specification For Fabrication of Piping Systems Turbine Generator Plant; Specification No. 9321-01-248-18; Revision 18; January 15, 2010.
7.6. Indian Point System Descriptions/Design Manuals.
System Name SD No.
Main and Reheat Steam Supply 18.00 Extraction Steam and Heater Drains and Vents 19.02 Condensate 20.00 Feedwater 21.00 Circulating Water 23.04 Service Water 24.00 Main Turbine Lube Oil 26.00 Auxiliary Steam 29.01 Instrument Air 29.02 7.7. CHUG Industry Experience Documents (see Attachment A).
7.8. Indian Point FAC Program History Outage Reports, transmitted to CSI on 7/15/2009.
7.9. EPRI, Flow-Accelerated Corrosion in Power Plants, B. Chexal et al, EPRI TR-106611-R1, 1998.
Report No. 0700.104-03, Revision 2 Page 18 of 20
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program 7.10. Indian Point Unit 2 FAC Susceptible Piping and Instrumentation Diagrams.
Rev System (Drawing Title) P&ID # #
Main Steam 9321-F-2017 84 Main Steam A235308 49 Main Steam 227780 53 Main Steam Traps (Sheet 1) 9321-F-2041 35 Main Steam Traps (Sheet 2) 9321-F-2042 21 Steam Drain and Gland Seal for Low and High Pressure Turbines B237144 4 Steam Drain and Gland Seal for Low and High Pressure Turbines B237145 6 Boiler Feed Pump Turbine Steam Lines Drains & Vents 9321-H-2024 23 Moisture Separator and Reheater Drains & Vents 9321-F-2023 35 Moisture Preseparator A228272 16 Extraction Steam 9321-F-2020 43 Extraction Steam Trap System 9321-F-2031 17 Heater Drains & Vents 9321-F-2022 53 Heater Drains & Vents A235304 23 Moisture Separator Reheaters Vent Chamber Discharge A209847 13 Superheater Building Service Boilers 9321-F-2120 69 Auxiliary Steam Supply and Condensate Return System A209775 45 Auxiliary Steam System (Sheet 1) B192490 22 Auxiliary Steam System (Sheet 2) 192491 39 Auxiliary Steam System (Sheet 3) B192493 8 Water Treatment System (Sheet 3) A192496 18 Steam Activated Carbon Filter B227209 16 Auxiliary Boiler Feed B193201 15 Condensate & Boiler Feed Pump Suction (Sheet 1) 9321-2018 141 Condensate & Boiler Feed Pump Suction (Sheet 2) A235307 32 Boiler Feedwater 9321-F-2019 113 Steam Generator Blowdown & Blowdown Sample System 9321-F-2729 69 7.11. CHECWORKS Steam/Feedwater Application Guidelines for Plant Modeling and Evaluation of Component Inspection Data. EPRI, Palo Alto, CA and CSI Technologies, Inc., Elgin, IL: 2009. 1019176. (For information only).
7.12. Indian Point Isometric Drawings for FAC-susceptible piping, gathered by CSI on 4/3/2009 (For information only).
Report No. 0700.104-03, Revision 2 Page 19 of 20
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program 7.13. Electronic correspondence between CSI and Indian Point personnel (see Attachment B) (For information only).
7.13.1. Email from Ryan Doremus (CSI) to Ian Mew (IPEC) regarding a Line Naming Convention, dated 7/27/2009.
7.13.2. Email from Ian Mew (IPEC) to Ryan Doremus (CSI) regarding responses to information requests, dated 8/10/2009.
7.13.3. Email from Ian Mew (IPEC) to Ryan Doremus (CSI) regarding responses to information requests, dated 8/13/2009.
7.14. CHUG Position Paper Number 6, Recommendations for an Effective Flow-Accelerated Corrosion Program for Small-Bore Piping, Revision 0, October 2007 (For information only).
7.15. Flow Accelerated Corrosion Program Plan Supplement; Edited by Hazel Pearsall, FAC Program Engineer; Dated April 28, 2003 (For information only).
Report No. 0700.104-03, Revision 2 Page 20 of 20
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Appendix A SNM Program Lines Indian Point Unit 2 Report No. 0700.104-03, Appendix A, Revision 2 Page A-1 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Auxiliary Feedwater (AF), Unit 2 2-AF-01: Service Boiler Auxiliary Feedwater Lines Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-AF-001 Text19: 6 1 2 FL 2 2 1 2 No No This large bore line is important to 9321-F-2120 P&ID Deaerator Header to plant operation and/or is a Boiler Feed Pumps personnel safety issue upon failure.
2-AF-002 Text19: 4 1 2 FL 2 2 1 2 No No This large bore line is important to 9321-F-2120 P&ID Aux. Feed header to #23 plant operation and/or is a Boiler Feed Pump and personnel safety issue upon #10 House Service failure. Deaerator 2-AF-003 Text19: 4 1 2 FL 2 2 1 2 No No This large bore line is important to 9321-F-2120 P&ID Aux. Feed header to #21 plant operation and/or is a Boiler Feed Pump personnel safety issue upon failure.
2-AF-004 Text19: 4 1 2 FL 2 2 1 2 No No This large bore line is important to 9321-F-2120 P&ID Aux. Feed header to #22 plant operation and/or is a Boiler Feed Pump personnel safety issue upon failure.
2-AF-005 Text19: 4 1 2 FL 2 2 1 2 No No This large bore line is important to 9321-F-2120 P&ID Aux. Feed header to #23 plant operation and/or is a Boiler Feed Pump personnel safety issue upon failure.
2-AF-006 Text19: 6 1 2 FL 2 2 1 2 No No This large bore line is important to 9321-F-2120 P&ID Aux. Feed header to #10 plant operation and/or is a House Service Deaerator personnel safety issue upon failure.
Text19:
2-AF-007 1.5 2 N/A No No 9321-F-2120 P&ID Boiler Feed Pump overflow header to Deaerator 2-AF-008 Text19: 1.5 2 N/A No No 9321-F-2120 P&ID Boiler Feed Pump discharge Unit #3 tie-in.
2-AF-011-A Text19: 1 1 2 FP 2 2 1 2 No No This line exists in an area 9321-F-2120 P&ID #21 BFP discharge accessible by plant personnel overflow line upstream of during operation, and a leak orifice presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-2 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Auxiliary Feedwater (AF), Unit 2 2-AF-01: Service Boiler Auxiliary Feedwater Lines Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-AF-011-B Text19: 1 2 N/A No No 9321-F-2120 P&ID #21 BFP discharge overflow line downstream of orifice 2-AF-012-A Text19: 1 1 2 FP 2 2 1 2 No No This line exists in an area 9321-F-2120 P&ID #22 BFP discharge accessible by plant personnel overflow line upstream of during operation, and a leak orifice presents a burn risk to a passerby.
2-AF-012-B Text19: 1 2 N/A No No 9321-F-2120 P&ID #22 BFP discharge overflow line downstream of orifice 2-AF-013-A Text19: 1 1 2 FP 2 2 1 2 No No This line exists in an area 9321-F-2120 P&ID #23 BFP discharge accessible by plant personnel overflow line upstream of during operation, and a leak orifice presents a burn risk to a passerby.
2-AF-013-B Text19: 1 2 N/A No No 9321-F-2120 P&ID #23 BFP discharge overflow line downstream of orifice Text19:
2-AF-014 3 1 2 FL 2 2 1 2 No No This large bore line is important to 9321-F-2120 P&ID #21 BFP discharge line plant operation and/or is a personnel safety issue upon failure.
2-AF-015 Text19: 3 1 2 FL 2 2 1 2 No No This large bore line is important to 9321-F-2120 P&ID #22 BFP discharge line plant operation and/or is a personnel safety issue upon failure.
2-AF-016 Text19: 3 1 2 FL 2 2 1 2 No No This large bore line is important to 9321-F-2120 P&ID #23 BFP discharge line plant operation and/or is a personnel safety issue upon failure.
2-AF-017 Text19: 4 1 2 FL 2 2 1 2 No No This large bore line is important to 9321-F-2120 P&ID #21 and #22 BFP plant operation and/or is a discharge header personnel safety issue upon failure.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-3 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Auxiliary Feedwater (AF), Unit 2 2-AF-01: Service Boiler Auxiliary Feedwater Lines Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-AF-018 Text19: 2.5 1 2 FL 2 2 1 2 No No This large bore line is important to 9321-F-2120 P&ID LH Boiler #22 Feed Line plant operation and/or is a personnel safety issue upon failure.
2-AF-019 Text19: 2.5 1 2 FL 2 2 1 2 No No This large bore line is important to 9321-F-2120 P&ID AF-144 bypass line plant operation and/or is a personnel safety issue upon failure.
2-AF-020 Text19: 4 1 2 FL 2 2 1 2 No No This large bore line is important to B193201, 9321- P&ID Unit 1 Service Boiler plant operation and/or is a F-2021 Feed Pump discharge tie-personnel safety issue upon in line.
failure.
2-AF-021 Text19: 1 1 2 FP 2 2 1 2 No No This line exists in an area 9321-F-2120 P&ID BFP discharge header to accessible by plant personnel Desuperheater Station during operation, and a leak presents a burn risk to a passerby.
2-AF-022 Text19: 2.5 1 2 FL 2 2 1 2 No No This large bore line is important to 9321-F-2120 P&ID RH Boiler #21 Feed Line plant operation and/or is a personnel safety issue upon failure.
2-AF-023 Text19: 2.5 1 2 FL 2 2 1 2 No No This large bore line is important to 9321-F-2120 P&ID AF-138 bypass line plant operation and/or is a personnel safety issue upon failure.
2-AF-024 Text19: 0.75 2 N/A No No 9321-F-2120 P&ID RH Boiler #21 Continuous Blowdown Line 2-AF-025 Text19: 1.5 2 N/A No No 9321-F-2120 P&ID RH Boiler #21 Intermittent Blowdown Line 2-AF-026 Text19: 0.75 2 N/A No No 9321-F-2120 P&ID LH Boiler #22 Continuous Blowdown Line 2-AF-027 Text19: 1.5 2 N/A No No 9321-F-2120 P&ID LH Boiler #22 Intermittent Blowdown Line Report No. 0700.104-03, Appendix A, Revision 2 Page A-4 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Auxiliary Feedwater (AF), Unit 2 2-AF-01: Service Boiler Auxiliary Feedwater Lines Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-AF-028 Text19: 0.75 2 N/A No No 9321-F-2120 P&ID Continuous Blowdown line to HSBSPCLs 2-AF-029 Text19: 1.5 2 N/A No No 9321-F-2120 P&ID Boiler Blowdown Tank Bottom Drain 2-AF-030 Text19: 1.5 2 N/A No No 9321-F-2120 P&ID Boiler Blowdown Tank Drain Bypass 2-AF-031 Text19: 1.25 2 N/A No No 9321-F-2120 P&ID Boiler Blowdown Tank Drain Vent 2-AF-032 Text19: 6 1 2 FL 2 1 1 2 No No This large bore line is important to 9321-F-2120 P&ID Boiler Blowdown Tank plant operation and/or is a Drain personnel safety issue upon failure.
2-AF-033 Text19: 2 N/A No No B193201, 9321- P&ID ABSPCLB Aux. Feed Inlet F-2120 2-AF-034 Text19: 2 N/A No No 9321-F-2120 P&ID ABSPCLB Aux. Feed Outlet to Dissolved O2 Analyzer Text19:
2-AF-035 2 N/A No No 9321-F-2120 P&ID ABSPCLB Aux. Feed Outlet to Cooling Bath Text19:
2-AF-037 2 1 2 FP 1 2 1 2 No No This line exists in an area B193201 P&ID Flash Tank Drain to accessible by plant personnel Service Boiler Deaerator during operation, and a leak presents a burn risk to a passerby.
2-AF-038 Text19: 1.25 2 N/A No No B193201 P&ID Service Boiler Deaerator Vent 2-AF-039 Text19: 6 1 2 FL 2 2 1 2 No No This large bore line is important to B193201 P&ID Service Boiler Deaerator plant operation and/or is a 6" Drain to OB personnel safety issue upon failure.
2-AF-040 Text19: 4 1 2 FL 2 2 1 2 No No This large bore line is important to B193201 P&ID Service Boiler Deaerator plant operation and/or is a Drain vent personnel safety issue upon failure.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-5 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Auxiliary Feedwater (AF), Unit 2 2-AF-01: Service Boiler Auxiliary Feedwater Lines Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-AF-041 Text19: 2 1 2 FP 2 2 1 2 No No This line exists in an area B193201 P&ID Service Boiler Deaerator accessible by plant personnel 2" Drain to OB during operation, and a leak presents a burn risk to a passerby.
2-AF-042 Text19: 0.75 2 N/A No No B193201 P&ID Drain from multiport valve.
Text19:
2-AF-043 6 1 2 FL 2 2 1 2 No No This large bore line is important to B193201 P&ID Service Boiler Deaerator plant operation and/or is a Drain to Service Boiler personnel safety issue upon Feed Pumps failure.
2-AF-044 Text19: 4 1 2 FL 2 2 1 2 No No This large bore line is important to B193201 P&ID Service Boiler Pump No.
plant operation and/or is a 11 Feed Line personnel safety issue upon failure.
2-AF-045 Text19: 4 1 2 FL 2 2 1 2 No No This large bore line is important to B193201 P&ID Service Boiler Pump No.
plant operation and/or is a 12 Feed Line personnel safety issue upon failure.
2-AF-046 Text19: 4 1 2 FL 2 2 1 2 No No This large bore line is important to B193201 P&ID Service Boiler Pump No.
plant operation and/or is a 13 Feed Line personnel safety issue upon failure.
2-AF-047 Text19: 3 1 2 FL 2 2 1 2 No No This large bore line is important to B193201 P&ID Service Boiler Pump No.
plant operation and/or is a 11 Discharge Line personnel safety issue upon failure.
2-AF-048 Text19: 3 1 2 FL 2 2 1 2 No No This large bore line is important to B193201 P&ID Service Boiler Pump No.
plant operation and/or is a 12 Discharge Line personnel safety issue upon failure.
2-AF-049 Text19: 3 1 2 FL 2 2 1 2 No No This large bore line is important to B193201 P&ID Service Boiler Pump No.
plant operation and/or is a 13 Discharge Line personnel safety issue upon failure.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-6 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Auxiliary Feedwater (AF), Unit 2 2-AF-01: Service Boiler Auxiliary Feedwater Lines Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-AF-050 Text19: 6 1 2 FL 2 2 1 2 No No This large bore line is important to B193201 P&ID Service Boiler Pump plant operation and/or is a Discharge Header personnel safety issue upon failure.
2-AF-051 Text19: 1.5 2 N/A No No B193201 P&ID AF59 Vent to Service Boiler Deaerator 2-AF-052 Text19: 1.5 2 N/A No No B193201 P&ID AF58 Vent to Service Boiler Deaerator 2-AF-053 Text19: 1.5 2 N/A No No B193201 P&ID AF57 Vent to Service Boiler Deaerator Text19:
2-AF-054 1.5 2 N/A No No B193201 P&ID Check valve vent header to Service Boiler Deaerator Text19:
2-AF-057 2 N/A No No 9321-F-2120 P&ID Chemical Bench Sink Report No. 0700.104-03, Appendix A, Revision 2 Page A-7 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Auxiliary Steam (AS), Unit 2 2-AS-03: Remainder of Auxiliary Steam Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-AS-001-A Text19: 10 1 2 FL 1 2 1 2 No No This large bore line is important to B192493, SD 29.01 10" Aux. Steam Header plant operation and/or is a B192490, personnel safety issue upon 192491 failure.
2-AS-002 Text19: 10 1 2 FL 1 2 1 2 No No This large bore line is important to 9321-F-2120 SD 29.01 Aux. Steam Header from plant operation and/or is a Service Boilers personnel safety issue upon failure.
2-AS-003 Text19: 8 1 2 FL 1 2 1 2 No No This large bore line is important to 9321-F-2120 SD 29.01 Aux. Steam from #22 LH plant operation and/or is a Boiler personnel safety issue upon failure.
2-AS-004 Text19: 8 1 2 FL 1 2 1 2 No No This large bore line is important to 9321-F-2120 SD 29.01 Aux. Steam from #21 RH plant operation and/or is a Boiler personnel safety issue upon failure.
2-AS-005 Text19: 4 1 2 FL 1 2 1 2 No No This large bore line is important to 9321-F-2120 SD 29.01 Aux. Steam Drain to plant operation and/or is a Deaerator personnel safety issue upon failure.
2-AS-006 Text19: 1.5 1 2 FP 1 2 1 2 No No This line exists in an area 9321-F-2120 SD 29.01 FCV-1148 Bypass Line accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-AS-008 Text19: 1.25 1 2 FP 1 2 1 2 No No This line exists in an area A209775 P&ID Steam to 21 and 22 Air accessible by plant personnel Tempering Units during operation, and a leak presents a burn risk to a passerby.
2-AS-009 Text19: 8 1 2 FL 1 2 1 2 No No This large bore line is important to 9321-F-2120 P&ID Steam to AST-26 plant operation and/or is a personnel safety issue upon failure.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-8 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Auxiliary Steam (AS), Unit 2 2-AS-03: Remainder of Auxiliary Steam Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-AS-015 Text19: 1.5 1 2 FP 1 2 1 2 No No This line exists in an area 9321-F-2120 SD 29.01 #21 RH Boiler Drain accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-AS-016 Text19: 1.5 1 2 FP 1 2 1 2 No No This line exists in an area 9321-F-2120 SD 29.01 #22 LH Boiler Drain accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-AS-017 Text19: 1.5 1 2 FP 1 2 1 2 No No This line exists in an area 9321-F-2120 SD 29.01 Boiler Drain Header to accessible by plant personnel Blowdown Tank during operation, and a leak presents a burn risk to a passerby.
2-AS-018 Text19: 1 2 N/A No No 9321-F-2120 P&ID RH Boiler #21 Atomizing Steam bleed-off line Text19:
2-AS-019 1 2 N/A No No 9321-F-2120 P&ID LH Boiler #22 Atomizing Steam bleed-off line 2-AS-025 Text19: 1 2 N/A No No 9321-F-2120 P&ID Oil Separator Tank outlet Text19:
2-AS-026 1 2 N/A No No 9321-F-2120 P&ID Oil Separator Tank outlet to Carbon Filter Tank Text19:
2-AS-027 1 2 N/A No No 9321-F-2120 P&ID Oil Separator Tank outlet to Floor Drain Text19:
2-AS-030 2 2 N/A No No B192490 P&ID Steam to Water Heater Text19:
2-AS-031 6 1 2 FL 1 2 1 2 No No This large bore line is important to B192490 SD 29.01 Steam Header to Barge plant operation and/or is a Steam Connections personnel safety issue upon failure.
2-AS-032 Text19: 4 1 2 FL 1 2 1 2 No No This large bore line is important to B192490 SD 29.01 Steam to AS845 plant operation and/or is a personnel safety issue upon failure.
2-AS-033 Text19: 1.5 2 N/A No No B192490 P&ID Steam to AS840 Report No. 0700.104-03, Appendix A, Revision 2 Page A-9 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Auxiliary Steam (AS), Unit 2 2-AS-03: Remainder of Auxiliary Steam Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-AS-036 Text19: 4 1 2 FL 1 2 1 2 No No This large bore line is important to B192490 SD 29.01 Steam line to UH-1239 plant operation and/or is a personnel safety issue upon failure.
2-AS-037 Text19: 1 2 N/A No No B192490 P&ID PRV-7343 Bypass Text19:
2-AS-039 2 N/A No No B192490 P&ID Steam to Screens Text19:
2-AS-046 4 1 2 FL 1 2 1 2 No No This large bore line is important to 192491 SD 29.01 Steam header to Service plant operation and/or is a Boiler Feed Pump No. 13 personnel safety issue upon failure.
2-AS-047 Text19: 6 1 2 FL 1 2 1 2 No No This large bore line is important to 192491 SD 29.01 Steam header to Carbon plant operation and/or is a Filter Tanks personnel safety issue upon failure.
2-AS-048 Text19: 2 2 N/A No No 192491 P&ID Steam to Service Boiler Phosphate Mix Tanks and Continuous Heaters Text19:
2-AS-051 2 1 2 FP 1 2 1 2 No No This line exists in an area 192491 SD 29.01 Steam to Service Boiler accessible by plant personnel Feed Pump No. 13 during operation, and a leak presents a burn risk to a passerby.
Text19:
2-AS-053 4 1 2 FL 1 2 1 2 No No This large bore line is important to 192491 SD 29.01 Steam from Service plant operation and/or is a Boiler Feed Pump No. 13 personnel safety issue upon failure.
2-AS-054 Text19: 8 1 2 FL 1 2 1 2 No No This large bore line is important to 192491 SD 29.01 Steam from Service plant operation and/or is a Boiler Feed Pump No. 13 personnel safety issue upon to #10 Service Deaerator failure.
2-AS-055 Text19: 8 1 2 FL 1 2 1 2 No No This large bore line is important to 192491 SD 29.01 Steam from Service plant operation and/or is a Boiler Feed Pump No. 13 personnel safety issue upon to Atmospheric Vent failure. header Report No. 0700.104-03, Appendix A, Revision 2 Page A-10 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Auxiliary Steam (AS), Unit 2 2-AS-03: Remainder of Auxiliary Steam Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-AS-057 Text19: 10 1 2 FL 1 2 1 2 No No This large bore line is important to 192491 P&ID Steam drain to #10 plant operation and/or is a Service Deaerator via personnel safety issue upon AS484 failure.
2-AS-058 Text19: 4 1 2 FL 1 2 1 2 No No This large bore line is important to 192491 P&ID Steam to Heating and plant operation and/or is a Ventilation Pressure personnel safety issue upon Reducing Station failure.
2-AS-060 Text19: 2 2 N/A No No 192491 P&ID Steam from Heating and Ventilation Pressure Reducing Station 2-AS-070 Text19: 3 1 2 FL 1 2 1 2 No No This large bore line is important to 192491, SD 29.01 Steam header to Carbon plant operation and/or is a B227209 Filter Tanks personnel safety issue upon failure.
2-AS-073 Text19: 2 2 N/A No No 192491 P&ID Header to Service Boiler Phosphate Mix Tanks 2-AS-074 Text19: 0.75 2 N/A No No 192491 P&ID Steam to Service Boiler Phosphate Mix Tank No.
11 Text19:
2-AS-075 0.75 2 N/A No No 192491 P&ID Steam to Service Boiler Phosphate Mix Tank No.
12 Text19:
2-AS-076 2 2 N/A No No 192491 P&ID Steam to Continuous Heaters via AS568 2-AS-077 Text19: 2 2 N/A No No 192491 P&ID Steam to Continuous Heaters via AS112 2-AS-079 Text19: 2 2 N/A No No 192491 P&ID Steam header to Continuous Heaters via AS568 2-AS-080 Text19: 1 2 N/A No No 192491 P&ID Steam to Continuous Heater No. 11 Report No. 0700.104-03, Appendix A, Revision 2 Page A-11 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Auxiliary Steam (AS), Unit 2 2-AS-03: Remainder of Auxiliary Steam Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-AS-081 Text19: 1 2 N/A No No 192491 P&ID Steam to Continuous Heater No. 12 2-AS-082-A Text19: 8 1 2 FL 1 2 1 2 No No This large bore line is important to 192491 SD 29.01 Floor trench drain to cap plant operation and/or is a personnel safety issue upon failure.
2-AS-082-B Text19: 1.5 2 N/A No No 192491 P&ID Floor trench drain downstream of cap 2-AS-083 Text19: 16 1 2 FL 1 2 1 2 No No This large bore line is important to 192491 SD 29.01 Aux Steam Vent to plant operation and/or is a Atmosphere personnel safety issue upon failure.
2-AS-087 Text19: 3 1 2 FL 1 2 1 2 No No This large bore line is important to B227209 SD 29.01 Steam to 21ACFT plant operation and/or is a personnel safety issue upon failure.
2-AS-088 Text19: 3 1 2 FL 1 2 1 2 No No This large bore line is important to B227209 SD 29.01 Steam to 22ACFT plant operation and/or is a personnel safety issue upon failure.
2-AS-091 Text19: 0.75 2 N/A No No B227209 P&ID Port Basin drain from Aux. Steam supply to ACFTs Text19:
2-AS-093 1.5 2 N/A No No B227209 P&ID PRV-5245 Bypass Text19:
2-AS-096 4 1 2 FL 1 2 1 2 No No This large bore line is important to 192491, P&ID Aux. Steam to Flash Tank plant operation and/or is a B193201 personnel safety issue upon failure.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-12 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Auxiliary Steam Traps (AST), Unit 2 2-AST-01: Steam Trap Lines from Auxiliary Steam Lines Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-AST-002 Text19: 0.75 1 2 FP 1 3 1 2 No No This line exists in an area A227780, PEPSE Steam to and from AST-accessible by plant personnel A209775 50 during operation, and a leak presents a burn risk to a passerby.
2-AST-006 Text19: 1.5 2 N/A No No 9321-F-2120 P&ID Steam to Hot Water Heat Exchangers 2-AST-007 Text19: 0.75 2 N/A No No 9321-F-2120 P&ID Steam to and from AS-1176 2-AST-007-A Text19: 1 2 N/A No No 9321-F-2120 P&ID Steam to Condensate Return via AST-35 Text19:
2-AST-009 2 2 N/A No No 9321-F-2120 P&ID Hot Water Heat Exchangers Discharge Line Text19:
2-AST-010 4 1 2 FL 1 2 1 2 No No This large bore line is important to 9321-F-2120 SD 29.01 Condensate Return plant operation and/or is a Header personnel safety issue upon failure.
2-AST-011 Text19: 0.75 2 N/A No No 9321-F-2120 P&ID Steam to and from AS-1093 Text19:
2-AST-013 2 N/A No No 9321-F-2120 P&ID Steam Supply Drain to Condensate Return via AST-31 Text19:
2-AST-017 8 1 2 FL 1 3 1 2 No No This large bore line is important to A209775 P&ID Steam to AST-33 plant operation and/or is a personnel safety issue upon failure.
2-AST-019 Text19: 1 2 N/A No No A209775 P&ID AST-33 Discharge Text19:
2-AST-020 1 1 2 FP 1 2 1 2 No No This line exists in an area A209775 P&ID Steam to AST-20 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-13 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Auxiliary Steam Traps (AST), Unit 2 2-AST-01: Steam Trap Lines from Auxiliary Steam Lines Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-AST-021 Text19: 1 1 2 FP 1 2 1 2 No No This line exists in an area 9321-F-2120 SD 29.01 #21 Fuel Oil Heater accessible by plant personnel heating steam outlet during operation, and a leak presents a burn risk to a passerby.
2-AST-021-A Text19: 1 2 N/A No No A209775 P&ID AST-20 Discharge Text19:
2-AST-022 1 1 2 FP 1 2 1 2 No No This line exists in an area 9321-F-2120 SD 29.01 #22 Fuel Oil Heater accessible by plant personnel heating steam outlet during operation, and a leak presents a burn risk to a passerby.
2-AST-023 Text19: 1 1 2 FP 1 2 1 2 No No This line exists in an area 9321-F-2120 SD 29.01 #23 Fuel Oil Heater accessible by plant personnel heating steam outlet during operation, and a leak presents a burn risk to a passerby.
2-AST-024 Text19: 1 2 N/A No No 9321-F-2120 P&ID Fuel Oil heating steam outlet from steam traps to oil separator tank Text19:
2-AST-025 4 1 2 FL 1 3 1 2 No No This large bore line is important to A209775 P&ID Steam to AST-2 and 3 plant operation and/or is a personnel safety issue upon failure.
2-AST-027 Text19: 0.75 1 2 FP 1 3 1 2 No No This line exists in an area A209775 P&ID Steam to AST-6 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-AST-028 Text19: 0.75 1 2 FP 1 3 1 2 No No This line exists in an area A209775 P&ID Steam to AST-7 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-AST-032 Text19: 0.75 1 2 FP 1 3 1 2 No No This line exists in an area A209775 P&ID Steam to AST-4 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-14 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Auxiliary Steam Traps (AST), Unit 2 2-AST-01: Steam Trap Lines from Auxiliary Steam Lines Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-AST-033 Text19: 0.75 1 2 FP 1 3 1 2 No No This line exists in an area A209775 P&ID Steam to AST-5 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-AST-034 Text19: 0.75 2 N/A No No B192490 P&ID Steam to and from AS849 Text19:
2-AST-035-A 0.75 2 N/A No No A209775 P&ID AST-6 Discharge Text19:
2-AST-036 0.75 2 N/A No No A209775 P&ID AST-7 Discharge Text19:
2-AST-037 1.5 2 N/A No No A209775 P&ID AST-4 Discharge Text19:
2-AST-038 0.75 2 N/A No No B192490 P&ID Steam to and from UH-1238 2-AST-038-A Text19: 0.75 2 N/A No No A209775 P&ID AST-5 Discharge Text19:
2-AST-041 1 2 N/A No No B192490 P&ID Steam to and from AST-27 2-AST-042 Text19: 1 2 N/A No No B192490 P&ID AST-27 Bypass Text19:
2-AST-043 1 2 N/A No No B192490 P&ID Steam to and from AST-42 Text19:
2-AST-044 1 2 N/A No No B192490 P&ID AST-42 Bypass Text19:
2-AST-049-A 0.5 2 N/A No No 192491 P&ID Steam to and from AST-38 2-AST-050-A Text19: 0.5 2 N/A No No 192491 P&ID Steam to and from AST-37 2-AST-052 Text19: 0.75 2 N/A No No 192491 P&ID Steam to and from AST-45 2-AST-058 Text19: 1 2 N/A No No A209775 P&ID AST-2 Discharge Text19:
2-AST-059 1 2 N/A No No A209775 P&ID AST-3 Discharge Text19:
2-AST-061 1 2 N/A No No 192491 P&ID Steam to and from AST-39 Report No. 0700.104-03, Appendix A, Revision 2 Page A-15 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Auxiliary Steam Traps (AST), Unit 2 2-AST-01: Steam Trap Lines from Auxiliary Steam Lines Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-AST-063 Text19: 1 2 N/A No No 192491 P&ID Steam to and from AST-32 2-AST-065 Text19: 1 2 N/A No No 192491 P&ID AST-32 and 39 drain to Cond. Return Header 2-AST-066 Text19: 2 2 N/A No No 192491 P&ID Steam to and from FP-1198 2-AST-067 Text19: 2 2 N/A No No 192491 P&ID Steam to and from UH-1300 2-AST-069-A Text19: 3 1 2 FL 1 2 1 2 No No This large bore line is important to 192491 SD 29.01 Stub to AST-30 and drain plant operation and/or is a personnel safety issue upon failure.
2-AST-069-B Text19: 1 2 N/A No No 192491 P&ID Steam to and from AST-30 Report No. 0700.104-03, Appendix A, Revision 2 Page A-16 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Steam Generator Blowdown (BD), Unit 2 2-BD-01: Steam Generator Blowdown to Sample Coolers and Blowdown Tank Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-BD-001 Text19: 2 1 2 FP 2 3 1 2 No No This line exists in an area 9321-F-2729 P&ID SG 21 Blowdown via MS-accessible by plant personnel 67-A during operation, and a leak presents a burn risk to a passerby.
2-BD-002 Text19: 2 1 2 FP 2 3 1 2 No No This line exists in an area 9321-F-2729 P&ID SG 21 Blowdown via MS-accessible by plant personnel 67-B during operation, and a leak presents a burn risk to a passerby.
2-BD-003 Text19: 2 1 2 FP 2 3 1 2 No No This line exists in an area 9321-F-2729 P&ID SG 22 Blowdown via MS-accessible by plant personnel 67-C during operation, and a leak presents a burn risk to a passerby.
2-BD-004 Text19: 2 1 2 FP 2 3 1 2 No No This line exists in an area 9321-F-2729 P&ID SG 22 Blowdown via MS-accessible by plant personnel 67-D during operation, and a leak presents a burn risk to a passerby.
2-BD-005 Text19: 2 1 2 FP 2 3 1 2 No No This line exists in an area 9321-F-2729 P&ID SG 23 Blowdown via MS-accessible by plant personnel 67-E during operation, and a leak presents a burn risk to a passerby.
2-BD-006 Text19: 2 1 2 FP 2 3 1 2 No No This line exists in an area 9321-F-2729 P&ID SG 23 Blowdown via MS-accessible by plant personnel 67-F during operation, and a leak presents a burn risk to a passerby.
Text19:
2-BD-007 2 1 2 FP 2 3 1 2 No No This line exists in an area 9321-F-2729 P&ID SG 24 Blowdown via MS-accessible by plant personnel 67-G during operation, and a leak presents a burn risk to a passerby.
2-BD-008 Text19: 2 1 2 FP 2 3 1 2 No No This line exists in an area 9321-F-2729 P&ID SG 24 Blowdown via MS-accessible by plant personnel 67-H during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-17 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Steam Generator Blowdown (BD), Unit 2 2-BD-01: Steam Generator Blowdown to Sample Coolers and Blowdown Tank Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-BD-009-A Text19: 2 1 2 FP 2 3 1 2 No No This line exists in an area 9321-F-2729 P&ID SG 21 Blowdown accessible by plant personnel Upstream of Line Spec during operation, and a leak Change presents a burn risk to a passerby.
2-BD-010-A Text19: 2 1 2 FP 2 3 1 2 No No This line exists in an area 9321-F-2729 P&ID SG 22 Blowdown accessible by plant personnel Upstream of Line Spec during operation, and a leak Change presents a burn risk to a passerby.
2-BD-011-A Text19: 2 1 2 FP 2 3 1 2 No No This line exists in an area 9321-F-2729 P&ID SG 23 Blowdown accessible by plant personnel Upstream of Line Spec during operation, and a leak Change presents a burn risk to a passerby.
2-BD-012-A Text19: 2 1 2 FP 2 3 1 2 No No This line exists in an area 9321-F-2729 P&ID SG 24 Blowdown accessible by plant personnel Upstream of Line Spec during operation, and a leak Change presents a burn risk to a passerby.
2-BD-017 Text19: 1 1 2 FP 2 3 1 2 No No This line exists in an area 9321-F-2729 P&ID SG 23 1" Blowdown Line accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-BD-018 Text19: 1 1 2 FP 2 3 1 2 No No This line exists in an area 9321-F-2729 P&ID SG 24 1" Blowdown Line accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-BD-019 Text19: 18 1 2 FL 2 3 1 2 No No This large bore line is important to 9321-F-2729 P&ID Blowdown Tank vent to plant operation and/or is a Atmosphere personnel safety issue upon failure.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-18 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Extraction Steam Traps (EST), Unit 2 2-1EST-01: Extraction Steam Trap Headers to the Drains Collecting Tank Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-1EST-013-A Text19: 4 1 2 FL 1 3 1 2 No No This large bore line is important to 9321-F-2031 P&ID Steam Trap Header from plant operation and/or is a EST-1 and 1A personnel safety issue upon failure.
2-1EST-013-B Text19: 4 1 1 FL 1 1 1 1 No No This large bore line is important to 9321-F-2031 P&ID Steam Trap Header from plant operation and/or is a EST-1, 1A, 2, and 6 personnel safety issue upon failure.
2-1EST-014 Text19: 6 1 1 FL 1 1 1 1 No No This large bore line is important to 9321-F-2031 P&ID Main Extraction Steam plant operation and/or is a Trap Header personnel safety issue upon failure.
2-3EST-01: Steam Trap lines from Extraction Steam to the #23 FWHs Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description Text19:
2-3EST-012-A 2 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE Extraction Steam to EST-accessible by plant personnel 14 during operation, and a leak presents a burn risk to a passerby.
2-3EST-012-B Text19: 2 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE EST-14 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
Text19:
2-3EST-013-A 0.75 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE Extraction Steam to EST-accessible by plant personnel 15 during operation, and a leak presents a burn risk to a passerby.
2-3EST-013-B Text19: 0.75 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE Header from EST-15 to accessible by plant personnel Steam Trap Header during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-19 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Extraction Steam Traps (EST), Unit 2 2-3EST-01: Steam Trap lines from Extraction Steam to the #23 FWHs Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-3EST-014-A Text19: 0.75 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE Extraction Steam to EST-accessible by plant personnel 16 during operation, and a leak presents a burn risk to a passerby.
2-3EST-014-B Text19: 0.75 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE Header from EST-16 to accessible by plant personnel Steam Trap Header during operation, and a leak presents a burn risk to a passerby.
2-3EST-015-A Text19: 2 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE Extraction Steam to EST-accessible by plant personnel 17 during operation, and a leak presents a burn risk to a passerby.
2-3EST-015-B Text19: 2 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE EST-17 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-3EST-016-A Text19: 0.75 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE Extraction Steam to EST-accessible by plant personnel 18 during operation, and a leak presents a burn risk to a passerby.
2-3EST-016-B Text19: 0.75 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE EST-18 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
Text19:
2-3EST-017-A 0.75 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE Extraction Steam to EST-accessible by plant personnel 19 during operation, and a leak presents a burn risk to a passerby.
2-3EST-017-B Text19: 0.75 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE EST-19 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-20 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Extraction Steam Traps (EST), Unit 2 2-3EST-01: Steam Trap lines from Extraction Steam to the #23 FWHs Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-3EST-018-A Text19: 2 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE Extraction Steam to EST-accessible by plant personnel 20 during operation, and a leak presents a burn risk to a passerby.
2-3EST-018-B Text19: 2 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE EST-20 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-3EST-019-A Text19: 0.75 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE Extraction Steam to EST-accessible by plant personnel 21 during operation, and a leak presents a burn risk to a passerby.
2-3EST-019-B Text19: 0.75 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE EST-21 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-3EST-020-A Text19: 0.75 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE Extraction Steam to EST-accessible by plant personnel 23 during operation, and a leak presents a burn risk to a passerby.
2-3EST-020-B Text19: 0.75 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE EST-23 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-4EST-01: Lines from Stm Traps to the Stm Trap Drains Header from Ext lines to #24 FWHs Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description Text19:
2-4EST-001 0.75 1 1 FP 1 1 1 1 Yes No Components in the line have been 9321-F-2031 PEPSE EST-5 to Steam Trap replaced in the past. This line Header exists in an area accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-21 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Extraction Steam Traps (EST), Unit 2 2-4EST-01: Lines from Stm Traps to the Stm Trap Drains Header from Ext lines to #24 FWHs Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-4EST-002 Text19: 0.75 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE EST-6 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-4EST-003 Text19: 0.75 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE EST-7 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-4EST-004 Text19: 0.75 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE EST-8 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-4EST-005 Text19: 0.75 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE EST-9 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-4EST-006 Text19: 0.75 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE EST-10 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-4EST-007 Text19: 0.75 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE EST-11 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
Text19:
2-4EST-008 0.75 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE EST-12 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-4EST-009 Text19: 0.75 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE EST-13 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-22 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Extraction Steam Traps (EST), Unit 2 2-5EST-01: Steam Trap lines from Extraction Steam to the #25 FWHs Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-5EST-040-A Text19: 0.75 1 1 FP 1 2 1 1 No No This line exists in an area 9321-F-2031 P&ID Extraction steam to EST-4 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-5EST-040-B Text19: 0.75 1 1 FP 1 2 1 1 No No This line exists in an area 9321-F-2031 P&ID EST-4 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-6EST-01: Steam Trap lines from Extraction Steam to the #26 FWHs Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description Text19:
2-6EST-015-A 2 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2031 PEPSE Extraction Steam to EST-accessible by plant personnel 1 during operation, and a leak presents a burn risk to a passerby.
2-6EST-015-B Text19: 2 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2031 PEPSE Extraction Steam to EST-accessible by plant personnel 1A during operation, and a leak presents a burn risk to a passerby.
2-6EST-015-C Text19: 2 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2031 PEPSE EST-1 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
Text19:
2-6EST-015-D 2 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2031 PEPSE EST-1A to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-6EST-016-A Text19: 0.75 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2031 PEPSE Extraction Steam to EST-accessible by plant personnel 2 during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-23 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Extraction Steam Traps (EST), Unit 2 2-6EST-01: Steam Trap lines from Extraction Steam to the #26 FWHs Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-6EST-016-B Text19: 0.75 1 1 FP 1 3 1 1 Yes No Components in this line have 9321-F-2031 PEPSE, EST-2 to Steam Trap been replaced in the past. This Replacement Header line exists in an area accessible History by plant personnel during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-24 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Extraction Steam (EX), Unit 2 2-3EX-01: Boiler Feed Pump Turbine Drains to Condensers Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-3EX-021 Text19: 1.5 1 2 FP 1 3 1 No No This line exists in an area A227780 PEPSE Continuous Drain from accessible by plant personnel #21 Steam Generator during operation, and a leak Feed Pump Turbine drain presents an injury risk to a to #21 Condenser passerby.
2-3EX-022 Text19: 1.5 1 2 FP 1 3 1 No No This line exists in an area A227780 PEPSE Continuous Drain from accessible by plant personnel #22 Steam Generator during operation, and a leak Feed Pump Turbine drain presents an injury risk to a to #22 Condenser passerby.
2-5EX-01: HP Turbine Crossunder Piping Drip Pots to the Condenser Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description Text19:
2-5EX-025-A 2 1 1 FP 1 2 1 1 No No This line exists in an area A235308 P&ID Crossunder Piping leakoff accessible by plant personnel from Moisture during operation, and a leak Preseparator A upstream presents a burn risk to a passerby. of Pipe Spec Change Text19:
2-5EX-026-A 2 1 1 FP 1 2 1 1 No No This line exists in an area A235308 P&ID Crossunder Piping leakoff accessible by plant personnel from Moisture during operation, and a leak Preseparator B upstream presents a burn risk to a passerby. of Pipe Spec Change 2-5EX-027-A Text19: 2 1 1 FP 1 2 1 1 No No This line exists in an area A235308 P&ID Crossunder Piping leakoff accessible by plant personnel from Moisture during operation, and a leak Preseparator C upstream presents a burn risk to a passerby. of Pipe Spec Change 2-5EX-028-A Text19: 2 1 1 FP 1 2 1 1 No No This line exists in an area A235308 P&ID Crossunder Piping leakoff accessible by plant personnel from Moisture during operation, and a leak Preseparator D upstream presents a burn risk to a passerby. of Pipe Spec Change 2-5EX-117 Text19: 1.5 1 1 FP 1 1 1 1 No No This line exists in an area B237145 P&ID HP Turbine Drain accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-25 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Extraction Steam (EX), Unit 2 2-5EX-01: HP Turbine Crossunder Piping Drip Pots to the Condenser Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-5EX-118 Text19: 1.5 1 1 FP 1 1 1 1 No No This line exists in an area B237145 P&ID Crossunder piping leakoff accessible by plant personnel to FCV-1156 during operation, and a leak presents a burn risk to a passerby.
2-5EX-119 Text19: 1.5 1 1 FP 1 1 1 1 No No This line exists in an area B237145 P&ID Crossunder piping leakoff accessible by plant personnel to FCV-1164 during operation, and a leak presents a burn risk to a passerby.
2-5EX-120 Text19: 1.5 1 1 FP 1 1 1 1 No No This line exists in an area B237145 P&ID Crossunder piping leakoff accessible by plant personnel to FCV-1157 during operation, and a leak presents a burn risk to a passerby.
2-5EX-121 Text19: 1.5 1 1 FP 1 1 1 1 No No This line exists in an area B237145 P&ID Crossunder piping leakoff accessible by plant personnel to FCV-1165 during operation, and a leak presents a burn risk to a passerby.
2-5EX-122 Text19: 1 1 FP 1 1 1 1 No No This line exists in an area B237145 P&ID Crossunder piping to accessible by plant personnel Moisture Separator Outlet during operation, and a leak Line presents a burn risk to a passerby.
2-5EX-123 Text19: 1 1 FP 1 1 1 1 No No This line exists in an area B237145 P&ID Crossunder piping to accessible by plant personnel Moisture Separator Outlet during operation, and a leak Line presents a burn risk to a passerby.
2-5EX-124 Text19: 1 1 FP 1 1 1 1 No No This line exists in an area B237145 P&ID Crossunder piping to accessible by plant personnel Moisture Separator Outlet during operation, and a leak Line presents a burn risk to a passerby.
2-5EX-125 Text19: 1 1 FP 1 1 1 1 No No This line exists in an area B237145 P&ID Crossunder piping to accessible by plant personnel Moisture Separator Outlet during operation, and a leak Line presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-26 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Extraction Steam (EX), Unit 2 2-5EX-01: HP Turbine Crossunder Piping Drip Pots to the Condenser Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-5EX-128 Text19: 1 2 FL 1 3 1 2 No No This large bore line is important to B237145, PEPSE LP Leakoff Header to plant operation and/or is a B237144 Gland Condenser personnel safety issue upon failure.
2-5EX-129 Text19: 1.5 1 1 FP 1 1 1 1 No No This line exists in an area B237145 P&ID Crossunder piping leakoff accessible by plant personnel to FCV1154 during operation, and a leak presents a burn risk to a passerby.
2-6EX-01: HP Turbine Extraction Steam to #26 Feedwater Heaters Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description Text19:
2-6EX-001-A 12 1 1 FL 1 3 1 1 Yes No All other components in this line 9321-F-2020 SFA Model ES8-1-6THPT ES to have been clad with Stainless HDR: HP Turbine Steel to mitigate FAC. Extraction Nozzle to #26 FWHs.
2-6EX-002-A Text19: 12 1 1 FL 1 3 1 1 Yes No All other components in this line 9321-F-2020 SFA Model ES8-2-6THPT ES to have been clad with Stainless HDR: HP Turbine Steel to mitigate FAC. Extraction Nozzle to #26 FWHs.
Text19:
2-6EX-006-B 12 1 1 FL 1 3 1 1 Yes No All other components in this line 9321-F-2020 SFA Model ES8-7-6THPT ESHDR to have been clad with Stainless FWH 26A: Extraction Steel to mitigate FAC. Steam Inlet Nozzle to FWH 26A.
2-6EX-008-B Text19: 12 1 1 FL 1 3 1 1 Yes No All other components in this line 9321-F-2020 SFA Model ES8-6-6THPT ESHDR to have been clad with Stainless FWH 26B: Extraction Steel to mitigate FAC. Steam Inlet Nozzle to FWH 26B.
2-6EX-010-B Text19: 12 1 1 FL 1 3 1 1 Yes No All other components in this line 9321-F-2020 SFA Model ES8-4-6THPT ESHDR to have been clad with Stainless FWH 26C: Extraction Steel to mitigate FAC. Steam Inlet Nozzle to FWH 26C.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-27 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Feed Water (FW), Unit 2 2-FW-01: Feedwater Lines from the Boiler Feed Pumps to the Steam Generators Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-FW-031-A Text19: 30 1 1 FL 2 3 1 1 No Yes This large bore line is important to 9321-F-2019 PEPSE Feedwater Header to plant operation and/or is a Steam Generators personnel safety issue upon downstream of Main Line failure. There is high industry to SG 23 experience in Feedwater min-flow lines.
2-FW-062 Text19: 0.75 1 2 FP 2 3 1 2 No No This line exists in an area 9321-F-2019 P&ID Feedwater to Sampling accessible by plant personnel Upstream of BFD-1138 during operation, and a leak presents a burn risk to a passerby.
2-FW-03: Boiler Feed Pump Recirc Lines to the Drains Collecting Tank Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description Text19:
2-FW-063 6 1 1 FL 2 2 2 1 No Yes This large bore line is important to 9321-F-2019 CSI Document BFP No. 21 Recirc to plant operation and/or is a 0700.104.C.008 Drains Collecting Tank personnel safety issue upon failure. Industry experience exists in Boiler Feed Pump recirculation lines.
2-FW-064 Text19: 6 1 1 FL 2 2 2 1 No Yes This large bore line is important to 9321-F-2019 CSI Document BFP No. 22 Recirc to plant operation and/or is a 0700.104.C.008 Drains Collecting Tank personnel safety issue upon failure. Industry experience exists in Boiler Feed Pump recirculation lines.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-28 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Gland Sealing Steam (GS), Unit 2 2-GS-01: Gland Steam to and from HP, LP, and BFP Turbines Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-GS-001 Text19: 12 1 2 FL 1 3 1 2 No No This large bore line is important to A235308 PEPSE Gland Seal Steam plant operation and/or is a Header to HP and LP personnel safety issue upon Turbines failure.
2-GS-002 Text19: 10 1 2 FL 1 3 1 2 No No This large bore line is important to A235308 PEPSE Gland Seal to HP Turbine plant operation and/or is a personnel safety issue upon failure.
2-GS-003 Text19: 10 1 2 FL 1 3 1 2 No No This large bore line is important to A235308 PEPSE Gland Seal to HP Turbine plant operation and/or is a personnel safety issue upon failure.
2-GS-004 Text19: 6 1 2 FL 1 3 1 2 No No This large bore line is important to A235308 PEPSE Gland Seal to LP Turbine plant operation and/or is a 21 personnel safety issue upon failure.
2-GS-005 Text19: 2 1 2 FT 1 3 1 2 No No Loss of sealing steam to the A235308 PEPSE Gland Seal to LP Turbine turbine will cause a plant 21 shutdown or downpower.
2-GS-006 Text19: 6 1 2 FL 1 3 1 2 No No This large bore line is important to A235308 PEPSE Gland Seal to LP Turbine plant operation and/or is a 21 personnel safety issue upon failure.
Text19:
2-GS-007 2 1 2 FT 1 3 1 2 No No Loss of sealing steam to the A235308 PEPSE Gland Seal to LP Turbine turbine will cause a plant 21 shutdown or downpower.
2-GS-008 Text19: 6 1 2 FL 1 3 1 2 No No This large bore line is important to A235308 PEPSE Gland Seal to LP Turbine plant operation and/or is a 22 personnel safety issue upon failure.
2-GS-009 Text19: 2 1 2 FT 1 3 1 2 No No Loss of sealing steam to the A235308 PEPSE Gland Seal to LP Turbine turbine will cause a plant 22 shutdown or downpower.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-29 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Gland Sealing Steam (GS), Unit 2 2-GS-01: Gland Steam to and from HP, LP, and BFP Turbines Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-GS-010 Text19: 6 1 2 FL 1 3 1 2 No No This large bore line is important to A235308 PEPSE Gland Seal to LP Turbine plant operation and/or is a 22 personnel safety issue upon failure.
2-GS-011 Text19: 2 1 2 FT 1 3 1 2 No No Loss of sealing steam to the A235308 PEPSE Gland Seal to LP Turbine turbine will cause a trip or 22 downpower.
2-GS-012 Text19: 6 1 2 FL 1 3 1 2 No No This large bore line is important to A235308 PEPSE Gland Seal to LP Turbine plant operation and/or is a 23 personnel safety issue upon failure.
2-GS-013 Text19: 2 1 2 FT 1 3 1 2 No No Loss of sealing steam to the A235308 PEPSE Gland Seal to LP Turbine turbine will cause a plant 23 shutdown or downpower.
Text19:
2-GS-014 6 1 2 FL 1 3 1 2 No No This large bore line is important to A235308 PEPSE Gland Seal to LP Turbine plant operation and/or is a 23 personnel safety issue upon failure.
2-GS-015 Text19: 2 1 2 FT 1 3 1 2 No No Loss of sealing steam to the A235308 PEPSE Gland Seal to LP Turbine turbine will cause a plant 23 shutdown or downpower.
Text19:
2-GS-016 6 1 2 FL 1 3 1 2 No No This large bore line is important to 9321-H-2024 PEPSE Gland Seal supply to plant operation and/or is a BFP Turbines personnel safety issue upon failure.
2-GS-020 Text19: 4 1 2 FL 1 3 1 2 No No This large bore line is important to 9321-H-2024 PEPSE Steam to BFPT #22 plant operation and/or is a personnel safety issue upon failure.
2-GS-021 Text19: 4 1 2 FL 1 3 1 2 No No This large bore line is important to 9321-H-2024 PEPSE Steam to BFPT #21 plant operation and/or is a personnel safety issue upon failure.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-30 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Gland Sealing Steam (GS), Unit 2 2-GS-01: Gland Steam to and from HP, LP, and BFP Turbines Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-GS-022 Text19: 3 1 2 FL 1 3 1 2 No No This large bore line is important to 9321-H-2024 PEPSE Steam to BFPT #22 plant operation and/or is a personnel safety issue upon failure.
2-GS-023 Text19: 3 1 2 FL 1 3 1 2 No No This large bore line is important to 9321-H-2024 PEPSE Steam to BFPT #21 plant operation and/or is a personnel safety issue upon failure.
2-GS-032 Text19: 3 1 2 FL 1 3 1 2 No No This large bore line is important to 9321-H-2024 PEPSE BFPT #22 Gland Steam plant operation and/or is a Discharge personnel safety issue upon failure.
2-GS-034 Text19: 3 1 2 FL 1 3 1 2 No No This large bore line is important to 9321-H-2024 PEPSE BFPT #21 Gland Steam plant operation and/or is a Discharge personnel safety issue upon failure.
2-GS-036 Text19: 6 1 2 FL 1 3 1 2 No No This large bore line is important to 9321-H-2024 PEPSE BFPT Gland Steam plant operation and/or is a Discharge Header to personnel safety issue upon Gland Condenser failure.
2-GS-038 Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-H-2024, PEPSE BFPT Gland Steam accessible by plant personnel B237144 Discharge Header drain during operation, and a leak to waste header presents a burn risk to a passerby.
2-GS-039 Text19: 2 1 2 FP 1 3 1 2 No No This line exists in an area 9321-H-2024 PEPSE BFPT #21 Exhaust accessible by plant personnel Cylinder Drain during operation, and a leak presents a burn risk to a passerby.
2-GS-040 Text19: 2 1 2 FP 1 3 1 2 No No This line exists in an area 9321-H-2024 PEPSE BFPT #22 Exhaust accessible by plant personnel Cylinder Drain during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-31 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Gland Sealing Steam (GS), Unit 2 2-GS-01: Gland Steam to and from HP, LP, and BFP Turbines Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-GS-041 Text19: 3 1 2 FL 1 3 1 2 No No This large bore line is important to 9321-H-2024 PEPSE BFPT Exhaust Cylinder plant operation and/or is a Drain header to Boiler personnel safety issue upon Feed Pump Drip Tank failure.
2-GS-042 Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-H-2024 PEPSE BFPT Exhaust Cylinder accessible by plant personnel Drain header line to during operation, and a leak Boiler Feed Pump Drip presents a burn risk to a passerby. Tank vent 2-GS-043 Text19: 3 1 2 FL 1 3 1 2 No No This large bore line is important to 9321-H-2024 PEPSE BFPT Drip Tank vent to plant operation and/or is a Condenser #21 personnel safety issue upon failure.
2-GS-047 Text19: 1 2 FL 1 3 1 2 No No This large bore line is important to B237145 PEPSE Gland Seal Return from plant operation and/or is a HP Turbine personnel safety issue upon failure.
2-GS-048 Text19: 1 2 FL 1 3 1 2 No No This large bore line is important to B237145 PEPSE Gland Seal Return from plant operation and/or is a HP Turbine personnel safety issue upon failure.
2-GS-049 Text19: 1 2 FL 1 3 1 2 No No This large bore line is important to B237144 PEPSE Gland Seal Return from plant operation and/or is a #21 LP Turbine personnel safety issue upon failure.
Text19:
2-GS-050 1 2 FL 1 3 1 2 No No This large bore line is important to B237144 PEPSE Gland Seal Return from plant operation and/or is a #21 LP Turbine personnel safety issue upon failure.
2-GS-051 Text19: 1 2 FL 1 3 1 2 No No This large bore line is important to B237144 PEPSE Gland Seal Return from plant operation and/or is a #22 LP Turbine personnel safety issue upon failure.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-32 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Gland Sealing Steam (GS), Unit 2 2-GS-01: Gland Steam to and from HP, LP, and BFP Turbines Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-GS-052 Text19: 1 2 FL 1 3 1 2 No No This large bore line is important to B237144 PEPSE Gland Seal Return from plant operation and/or is a #22 LP Turbine personnel safety issue upon failure.
2-GS-053 Text19: 1 2 FL 1 3 1 2 No No This large bore line is important to B237144 PEPSE Gland Seal Return from plant operation and/or is a #23 LP Turbine personnel safety issue upon failure.
2-GS-054 Text19: 1 2 FL 1 3 1 2 No No This large bore line is important to B237144 PEPSE Gland Seal Return from plant operation and/or is a #23 LP Turbine personnel safety issue upon failure.
2-GS-055 Text19: 1 2 FL 1 3 1 2 No No This large bore line is important to B237145, PEPSE Gland Seal return header plant operation and/or is a B237144 to Gland Condenser personnel safety issue upon failure.
2-GS-056 Text19: 1 1 FL 2 1 1 1 No No This large bore line is important to B237144 PEPSE Gland Condenser Drain plant operation and/or is a to Main Condenser personnel safety issue upon failure.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-33 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Gland Steam Traps (GST), Unit 2 2-GST-01: Steam Trap Lines from the Gland Seal System Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-GST-017 Text19: 0.75 1 2 FP 1 3 1 2 No No This line exists in an area 9321-H-2024 PEPSE Steam to GST-1 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-GST-019 Text19: 0.75 1 2 FP 1 3 1 2 No No This line exists in an area 9321-H-2024 PEPSE GST-1 Discharge to accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-GST-024 Text19: 0.75 1 2 FP 1 3 1 2 No No This line exists in an area 9321-H-2024 PEPSE Steam to GST-3 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-GST-026 Text19: 0.75 1 2 FP 1 3 1 2 No No This line exists in an area 9321-H-2024 PEPSE GST-3 Discharge to accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-GST-027 Text19: 0.75 1 2 FP 1 3 1 2 No No This line exists in an area 9321-H-2024 PEPSE Steam to GST-2 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-GST-029 Text19: 0.75 1 2 FP 1 3 1 2 No No This line exists in an area 9321-H-2024 PEPSE GST-2 Discharge to accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
Text19:
2-GST-030 2 1 2 FP 1 3 1 2 No No This line exists in an area 9321-H-2024 PEPSE Header from GST-1 and 3 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-GST-031 Text19: 2 1 2 FP 1 3 1 2 No No This line exists in an area 9321-H-2024 PEPSE Gland Steam Trap accessible by plant personnel Header to Boiler Feed during operation, and a leak Pump Drip Tank presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-34 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Heater Drains & Vents (HD), Unit 2 2-1HD-02: #21 Feedwater Heater Vents Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-1HD-021 Text19: 6 1 2 FL 1 3 1 2 No No This large bore line is important to A235304 PEPSE FWH 21A High Level plant operation and/or is a Dump to Condenser 23 personnel safety issue upon failure.
2-1HD-022 Text19: 6 1 2 FL 1 3 1 2 No No This large bore line is important to A235304 PEPSE FWH 21B High Level plant operation and/or is a Dump to Condenser 22 personnel safety issue upon failure.
2-1HD-023 Text19: 6 1 2 FL 1 3 1 2 No No This large bore line is important to A235304 PEPSE FWH 21C High Level plant operation and/or is a Dump to Condenser 21 personnel safety issue upon failure.
2-1HD-024 Text19: 5 1 2 FL 1 3 1 2 No No This large bore line is important to A235304 PEPSE FWH 21A 5" Vent to plant operation and/or is a Condenser 23 personnel safety issue upon failure.
2-1HD-025 Text19: 5 1 2 FL 1 3 1 2 No No This large bore line is important to A235304 PEPSE FWH 21B 5" Vent to plant operation and/or is a Condenser 22 personnel safety issue upon failure.
2-1HD-026 Text19: 5 1 2 FL 1 3 1 2 No No This large bore line is important to A235304 PEPSE FWH 21C 5" Vent to plant operation and/or is a Condenser 21 personnel safety issue upon failure.
Text19:
2-1HD-027 1 2 N/A No No Low Temp and Press. Leak- A235304 PEPSE FWH 21A 1" Vent to before-break situation. Condenser 23 2-1HD-028 Text19: 1 2 N/A No No Low Temp and Press. Leak- A235304 PEPSE FWH 21B 1" Vent to before-break situation. Condenser 22 2-1HD-029 Text19: 1 2 N/A No No Low Temp and Press. Leak- A235304 PEPSE FWH 21C 1" Vent to before-break situation. Condenser 21 Report No. 0700.104-03, Appendix A, Revision 2 Page A-35 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Heater Drains & Vents (HD), Unit 2 2-2HD-02: #22 Feedwater Heater Vents Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-2HD-019 Text19: 6 1 2 FL 1 3 1 2 No No This large bore line is important to A235304 P&ID FWH 22A High Level plant operation and/or is a Dump to Condenser 23 personnel safety issue upon failure.
2-2HD-020 Text19: 6 1 2 FL 1 3 1 2 No No This large bore line is important to A235304 P&ID FWH 22B High Level plant operation and/or is a Dump to Condenser 22 personnel safety issue upon failure.
2-2HD-021 Text19: 6 1 2 FL 1 3 1 2 No No This large bore line is important to A235304 P&ID FWH 22C High Level plant operation and/or is a Dump to Condenser 21 personnel safety issue upon failure.
2-2HD-022 Text19: 2.5 1 2 FL 1 3 1 2 No No This large bore line is important to A235304 P&ID FWH 22A 2-1/2" Vent to plant operation and/or is a Condenser 23 personnel safety issue upon failure.
2-2HD-023 Text19: 2.5 1 2 FL 1 3 1 2 No No This large bore line is important to A235304 P&ID FWH 22B 2-1/2" Vent to plant operation and/or is a Condenser 22 personnel safety issue upon failure.
2-2HD-024 Text19: 2.5 1 2 FL 1 3 1 2 No No This large bore line is important to A235304 P&ID FWH 22C 2-1/2" Vent to plant operation and/or is a Condenser 21 personnel safety issue upon failure.
Text19:
2-2HD-025 1 1 2 FP 1 3 1 2 No No This line exists in an area A235304 P&ID FWH 22A 1" Vent to accessible by plant personnel Condenser 23 during operation, and a leak presents a burn risk to a passerby.
2-2HD-026 Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area A235304 P&ID FWH 22B 1" Vent to accessible by plant personnel Condenser 22 during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-36 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Heater Drains & Vents (HD), Unit 2 2-2HD-02: #22 Feedwater Heater Vents Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-2HD-027 Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area A235304 P&ID FWH 22C 1" Vent to accessible by plant personnel Condenser 21 during operation, and a leak presents a burn risk to a passerby.
2-3HD-02: #23 Feedwater Heater Vents Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description Text19:
2-3HD-027 2 1 1 FP 1 1 1 1 No Yes This line exists in an area A235304 PEPSE FWH 23A Vent to 3EX-53 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-3HD-028 Text19: 2 1 1 FP 1 1 1 1 No Yes This line exists in an area A235304 PEPSE FWH 23A Vent to 3EX-accessible by plant personnel 534 during operation, and a leak presents a burn risk to a passerby.
2-3HD-029 Text19: 2 1 1 FP 1 1 1 1 No Yes This line exists in an area A235304 PEPSE FWH 23B Vent to 3EX-accessible by plant personnel 536 during operation, and a leak presents a burn risk to a passerby.
2-3HD-030 Text19: 2 1 1 FP 1 1 1 1 No Yes This line exists in an area A235304 PEPSE FWH 23B Vent to 3EX-accessible by plant personnel 539 during operation, and a leak presents a burn risk to a passerby.
Text19:
2-3HD-031 2 1 1 FP 1 1 1 1 No Yes This line exists in an area A235304 PEPSE FWH 23C Vent to 3EX-accessible by plant personnel 541 during operation, and a leak presents a burn risk to a passerby.
2-3HD-032 Text19: 2 1 1 FP 1 1 1 1 No Yes This line exists in an area A235304 PEPSE FWH 23C Vent to 3EX-accessible by plant personnel 544 during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-37 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Heater Drains & Vents (HD), Unit 2 2-3HD-02: #23 Feedwater Heater Vents Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-3HD-039 Text19: 3 1 1 FL 1 1 1 1 No Yes This large bore line is important to A235304 PEPSE FWH 23A 3" Vent Header plant operation and/or is a personnel safety issue upon failure.
2-3HD-040 Text19: 3 1 1 FL 1 1 1 1 No Yes This large bore line is important to A235304 PEPSE FWH 23B 3" Vent Header plant operation and/or is a personnel safety issue upon failure.
2-3HD-041 Text19: 3 1 1 FL 1 1 1 1 No Yes This large bore line is important to A235304 PEPSE FWH 23C 3" Vent Header plant operation and/or is a personnel safety issue upon failure.
2-3HD-042 Text19: 4 1 1 FL 1 1 1 1 No Yes This large bore line is important to A235304 PEPSE 4" Vent Header from plant operation and/or is a FWH 23A and 23B personnel safety issue upon failure.
2-3HD-043 Text19: 4 1 1 FL 1 1 1 1 No Yes This large bore line is important to A235304 PEPSE 4" Vent Header from #23 plant operation and/or is a FWHs personnel safety issue upon failure.
2-3HD-044 Text19: 1 1 1 FP 1 1 1 1 No Yes This line exists in an area A235304 PEPSE FWH 23A 1" Vent accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-3HD-045 Text19: 1 1 1 FP 1 1 1 1 No Yes This line exists in an area A235304 PEPSE FWH 23B 1" Vent accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-3HD-046 Text19: 1 1 1 FP 1 1 1 1 No Yes This line exists in an area A235304 PEPSE FWH 23C 1" Vent accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-38 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Heater Drains & Vents (HD), Unit 2 2-3HD-02: #23 Feedwater Heater Vents Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-3HD-047 Text19: 2 1 1 FP 1 1 1 1 No Yes This line exists in an area A235304 PEPSE 2" Vent From FWH 23A accessible by plant personnel and 23B during operation, and a leak presents a burn risk to a passerby.
2-3HD-048 Text19: 2 1 1 FP 1 1 1 1 No Yes This line exists in an area A235304 PEPSE 2" Vent From #23 FWHs accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-4HD-02: #24 Feedwater Heater Vents Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description Text19:
2-4HD-016 1 1 1 FP 1 1 1 1 No Yes This line exists in an area A235304 PEPSE FWH 24A 1" Vent accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-4HD-017 Text19: 1 1 1 FP 1 1 1 1 No Yes This line exists in an area A235304 PEPSE FWH 24B 1" Vent accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
Text19:
2-4HD-018 1 1 1 FP 1 1 1 1 No Yes This line exists in an area A235304 PEPSE FWH 24C 1" Vent accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-4HD-019 Text19: 2 1 1 FP 1 1 1 1 No Yes This line exists in an area A235304 PEPSE 2" Vent Header from accessible by plant personnel FWH 24A and 24B during operation, and a leak presents a burn risk to a passerby.
2-4HD-020 Text19: 2 1 1 FP 1 1 1 1 No Yes This line exists in an area A235304 PEPSE 2" Vent Header from #24 accessible by plant personnel FWHs to Condenser 22 during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-39 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Heater Drains & Vents (HD), Unit 2 2-4HD-02: #24 Feedwater Heater Vents Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-4HD-021 Text19: 2 1 1 FP 1 1 1 1 No Yes This line exists in an area A235304 PEPSE FWH 24A 2" Vent accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-4HD-022 Text19: 2 1 1 FP 1 1 1 1 No Yes This line exists in an area A235304 PEPSE FWH 24B 2" Vent accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-4HD-023 Text19: 2 1 1 FP 1 1 1 1 No Yes This line exists in an area A235304 PEPSE FWH 24B 2" Vent accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-4HD-024 Text19: 3 1 1 FL 1 1 1 1 No Yes This large bore line is important to A235304 PEPSE 3" Vent Header from plant operation and/or is a FWH 24A and 24B personnel safety issue upon failure.
2-4HD-025 Text19: 3 1 1 FL 1 1 1 1 No Yes This large bore line is important to A235304 PEPSE 3" Vent Header from #24 plant operation and/or is a FWHs to Condenser 22 personnel safety issue upon failure.
2-5HD-02: Heater Vents from #25 Feedwater Heater and Heater Drain Tank vents to #25 Feedwater Heaters Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description Text19:
2-5HD-044 10 1 1 FL 1 2 1 1 Yes No Components in this line have 9321-F-2022 PEPSE, Heater Drain Tank vent to been replaced. This large bore Replacement FWH 25A line is important to plant operation History and/or is a personnel safety issue upon failure.
2-5HD-045 Text19: 10 1 1 FL 1 2 1 1 Yes No Components in this line have 9321-F-2022 PEPSE, Heater Drain Tank vent to been replaced. This large bore Replacement FWH 25B line is important to plant operation History and/or is a personnel safety issue upon failure.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-40 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Heater Drains & Vents (HD), Unit 2 2-5HD-02: Heater Vents from #25 Feedwater Heater and Heater Drain Tank vents to #25 Feedwater Heaters Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-5HD-046 Text19: 10 1 1 FL 1 2 1 1 Yes No Components in this line have 9321-F-2022 PEPSE, Heater Drain Tank vent to been replaced. This large bore Replacement FWH 25C line is important to plant operation History and/or is a personnel safety issue upon failure.
2-5HD-047 Text19: 1.5 1 1 FP 1 2 1 1 No Yes This line exists in an area 9321-F-2022 PEPSE FWH 25A Vent accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-5HD-048 Text19: 1.5 1 1 FP 1 2 1 1 No Yes This line exists in an area 9321-F-2022 PEPSE FWH 25B Vent accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-5HD-049 Text19: 1.5 1 1 FP 1 2 1 1 No Yes This line exists in an area 9321-F-2022 PEPSE FWH 25C Vent accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
Text19:
2-5HD-050 2 1 1 FP 1 2 1 1 No Yes This line exists in an area 9321-F-2022 PEPSE Vent header from FWH accessible by plant personnel 25A and 25B during operation, and a leak presents a burn risk to a passerby.
2-5HD-051 Text19: 2.5 1 1 FL 1 2 1 1 No Yes This large bore line is important to 9321-F-2022, PEPSE #25 FWH Vent header to plant operation and/or is a A235304 Condenser personnel safety issue upon failure.
2-5HD-03: HDT Drains to HDPs and Condensers and HDP Vents to HDT Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description Text19:
2-5HD-057 2 1 1 FP 1 2 1 1 No No This line exists in an area 9321-F-2022 PEPSE #21 HDP vent to HDT accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-41 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Heater Drains & Vents (HD), Unit 2 2-5HD-03: HDT Drains to HDPs and Condensers and HDP Vents to HDT Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-5HD-058 Text19: 2 1 1 FP 1 2 1 1 No No This line exists in an area 9321-F-2022 PEPSE #22 HDP vent to HDT accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-5HD-059 Text19: 24 1 1 FL 2 2 1 1 Yes No Components in this line have 9321-F-2022, PEPSE, Heater Drain Tank drain been replaced with FAC-resistant A235304 Replacement to Condensers material. This large bore line is History important to plant operation and/or is a personnel safety issue upon failure.
2-5HD-060 Text19: 24 1 1 FL 2 2 1 1 Yes No Components in this line have A235304 PEPSE, HDT Drain Header to been replaced with FAC-resistant Replacement Condensers 21 and 22 material. This large bore line is History important to plant operation and/or is a personnel safety issue upon failure.
2-5HD-061-A Text19: 14 1 1 FL 2 2 1 1 Yes No Components in this line have A235304 PEPSE, HDT Drain to LCV-5003 been replaced with FAC-resistant Replacement material. This large bore line is History important to plant operation and/or is a personnel safety issue upon failure.
2-5HD-061-B Text19: 8 1 1 FL 2 2 1 1 Yes No Components in this line have A235304 PEPSE, LCV-5003 to Condenser been replaced with FAC-resistant Replacement 21 material. This large bore line is History important to plant operation and/or is a personnel safety issue upon failure.
2-5HD-062-A Text19: 14 1 1 FL 2 2 1 1 Yes No Components in this line have A235304 PEPSE, HDT Drain to LCV-5002 been replaced with FAC-resistant Replacement material. This large bore line is History important to plant operation and/or is a personnel safety issue upon failure.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-42 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Heater Drains & Vents (HD), Unit 2 2-5HD-03: HDT Drains to HDPs and Condensers and HDP Vents to HDT Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-5HD-062-B Text19: 8 1 1 FL 2 2 1 1 Yes No Components in this line have A235304 PEPSE, LCV-5002 to Condenser been replaced with FAC-resistant Replacement 22 material. This large bore line is History important to plant operation and/or is a personnel safety issue upon failure.
2-5HD-063-A Text19: 14 1 1 FL 2 2 1 1 Yes No Components in this line have A235304 PEPSE, HDT Drain to LCV-5001 been replaced with FAC-resistant Replacement material. This large bore line is History important to plant operation and/or is a personnel safety issue upon failure.
2-5HD-063-B Text19: 8 1 1 FL 2 2 1 1 Yes No Components in this line have A235304 PEPSE, LCV-5001 to Condenser been replaced with FAC-resistant Replacement 23 material. This large bore line is History important to plant operation and/or is a personnel safety issue upon failure.
2-6HD-02: Heater Vents from #26 Feedwater Heater Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description Text19:
2-6HD-025 1 1 1 FP 1 2 1 1 No Yes This line exists in an area 9321-F-2022 PEPSE FWH 26A vent via 6EX-10 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-6HD-026 Text19: 1 1 1 FP 1 2 1 1 No Yes This line exists in an area 9321-F-2022 PEPSE FWH 26A vent via 6EX-accessible by plant personnel 500 during operation, and a leak presents a burn risk to a passerby.
2-6HD-027 Text19: 1 1 1 FP 1 2 1 1 No Yes This line exists in an area 9321-F-2022 PEPSE FWH 26A vent from 6EX-accessible by plant personnel 10 and 6EX-500 during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-43 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Heater Drains & Vents (HD), Unit 2 2-6HD-02: Heater Vents from #26 Feedwater Heater Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-6HD-028 Text19: 1 1 1 FP 1 2 1 1 No Yes This line exists in an area 9321-F-2022 PEPSE FWH 26A vent via 6EX-9 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-6HD-029 Text19: 1 1 1 FP 1 2 1 1 No Yes This line exists in an area 9321-F-2022 PEPSE FWH 26B vent via 6EX-accessible by plant personnel 10-1 during operation, and a leak presents a burn risk to a passerby.
2-6HD-030 Text19: 1 1 1 FP 1 2 1 1 No Yes This line exists in an area 9321-F-2022 PEPSE FWH 26B vent via 6EX-accessible by plant personnel 501 during operation, and a leak presents a burn risk to a passerby.
2-6HD-031 Text19: 1 1 1 FP 1 2 1 1 No Yes This line exists in an area 9321-F-2022 PEPSE FWH 26B vent from 6EX-accessible by plant personnel 10-1 and 6EX-501 during operation, and a leak presents a burn risk to a passerby.
2-6HD-032 Text19: 1 1 1 FP 1 2 1 1 No Yes This line exists in an area 9321-F-2022 PEPSE FWH 26B vent via 6EX accessible by plant personnel 1 during operation, and a leak presents a burn risk to a passerby.
2-6HD-033 Text19: 1 1 1 FP 1 2 1 1 No Yes This line exists in an area 9321-F-2022 PEPSE FWH 26C vent via 6EX-accessible by plant personnel 10-2 during operation, and a leak presents a burn risk to a passerby.
Text19:
2-6HD-034 1 1 1 FP 1 2 1 1 No Yes This line exists in an area 9321-F-2022 PEPSE FWH 26C vent via 6EX-accessible by plant personnel 502 during operation, and a leak presents a burn risk to a passerby.
2-6HD-035 Text19: 1 1 1 FP 1 2 1 1 No Yes This line exists in an area 9321-F-2022 PEPSE FWH 26C vent from 6EX-accessible by plant personnel 10-2 and 6EX-502 during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-44 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Heater Drains & Vents (HD), Unit 2 2-6HD-02: Heater Vents from #26 Feedwater Heater Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-6HD-036 Text19: 1 1 1 FP 1 2 1 1 No Yes This line exists in an area 9321-F-2022 PEPSE FWH 26C vent via 6EX accessible by plant personnel 2 during operation, and a leak presents a burn risk to a passerby.
2-6HD-037 Text19: 1.5 1 1 FP 1 2 1 1 No Yes This line exists in an area 9321-F-2022 PEPSE Heater Start Up Vent accessible by plant personnel Header from FWH 26A during operation, and a leak and 26B presents a burn risk to a passerby.
2-6HD-038 Text19: 2 1 1 FP 1 2 1 1 No Yes This line exists in an area 9321-F-2022, PEPSE #26 FWH Startup Vent accessible by plant personnel A235304 Header to Condenser during operation, and a leak presents a burn risk to a passerby.
2-6HD-039 Text19: 1.5 1 1 FP 1 2 1 1 No Yes This line exists in an area 9321-F-2022 PEPSE Heater Vent Header from accessible by plant personnel FWH 26A and 26B during operation, and a leak presents a burn risk to a passerby.
2-6HD-040 Text19: 2 1 1 FP 1 2 1 1 No Yes This line exists in an area 9321-F-2022, PEPSE #26 FWH Vent Header to accessible by plant personnel A235304 Condenser during operation, and a leak presents a burn risk to a passerby.
2-HD-01: Heater Drain Pump discharge to Boiler Feed Pumps Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description Text19:
2-HD-004-A 0.5 1 2 FP 2 2 1 2 No No This line exists in an area 9321-F-2022 PEPSE #21 HDP to HDP Water accessible by plant personnel Chem. Monitor Upstream during operation, and a leak of Root Isolation Valve presents a burn risk to a passerby.
2-HD-005-A Text19: 0.5 1 2 FP 2 2 1 2 No No This line exists in an area 9321-F-2022 PEPSE #22 HDP to HDP Water accessible by plant personnel Chem. Monitor Upstream during operation, and a leak of Root Isolation Valve presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-45 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam (MS), Unit 2 2-MS-01: Main Steam from Stm Gen to HP Turbine, BFP Turbine, MSRs, Aux. Steam, SJAEs, and Priming Ejectors.
Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MS-001 Text19: 28 1 3 FL 3 3 1 3 No No High quality main steam line. 9321-F-2017, PEPSE Main Steam from Steam This large bore line is important to A235308 Generator 21 Shell plant operation and/or is a personnel safety issue upon failure.
2-MS-002 Text19: 28 1 3 FL 3 3 1 3 No No High quality main steam line. 9321-F-2017, PEPSE Main Steam from Steam This large bore line is important to A235308 Generator 22 Shell plant operation and/or is a personnel safety issue upon failure.
2-MS-003 Text19: 28 1 3 FL 3 3 1 3 No No High quality main steam line. 9321-F-2017, PEPSE Main Steam from Steam This large bore line is important to A235308 Generator 23 Shell plant operation and/or is a personnel safety issue upon failure.
Text19:
2-MS-004 28 1 3 FL 3 3 1 3 No No High quality main steam line. 9321-F-2017, PEPSE Main Steam from Steam This large bore line is important to A235308 Generator 24 Shell plant operation and/or is a personnel safety issue upon failure.
Text19:
2-MS-005 24 1 3 FL 3 3 1 3 No No High quality main steam line. A235308 PEPSE Line from 2-MS-001 to This large bore line is important to Seal Steam and MSR plant operation and/or is a Header.
personnel safety issue upon failure.
Text19:
2-MS-006 24 1 3 FL 3 3 1 3 No No High quality main steam line. A235308 PEPSE Line from 2-MS-002 to This large bore line is important to Gland Seal Steam and plant operation and/or is a MSR B Header.
personnel safety issue upon failure.
2-MS-007 Text19: 20 1 3 FL 3 3 1 3 No No High quality main steam line. A235308, PEPSE Gland Seal Steam, MSR This large bore line is important to A227780 B, and Aux. Steam plant operation and/or is a Header.
personnel safety issue upon failure.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-46 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam (MS), Unit 2 2-MS-01: Main Steam from Stm Gen to HP Turbine, BFP Turbine, MSRs, Aux. Steam, SJAEs, and Priming Ejectors.
Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MS-008 Text19: 24 1 3 FL 3 3 1 3 No No High quality main steam line. A235308 PEPSE Line from 2-MS-001 (3) to This large bore line is important to MSR A Header plant operation and/or is a personnel safety issue upon failure.
2-MS-009 Text19: 24 1 3 FL 3 3 1 3 No No High quality main steam line. A235308 PEPSE Line from 2-MS-004 to This large bore line is important to MSR A Header plant operation and/or is a personnel safety issue upon failure.
2-MS-010 Text19: 20 1 3 FL 3 3 1 3 No No High quality main steam line. A235308, PEPSE MSR A, BFP Turbine, This large bore line is important to A227780 SJAE, and Priming plant operation and/or is a Ejector Header personnel safety issue upon failure.
Text19:
2-MS-011 28 1 3 FL 3 3 1 3 No No High quality main steam line. A235308 PEPSE Main Steam to NE HP This large bore line is important to Turbine Inlet plant operation and/or is a personnel safety issue upon failure.
Text19:
2-MS-011-A 4 1 3 FL 3 3 1 3 No No High quality main steam line. A235308 PEPSE MS-863 Bypass This large bore line is important to plant operation and/or is a personnel safety issue upon failure.
Text19:
2-MS-012 28 1 3 FL 3 3 1 3 No No High quality main steam line. A235308 PEPSE Main Steam to SE HP This large bore line is important to Turbine Inlet plant operation and/or is a personnel safety issue upon failure.
2-MS-012-A Text19: 4 1 3 FL 3 3 1 3 No No High quality main steam line. A235308 PEPSE MS-864 Bypass This large bore line is important to plant operation and/or is a personnel safety issue upon failure.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-47 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam (MS), Unit 2 2-MS-01: Main Steam from Stm Gen to HP Turbine, BFP Turbine, MSRs, Aux. Steam, SJAEs, and Priming Ejectors.
Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MS-013 Text19: 28 1 3 FL 3 3 1 3 No No High quality main steam line. A235308 PEPSE Main Steam to NW HP This large bore line is important to Turbine Inlet plant operation and/or is a personnel safety issue upon failure.
2-MS-013-A Text19: 4 1 3 FL 3 3 1 3 No No High quality main steam line. A235308 PEPSE MS-865 Bypass This large bore line is important to plant operation and/or is a personnel safety issue upon failure.
2-MS-014 Text19: 28 1 3 FL 3 3 1 3 No No High quality main steam line. A235308 PEPSE Main Steam to SW HP This large bore line is important to Turbine Inlet plant operation and/or is a personnel safety issue upon failure.
Text19:
2-MS-014-A 4 1 3 FL 3 3 1 3 No No High quality main steam line. A235308 PEPSE MS-866 Bypass This large bore line is important to plant operation and/or is a personnel safety issue upon failure.
Text19:
2-MS-015 20 1 3 FL 3 3 1 3 No No High quality main steam line. A235308 PEPSE Main Steam Balancing This large bore line is important to Line between 2-MS-001 plant operation and/or is a and 2-MS-003 personnel safety issue upon failure.
Text19:
2-MS-016 12 1 3 FL 3 3 1 3 No No High quality main steam line. A227780 PEPSE Main Steam to Reheater This large bore line is important to Steam Control Station A.
plant operation and/or is a personnel safety issue upon failure.
2-MS-017 Text19: 8 1 3 FL 3 3 1 3 No No High quality main steam line. A227780 PEPSE Reheater Steam Control This large bore line is important to Station A line to PCV plant operation and/or is a 1175-1 personnel safety issue upon failure.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-48 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam (MS), Unit 2 2-MS-01: Main Steam from Stm Gen to HP Turbine, BFP Turbine, MSRs, Aux. Steam, SJAEs, and Priming Ejectors.
Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MS-018 Text19: 8 1 3 FL 3 3 1 3 No No High quality main steam line. A227780 PEPSE Reheater Steam Control This large bore line is important to Station A line to PCV plant operation and/or is a 1175-2 personnel safety issue upon failure.
2-MS-019 Text19: 1 1 3 FP 3 3 1 3 No No High quality main steam line. A227780 PEPSE Reheater Steam Control This line exists in an area Station A line to PCV accessible by plant personnel 1108 during operation, and a leak presents a burn risk to a passerby.
2-MS-020 Text19: 12 1 3 FL 3 3 1 3 No No High quality main steam line. A227780 PEPSE Reheater Steam Header This large bore line is important to A plant operation and/or is a personnel safety issue upon failure.
Text19:
2-MS-021 6 1 3 FL 3 3 1 3 No No High quality main steam line. A227780 PEPSE Reheater Header to MSR This large bore line is important to 21A plant operation and/or is a personnel safety issue upon failure.
Text19:
2-MS-022 6 1 3 FL 3 3 1 3 No No High quality main steam line. A227780 PEPSE Reheater Header to MSR This large bore line is important to 22A plant operation and/or is a personnel safety issue upon failure.
Text19:
2-MS-023 6 1 3 FL 3 3 1 3 No No High quality main steam line. A227780 PEPSE Reheater Header to MSR This large bore line is important to 23A plant operation and/or is a personnel safety issue upon failure.
2-MS-024 Text19: 12 1 3 FL 3 3 1 3 No No High quality main steam line. A227780 PEPSE Main Steam to Reheater This large bore line is important to Steam Control Station B.
plant operation and/or is a personnel safety issue upon failure.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-49 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam (MS), Unit 2 2-MS-01: Main Steam from Stm Gen to HP Turbine, BFP Turbine, MSRs, Aux. Steam, SJAEs, and Priming Ejectors.
Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MS-025 Text19: 8 1 3 FL 3 3 1 3 No No High quality main steam line. A227780 PEPSE Reheater Steam Control This large bore line is important to Station B line to PCV plant operation and/or is a 1175-3 personnel safety issue upon failure.
2-MS-026 Text19: 8 1 3 FL 3 3 1 3 No No High quality main steam line. A227780 PEPSE Reheater Steam Control This large bore line is important to Station B line to PCV plant operation and/or is a 1175-4 personnel safety issue upon failure.
2-MS-027 Text19: 1 1 3 FP 3 3 1 3 No No High quality main steam line. A227780 PEPSE Reheater Steam Control This line exists in an area Station B line to PCV accessible by plant personnel 1109 during operation, and a leak presents a burn risk to a passerby.
Text19:
2-MS-028 12 1 3 FL 3 3 1 3 No No High quality main steam line. A227780 PEPSE Reheater Steam Header This large bore line is important to B plant operation and/or is a personnel safety issue upon failure.
Text19:
2-MS-029 6 1 3 FL 3 3 1 3 No No High quality main steam line. A227780 PEPSE Reheater Header to MSR This large bore line is important to 21B plant operation and/or is a personnel safety issue upon failure.
Text19:
2-MS-030 6 1 3 FL 3 3 1 3 No No High quality main steam line. A227780 PEPSE Reheater Header to MSR This large bore line is important to 22B plant operation and/or is a personnel safety issue upon failure.
2-MS-031 Text19: 6 1 3 FL 3 3 1 3 No No High quality main steam line. A227780 PEPSE Reheater Header to MSR This large bore line is important to 23B plant operation and/or is a personnel safety issue upon failure.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-50 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam (MS), Unit 2 2-MS-01: Main Steam from Stm Gen to HP Turbine, BFP Turbine, MSRs, Aux. Steam, SJAEs, and Priming Ejectors.
Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MS-032 Text19: 1 1 3 FP 3 3 1 3 No No High quality main steam line. A227780 PEPSE Reheater Cal. Line This line exists in an area accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MS-033 Text19: 4 1 3 FL 3 3 1 3 No No High quality main steam line. A227780 PEPSE Main Steam to BFP #21 This large bore line is important to Turbine plant operation and/or is a personnel safety issue upon failure.
2-MS-034 Text19: 4 1 3 FL 3 3 1 3 No No High quality main steam line. A227780 PEPSE Main Steam to BFP #22 This large bore line is important to Turbine plant operation and/or is a personnel safety issue upon failure.
Text19:
2-MS-035 6 1 3 FL 3 3 1 3 No No High quality main steam line. A227780 PEPSE Main Steam to SJAEs This large bore line is important to and Priming Ejectors plant operation and/or is a personnel safety issue upon failure.
Text19:
2-MS-036-A 3 1 3 FL 3 3 1 3 No No High quality main steam line. A227780 PEPSE SJAE Steam Supply This large bore line is important to Upstream of PCV 1132 plant operation and/or is a personnel safety issue upon failure.
Text19:
2-MS-036-B 3 1 2 FL 1 3 1 2 No No This large bore line is important to A227780 SD No. 18.0 SJAE Steam Supply plant operation and/or is a Downstream of PCV 1132 personnel safety issue upon failure.
2-MS-037 Text19: 3 1 2 FL 1 3 1 2 No No This large bore line is important to A227780 SD No. 18.0 SJAE Header plant operation and/or is a personnel safety issue upon failure.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-51 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam (MS), Unit 2 2-MS-01: Main Steam from Stm Gen to HP Turbine, BFP Turbine, MSRs, Aux. Steam, SJAEs, and Priming Ejectors.
Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MS-038 Text19: 2 1 2 FT 1 3 1 2 No No This line is necessary for A227780 SD No. 18.0 Header to SJAE 21 removing non-condensable gases from the condenser. A failure in this line will cause a trip or a downpower 2-MS-039 Text19: 2 1 2 FT 1 3 1 2 No No This line is necessary for A227780 SD No. 18.0 Header to SJAE 22 removing non-condensable gases from the condenser. A failure in this line will cause a trip or a downpower 2-MS-040 Text19: 2 1 2 FT 1 3 1 2 No No This line is necessary for A227780 SD No. 18.0 Header to SJAE 23 removing non-condensable gases from the condenser. A failure in this line will cause a trip or a downpower Text19:
2-MS-041 1 2 FT 1 3 1 2 No No This line is necessary for A227780 SD No. 18.0 SJAE Steam Supply via removing non-condensable gases MS-797 from the condenser. A failure in this line will cause a trip or a downpower Text19:
2-MS-042 1 2 FT 1 3 1 2 No No This line is necessary for A227780 SD No. 18.0 SJAE Steam Supply via removing non-condensable gases MS-798 from the condenser. A failure in this line will cause a trip or a downpower Text19:
2-MS-043 1 2 FT 1 3 1 2 No No This line is necessary for A227780 SD No. 18.0 SJAE Steam Supply via removing non-condensable gases MS-799 from the condenser. A failure in this line will cause a trip or a downpower 2-MS-044 Text19: 1 2 FT 1 3 1 2 No No This line is necessary for A227780 SD No. 18.0 SJAE Steam Supply via removing non-condensable gases MS-800 from the condenser. A failure in this line will cause a trip or a downpower Report No. 0700.104-03, Appendix A, Revision 2 Page A-52 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam (MS), Unit 2 2-MS-01: Main Steam from Stm Gen to HP Turbine, BFP Turbine, MSRs, Aux. Steam, SJAEs, and Priming Ejectors.
Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MS-045 Text19: 1 2 FT 1 3 1 2 No No This line is necessary for A227780 SD No. 18.0 SJAE Steam Supply via removing non-condensable gases MS-801 from the condenser. A failure in this line will cause a trip or a downpower 2-MS-046 Text19: 1 2 FT 1 3 1 2 No No This line is necessary for A227780 SD No. 18.0 SJAE Steam Supply via removing non-condensable gases MS-802 from the condenser. A failure in this line will cause a trip or a downpower 2-MS-047 Text19: 1 2 FT 1 3 1 2 No No This line is necessary for A227780 SD No. 18.0 SJAE Steam Supply via removing non-condensable gases MS-803 from the condenser. A failure in this line will cause a trip or a downpower Text19:
2-MS-048 1 2 FT 1 3 1 2 No No This line is necessary for A227780 SD No. 18.0 SJAE Steam Supply via removing non-condensable gases MS-804 from the condenser. A failure in this line will cause a trip or a downpower Text19:
2-MS-049 1 2 FT 1 3 1 2 No No This line is necessary for A227780 SD No. 18.0 SJAE Steam Supply via removing non-condensable gases MS-805 from the condenser. A failure in this line will cause a trip or a downpower Text19:
2-MS-050 1 2 FT 1 3 1 2 No No This line is necessary for A227780 SD No. 18.0 SJAE Steam Supply via removing non-condensable gases MS-806 from the condenser. A failure in this line will cause a trip or a downpower 2-MS-051 Text19: 1 2 FT 1 3 1 2 No No This line is necessary for A227780 SD No. 18.0 SJAE Steam Supply via removing non-condensable gases MS-807 from the condenser. A failure in this line will cause a trip or a downpower Report No. 0700.104-03, Appendix A, Revision 2 Page A-53 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam (MS), Unit 2 2-MS-01: Main Steam from Stm Gen to HP Turbine, BFP Turbine, MSRs, Aux. Steam, SJAEs, and Priming Ejectors.
Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MS-052 Text19: 1 2 FT 1 3 1 2 No No This line is necessary for A227780 SD No. 18.0 SJAE Steam Supply via removing non-condensable gases MS-808 from the condenser. A failure in this line will cause a trip or a downpower 2-MS-053 Text19: 1 2 FT 1 3 1 2 No No This line is necessary for A227780 SD No. 18.0 SJAE Steam Supply via removing non-condensable gases MS-809 from the condenser. A failure in this line will cause a trip or a downpower 2-MS-054 Text19: 1 2 FT 1 3 1 2 No No This line is necessary for A227780 SD No. 18.0 SJAE Steam Supply via removing non-condensable gases MS-810 from the condenser. A failure in this line will cause a trip or a downpower Text19:
2-MS-055 1 2 FT 1 3 1 2 No No This line is necessary for A227780 SD No. 18.0 SJAE Steam Supply via removing non-condensable gases MS-811 from the condenser. A failure in this line will cause a trip or a downpower Text19:
2-MS-056 1 2 FT 1 3 1 2 No No This line is necessary for A227780 SD No. 18.0 SJAE Steam Supply via removing non-condensable gases MS-812 from the condenser. A failure in this line will cause a trip or a downpower Text19:
2-MS-057 1 2 FT 1 3 1 2 No No This line is necessary for A227780 SD No. 18.0 SJAE Steam Supply via removing non-condensable gases MS-813 from the condenser. A failure in this line will cause a trip or a downpower 2-MS-058 Text19: 1 2 FT 1 3 1 2 No No This line is necessary for A227780 SD No. 18.0 SJAE Steam Supply via removing non-condensable gases MS-814 from the condenser. A failure in this line will cause a trip or a downpower Report No. 0700.104-03, Appendix A, Revision 2 Page A-54 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam (MS), Unit 2 2-MS-01: Main Steam from Stm Gen to HP Turbine, BFP Turbine, MSRs, Aux. Steam, SJAEs, and Priming Ejectors.
Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MS-059-A Text19: 6 1 3 FL 3 3 1 3 No No High quality main steam line. A227780 PEPSE Main Steam to Priming This large bore line is important to Ejectors Header plant operation and/or is a Upstream of PCV 1133 personnel safety issue upon failure.
2-MS-059-B Text19: 6 1 2 FL 1 3 1 2 No No This large bore line is important to A227780 SD No. 18.0 Main Steam to Priming plant operation and/or is a Ejectors Header personnel safety issue upon Downstream of PCV 1133 failure.
2-MS-060 Text19: 6 1 2 FL 1 3 1 2 No No This large bore line is important to A227780 SD No. 18.0 Priming Ejectors Header plant operation and/or is a personnel safety issue upon failure.
2-MS-061 Text19: 3 1 2 FL 1 3 1 2 No No This large bore line is important to A227780 SD No. 18.0 Priming Ejectors Header plant operation and/or is a to PE 21 personnel safety issue upon failure.
2-MS-062 Text19: 3 1 2 FL 1 3 1 2 No No This large bore line is important to A227780 SD No. 18.0 Priming Ejectors Header plant operation and/or is a to PE 22 personnel safety issue upon failure.
2-MS-063 Text19: 3 1 2 FL 1 3 1 2 No No This large bore line is important to A227780 SD No. 18.0 Priming Ejectors Header plant operation and/or is a to PE 23 personnel safety issue upon failure.
2-MS-064 Text19: 12 1 3 FL 3 3 1 3 No No High quality main steam line. A235308 PEPSE Balancing line between This large bore line is important to SE and SW HP Turbine plant operation and/or is a Steam Feed Lines.
personnel safety issue upon failure.
2-MS-076 Text19: 3 1 2 FL 1 3 1 2 No No This large bore line is important to A235308 P&ID MS-863 Valve leakoff to plant operation and/or is a condenser.
personnel safety issue upon failure.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-55 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam (MS), Unit 2 2-MS-01: Main Steam from Stm Gen to HP Turbine, BFP Turbine, MSRs, Aux. Steam, SJAEs, and Priming Ejectors.
Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MS-077 Text19: 3 1 2 FL 1 3 1 2 No No This large bore line is important to A235308 P&ID MS-864 Valve leakoff to plant operation and/or is a condenser.
personnel safety issue upon failure.
2-MS-078 Text19: 3 1 2 FL 1 3 1 2 No No This large bore line is important to A235308 P&ID MS-865 Valve leakoff to plant operation and/or is a condenser.
personnel safety issue upon failure.
2-MS-079 Text19: 3 1 2 FL 1 3 1 2 No No This large bore line is important to A235308 P&ID MS-866 Valve leakoff to plant operation and/or is a condenser.
personnel safety issue upon failure.
2-MS-143 Text19: 0.75 1 2 FP 1 3 1 2 No No This line exists in an area A235308 PEPSE Main Steam Stop Valve accessible by plant personnel drain to 23 Cond. West during operation, and a leak Side presents a burn risk to a passerby.
2-MS-144 Text19: 0.75 1 2 FP 1 3 1 2 No No This line exists in an area A235308 PEPSE Main Steam Stop Valve accessible by plant personnel drain to 23 Cond. East during operation, and a leak Side presents a burn risk to a passerby.
2-MS-192 Text19: 4 1 3 FL 3 3 1 3 No No High quality main steam line. A227780 PEPSE Main Steam Header to This large bore line is important to Aux. Steam Upstream of plant operation and/or is a PCV-1015 personnel safety issue upon failure.
Text19:
2-MS-198 1 2 FP 1 3 1 2 No No This line exists in an area B237145 P&ID LH Control Valve Stem accessible by plant personnel Leak-off Lines during operation, and a leak presents a burn risk to a passerby.
2-MS-199 Text19: 1 2 FP 1 3 1 2 No No This line exists in an area B237145 P&ID RH Control Valve Stem accessible by plant personnel Leak-off Lines during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-56 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam (MS), Unit 2 2-MS-01: Main Steam from Stm Gen to HP Turbine, BFP Turbine, MSRs, Aux. Steam, SJAEs, and Priming Ejectors.
Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MS-200 Text19: 1.5 1 2 FP 1 3 1 2 No No This line exists in an area B237145 P&ID Upper LH HP Turbine accessible by plant personnel Feed Leakoff during operation, and a leak presents a burn risk to a passerby.
2-MS-201 Text19: 1.5 1 2 FP 1 3 1 2 No No This line exists in an area B237145 P&ID Lower LH HP Turbine accessible by plant personnel Feed Leakoff during operation, and a leak presents a burn risk to a passerby.
2-MS-202 Text19: 1.5 1 2 FP 1 3 1 2 No No This line exists in an area B237145 P&ID Upper RH HP Turbine accessible by plant personnel Feed Leakoff during operation, and a leak presents a burn risk to a passerby.
2-MS-203 Text19: 1.5 1 2 FP 1 3 1 2 No No This line exists in an area B237145 P&ID Lower LH HP Turbine accessible by plant personnel Feed Leakoff during operation, and a leak presents a burn risk to a passerby.
2-MS-06: Main Steam Supply to Gland Steam Header Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description Text19:
2-MS-187 4 1 3 FL 3 3 1 3 No No High quality main steam line. A235308 PEPSE Main Steam Supply to This large bore line is important to Gland Seal Regulator plant operation and/or is a Station personnel safety issue upon failure.
Text19:
2-MS-188-A 3 1 3 FL 3 3 1 3 No No High quality main steam line. A235308 PEPSE Gland Seal Steam This large bore line is important to Supply upstream of PCV-plant operation and/or is a 1145-1 personnel safety issue upon failure.
2-MS-188-B Text19: 12 1 2 FL 1 3 1 2 No No This large bore line is important to A235308 PEPSE Gland Seal Steam plant operation and/or is a Supply downstream of personnel safety issue upon PCV-1145-1 failure.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-57 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam (MS), Unit 2 2-MS-06: Main Steam Supply to Gland Steam Header Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MS-189-A Text19: 3 1 3 FL 3 3 1 3 No No High quality main steam line. A235308 PEPSE Gland Seal Steam This large bore line is important to Supply upstream of PCV-plant operation and/or is a 1145-2 personnel safety issue upon failure.
2-MS-189-B Text19: 12 1 2 FL 1 3 1 2 No No This large bore line is important to A235308 PEPSE Gland Seal Steam plant operation and/or is a Supply downstream of personnel safety issue upon PCV-1145-2 failure.
2-MS-191 Text19: 12 1 2 FL 1 3 1 2 No No This large bore line is important to A235308 PEPSE Main Steam to Gland plant operation and/or is a Seal Steam Header.
personnel safety issue upon failure.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-58 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Moisture Separator Reheater Drains (MSD), Unit 2 2-MSD-01: Moisture Separator Drains to the Heater Drain Tank and Drains Collecting Tank Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MSD-097 Text19: 2.5 1 1 FL 1 2 1 1 No No This large bore line is important to 9321-F-2023 PEPSE MS Drain Tank 21A vent plant operation and/or is a to MSR personnel safety issue upon failure.
2-MSD-098 Text19: 2.5 1 1 FL 1 2 1 1 No No This large bore line is important to 9321-F-2023 PEPSE MS Drain Tank 22A vent plant operation and/or is a to MSR personnel safety issue upon failure.
2-MSD-099 Text19: 2.5 1 1 FL 1 2 1 1 No No This large bore line is important to 9321-F-2023 PEPSE MS Drain Tank 23A vent plant operation and/or is a to MSR personnel safety issue upon failure.
2-MSD-100 Text19: 2.5 1 1 FL 1 2 1 1 No No This large bore line is important to 9321-F-2023 PEPSE MS Drain Tank 21B vent plant operation and/or is a to MSR personnel safety issue upon failure.
2-MSD-101 Text19: 2.5 1 1 FL 1 2 1 1 No No This large bore line is important to 9321-F-2023 PEPSE MS Drain Tank 22B vent plant operation and/or is a to MSR personnel safety issue upon failure.
2-MSD-102 Text19: 2.5 1 1 FL 1 2 1 1 No No This large bore line is important to 9321-F-2023 PEPSE MS Drain Tank 23B vent plant operation and/or is a to MSR personnel safety issue upon failure.
Text19:
2-MSD-103-A 6 1 1 FL 2 2 1 1 Yes No All other components in this line 9321-F-2023 SFA Model MSD33A-1-MSDT 21A to have been clad with Stainless HDT: MS Drain Tank Steel to mitigate FAC. 21A Nozzle to Heater Drain Tank 2-MSD-103-C Text19: 6 1 1 FL 2 2 1 1 Yes No All other components in this line 9321-F-2023 SFA Model MSD33A-1-MSDT 21A to have been clad with Stainless HDT: Heater Drain Tank Steel to mitigate FAC. Nozzle from MS Drain Tank 21A Report No. 0700.104-03, Appendix A, Revision 2 Page A-59 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Moisture Separator Reheater Drains (MSD), Unit 2 2-MSD-01: Moisture Separator Drains to the Heater Drain Tank and Drains Collecting Tank Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MSD-104-A Text19: 6 1 1 FL 2 2 1 1 Yes No All other components in this line 9321-F-2023 SFA Model MSD34A-1-MSDT 22A to have been clad with Stainless HDT: MS Drain Tank Steel to mitigate FAC. 22A Nozzle to Heater Drain Tank 2-MSD-104-C Text19: 6 1 1 FL 2 2 1 1 Yes No All other components in this line 9321-F-2023 SFA Model MSD34A-1-MSDT 22A to have been clad with Stainless HDT: Heater Drain Tank Steel to mitigate FAC. Nozzle from MS Drain Tank 22A 2-MSD-105-A Text19: 6 1 1 FL 2 2 1 1 Yes No All other components in this line 9321-F-2023 SFA Model MSD35A-1-MSDT 23A to have been clad with Stainless HDT: MS Drain Tank Steel to mitigate FAC. 23A Nozzle to Heater Drain Tank 2-MSD-105-C Text19: 6 1 1 FL 2 2 1 1 Yes No All other components in this line 9321-F-2023 SFA Model MSD35A-1-MSDT 23A to have been clad with Stainless HDT: Heater Drain Tank Steel to mitigate FAC. Nozzle from MS Drain Tank 23A 2-MSD-106-A Text19: 6 1 1 FL 2 2 1 1 Yes No All other components in this line 9321-F-2023 SFA Model MSD36A-1-MSDT 21B to have been clad with Stainless HDT: MS Drain Tank Steel to mitigate FAC. 21B Nozzle to Heater Drain Tank 2-MSD-106-C Text19: 6 1 1 FL 2 2 1 1 Yes No All other components in this line 9321-F-2023 SFA Model MSD36A-1-MSDT 21B to have been clad with Stainless HDT: Heater Drain Tank Steel to mitigate FAC. Nozzle from MS Drain Tank 21B 2-MSD-107-A Text19: 6 1 1 FL 2 2 1 1 Yes No All other components in this line 9321-F-2023 SFA Model MSD37A-1-MSDT 22B to have been clad with Stainless HDT: MS Drain Tank Steel to mitigate FAC. 22B Nozzle to Heater Drain Tank 2-MSD-107-C Text19: 6 1 1 FL 2 2 1 1 Yes No All other components in this line 9321-F-2023 SFA Model MSD37A-1-MSDT 22B to have been clad with Stainless HDT: Heater Drain Tank Steel to mitigate FAC. Nozzle from MS Drain Tank 22B Report No. 0700.104-03, Appendix A, Revision 2 Page A-60 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Moisture Separator Reheater Drains (MSD), Unit 2 2-MSD-01: Moisture Separator Drains to the Heater Drain Tank and Drains Collecting Tank Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MSD-108-A Text19: 6 1 1 FL 2 2 1 1 Yes No All other components in this line 9321-F-2023 SFA Model MSD38A-1-MSDT 23B to have been clad with Stainless HDT: MS Drain Tank Steel to mitigate FAC. 23B Nozzle to Heater Drain Tank 2-MSD-108-C Text19: 6 1 1 FL 2 2 1 1 Yes No All other components in this line 9321-F-2023 SFA Model MSD38A-1-MSDT 23B to have been clad with Stainless HDT: Heater Drain Tank Steel to mitigate FAC. Nozzle from MS Drain Tank 23B 2-MSD-02: Reheater Drains to #26 Feedwater Heaters and Condensers Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description Text19:
2-MSD-145 2.5 1 2 FL 1 3 1 2 No No This large bore line is important to 9321-F-2023 PEPSE Reheater Drain Tank 21A plant operation and/or is a Vent to MSR personnel safety issue upon failure.
2-MSD-146 Text19: 2.5 1 2 FL 1 3 1 2 No No This large bore line is important to 9321-F-2023 PEPSE Reheater Drain Tank 22A plant operation and/or is a Vent to MSR personnel safety issue upon failure.
2-MSD-147 Text19: 2.5 1 2 FL 1 3 1 2 No No This large bore line is important to 9321-F-2023 PEPSE Reheater Drain Tank 23A plant operation and/or is a Vent to MSR personnel safety issue upon failure.
Text19:
2-MSD-148 2.5 1 2 FL 1 3 1 2 No No This large bore line is important to 9321-F-2023 PEPSE Reheater Drain Tank 21B plant operation and/or is a Vent to MSR personnel safety issue upon failure.
2-MSD-149 Text19: 2.5 1 2 FL 1 3 1 2 No No This large bore line is important to 9321-F-2023 PEPSE Reheater Drain Tank 22B plant operation and/or is a Vent to MSR personnel safety issue upon failure.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-61 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Moisture Separator Reheater Drains (MSD), Unit 2 2-MSD-02: Reheater Drains to #26 Feedwater Heaters and Condensers Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MSD-150 Text19: 2.5 1 2 FL 1 3 1 2 No No This large bore line is important to 9321-F-2023 PEPSE Reheater Drain Tank 23B plant operation and/or is a Vent to MSR personnel safety issue upon failure.
2-MSD-175 Text19: 8 1 2 FL 1 3 1 2 No No This large bore line is important to 9321-F-2023 PEPSE Reheater 21A to plant operation and/or is a Condenser 23 personnel safety issue upon failure.
2-MSD-176 Text19: 8 1 2 FL 1 3 1 2 No No This large bore line is important to 9321-F-2023 PEPSE Reheater 22A to plant operation and/or is a Condenser 22 personnel safety issue upon failure.
2-MSD-177 Text19: 8 1 2 FL 1 3 1 2 No No This large bore line is important to 9321-F-2023 PEPSE Reheater 23A to plant operation and/or is a Condenser 23 personnel safety issue upon failure.
2-MSD-178 Text19: 6 1 2 FL 1 3 1 2 No No This large bore line is important to 9321-F-2023 PEPSE Reheater 21B to plant operation and/or is a Condenser 21 personnel safety issue upon failure.
2-MSD-179 Text19: 6 1 2 FL 1 3 1 2 No No This large bore line is important to 9321-F-2023 PEPSE Reheater 22B to plant operation and/or is a Condenser 22 personnel safety issue upon failure.
Text19:
2-MSD-180 6 1 2 FL 1 3 1 2 No No This large bore line is important to 9321-F-2023 PEPSE Reheater 23B to plant operation and/or is a Condenser 21 personnel safety issue upon failure.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-62 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam Traps (MST), Unit 2 2-MST-01: Steam Trap Lines from the Main Steam System Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MST-019-A Text19: 12 1 1 FL 1 2 1 1 No No This large bore line is important to A227780 PEPSE Crossunder Steam Trap plant operation and/or is a to Condenser 21 personnel safety issue upon failure.
2-MST-020-A Text19: 12 1 1 FL 1 2 1 1 No No This large bore line is important to A227780 PEPSE Crossunder Steam Trap plant operation and/or is a to Condenser 21 personnel safety issue upon failure.
2-MST-021-A Text19: 12 1 1 FL 1 2 1 1 No No This large bore line is important to A227780 PEPSE Crossunder Steam Trap plant operation and/or is a to Condenser 22 personnel safety issue upon failure.
2-MST-022-A Text19: 12 1 1 FL 1 2 1 1 No No This large bore line is important to A227780 PEPSE Crossunder Steam Trap plant operation and/or is a to Condenser 22 personnel safety issue upon failure.
2-MST-023-A Text19: 12 1 1 FL 1 2 1 1 No No This large bore line is important to A227780 PEPSE Crossunder Steam Trap plant operation and/or is a to Condenser 23 personnel safety issue upon failure.
2-MST-024-A Text19: 12 1 1 FL 1 2 1 1 No No This large bore line is important to A227780 PEPSE Crossunder Steam Trap plant operation and/or is a to Condenser 23 personnel safety issue upon failure.
Text19:
2-MST-080-A 1.5 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main steam to MST-1 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-080-B Text19: 1.5 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID MST-1 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-63 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam Traps (MST), Unit 2 2-MST-01: Steam Trap Lines from the Main Steam System Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MST-081-A Text19: 1.5 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main steam to MST-2 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-081-B Text19: 1.5 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID MST-2 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-082-A Text19: 1.5 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main steam to MST-3 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-082-B Text19: 1.5 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID MST-3 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-083-A Text19: 1.5 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main Steam from Drain accessible by plant personnel Pot to MST-4 during operation, and a leak presents a burn risk to a passerby.
2-MST-083-B Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main Steam from MS accessible by plant personnel 24 US Leakoff to MST-4.
during operation, and a leak presents a burn risk to a passerby.
Text19:
2-MST-083-C 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID MST-4 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-084-A Text19: 1.25 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main Steam from MS accessible by plant personnel 21 US Leakoff to MST-5 during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-64 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam Traps (MST), Unit 2 2-MST-01: Steam Trap Lines from the Main Steam System Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MST-084-B Text19: 1.25 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID MST-5 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-085-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main Steam from MS-2A accessible by plant personnel US Leakoff to MST-6 during operation, and a leak presents a burn risk to a passerby.
2-MST-085-B Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main Steam from MS accessible by plant personnel 21 DS Leakoff to MST-6 during operation, and a leak presents a burn risk to a passerby.
2-MST-085-C Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID MST-6 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-086-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main Steam from MS-2A accessible by plant personnel DS Leakoff to MST-8 during operation, and a leak presents a burn risk to a passerby.
2-MST-086-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID MST-8 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
Text19:
2-MST-087-A 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main Steam from MS-2B accessible by plant personnel DS Leakoff to MST-9 during operation, and a leak presents a burn risk to a passerby.
2-MST-087-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID MST-9 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-65 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam Traps (MST), Unit 2 2-MST-01: Steam Trap Lines from the Main Steam System Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MST-088-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main Steam from MS accessible by plant personnel 22 DS Leakoff to MST-10 during operation, and a leak presents a burn risk to a passerby.
2-MST-088-B Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main Steam from MS-2B accessible by plant personnel US Leakoff to MST-10 during operation, and a leak presents a burn risk to a passerby.
2-MST-088-C Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID MST-10 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-089-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main Steam from MS accessible by plant personnel 22 US Leakoff to MST-12 during operation, and a leak presents a burn risk to a passerby.
2-MST-089-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID MST-12 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-090-A Text19: 1.25 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main Steam from MS accessible by plant personnel 23 US Leakoff to MST-13 during operation, and a leak presents a burn risk to a passerby.
Text19:
2-MST-090-B 1.25 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID MST-13 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-091-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main Steam from MS accessible by plant personnel 23 DS Leakoff to MST-14 during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-66 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam Traps (MST), Unit 2 2-MST-01: Steam Trap Lines from the Main Steam System Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MST-091-B Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main Steam from MS-2C accessible by plant personnel US Leakoff to MST-14 during operation, and a leak presents a burn risk to a passerby.
2-MST-091-C Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID MST-14 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-092-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main Steam from MS-2C accessible by plant personnel DS Leakoff to MST-16 during operation, and a leak presents a burn risk to a passerby.
2-MST-092-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID MST-16 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-093-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main Steam from MS accessible by plant personnel 24 DS Leakoff to MST-18 during operation, and a leak presents a burn risk to a passerby.
2-MST-093-B Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main Steam from MS-2D accessible by plant personnel US Leakoff to MST-18 during operation, and a leak presents a burn risk to a passerby.
Text19:
2-MST-093-C 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID MST-18 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-094-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main Steam from MS-2D accessible by plant personnel DS Leakoff to MST-20 during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-67 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam Traps (MST), Unit 2 2-MST-01: Steam Trap Lines from the Main Steam System Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MST-094-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID MST-20 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-095-A Text19: 1.5 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main Steam to MST-21 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-095-B Text19: 1.5 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID MST-21 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-096-A Text19: 1.5 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main Steam to MST-22 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-096-B Text19: 1.5 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID MST-22 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-097-A Text19: 1.5 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main Steam to MST-23 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-097-B Text19: 1.5 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID MST-23 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-098-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Exit Nozzle US of Valve accessible by plant personnel MS-90-1 during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-68 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam Traps (MST), Unit 2 2-MST-01: Steam Trap Lines from the Main Steam System Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MST-099-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main Steam to MST-25 accessible by plant personnel via Steam Dump Lines during operation, and a leak presents a burn risk to a passerby.
2-MST-099-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID MST-25 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-100-A Text19: 1.25 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2042 PEPSE Main Steam to MST-26 accessible by plant personnel via Steam Dump Lines during operation, and a leak presents a burn risk to a passerby.
2-MST-100-B Text19: 1.25 1 1 FP 1 3 1 1 Yes No Components have been replaced 9321-F-2042 P&ID, MST-26 to Steam Trap in a similar line. This line exists in Replacement Header an area accessible by plant History personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-101-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main Steam to MST-27 accessible by plant personnel via Steam Dump Lines during operation, and a leak presents a burn risk to a passerby.
2-MST-101-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID MST-27 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-102-A Text19: 1.25 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2042 PEPSE Main Steam to MST-28 accessible by plant personnel via Steam Dump Lines during operation, and a leak presents a burn risk to a passerby.
2-MST-102-B Text19: 1.25 1 1 FP 1 3 1 1 Yes No Components have been replaced 9321-F-2042 P&ID, MST-28 to Steam Trap in a similar line. This line exists in Replacement Header an area accessible by plant History personnel during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-69 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam Traps (MST), Unit 2 2-MST-01: Steam Trap Lines from the Main Steam System Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MST-103-A Text19: 1.25 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2042 PEPSE Main Steam to MST-29 accessible by plant personnel via Steam Dump Lines during operation, and a leak presents a burn risk to a passerby.
2-MST-103-B Text19: 1.25 1 1 FP 1 3 1 1 Yes No Components have been replaced 9321-F-2042 P&ID, MST-29 to Steam Trap in a similar line. This line exists in Replacement Header an area accessible by plant History personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-104-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2042 PEPSE Main Steam to MST-30 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-104-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID MST-30 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-105-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2042 PEPSE Main Steam to MST-31 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-105-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID MST-31 to Header accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-105-D Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID Header to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-106-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2042 PEPSE Main Steam to MST-32 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-70 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam Traps (MST), Unit 2 2-MST-01: Steam Trap Lines from the Main Steam System Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MST-106-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID MST-32 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-107-A Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 SD No. 18.0 Steam to MST-33 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-107-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID MST-33 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-108-A Text19: 1.25 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2042 PEPSE Main Steam to MST-34 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-108-B Text19: 1.25 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID MST-34 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-109-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2042 PEPSE Main Steam to MST-35 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-109-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID MST-35 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-110-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main Steam to MST-36 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-71 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam Traps (MST), Unit 2 2-MST-01: Steam Trap Lines from the Main Steam System Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MST-110-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID MST-36 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-111-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2042 PEPSE Main Steam to MST-37 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-111-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID MST-37 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-112-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2042 PEPSE Main Steam to MST-38 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-112-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID MST-38 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-113-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2042 PEPSE Main Steam to MST-39 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-113-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID MST-39 to Header accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-113-D Text19: 1.25 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID Header to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-72 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam Traps (MST), Unit 2 2-MST-01: Steam Trap Lines from the Main Steam System Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MST-114-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2042 PEPSE Main Steam to MST-40 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-114-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID MST-40 to Header accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-115-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main Steam to MST-41 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-115-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID MST-41 to Header accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-116-A Text19: 1.25 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2042 PEPSE Main Steam to MST-42 accessible by plant personnel via Steam Dump Lines during operation, and a leak presents a burn risk to a passerby.
2-MST-116-B Text19: 1.25 1 1 FP 1 3 1 1 Yes No Components have been replaced 9321-F-2042 P&ID, MST-42 to Steam Trap in a similar line. This line exists in Replacement Header an area accessible by plant History personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-117-A Text19: 1.25 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2042 PEPSE Main Steam to MST-43 accessible by plant personnel via Steam Dump Lines during operation, and a leak presents a burn risk to a passerby.
2-MST-117-B Text19: 1.25 1 1 FP 1 3 1 1 Yes No Components have been replaced 9321-F-2042 P&ID, MST-43 to Steam Trap in this line. This line exists in an Replacement Header area accessible by plant History personnel during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-73 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam Traps (MST), Unit 2 2-MST-01: Steam Trap Lines from the Main Steam System Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MST-118-A Text19: 1.25 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2042 PEPSE Main Steam to MST-44 accessible by plant personnel via Steam Dump Lines during operation, and a leak presents a burn risk to a passerby.
2-MST-118-B Text19: 1.25 1 1 FP 1 3 1 1 Yes No Components have been replaced 9321-F-2042 P&ID, MST-44 to Steam Trap in a similar line. This line exists in Replacement Header an area accessible by plant History personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-119-A Text19: 1.25 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2042 PEPSE Main Steam to MST-45 accessible by plant personnel via Steam Dump Lines during operation, and a leak presents a burn risk to a passerby.
2-MST-119-B Text19: 1.25 1 1 FP 1 3 1 1 Yes No Components have been replaced 9321-F-2042 P&ID, MST-45 to Steam Trap in a similar line. This line exists in Replacement Header an area accessible by plant History personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-120-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2042 PEPSE Main Steam to MST-46 accessible by plant personnel via Steam Dump Lines during operation, and a leak presents a burn risk to a passerby.
Text19:
2-MST-120-B 1 1 1 FP 1 3 1 1 Yes No Components have been replaced 9321-F-2042 P&ID, MST-46 to Steam Trap in a similar line. This line exists in Replacement Header an area accessible by plant History personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-121-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2042 PEPSE Main Steam to MST-47 accessible by plant personnel via Steam Dump Lines during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-74 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam Traps (MST), Unit 2 2-MST-01: Steam Trap Lines from the Main Steam System Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MST-121-B Text19: 1 1 1 FP 1 3 1 1 Yes No Components have been replaced 9321-F-2042 P&ID, MST-47 to Steam Trap in a similar line. This line exists in Replacement Header an area accessible by plant History personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-122-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2042 PEPSE Main Steam to MST-48 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-122-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID MST-48 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-123-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2042 PEPSE Main Steam to MST-49 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
Text19:
2-MST-123-B 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID MST-49 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-124-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2042 PEPSE Main Steam to MST-50 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-124-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID MST-50 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-125-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2042 PEPSE Main Steam to MST-51 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-75 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam Traps (MST), Unit 2 2-MST-01: Steam Trap Lines from the Main Steam System Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MST-125-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID MST-51 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-126-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2042 PEPSE Main Steam to MST-52 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-126-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID MST-52 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-127-A Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID Steam to MST-56 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-127-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID MST-56 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-128-A Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID Steam to MST-57 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-128-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID MST-57 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-129-A Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID Steam to MST-58 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-76 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam Traps (MST), Unit 2 2-MST-01: Steam Trap Lines from the Main Steam System Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MST-129-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID MST-58 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-130-A Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID Steam to MST-59 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-130-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID MST-59 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-131-A Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID Steam to MST-60 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-131-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID MST-60 to Header accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-132-A Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID Steam to MST-61 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-132-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID MST-61 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-133-A Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID Steam to MST-62 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-77 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam Traps (MST), Unit 2 2-MST-01: Steam Trap Lines from the Main Steam System Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MST-133-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID MST-62 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-134-A Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID Steam to MST-63 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-134-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID MST-63 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-135-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Steam to MST-64 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-135-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID MST-64 to Header accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-136-A Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID Steam to MST-65 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-136-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID MST-65 to Header accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-193-A Text19: 0.75 1 3 FP 3 3 1 3 No No High quality main steam line. A227780 PEPSE Main Steam to MST-100 This line exists in an area accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-78 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam Traps (MST), Unit 2 2-MST-01: Steam Trap Lines from the Main Steam System Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MST-193-B Text19: 0.75 1 2 FP 1 3 1 2 No No This line exists in an area A227780 PEPSE MST-100 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-79 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Moisture Preseparator Drains (PD), Unit 2 2-PD-01: Moisture Preseparator Drain Lines Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-PD-005 Text19: 3 1 1 FL 1 2 1 1 No No This large bore line is important to A228272 PEPSE Moisture Preseparator plant operation and/or is a "A" to 20" Line personnel safety issue upon failure.
2-PD-006 Text19: 3 1 1 FL 1 2 1 1 No No This large bore line is important to A228272 PEPSE Moisture Preseparator plant operation and/or is a "B" to 20" Line personnel safety issue upon failure.
2-PD-007 Text19: 3 1 1 FL 1 2 1 1 No No This large bore line is important to A228272 PEPSE Moisture Preseparator plant operation and/or is a "C" to 20" Line personnel safety issue upon failure.
2-PD-008 Text19: 3 1 1 FL 1 2 1 1 No No This large bore line is important to A228272 PEPSE Moisture Preseparator plant operation and/or is a "D" to 20" Line personnel safety issue upon failure.
2-PD-009-A Text19: 20 1 1 FL 1 2 1 1 Yes No All other components in this line A228272 SFA Model ES7A-1-SEP TKA VNT to were replaced with Stainless FWH25: Separating Steel to mitigate FAC. Tank A Nozzle to Extraction Steam Header 2-PD-010-A Text19: 20 1 1 FL 1 2 1 1 Yes No All other components in this line A228272 SFA Model ES7A-2-SEP TKB VNT to were replaced with Stainless FWH25: Separating Steel to mitigate FAC. Tank B Nozzle to Extraction Steam Header Report No. 0700.104-03, Appendix A, Revision 2 Page A-80 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Reheat Steam Traps (RST), Unit 2 2-RST-01: Reheat Steam Trap Lines Downstream of Reheater Steam Traps Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-RST-001 Text19: 0.75 1 2 FP 1 3 1 2 No No This line exists in an area 9321-H-2024 PEPSE RST-1 to BFP Turbine accessible by plant personnel Drip Tank Header during operation, and a leak presents a burn risk to a passerby.
2-RST-002 Text19: 0.75 1 2 FP 1 3 1 2 No No This line exists in an area 9321-H-2024 PEPSE RST-2 to BFP Turbine accessible by plant personnel Drip Tank Header during operation, and a leak presents a burn risk to a passerby.
2-RST-003 Text19: 0.75 1 2 FP 1 3 1 2 No No This line exists in an area 9321-H-2024 PEPSE RST-3 to BFP Turbine accessible by plant personnel Drip Tank Header during operation, and a leak presents a burn risk to a passerby.
2-RST-004 Text19: 2 1 2 FP 1 3 1 2 No No This line exists in an area 9321-H-2024 PEPSE Reheat Steam Trap accessible by plant personnel Header to BFP Turbine during operation, and a leak Drip Tank presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-81 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Service Boiler (SB), Unit 2 2-SB-01: Service Boiler Lines Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-SB-001 Text19: 6 1 2 FL 1 3 1 2 No No This large bore line is important to A227780, PEPSE Auxiliary Steam from plant operation and/or is a A209775 PCV-1015 personnel safety issue upon failure.
2-SB-004 Text19: 2 2 N/A No No 9321-F-2120 P&ID Steam to Condensate Return, Hot Water Heat Exchangers, and Office Unit Heaters 2-SB-005 Text19: 2 2 N/A No No 9321-F-2120 P&ID Steam to Hot Water Heat Exchangers and Office Unit Heaters 2-SB-011 Text19: 1 2 N/A No No 9321-F-2120 P&ID Header Drain to AST-35 Text19:
2-SB-012 1.5 2 N/A No No 9321-F-2120 P&ID Steam to Office Unit Heaters Text19:
2-SB-015 8 1 2 FL 1 3 1 2 No No This large bore line is important to A209775 P&ID Steam from Aux. Steam plant operation and/or is a Header personnel safety issue upon failure.
2-SB-016 Text19: 8 1 2 FL 1 3 1 2 No No This large bore line is important to A209775 P&ID Desuperheater Header plant operation and/or is a personnel safety issue upon failure.
2-SB-022 Text19: 2 2 N/A No No A209775 P&ID Steam trap header to Cond. Receiver 2-SB-023 Text19: 4 1 2 FL 1 3 1 2 No No This large bore line is important to A209775 P&ID Header to Steam Traps plant operation and/or is a personnel safety issue upon failure.
2-SB-026 Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area A209775 P&ID Desuperheater Header accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-82 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Service Boiler (SB), Unit 2 2-SB-01: Service Boiler Lines Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-SB-030 Text19: 8 1 2 FL 1 3 1 2 No No This large bore line is important to A209775 P&ID Steam to Desuperheater plant operation and/or is a personnel safety issue upon failure.
2-SB-039 Text19: 4 1 2 FL 1 2 1 2 No No This large bore line is important to A209775 P&ID Service Boiler Header to plant operation and/or is a Air Tempering Units personnel safety issue upon failure.
2-SB-042 Text19: 6 1 2 FL 2 2 1 2 No No This large bore line is important to 9321-F-2021, P&ID Line from #10 House plant operation and/or is a B193201 Service Boiler Deaerator personnel safety issue upon failure.
2-SB-043 Text19: 1.5 2 N/A No No 9321-F-2021, P&ID Line from #10 House B193201 Service Boiler Deaerator Report No. 0700.104-03, Appendix A, Revision 2 Page A-83 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Condensate Return Unit Heaters to Service Boiler D (UH), Unit 2 2-UH-01: Condensate Return from Unit Heaters to the Deaerator Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-UH-001 Text19: 4 1 2 FL 2 1 1 2 No No This large bore line is important to A209775, 9321- P&ID Condensate return plant operation and/or is a F-2120 pumps to #20 House personnel safety issue upon Service Deaerator failure.
2-UH-002 Text19: 4 1 2 FL 2 1 1 2 No No This large bore line is important to 9321-F-2120, P&ID Condensate return to #10 plant operation and/or is a B193201 House Service Deaerator personnel safety issue upon failure.
2-UH-003 Text19: 10 1 2 FL 3 1 1 2 No No This large bore line is important to A209775 SD No. 29.01 Desuperheater outlet plant operation and/or is a header to various unit personnel safety issue upon heaters failure.
2-UH-004 Text19: 8 1 2 FL 3 1 1 2 No No This large bore line is important to A209775 SD No. 29.01 Desuperheater outlet plant operation and/or is a steam to Gland Seal personnel safety issue upon Steam Header failure.
2-UH-071 Text19: 6 1 2 FL 1 1 1 2 No No Based on engineering judgment, A209775 P&ID Unit Heater Drain Header these lines are not as susceptible to Condensate Receiver as the numbers may imply.
Susceptibility level was lowered accordingly. This large bore line is important to plant operation and/or is a personnel safety issue upon failure.
2-UH-072 Text19: 6 1 2 FL 1 1 1 2 No No Based on engineering judgment, A209775 P&ID Unit Heater Drain Header these lines are not as susceptible to Condensate Receiver as the numbers may imply.
Susceptibility level was lowered accordingly. This large bore line is important to plant operation and/or is a personnel safety issue upon failure.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-84 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Condensate Return Unit Heaters to Service Boiler D (UH), Unit 2 2-UH-01: Condensate Return from Unit Heaters to the Deaerator Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-UH-073 Text19: 4 1 2 FL 1 1 1 2 No No Based on engineering judgment, A209775 P&ID Condensate Receiver these lines are not as susceptible Vent to Atmosphere as the numbers may imply.
Susceptibility level was lowered accordingly. This large bore line is important to plant operation and/or is a personnel safety issue upon failure.
2-UH-074 Text19: 3 1 2 FL 2 1 1 2 No No This large bore line is important to A209775 P&ID Condensate Receiver plant operation and/or is a Drain to Cond. Return personnel safety issue upon Pump #21 failure.
2-UH-075 Text19: 3 1 2 FL 2 1 1 2 No No This large bore line is important to A209775 P&ID Condensate Receiver plant operation and/or is a Drain to Cond. Return personnel safety issue upon Pump #22 failure.
2-UH-077 Text19: 4 1 2 FL 2 1 1 2 No No This large bore line is important to A209775 P&ID Cond. Return Pump #21 plant operation and/or is a Discharge personnel safety issue upon failure.
2-UH-078 Text19: 4 1 2 FL 2 1 1 2 No No This large bore line is important to A209775 P&ID Cond. Return Pump #21 plant operation and/or is a Discharge personnel safety issue upon failure.
Text19:
2-UH-079 2 1 2 FP 2 1 1 2 No No This line exists in an area B193201 P&ID Line from #20 House accessible by plant personnel Service Boiler to Service during operation, and a leak Boiler Deaerator presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix A, Revision 2 Page A-85 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Condensate Return Unit Heater Steam Traps (UHT), Unit 2 2-UHT-01: Steam Trap Lines from the Condensate Return from Unit Heaters to the Deaerator system Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-UHT-005 Text19: 1 1 2 FP 3 1 1 2 No No This line exists in an area A209775 SD No. 29.01 Steam to UHT-510 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-UHT-006 Text19: 1 1 2 FP 3 1 1 2 No No This line exists in an area A209775 SD No. 29.01 Steam to UHT-511 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-UHT-007 Text19: 2 2 N/A No No A209775 P&ID Steam trap header to Cond. Receiver from UHT-510.
2-UHT-008 Text19: 1 2 N/A No No A209775 P&ID Steam from gland steam supply steam traps Text19:
2-UHT-009 2 2 N/A No No A209775 P&ID Steam to and from 215UHR 2-UHT-010 Text19: 2 2 N/A No No A209775 P&ID Steam to and from 217UHR 2-UHT-011 Text19: 2 2 N/A No No A209775 P&ID Steam to and from 29UHR Text19:
2-UHT-012 2 2 N/A No No A209775 P&ID Steam to and from 22UHR Text19:
2-UHT-013 1 2 N/A No No A209775 P&ID Steam to and from UHT-2-1 2-UHT-014 Text19: 2 2 N/A No No A209775 P&ID Steam to and from 221UHR 2-UHT-015 Text19: 2 2 N/A No No A209775 P&ID Steam to and from 219UHR 2-UHT-016 Text19: 2 2 N/A No No A209775 P&ID Steam to and from 211UHR 2-UHT-017 Text19: 2 2 N/A No No A209775 P&ID Steam to and from 24UHR Report No. 0700.104-03, Appendix A, Revision 2 Page A-86 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Condensate Return Unit Heater Steam Traps (UHT), Unit 2 2-UHT-01: Steam Trap Lines from the Condensate Return from Unit Heaters to the Deaerator system Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-UHT-018 Text19: 1 2 N/A No No A209775 P&ID Steam to and from UHT-2-2 2-UHT-019 Text19: 2 2 N/A No No A209775 P&ID Steam to and from 225UHR 2-UHT-020 Text19: 2 2 N/A No No A209775 P&ID Steam to and from 224UHR 2-UHT-021 Text19: 2 2 N/A No No A209775 P&ID Steam to and from 223UHR 2-UHT-022 Text19: 2 2 N/A No No A209775 P&ID Steam to and from 213UHR Text19:
2-UHT-023 2 2 N/A No No A209775 P&ID Steam to and from 27UHR 2-UHT-024 Text19: 1 2 N/A No No A209775 P&ID Steam to and from UHT-1-1 2-UHT-024-A Text19: 4 1 2 FL 1 3 1 2 No No This large bore line is important to A209775 P&ID Steam to UHT-512 and plant operation and/or is a 513 personnel safety issue upon failure.
2-UHT-025 Text19: 1 2 N/A No No A209775 P&ID Steam to and from Oil Preheater Text19:
2-UHT-026 1 2 N/A No No A209775 P&ID Steam to and from UHT-4-1 2-UHT-027 Text19: 2 2 N/A No No A209775 P&ID Steam to and from 24AUHR 2-UHT-028 Text19: 1.5 2 N/A No No A209775 P&ID Steam to and from UHT-2-3 2-UHT-029 Text19: 1 2 N/A No No A209775 P&ID Steam to and from 248UHR 2-UHT-030 Text19: 1 2 N/A No No A209775 P&ID Steam to and from 250UHR Report No. 0700.104-03, Appendix A, Revision 2 Page A-87 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Condensate Return Unit Heater Steam Traps (UHT), Unit 2 2-UHT-01: Steam Trap Lines from the Condensate Return from Unit Heaters to the Deaerator system Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-UHT-031 Text19: 1 2 N/A No No A209775 P&ID Steam to and from 249UHR 2-UHT-032 Text19: 1 2 N/A No No A209775 P&ID Steam to and from 252UHR 2-UHT-033 Text19: 1 2 N/A No No A209775 P&ID Steam to and from 251UHR 2-UHT-034 Text19: 1 2 N/A No No A209775 P&ID Steam to and from UHT-11-3 2-UHT-035 Text19: 1 2 N/A No No A209775 P&ID Steam to and from 247UHR Text19:
2-UHT-036 1 2 N/A No No A209775 P&ID Steam to and from 246UHR 2-UHT-037 Text19: 1 2 N/A No No A209775 P&ID Steam to and from 245UHR 2-UHT-038 Text19: 1 2 N/A No No A209775 P&ID Steam to and from UHT-11-2 2-UHT-039 Text19: 2 2 N/A No No A209775 P&ID UHT-511 outlet Text19:
2-UHT-040 2 2 N/A No No A209775 P&ID Steam to and from 214UHR Text19:
2-UHT-041 2 2 N/A No No A209775 P&ID Steam to and from 216UHR 2-UHT-042 Text19: 2 2 N/A No No A209775 P&ID Steam to and from 218UHR 2-UHT-043 Text19: 2 2 N/A No No A209775 P&ID Steam to and from 220UHR 2-UHT-044 Text19: 2 2 N/A No No A209775 P&ID Steam to and from 222UHR 2-UHT-045 Text19: 1 2 N/A No No A209775 P&ID Steam to and from 260UHR Report No. 0700.104-03, Appendix A, Revision 2 Page A-88 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Condensate Return Unit Heater Steam Traps (UHT), Unit 2 2-UHT-01: Steam Trap Lines from the Condensate Return from Unit Heaters to the Deaerator system Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-UHT-046 Text19: 1 2 N/A No No A209775 P&ID Steam to and from UHT-4-2 2-UHT-047 Text19: 2 2 N/A No No A209775 P&ID Steam to and from 21UHR 2-UHT-048 Text19: 2 2 N/A No No A209775 P&ID Steam to and from 28UHR 2-UHT-049 Text19: 2 2 N/A No No A209775 P&ID Steam to and from 23UHR 2-UHT-050 Text19: 2 2 N/A No No A209775 P&ID Steam to and from 210UHR Text19:
2-UHT-051 2 2 N/A No No A209775 P&ID Steam to and from 212UHR 2-UHT-052 Text19: 2 2 N/A No No A209775 P&ID Steam to and from 25UHR 2-UHT-053 Text19: 0.75 2 N/A No No A209775 P&ID Steam to and from UHT-11-1 2-UHT-056 Text19: 1 2 N/A No No A209775 P&ID UHT-513 Discharge Text19:
2-UHT-057 0.5 2 N/A No No A209775 P&ID UHT-512 Discharge Text19:
2-UHT-060 0.75 2 N/A No No A209775 P&ID 21 Air Tempering Unit Discharge 2-UHT-061 Text19: 0.75 2 N/A No No A209775 P&ID 22 Air Tempering Unit Discharge 2-UHT-062 Text19: 1 2 N/A No No A209775 P&ID Steam to various unit heaters 2-UHT-063 Text19: 0.75 2 N/A No No A209775 P&ID Steam to and from UH-TSC-1 2-UHT-064 Text19: 0.75 2 N/A No No A209775 P&ID Steam to and from 242UHR Report No. 0700.104-03, Appendix A, Revision 2 Page A-89 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Condensate Return Unit Heater Steam Traps (UHT), Unit 2 2-UHT-01: Steam Trap Lines from the Condensate Return from Unit Heaters to the Deaerator system Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-UHT-065 Text19: 0.75 2 N/A No No A209775 P&ID Steam to and from 243UHR 2-UHT-066 Text19: 0.75 2 N/A No No A209775 P&ID Steam to and from 244UHR 2-UHT-067 Text19: 0.75 2 N/A No No A209775 P&ID Steam to and from UHT-8-246 2-UHT-068 Text19: 0.75 2 N/A No No A209775 P&ID Steam to and from 253UHR 2-UHT-069 Text19: 2 2 N/A No No A209775 P&ID Unit Heater Drain to Discharge Tunnel Text19:
2-UHT-089 0.75 2 N/A No No B227209 P&ID Steam to and from UH-1020 2-UHT-090 Text19: 0.75 2 N/A No No B227209 P&ID Steam to and from UH-1019 2-UHT-092 Text19: 0.75 2 N/A No No B227209 P&ID Steam to and from UH-1021 Report No. 0700.104-03, Appendix A, Revision 2 Page A-90 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Report Header Legend:
F Consequence of Failure 1 = High Consequence of Failure (Category 1) 2 = Low Consequence of Failure (Category 2)
S Susceptibility level 1 = High Susceptibility 2 = Moderate Susceptibility 3 = Low Susceptibility F Crit. Consequence of Failure Criteria (see below)
Q Operating Quality code 1 = 30% to 99.5%
2 = < 30%
3 = > 99.5%
T Operating Temperature code 1 = 250 to 350 deg F 2 = 350 to 400 deg F 3 = < 250 deg F, > 400 deg F O Operating time code 1 = Lines operating frequently or w/ severe cond.
2 = Lines operating infrequently Priority Priority 1 = High Priority 2 = Moderate Priority 3 = Low Priority Plant Exp. Plant Experience Ind. Exp. Industry Experience Consequence of Failure Criteria (F Crit.) Legend:
FI High consequence of Failure: non-Isolable line FL High consequence of Failure: Large-bore line FP High consequence of Failure: Personnel safety issue (frequently accessed location)
FS High consequence of Failure: Safety-related line FT High consequence of Failure: shutdown or Trip upon failure Report No. 0700.104-03, Appendix A, Revision 2 Page A-91 of 91
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Appendix B SNM Program Lines Sorted by Susceptibility High Consequence of Failure - High Susceptibility Indian Point Unit 2 Report No. 0700.104-03, Appendix B, Revision 2 Page B-1 of 27
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Extraction Steam Traps (EST), Unit 2 2-1EST-01: Extraction Steam Trap Headers to the Drains Collecting Tank Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-1EST-013-B Text19: 4 1 1 FL 1 1 1 1 No No This large bore line is important to 9321-F-2031 P&ID Steam Trap Header from plant operation and/or is a EST-1, 1A, 2, and 6 personnel safety issue upon failure.
2-1EST-014 Text19: 6 1 1 FL 1 1 1 1 No No This large bore line is important to 9321-F-2031 P&ID Main Extraction Steam plant operation and/or is a Trap Header personnel safety issue upon failure.
2-3EST-01: Steam Trap lines from Extraction Steam to the #23 FWHs Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description Text19:
2-3EST-012-A 2 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE Extraction Steam to EST-accessible by plant personnel 14 during operation, and a leak presents a burn risk to a passerby.
2-3EST-012-B Text19: 2 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE EST-14 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-3EST-013-A Text19: 0.75 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE Extraction Steam to EST-accessible by plant personnel 15 during operation, and a leak presents a burn risk to a passerby.
Text19:
2-3EST-013-B 0.75 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE Header from EST-15 to accessible by plant personnel Steam Trap Header during operation, and a leak presents a burn risk to a passerby.
2-3EST-014-A Text19: 0.75 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE Extraction Steam to EST-accessible by plant personnel 16 during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix B, Revision 2 Page B-2 of 27
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Extraction Steam Traps (EST), Unit 2 2-3EST-01: Steam Trap lines from Extraction Steam to the #23 FWHs Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-3EST-014-B Text19: 0.75 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE Header from EST-16 to accessible by plant personnel Steam Trap Header during operation, and a leak presents a burn risk to a passerby.
2-3EST-015-A Text19: 2 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE Extraction Steam to EST-accessible by plant personnel 17 during operation, and a leak presents a burn risk to a passerby.
2-3EST-015-B Text19: 2 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE EST-17 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-3EST-016-A Text19: 0.75 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE Extraction Steam to EST-accessible by plant personnel 18 during operation, and a leak presents a burn risk to a passerby.
2-3EST-016-B Text19: 0.75 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE EST-18 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-3EST-017-A Text19: 0.75 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE Extraction Steam to EST-accessible by plant personnel 19 during operation, and a leak presents a burn risk to a passerby.
Text19:
2-3EST-017-B 0.75 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE EST-19 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-3EST-018-A Text19: 2 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE Extraction Steam to EST-accessible by plant personnel 20 during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix B, Revision 2 Page B-3 of 27
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Extraction Steam Traps (EST), Unit 2 2-3EST-01: Steam Trap lines from Extraction Steam to the #23 FWHs Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-3EST-018-B Text19: 2 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE EST-20 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-3EST-019-A Text19: 0.75 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE Extraction Steam to EST-accessible by plant personnel 21 during operation, and a leak presents a burn risk to a passerby.
2-3EST-019-B Text19: 0.75 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE EST-21 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-3EST-020-A Text19: 0.75 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE Extraction Steam to EST-accessible by plant personnel 23 during operation, and a leak presents a burn risk to a passerby.
2-3EST-020-B Text19: 0.75 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE EST-23 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-4EST-01: Lines from Stm Traps to the Stm Trap Drains Header from Ext lines to #24 FWHs Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description Text19:
2-4EST-001 0.75 1 1 FP 1 1 1 1 Yes No Components in the line have been 9321-F-2031 PEPSE EST-5 to Steam Trap replaced in the past. This line Header exists in an area accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-4EST-002 Text19: 0.75 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE EST-6 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix B, Revision 2 Page B-4 of 27
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Extraction Steam Traps (EST), Unit 2 2-4EST-01: Lines from Stm Traps to the Stm Trap Drains Header from Ext lines to #24 FWHs Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-4EST-003 Text19: 0.75 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE EST-7 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-4EST-004 Text19: 0.75 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE EST-8 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-4EST-005 Text19: 0.75 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE EST-9 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-4EST-006 Text19: 0.75 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE EST-10 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-4EST-007 Text19: 0.75 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE EST-11 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-4EST-008 Text19: 0.75 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE EST-12 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
Text19:
2-4EST-009 0.75 1 1 FP 1 1 1 1 No No This line exists in an area 9321-F-2031 PEPSE EST-13 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix B, Revision 2 Page B-5 of 27
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Extraction Steam Traps (EST), Unit 2 2-5EST-01: Steam Trap lines from Extraction Steam to the #25 FWHs Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-5EST-040-A Text19: 0.75 1 1 FP 1 2 1 1 No No This line exists in an area 9321-F-2031 P&ID Extraction steam to EST-4 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-5EST-040-B Text19: 0.75 1 1 FP 1 2 1 1 No No This line exists in an area 9321-F-2031 P&ID EST-4 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-6EST-01: Steam Trap lines from Extraction Steam to the #26 FWHs Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description Text19:
2-6EST-016-B 0.75 1 1 FP 1 3 1 1 Yes No Components in this line have 9321-F-2031 PEPSE, EST-2 to Steam Trap been replaced in the past. This Replacement Header line exists in an area accessible History by plant personnel during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix B, Revision 2 Page B-6 of 27
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Extraction Steam (EX), Unit 2 2-5EX-01: HP Turbine Crossunder Piping Drip Pots to the Condenser Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-5EX-025-A Text19: 2 1 1 FP 1 2 1 1 No No This line exists in an area A235308 P&ID Crossunder Piping leakoff accessible by plant personnel from Moisture during operation, and a leak Preseparator A upstream presents a burn risk to a passerby. of Pipe Spec Change 2-5EX-026-A Text19: 2 1 1 FP 1 2 1 1 No No This line exists in an area A235308 P&ID Crossunder Piping leakoff accessible by plant personnel from Moisture during operation, and a leak Preseparator B upstream presents a burn risk to a passerby. of Pipe Spec Change 2-5EX-027-A Text19: 2 1 1 FP 1 2 1 1 No No This line exists in an area A235308 P&ID Crossunder Piping leakoff accessible by plant personnel from Moisture during operation, and a leak Preseparator C upstream presents a burn risk to a passerby. of Pipe Spec Change 2-5EX-028-A Text19: 2 1 1 FP 1 2 1 1 No No This line exists in an area A235308 P&ID Crossunder Piping leakoff accessible by plant personnel from Moisture during operation, and a leak Preseparator D upstream presents a burn risk to a passerby. of Pipe Spec Change 2-5EX-117 Text19: 1.5 1 1 FP 1 1 1 1 No No This line exists in an area B237145 P&ID HP Turbine Drain accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-5EX-118 Text19: 1.5 1 1 FP 1 1 1 1 No No This line exists in an area B237145 P&ID Crossunder piping leakoff accessible by plant personnel to FCV-1156 during operation, and a leak presents a burn risk to a passerby.
Text19:
2-5EX-119 1.5 1 1 FP 1 1 1 1 No No This line exists in an area B237145 P&ID Crossunder piping leakoff accessible by plant personnel to FCV-1164 during operation, and a leak presents a burn risk to a passerby.
2-5EX-120 Text19: 1.5 1 1 FP 1 1 1 1 No No This line exists in an area B237145 P&ID Crossunder piping leakoff accessible by plant personnel to FCV-1157 during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix B, Revision 2 Page B-7 of 27
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Extraction Steam (EX), Unit 2 2-5EX-01: HP Turbine Crossunder Piping Drip Pots to the Condenser Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-5EX-121 Text19: 1.5 1 1 FP 1 1 1 1 No No This line exists in an area B237145 P&ID Crossunder piping leakoff accessible by plant personnel to FCV-1165 during operation, and a leak presents a burn risk to a passerby.
2-5EX-122 Text19: 1 1 FP 1 1 1 1 No No This line exists in an area B237145 P&ID Crossunder piping to accessible by plant personnel Moisture Separator Outlet during operation, and a leak Line presents a burn risk to a passerby.
2-5EX-123 Text19: 1 1 FP 1 1 1 1 No No This line exists in an area B237145 P&ID Crossunder piping to accessible by plant personnel Moisture Separator Outlet during operation, and a leak Line presents a burn risk to a passerby.
2-5EX-124 Text19: 1 1 FP 1 1 1 1 No No This line exists in an area B237145 P&ID Crossunder piping to accessible by plant personnel Moisture Separator Outlet during operation, and a leak Line presents a burn risk to a passerby.
2-5EX-125 Text19: 1 1 FP 1 1 1 1 No No This line exists in an area B237145 P&ID Crossunder piping to accessible by plant personnel Moisture Separator Outlet during operation, and a leak Line presents a burn risk to a passerby.
2-5EX-129 Text19: 1.5 1 1 FP 1 1 1 1 No No This line exists in an area B237145 P&ID Crossunder piping leakoff accessible by plant personnel to FCV1154 during operation, and a leak presents a burn risk to a passerby.
2-6EX-01: HP Turbine Extraction Steam to #26 Feedwater Heaters Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description Text19:
2-6EX-001-A 12 1 1 FL 1 3 1 1 Yes No All other components in this line 9321-F-2020 SFA Model ES8-1-6THPT ES to have been clad with Stainless HDR: HP Turbine Steel to mitigate FAC. Extraction Nozzle to #26 FWHs.
Report No. 0700.104-03, Appendix B, Revision 2 Page B-8 of 27
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Extraction Steam (EX), Unit 2 2-6EX-01: HP Turbine Extraction Steam to #26 Feedwater Heaters Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-6EX-002-A Text19: 12 1 1 FL 1 3 1 1 Yes No All other components in this line 9321-F-2020 SFA Model ES8-2-6THPT ES to have been clad with Stainless HDR: HP Turbine Steel to mitigate FAC. Extraction Nozzle to #26 FWHs.
2-6EX-006-B Text19: 12 1 1 FL 1 3 1 1 Yes No All other components in this line 9321-F-2020 SFA Model ES8-7-6THPT ESHDR to have been clad with Stainless FWH 26A: Extraction Steel to mitigate FAC. Steam Inlet Nozzle to FWH 26A.
2-6EX-008-B Text19: 12 1 1 FL 1 3 1 1 Yes No All other components in this line 9321-F-2020 SFA Model ES8-6-6THPT ESHDR to have been clad with Stainless FWH 26B: Extraction Steel to mitigate FAC. Steam Inlet Nozzle to FWH 26B.
2-6EX-010-B Text19: 12 1 1 FL 1 3 1 1 Yes No All other components in this line 9321-F-2020 SFA Model ES8-4-6THPT ESHDR to have been clad with Stainless FWH 26C: Extraction Steel to mitigate FAC. Steam Inlet Nozzle to FWH 26C.
Report No. 0700.104-03, Appendix B, Revision 2 Page B-9 of 27
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Feed Water (FW), Unit 2 2-FW-01: Feedwater Lines from the Boiler Feed Pumps to the Steam Generators Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-FW-031-A Text19: 30 1 1 FL 2 3 1 1 No Yes This large bore line is important to 9321-F-2019 PEPSE Feedwater Header to plant operation and/or is a Steam Generators personnel safety issue upon downstream of Main Line failure. There is high industry to SG 23 experience in Feedwater min-flow lines.
2-FW-03: Boiler Feed Pump Recirc Lines to the Drains Collecting Tank Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description Text19:
2-FW-063 6 1 1 FL 2 2 2 1 No Yes This large bore line is important to 9321-F-2019 CSI Document BFP No. 21 Recirc to plant operation and/or is a 0700.104.C.008 Drains Collecting Tank personnel safety issue upon failure. Industry experience exists in Boiler Feed Pump recirculation lines.
2-FW-064 Text19: 6 1 1 FL 2 2 2 1 No Yes This large bore line is important to 9321-F-2019 CSI Document BFP No. 22 Recirc to plant operation and/or is a 0700.104.C.008 Drains Collecting Tank personnel safety issue upon failure. Industry experience exists in Boiler Feed Pump recirculation lines.
Report No. 0700.104-03, Appendix B, Revision 2 Page B-10 of 27
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Gland Sealing Steam (GS), Unit 2 2-GS-01: Gland Steam to and from HP, LP, and BFP Turbines Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-GS-056 Text19: 1 1 FL 2 1 1 1 No No This large bore line is important to B237144 PEPSE Gland Condenser Drain plant operation and/or is a to Main Condenser personnel safety issue upon failure.
Report No. 0700.104-03, Appendix B, Revision 2 Page B-11 of 27
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Heater Drains & Vents (HD), Unit 2 2-3HD-02: #23 Feedwater Heater Vents Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-3HD-027 Text19: 2 1 1 FP 1 1 1 1 No Yes This line exists in an area A235304 PEPSE FWH 23A Vent to 3EX-53 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-3HD-028 Text19: 2 1 1 FP 1 1 1 1 No Yes This line exists in an area A235304 PEPSE FWH 23A Vent to 3EX-accessible by plant personnel 534 during operation, and a leak presents a burn risk to a passerby.
2-3HD-029 Text19: 2 1 1 FP 1 1 1 1 No Yes This line exists in an area A235304 PEPSE FWH 23B Vent to 3EX-accessible by plant personnel 536 during operation, and a leak presents a burn risk to a passerby.
2-3HD-030 Text19: 2 1 1 FP 1 1 1 1 No Yes This line exists in an area A235304 PEPSE FWH 23B Vent to 3EX-accessible by plant personnel 539 during operation, and a leak presents a burn risk to a passerby.
2-3HD-031 Text19: 2 1 1 FP 1 1 1 1 No Yes This line exists in an area A235304 PEPSE FWH 23C Vent to 3EX-accessible by plant personnel 541 during operation, and a leak presents a burn risk to a passerby.
2-3HD-032 Text19: 2 1 1 FP 1 1 1 1 No Yes This line exists in an area A235304 PEPSE FWH 23C Vent to 3EX-accessible by plant personnel 544 during operation, and a leak presents a burn risk to a passerby.
Text19:
2-3HD-039 3 1 1 FL 1 1 1 1 No Yes This large bore line is important to A235304 PEPSE FWH 23A 3" Vent Header plant operation and/or is a personnel safety issue upon failure.
2-3HD-040 Text19: 3 1 1 FL 1 1 1 1 No Yes This large bore line is important to A235304 PEPSE FWH 23B 3" Vent Header plant operation and/or is a personnel safety issue upon failure.
Report No. 0700.104-03, Appendix B, Revision 2 Page B-12 of 27
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Heater Drains & Vents (HD), Unit 2 2-3HD-02: #23 Feedwater Heater Vents Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-3HD-041 Text19: 3 1 1 FL 1 1 1 1 No Yes This large bore line is important to A235304 PEPSE FWH 23C 3" Vent Header plant operation and/or is a personnel safety issue upon failure.
2-3HD-042 Text19: 4 1 1 FL 1 1 1 1 No Yes This large bore line is important to A235304 PEPSE 4" Vent Header from plant operation and/or is a FWH 23A and 23B personnel safety issue upon failure.
2-3HD-043 Text19: 4 1 1 FL 1 1 1 1 No Yes This large bore line is important to A235304 PEPSE 4" Vent Header from #23 plant operation and/or is a FWHs personnel safety issue upon failure.
2-3HD-044 Text19: 1 1 1 FP 1 1 1 1 No Yes This line exists in an area A235304 PEPSE FWH 23A 1" Vent accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-3HD-045 Text19: 1 1 1 FP 1 1 1 1 No Yes This line exists in an area A235304 PEPSE FWH 23B 1" Vent accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-3HD-046 Text19: 1 1 1 FP 1 1 1 1 No Yes This line exists in an area A235304 PEPSE FWH 23C 1" Vent accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-3HD-047 Text19: 2 1 1 FP 1 1 1 1 No Yes This line exists in an area A235304 PEPSE 2" Vent From FWH 23A accessible by plant personnel and 23B during operation, and a leak presents a burn risk to a passerby.
2-3HD-048 Text19: 2 1 1 FP 1 1 1 1 No Yes This line exists in an area A235304 PEPSE 2" Vent From #23 FWHs accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix B, Revision 2 Page B-13 of 27
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Heater Drains & Vents (HD), Unit 2 2-4HD-02: #24 Feedwater Heater Vents Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-4HD-016 Text19: 1 1 1 FP 1 1 1 1 No Yes This line exists in an area A235304 PEPSE FWH 24A 1" Vent accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-4HD-017 Text19: 1 1 1 FP 1 1 1 1 No Yes This line exists in an area A235304 PEPSE FWH 24B 1" Vent accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-4HD-018 Text19: 1 1 1 FP 1 1 1 1 No Yes This line exists in an area A235304 PEPSE FWH 24C 1" Vent accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-4HD-019 Text19: 2 1 1 FP 1 1 1 1 No Yes This line exists in an area A235304 PEPSE 2" Vent Header from accessible by plant personnel FWH 24A and 24B during operation, and a leak presents a burn risk to a passerby.
2-4HD-020 Text19: 2 1 1 FP 1 1 1 1 No Yes This line exists in an area A235304 PEPSE 2" Vent Header from #24 accessible by plant personnel FWHs to Condenser 22 during operation, and a leak presents a burn risk to a passerby.
2-4HD-021 Text19: 2 1 1 FP 1 1 1 1 No Yes This line exists in an area A235304 PEPSE FWH 24A 2" Vent accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-4HD-022 Text19: 2 1 1 FP 1 1 1 1 No Yes This line exists in an area A235304 PEPSE FWH 24B 2" Vent accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-4HD-023 Text19: 2 1 1 FP 1 1 1 1 No Yes This line exists in an area A235304 PEPSE FWH 24B 2" Vent accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix B, Revision 2 Page B-14 of 27
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Heater Drains & Vents (HD), Unit 2 2-4HD-02: #24 Feedwater Heater Vents Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-4HD-024 Text19: 3 1 1 FL 1 1 1 1 No Yes This large bore line is important to A235304 PEPSE 3" Vent Header from plant operation and/or is a FWH 24A and 24B personnel safety issue upon failure.
2-4HD-025 Text19: 3 1 1 FL 1 1 1 1 No Yes This large bore line is important to A235304 PEPSE 3" Vent Header from #24 plant operation and/or is a FWHs to Condenser 22 personnel safety issue upon failure.
2-5HD-02: Heater Vents from #25 Feedwater Heater and Heater Drain Tank vents to #25 Feedwater Heaters Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description Text19:
2-5HD-044 10 1 1 FL 1 2 1 1 Yes No Components in this line have 9321-F-2022 PEPSE, Heater Drain Tank vent to been replaced. This large bore Replacement FWH 25A line is important to plant operation History and/or is a personnel safety issue upon failure.
Text19:
2-5HD-045 10 1 1 FL 1 2 1 1 Yes No Components in this line have 9321-F-2022 PEPSE, Heater Drain Tank vent to been replaced. This large bore Replacement FWH 25B line is important to plant operation History and/or is a personnel safety issue upon failure.
2-5HD-046 Text19: 10 1 1 FL 1 2 1 1 Yes No Components in this line have 9321-F-2022 PEPSE, Heater Drain Tank vent to been replaced. This large bore Replacement FWH 25C line is important to plant operation History and/or is a personnel safety issue upon failure.
2-5HD-047 Text19: 1.5 1 1 FP 1 2 1 1 No Yes This line exists in an area 9321-F-2022 PEPSE FWH 25A Vent accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-5HD-048 Text19: 1.5 1 1 FP 1 2 1 1 No Yes This line exists in an area 9321-F-2022 PEPSE FWH 25B Vent accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix B, Revision 2 Page B-15 of 27
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Heater Drains & Vents (HD), Unit 2 2-5HD-02: Heater Vents from #25 Feedwater Heater and Heater Drain Tank vents to #25 Feedwater Heaters Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-5HD-049 Text19: 1.5 1 1 FP 1 2 1 1 No Yes This line exists in an area 9321-F-2022 PEPSE FWH 25C Vent accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-5HD-050 Text19: 2 1 1 FP 1 2 1 1 No Yes This line exists in an area 9321-F-2022 PEPSE Vent header from FWH accessible by plant personnel 25A and 25B during operation, and a leak presents a burn risk to a passerby.
2-5HD-051 Text19: 2.5 1 1 FL 1 2 1 1 No Yes This large bore line is important to 9321-F-2022, PEPSE #25 FWH Vent header to plant operation and/or is a A235304 Condenser personnel safety issue upon failure.
2-5HD-03: HDT Drains to HDPs and Condensers and HDP Vents to HDT Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description Text19:
2-5HD-057 2 1 1 FP 1 2 1 1 No No This line exists in an area 9321-F-2022 PEPSE #21 HDP vent to HDT accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
Text19:
2-5HD-058 2 1 1 FP 1 2 1 1 No No This line exists in an area 9321-F-2022 PEPSE #22 HDP vent to HDT accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-5HD-059 Text19: 24 1 1 FL 2 2 1 1 Yes No Components in this line have 9321-F-2022, PEPSE, Heater Drain Tank drain been replaced with FAC-resistant A235304 Replacement to Condensers material. This large bore line is History important to plant operation and/or is a personnel safety issue upon failure.
2-5HD-060 Text19: 24 1 1 FL 2 2 1 1 Yes No Components in this line have A235304 PEPSE, HDT Drain Header to been replaced with FAC-resistant Replacement Condensers 21 and 22 material. This large bore line is History important to plant operation and/or is a personnel safety issue upon failure.
Report No. 0700.104-03, Appendix B, Revision 2 Page B-16 of 27
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Heater Drains & Vents (HD), Unit 2 2-5HD-03: HDT Drains to HDPs and Condensers and HDP Vents to HDT Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-5HD-061-A Text19: 14 1 1 FL 2 2 1 1 Yes No Components in this line have A235304 PEPSE, HDT Drain to LCV-5003 been replaced with FAC-resistant Replacement material. This large bore line is History important to plant operation and/or is a personnel safety issue upon failure.
2-5HD-061-B Text19: 8 1 1 FL 2 2 1 1 Yes No Components in this line have A235304 PEPSE, LCV-5003 to Condenser been replaced with FAC-resistant Replacement 21 material. This large bore line is History important to plant operation and/or is a personnel safety issue upon failure.
2-5HD-062-A Text19: 14 1 1 FL 2 2 1 1 Yes No Components in this line have A235304 PEPSE, HDT Drain to LCV-5002 been replaced with FAC-resistant Replacement material. This large bore line is History important to plant operation and/or is a personnel safety issue upon failure.
2-5HD-062-B Text19: 8 1 1 FL 2 2 1 1 Yes No Components in this line have A235304 PEPSE, LCV-5002 to Condenser been replaced with FAC-resistant Replacement 22 material. This large bore line is History important to plant operation and/or is a personnel safety issue upon failure.
2-5HD-063-A Text19: 14 1 1 FL 2 2 1 1 Yes No Components in this line have A235304 PEPSE, HDT Drain to LCV-5001 been replaced with FAC-resistant Replacement material. This large bore line is History important to plant operation and/or is a personnel safety issue upon failure.
2-5HD-063-B Text19: 8 1 1 FL 2 2 1 1 Yes No Components in this line have A235304 PEPSE, LCV-5001 to Condenser been replaced with FAC-resistant Replacement 23 material. This large bore line is History important to plant operation and/or is a personnel safety issue upon failure.
Report No. 0700.104-03, Appendix B, Revision 2 Page B-17 of 27
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Heater Drains & Vents (HD), Unit 2 2-6HD-02: Heater Vents from #26 Feedwater Heater Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-6HD-025 Text19: 1 1 1 FP 1 2 1 1 No Yes This line exists in an area 9321-F-2022 PEPSE FWH 26A vent via 6EX-10 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-6HD-026 Text19: 1 1 1 FP 1 2 1 1 No Yes This line exists in an area 9321-F-2022 PEPSE FWH 26A vent via 6EX-accessible by plant personnel 500 during operation, and a leak presents a burn risk to a passerby.
2-6HD-027 Text19: 1 1 1 FP 1 2 1 1 No Yes This line exists in an area 9321-F-2022 PEPSE FWH 26A vent from 6EX-accessible by plant personnel 10 and 6EX-500 during operation, and a leak presents a burn risk to a passerby.
2-6HD-028 Text19: 1 1 1 FP 1 2 1 1 No Yes This line exists in an area 9321-F-2022 PEPSE FWH 26A vent via 6EX-9 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-6HD-029 Text19: 1 1 1 FP 1 2 1 1 No Yes This line exists in an area 9321-F-2022 PEPSE FWH 26B vent via 6EX-accessible by plant personnel 10-1 during operation, and a leak presents a burn risk to a passerby.
2-6HD-030 Text19: 1 1 1 FP 1 2 1 1 No Yes This line exists in an area 9321-F-2022 PEPSE FWH 26B vent via 6EX-accessible by plant personnel 501 during operation, and a leak presents a burn risk to a passerby.
Text19:
2-6HD-031 1 1 1 FP 1 2 1 1 No Yes This line exists in an area 9321-F-2022 PEPSE FWH 26B vent from 6EX-accessible by plant personnel 10-1 and 6EX-501 during operation, and a leak presents a burn risk to a passerby.
2-6HD-032 Text19: 1 1 1 FP 1 2 1 1 No Yes This line exists in an area 9321-F-2022 PEPSE FWH 26B vent via 6EX accessible by plant personnel 1 during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix B, Revision 2 Page B-18 of 27
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Heater Drains & Vents (HD), Unit 2 2-6HD-02: Heater Vents from #26 Feedwater Heater Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-6HD-033 Text19: 1 1 1 FP 1 2 1 1 No Yes This line exists in an area 9321-F-2022 PEPSE FWH 26C vent via 6EX-accessible by plant personnel 10-2 during operation, and a leak presents a burn risk to a passerby.
2-6HD-034 Text19: 1 1 1 FP 1 2 1 1 No Yes This line exists in an area 9321-F-2022 PEPSE FWH 26C vent via 6EX-accessible by plant personnel 502 during operation, and a leak presents a burn risk to a passerby.
2-6HD-035 Text19: 1 1 1 FP 1 2 1 1 No Yes This line exists in an area 9321-F-2022 PEPSE FWH 26C vent from 6EX-accessible by plant personnel 10-2 and 6EX-502 during operation, and a leak presents a burn risk to a passerby.
2-6HD-036 Text19: 1 1 1 FP 1 2 1 1 No Yes This line exists in an area 9321-F-2022 PEPSE FWH 26C vent via 6EX accessible by plant personnel 2 during operation, and a leak presents a burn risk to a passerby.
2-6HD-037 Text19: 1.5 1 1 FP 1 2 1 1 No Yes This line exists in an area 9321-F-2022 PEPSE Heater Start Up Vent accessible by plant personnel Header from FWH 26A during operation, and a leak and 26B presents a burn risk to a passerby.
2-6HD-038 Text19: 2 1 1 FP 1 2 1 1 No Yes This line exists in an area 9321-F-2022, PEPSE #26 FWH Startup Vent accessible by plant personnel A235304 Header to Condenser during operation, and a leak presents a burn risk to a passerby.
Text19:
2-6HD-039 1.5 1 1 FP 1 2 1 1 No Yes This line exists in an area 9321-F-2022 PEPSE Heater Vent Header from accessible by plant personnel FWH 26A and 26B during operation, and a leak presents a burn risk to a passerby.
2-6HD-040 Text19: 2 1 1 FP 1 2 1 1 No Yes This line exists in an area 9321-F-2022, PEPSE #26 FWH Vent Header to accessible by plant personnel A235304 Condenser during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix B, Revision 2 Page B-19 of 27
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Moisture Separator Reheater Drains (MSD), Unit 2 2-MSD-01: Moisture Separator Drains to the Heater Drain Tank and Drains Collecting Tank Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MSD-097 Text19: 2.5 1 1 FL 1 2 1 1 No No This large bore line is important to 9321-F-2023 PEPSE MS Drain Tank 21A vent plant operation and/or is a to MSR personnel safety issue upon failure.
2-MSD-098 Text19: 2.5 1 1 FL 1 2 1 1 No No This large bore line is important to 9321-F-2023 PEPSE MS Drain Tank 22A vent plant operation and/or is a to MSR personnel safety issue upon failure.
2-MSD-099 Text19: 2.5 1 1 FL 1 2 1 1 No No This large bore line is important to 9321-F-2023 PEPSE MS Drain Tank 23A vent plant operation and/or is a to MSR personnel safety issue upon failure.
2-MSD-100 Text19: 2.5 1 1 FL 1 2 1 1 No No This large bore line is important to 9321-F-2023 PEPSE MS Drain Tank 21B vent plant operation and/or is a to MSR personnel safety issue upon failure.
2-MSD-101 Text19: 2.5 1 1 FL 1 2 1 1 No No This large bore line is important to 9321-F-2023 PEPSE MS Drain Tank 22B vent plant operation and/or is a to MSR personnel safety issue upon failure.
2-MSD-102 Text19: 2.5 1 1 FL 1 2 1 1 No No This large bore line is important to 9321-F-2023 PEPSE MS Drain Tank 23B vent plant operation and/or is a to MSR personnel safety issue upon failure.
Text19:
2-MSD-103-A 6 1 1 FL 2 2 1 1 Yes No All other components in this line 9321-F-2023 SFA Model MSD33A-1-MSDT 21A to have been clad with Stainless HDT: MS Drain Tank Steel to mitigate FAC. 21A Nozzle to Heater Drain Tank 2-MSD-103-C Text19: 6 1 1 FL 2 2 1 1 Yes No All other components in this line 9321-F-2023 SFA Model MSD33A-1-MSDT 21A to have been clad with Stainless HDT: Heater Drain Tank Steel to mitigate FAC. Nozzle from MS Drain Tank 21A Report No. 0700.104-03, Appendix B, Revision 2 Page B-20 of 27
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Moisture Separator Reheater Drains (MSD), Unit 2 2-MSD-01: Moisture Separator Drains to the Heater Drain Tank and Drains Collecting Tank Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MSD-104-A Text19: 6 1 1 FL 2 2 1 1 Yes No All other components in this line 9321-F-2023 SFA Model MSD34A-1-MSDT 22A to have been clad with Stainless HDT: MS Drain Tank Steel to mitigate FAC. 22A Nozzle to Heater Drain Tank 2-MSD-104-C Text19: 6 1 1 FL 2 2 1 1 Yes No All other components in this line 9321-F-2023 SFA Model MSD34A-1-MSDT 22A to have been clad with Stainless HDT: Heater Drain Tank Steel to mitigate FAC. Nozzle from MS Drain Tank 22A 2-MSD-105-A Text19: 6 1 1 FL 2 2 1 1 Yes No All other components in this line 9321-F-2023 SFA Model MSD35A-1-MSDT 23A to have been clad with Stainless HDT: MS Drain Tank Steel to mitigate FAC. 23A Nozzle to Heater Drain Tank 2-MSD-105-C Text19: 6 1 1 FL 2 2 1 1 Yes No All other components in this line 9321-F-2023 SFA Model MSD35A-1-MSDT 23A to have been clad with Stainless HDT: Heater Drain Tank Steel to mitigate FAC. Nozzle from MS Drain Tank 23A 2-MSD-106-A Text19: 6 1 1 FL 2 2 1 1 Yes No All other components in this line 9321-F-2023 SFA Model MSD36A-1-MSDT 21B to have been clad with Stainless HDT: MS Drain Tank Steel to mitigate FAC. 21B Nozzle to Heater Drain Tank 2-MSD-106-C Text19: 6 1 1 FL 2 2 1 1 Yes No All other components in this line 9321-F-2023 SFA Model MSD36A-1-MSDT 21B to have been clad with Stainless HDT: Heater Drain Tank Steel to mitigate FAC. Nozzle from MS Drain Tank 21B 2-MSD-107-A Text19: 6 1 1 FL 2 2 1 1 Yes No All other components in this line 9321-F-2023 SFA Model MSD37A-1-MSDT 22B to have been clad with Stainless HDT: MS Drain Tank Steel to mitigate FAC. 22B Nozzle to Heater Drain Tank 2-MSD-107-C Text19: 6 1 1 FL 2 2 1 1 Yes No All other components in this line 9321-F-2023 SFA Model MSD37A-1-MSDT 22B to have been clad with Stainless HDT: Heater Drain Tank Steel to mitigate FAC. Nozzle from MS Drain Tank 22B Report No. 0700.104-03, Appendix B, Revision 2 Page B-21 of 27
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Moisture Separator Reheater Drains (MSD), Unit 2 2-MSD-01: Moisture Separator Drains to the Heater Drain Tank and Drains Collecting Tank Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MSD-108-A Text19: 6 1 1 FL 2 2 1 1 Yes No All other components in this line 9321-F-2023 SFA Model MSD38A-1-MSDT 23B to have been clad with Stainless HDT: MS Drain Tank Steel to mitigate FAC. 23B Nozzle to Heater Drain Tank 2-MSD-108-C Text19: 6 1 1 FL 2 2 1 1 Yes No All other components in this line 9321-F-2023 SFA Model MSD38A-1-MSDT 23B to have been clad with Stainless HDT: Heater Drain Tank Steel to mitigate FAC. Nozzle from MS Drain Tank 23B Report No. 0700.104-03, Appendix B, Revision 2 Page B-22 of 27
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam Traps (MST), Unit 2 2-MST-01: Steam Trap Lines from the Main Steam System Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MST-019-A Text19: 12 1 1 FL 1 2 1 1 No No This large bore line is important to A227780 PEPSE Crossunder Steam Trap plant operation and/or is a to Condenser 21 personnel safety issue upon failure.
2-MST-020-A Text19: 12 1 1 FL 1 2 1 1 No No This large bore line is important to A227780 PEPSE Crossunder Steam Trap plant operation and/or is a to Condenser 21 personnel safety issue upon failure.
2-MST-021-A Text19: 12 1 1 FL 1 2 1 1 No No This large bore line is important to A227780 PEPSE Crossunder Steam Trap plant operation and/or is a to Condenser 22 personnel safety issue upon failure.
2-MST-022-A Text19: 12 1 1 FL 1 2 1 1 No No This large bore line is important to A227780 PEPSE Crossunder Steam Trap plant operation and/or is a to Condenser 22 personnel safety issue upon failure.
2-MST-023-A Text19: 12 1 1 FL 1 2 1 1 No No This large bore line is important to A227780 PEPSE Crossunder Steam Trap plant operation and/or is a to Condenser 23 personnel safety issue upon failure.
2-MST-024-A Text19: 12 1 1 FL 1 2 1 1 No No This large bore line is important to A227780 PEPSE Crossunder Steam Trap plant operation and/or is a to Condenser 23 personnel safety issue upon failure.
Text19:
2-MST-100-B 1.25 1 1 FP 1 3 1 1 Yes No Components have been replaced 9321-F-2042 P&ID, MST-26 to Steam Trap in a similar line. This line exists in Replacement Header an area accessible by plant History personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-102-B Text19: 1.25 1 1 FP 1 3 1 1 Yes No Components have been replaced 9321-F-2042 P&ID, MST-28 to Steam Trap in a similar line. This line exists in Replacement Header an area accessible by plant History personnel during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix B, Revision 2 Page B-23 of 27
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam Traps (MST), Unit 2 2-MST-01: Steam Trap Lines from the Main Steam System Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MST-103-B Text19: 1.25 1 1 FP 1 3 1 1 Yes No Components have been replaced 9321-F-2042 P&ID, MST-29 to Steam Trap in a similar line. This line exists in Replacement Header an area accessible by plant History personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-116-B Text19: 1.25 1 1 FP 1 3 1 1 Yes No Components have been replaced 9321-F-2042 P&ID, MST-42 to Steam Trap in a similar line. This line exists in Replacement Header an area accessible by plant History personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-117-B Text19: 1.25 1 1 FP 1 3 1 1 Yes No Components have been replaced 9321-F-2042 P&ID, MST-43 to Steam Trap in this line. This line exists in an Replacement Header area accessible by plant History personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-118-B Text19: 1.25 1 1 FP 1 3 1 1 Yes No Components have been replaced 9321-F-2042 P&ID, MST-44 to Steam Trap in a similar line. This line exists in Replacement Header an area accessible by plant History personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-119-B Text19: 1.25 1 1 FP 1 3 1 1 Yes No Components have been replaced 9321-F-2042 P&ID, MST-45 to Steam Trap in a similar line. This line exists in Replacement Header an area accessible by plant History personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-120-B Text19: 1 1 1 FP 1 3 1 1 Yes No Components have been replaced 9321-F-2042 P&ID, MST-46 to Steam Trap in a similar line. This line exists in Replacement Header an area accessible by plant History personnel during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix B, Revision 2 Page B-24 of 27
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam Traps (MST), Unit 2 2-MST-01: Steam Trap Lines from the Main Steam System Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MST-121-B Text19: 1 1 1 FP 1 3 1 1 Yes No Components have been replaced 9321-F-2042 P&ID, MST-47 to Steam Trap in a similar line. This line exists in Replacement Header an area accessible by plant History personnel during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix B, Revision 2 Page B-25 of 27
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Moisture Preseparator Drains (PD), Unit 2 2-PD-01: Moisture Preseparator Drain Lines Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-PD-005 Text19: 3 1 1 FL 1 2 1 1 No No This large bore line is important to A228272 PEPSE Moisture Preseparator plant operation and/or is a "A" to 20" Line personnel safety issue upon failure.
2-PD-006 Text19: 3 1 1 FL 1 2 1 1 No No This large bore line is important to A228272 PEPSE Moisture Preseparator plant operation and/or is a "B" to 20" Line personnel safety issue upon failure.
2-PD-007 Text19: 3 1 1 FL 1 2 1 1 No No This large bore line is important to A228272 PEPSE Moisture Preseparator plant operation and/or is a "C" to 20" Line personnel safety issue upon failure.
2-PD-008 Text19: 3 1 1 FL 1 2 1 1 No No This large bore line is important to A228272 PEPSE Moisture Preseparator plant operation and/or is a "D" to 20" Line personnel safety issue upon failure.
2-PD-009-A Text19: 20 1 1 FL 1 2 1 1 Yes No All other components in this line A228272 SFA Model ES7A-1-SEP TKA VNT to were replaced with Stainless FWH25: Separating Steel to mitigate FAC. Tank A Nozzle to Extraction Steam Header 2-PD-010-A Text19: 20 1 1 FL 1 2 1 1 Yes No All other components in this line A228272 SFA Model ES7A-2-SEP TKB VNT to were replaced with Stainless FWH25: Separating Steel to mitigate FAC. Tank B Nozzle to Extraction Steam Header Report No. 0700.104-03, Appendix B, Revision 2 Page B-26 of 27
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Report Header Legend:
F Consequence of Failure 1 = High Consequence of Failure (Category 1) 2 = Low Consequence of Failure (Category 2)
S Susceptibility level 1 = High Susceptibility 2 = Moderate Susceptibility 3 = Low Susceptibility F Crit. Consequence of Failure Criteria (see below)
Q Operating Quality code 1 = 30% to 99.5%
2 = < 30%
3 = > 99.5%
T Operating Temperature code 1 = 250 to 350 deg F 2 = 350 to 400 deg F 3 = < 250 deg F, > 400 deg F O Operating time code 1 = Lines operating frequently or w/ severe cond.
2 = Lines operating infrequently Priority Priority 1 = High Priority 2 = Moderate Priority 3 = Low Priority Plant Exp. Plant Experience Ind. Exp. Industry Experience Consequence of Failure Criteria (F Crit.) Legend:
FI High consequence of Failure: non-Isolable line FL High consequence of Failure: Large-bore line FP High consequence of Failure: Personnel safety issue (frequently accessed location)
FS High consequence of Failure: Safety-related line FT High consequence of Failure: shutdown or Trip upon failure Report No. 0700.104-03, Appendix B, Revision 2 Page B-27 of 27
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Appendix C SNM Program Lines Sorted by Susceptibility High Consequence of Failure - Moderate Susceptibility Indian Point Unit 2 Report No. 0700.104-03, Appendix C, Revision 2 Page C-1 of 47
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Auxiliary Feedwater (AF), Unit 2 2-AF-01: Service Boiler Auxiliary Feedwater Lines Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-AF-001 Text19: 6 1 2 FL 2 2 1 2 No No This large bore line is important to 9321-F-2120 P&ID Deaerator Header to plant operation and/or is a Boiler Feed Pumps personnel safety issue upon failure.
2-AF-002 Text19: 4 1 2 FL 2 2 1 2 No No This large bore line is important to 9321-F-2120 P&ID Aux. Feed header to #23 plant operation and/or is a Boiler Feed Pump and personnel safety issue upon #10 House Service failure. Deaerator 2-AF-003 Text19: 4 1 2 FL 2 2 1 2 No No This large bore line is important to 9321-F-2120 P&ID Aux. Feed header to #21 plant operation and/or is a Boiler Feed Pump personnel safety issue upon failure.
2-AF-004 Text19: 4 1 2 FL 2 2 1 2 No No This large bore line is important to 9321-F-2120 P&ID Aux. Feed header to #22 plant operation and/or is a Boiler Feed Pump personnel safety issue upon failure.
2-AF-005 Text19: 4 1 2 FL 2 2 1 2 No No This large bore line is important to 9321-F-2120 P&ID Aux. Feed header to #23 plant operation and/or is a Boiler Feed Pump personnel safety issue upon failure.
2-AF-006 Text19: 6 1 2 FL 2 2 1 2 No No This large bore line is important to 9321-F-2120 P&ID Aux. Feed header to #10 plant operation and/or is a House Service Deaerator personnel safety issue upon failure.
Text19:
2-AF-011-A 1 1 2 FP 2 2 1 2 No No This line exists in an area 9321-F-2120 P&ID #21 BFP discharge accessible by plant personnel overflow line upstream of during operation, and a leak orifice presents a burn risk to a passerby.
2-AF-012-A Text19: 1 1 2 FP 2 2 1 2 No No This line exists in an area 9321-F-2120 P&ID #22 BFP discharge accessible by plant personnel overflow line upstream of during operation, and a leak orifice presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix C, Revision 2 Page C-2 of 47
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Auxiliary Feedwater (AF), Unit 2 2-AF-01: Service Boiler Auxiliary Feedwater Lines Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-AF-013-A Text19: 1 1 2 FP 2 2 1 2 No No This line exists in an area 9321-F-2120 P&ID #23 BFP discharge accessible by plant personnel overflow line upstream of during operation, and a leak orifice presents a burn risk to a passerby.
2-AF-014 Text19: 3 1 2 FL 2 2 1 2 No No This large bore line is important to 9321-F-2120 P&ID #21 BFP discharge line plant operation and/or is a personnel safety issue upon failure.
2-AF-015 Text19: 3 1 2 FL 2 2 1 2 No No This large bore line is important to 9321-F-2120 P&ID #22 BFP discharge line plant operation and/or is a personnel safety issue upon failure.
2-AF-016 Text19: 3 1 2 FL 2 2 1 2 No No This large bore line is important to 9321-F-2120 P&ID #23 BFP discharge line plant operation and/or is a personnel safety issue upon failure.
2-AF-017 Text19: 4 1 2 FL 2 2 1 2 No No This large bore line is important to 9321-F-2120 P&ID #21 and #22 BFP plant operation and/or is a discharge header personnel safety issue upon failure.
2-AF-018 Text19: 2.5 1 2 FL 2 2 1 2 No No This large bore line is important to 9321-F-2120 P&ID LH Boiler #22 Feed Line plant operation and/or is a personnel safety issue upon failure.
2-AF-019 Text19: 2.5 1 2 FL 2 2 1 2 No No This large bore line is important to 9321-F-2120 P&ID AF-144 bypass line plant operation and/or is a personnel safety issue upon failure.
2-AF-020 Text19: 4 1 2 FL 2 2 1 2 No No This large bore line is important to B193201, 9321- P&ID Unit 1 Service Boiler plant operation and/or is a F-2021 Feed Pump discharge tie-personnel safety issue upon in line.
failure.
Report No. 0700.104-03, Appendix C, Revision 2 Page C-3 of 47
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Auxiliary Feedwater (AF), Unit 2 2-AF-01: Service Boiler Auxiliary Feedwater Lines Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-AF-021 Text19: 1 1 2 FP 2 2 1 2 No No This line exists in an area 9321-F-2120 P&ID BFP discharge header to accessible by plant personnel Desuperheater Station during operation, and a leak presents a burn risk to a passerby.
2-AF-022 Text19: 2.5 1 2 FL 2 2 1 2 No No This large bore line is important to 9321-F-2120 P&ID RH Boiler #21 Feed Line plant operation and/or is a personnel safety issue upon failure.
2-AF-023 Text19: 2.5 1 2 FL 2 2 1 2 No No This large bore line is important to 9321-F-2120 P&ID AF-138 bypass line plant operation and/or is a personnel safety issue upon failure.
2-AF-032 Text19: 6 1 2 FL 2 1 1 2 No No This large bore line is important to 9321-F-2120 P&ID Boiler Blowdown Tank plant operation and/or is a Drain personnel safety issue upon failure.
2-AF-037 Text19: 2 1 2 FP 1 2 1 2 No No This line exists in an area B193201 P&ID Flash Tank Drain to accessible by plant personnel Service Boiler Deaerator during operation, and a leak presents a burn risk to a passerby.
2-AF-039 Text19: 6 1 2 FL 2 2 1 2 No No This large bore line is important to B193201 P&ID Service Boiler Deaerator plant operation and/or is a 6" Drain to OB personnel safety issue upon failure.
Text19:
2-AF-040 4 1 2 FL 2 2 1 2 No No This large bore line is important to B193201 P&ID Service Boiler Deaerator plant operation and/or is a Drain vent personnel safety issue upon failure.
2-AF-041 Text19: 2 1 2 FP 2 2 1 2 No No This line exists in an area B193201 P&ID Service Boiler Deaerator accessible by plant personnel 2" Drain to OB during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix C, Revision 2 Page C-4 of 47
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Auxiliary Feedwater (AF), Unit 2 2-AF-01: Service Boiler Auxiliary Feedwater Lines Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-AF-043 Text19: 6 1 2 FL 2 2 1 2 No No This large bore line is important to B193201 P&ID Service Boiler Deaerator plant operation and/or is a Drain to Service Boiler personnel safety issue upon Feed Pumps failure.
2-AF-044 Text19: 4 1 2 FL 2 2 1 2 No No This large bore line is important to B193201 P&ID Service Boiler Pump No.
plant operation and/or is a 11 Feed Line personnel safety issue upon failure.
2-AF-045 Text19: 4 1 2 FL 2 2 1 2 No No This large bore line is important to B193201 P&ID Service Boiler Pump No.
plant operation and/or is a 12 Feed Line personnel safety issue upon failure.
2-AF-046 Text19: 4 1 2 FL 2 2 1 2 No No This large bore line is important to B193201 P&ID Service Boiler Pump No.
plant operation and/or is a 13 Feed Line personnel safety issue upon failure.
2-AF-047 Text19: 3 1 2 FL 2 2 1 2 No No This large bore line is important to B193201 P&ID Service Boiler Pump No.
plant operation and/or is a 11 Discharge Line personnel safety issue upon failure.
2-AF-048 Text19: 3 1 2 FL 2 2 1 2 No No This large bore line is important to B193201 P&ID Service Boiler Pump No.
plant operation and/or is a 12 Discharge Line personnel safety issue upon failure.
Text19:
2-AF-049 3 1 2 FL 2 2 1 2 No No This large bore line is important to B193201 P&ID Service Boiler Pump No.
plant operation and/or is a 13 Discharge Line personnel safety issue upon failure.
2-AF-050 Text19: 6 1 2 FL 2 2 1 2 No No This large bore line is important to B193201 P&ID Service Boiler Pump plant operation and/or is a Discharge Header personnel safety issue upon failure.
Report No. 0700.104-03, Appendix C, Revision 2 Page C-5 of 47
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Auxiliary Steam (AS), Unit 2 2-AS-03: Remainder of Auxiliary Steam Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-AS-001-A Text19: 10 1 2 FL 1 2 1 2 No No This large bore line is important to B192493, SD 29.01 10" Aux. Steam Header plant operation and/or is a B192490, personnel safety issue upon 192491 failure.
2-AS-002 Text19: 10 1 2 FL 1 2 1 2 No No This large bore line is important to 9321-F-2120 SD 29.01 Aux. Steam Header from plant operation and/or is a Service Boilers personnel safety issue upon failure.
2-AS-003 Text19: 8 1 2 FL 1 2 1 2 No No This large bore line is important to 9321-F-2120 SD 29.01 Aux. Steam from #22 LH plant operation and/or is a Boiler personnel safety issue upon failure.
2-AS-004 Text19: 8 1 2 FL 1 2 1 2 No No This large bore line is important to 9321-F-2120 SD 29.01 Aux. Steam from #21 RH plant operation and/or is a Boiler personnel safety issue upon failure.
2-AS-005 Text19: 4 1 2 FL 1 2 1 2 No No This large bore line is important to 9321-F-2120 SD 29.01 Aux. Steam Drain to plant operation and/or is a Deaerator personnel safety issue upon failure.
2-AS-006 Text19: 1.5 1 2 FP 1 2 1 2 No No This line exists in an area 9321-F-2120 SD 29.01 FCV-1148 Bypass Line accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-AS-008 Text19: 1.25 1 2 FP 1 2 1 2 No No This line exists in an area A209775 P&ID Steam to 21 and 22 Air accessible by plant personnel Tempering Units during operation, and a leak presents a burn risk to a passerby.
2-AS-009 Text19: 8 1 2 FL 1 2 1 2 No No This large bore line is important to 9321-F-2120 P&ID Steam to AST-26 plant operation and/or is a personnel safety issue upon failure.
Report No. 0700.104-03, Appendix C, Revision 2 Page C-6 of 47
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Auxiliary Steam (AS), Unit 2 2-AS-03: Remainder of Auxiliary Steam Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-AS-015 Text19: 1.5 1 2 FP 1 2 1 2 No No This line exists in an area 9321-F-2120 SD 29.01 #21 RH Boiler Drain accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-AS-016 Text19: 1.5 1 2 FP 1 2 1 2 No No This line exists in an area 9321-F-2120 SD 29.01 #22 LH Boiler Drain accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-AS-017 Text19: 1.5 1 2 FP 1 2 1 2 No No This line exists in an area 9321-F-2120 SD 29.01 Boiler Drain Header to accessible by plant personnel Blowdown Tank during operation, and a leak presents a burn risk to a passerby.
2-AS-031 Text19: 6 1 2 FL 1 2 1 2 No No This large bore line is important to B192490 SD 29.01 Steam Header to Barge plant operation and/or is a Steam Connections personnel safety issue upon failure.
2-AS-032 Text19: 4 1 2 FL 1 2 1 2 No No This large bore line is important to B192490 SD 29.01 Steam to AS845 plant operation and/or is a personnel safety issue upon failure.
2-AS-036 Text19: 4 1 2 FL 1 2 1 2 No No This large bore line is important to B192490 SD 29.01 Steam line to UH-1239 plant operation and/or is a personnel safety issue upon failure.
2-AS-046 Text19: 4 1 2 FL 1 2 1 2 No No This large bore line is important to 192491 SD 29.01 Steam header to Service plant operation and/or is a Boiler Feed Pump No. 13 personnel safety issue upon failure.
2-AS-047 Text19: 6 1 2 FL 1 2 1 2 No No This large bore line is important to 192491 SD 29.01 Steam header to Carbon plant operation and/or is a Filter Tanks personnel safety issue upon failure.
Report No. 0700.104-03, Appendix C, Revision 2 Page C-7 of 47
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Auxiliary Steam (AS), Unit 2 2-AS-03: Remainder of Auxiliary Steam Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-AS-051 Text19: 2 1 2 FP 1 2 1 2 No No This line exists in an area 192491 SD 29.01 Steam to Service Boiler accessible by plant personnel Feed Pump No. 13 during operation, and a leak presents a burn risk to a passerby.
2-AS-053 Text19: 4 1 2 FL 1 2 1 2 No No This large bore line is important to 192491 SD 29.01 Steam from Service plant operation and/or is a Boiler Feed Pump No. 13 personnel safety issue upon failure.
2-AS-054 Text19: 8 1 2 FL 1 2 1 2 No No This large bore line is important to 192491 SD 29.01 Steam from Service plant operation and/or is a Boiler Feed Pump No. 13 personnel safety issue upon to #10 Service Deaerator failure.
2-AS-055 Text19: 8 1 2 FL 1 2 1 2 No No This large bore line is important to 192491 SD 29.01 Steam from Service plant operation and/or is a Boiler Feed Pump No. 13 personnel safety issue upon to Atmospheric Vent failure. header 2-AS-057 Text19: 10 1 2 FL 1 2 1 2 No No This large bore line is important to 192491 P&ID Steam drain to #10 plant operation and/or is a Service Deaerator via personnel safety issue upon AS484 failure.
2-AS-058 Text19: 4 1 2 FL 1 2 1 2 No No This large bore line is important to 192491 P&ID Steam to Heating and plant operation and/or is a Ventilation Pressure personnel safety issue upon Reducing Station failure.
2-AS-070 Text19: 3 1 2 FL 1 2 1 2 No No This large bore line is important to 192491, SD 29.01 Steam header to Carbon plant operation and/or is a B227209 Filter Tanks personnel safety issue upon failure.
2-AS-082-A Text19: 8 1 2 FL 1 2 1 2 No No This large bore line is important to 192491 SD 29.01 Floor trench drain to cap plant operation and/or is a personnel safety issue upon failure.
Report No. 0700.104-03, Appendix C, Revision 2 Page C-8 of 47
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Auxiliary Steam (AS), Unit 2 2-AS-03: Remainder of Auxiliary Steam Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-AS-083 Text19: 16 1 2 FL 1 2 1 2 No No This large bore line is important to 192491 SD 29.01 Aux Steam Vent to plant operation and/or is a Atmosphere personnel safety issue upon failure.
2-AS-087 Text19: 3 1 2 FL 1 2 1 2 No No This large bore line is important to B227209 SD 29.01 Steam to 21ACFT plant operation and/or is a personnel safety issue upon failure.
2-AS-088 Text19: 3 1 2 FL 1 2 1 2 No No This large bore line is important to B227209 SD 29.01 Steam to 22ACFT plant operation and/or is a personnel safety issue upon failure.
2-AS-096 Text19: 4 1 2 FL 1 2 1 2 No No This large bore line is important to 192491, P&ID Aux. Steam to Flash Tank plant operation and/or is a B193201 personnel safety issue upon failure.
Report No. 0700.104-03, Appendix C, Revision 2 Page C-9 of 47
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Auxiliary Steam Traps (AST), Unit 2 2-AST-01: Steam Trap Lines from Auxiliary Steam Lines Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-AST-002 Text19: 0.75 1 2 FP 1 3 1 2 No No This line exists in an area A227780, PEPSE Steam to and from AST-accessible by plant personnel A209775 50 during operation, and a leak presents a burn risk to a passerby.
2-AST-010 Text19: 4 1 2 FL 1 2 1 2 No No This large bore line is important to 9321-F-2120 SD 29.01 Condensate Return plant operation and/or is a Header personnel safety issue upon failure.
2-AST-017 Text19: 8 1 2 FL 1 3 1 2 No No This large bore line is important to A209775 P&ID Steam to AST-33 plant operation and/or is a personnel safety issue upon failure.
2-AST-020 Text19: 1 1 2 FP 1 2 1 2 No No This line exists in an area A209775 P&ID Steam to AST-20 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-AST-021 Text19: 1 1 2 FP 1 2 1 2 No No This line exists in an area 9321-F-2120 SD 29.01 #21 Fuel Oil Heater accessible by plant personnel heating steam outlet during operation, and a leak presents a burn risk to a passerby.
2-AST-022 Text19: 1 1 2 FP 1 2 1 2 No No This line exists in an area 9321-F-2120 SD 29.01 #22 Fuel Oil Heater accessible by plant personnel heating steam outlet during operation, and a leak presents a burn risk to a passerby.
Text19:
2-AST-023 1 1 2 FP 1 2 1 2 No No This line exists in an area 9321-F-2120 SD 29.01 #23 Fuel Oil Heater accessible by plant personnel heating steam outlet during operation, and a leak presents a burn risk to a passerby.
2-AST-025 Text19: 4 1 2 FL 1 3 1 2 No No This large bore line is important to A209775 P&ID Steam to AST-2 and 3 plant operation and/or is a personnel safety issue upon failure.
Report No. 0700.104-03, Appendix C, Revision 2 Page C-10 of 47
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Auxiliary Steam Traps (AST), Unit 2 2-AST-01: Steam Trap Lines from Auxiliary Steam Lines Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-AST-027 Text19: 0.75 1 2 FP 1 3 1 2 No No This line exists in an area A209775 P&ID Steam to AST-6 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-AST-028 Text19: 0.75 1 2 FP 1 3 1 2 No No This line exists in an area A209775 P&ID Steam to AST-7 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-AST-032 Text19: 0.75 1 2 FP 1 3 1 2 No No This line exists in an area A209775 P&ID Steam to AST-4 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-AST-033 Text19: 0.75 1 2 FP 1 3 1 2 No No This line exists in an area A209775 P&ID Steam to AST-5 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-AST-069-A Text19: 3 1 2 FL 1 2 1 2 No No This large bore line is important to 192491 SD 29.01 Stub to AST-30 and drain plant operation and/or is a personnel safety issue upon failure.
Report No. 0700.104-03, Appendix C, Revision 2 Page C-11 of 47
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Steam Generator Blowdown (BD), Unit 2 2-BD-01: Steam Generator Blowdown to Sample Coolers and Blowdown Tank Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-BD-001 Text19: 2 1 2 FP 2 3 1 2 No No This line exists in an area 9321-F-2729 P&ID SG 21 Blowdown via MS-accessible by plant personnel 67-A during operation, and a leak presents a burn risk to a passerby.
2-BD-002 Text19: 2 1 2 FP 2 3 1 2 No No This line exists in an area 9321-F-2729 P&ID SG 21 Blowdown via MS-accessible by plant personnel 67-B during operation, and a leak presents a burn risk to a passerby.
2-BD-003 Text19: 2 1 2 FP 2 3 1 2 No No This line exists in an area 9321-F-2729 P&ID SG 22 Blowdown via MS-accessible by plant personnel 67-C during operation, and a leak presents a burn risk to a passerby.
2-BD-004 Text19: 2 1 2 FP 2 3 1 2 No No This line exists in an area 9321-F-2729 P&ID SG 22 Blowdown via MS-accessible by plant personnel 67-D during operation, and a leak presents a burn risk to a passerby.
2-BD-005 Text19: 2 1 2 FP 2 3 1 2 No No This line exists in an area 9321-F-2729 P&ID SG 23 Blowdown via MS-accessible by plant personnel 67-E during operation, and a leak presents a burn risk to a passerby.
2-BD-006 Text19: 2 1 2 FP 2 3 1 2 No No This line exists in an area 9321-F-2729 P&ID SG 23 Blowdown via MS-accessible by plant personnel 67-F during operation, and a leak presents a burn risk to a passerby.
Text19:
2-BD-007 2 1 2 FP 2 3 1 2 No No This line exists in an area 9321-F-2729 P&ID SG 24 Blowdown via MS-accessible by plant personnel 67-G during operation, and a leak presents a burn risk to a passerby.
2-BD-008 Text19: 2 1 2 FP 2 3 1 2 No No This line exists in an area 9321-F-2729 P&ID SG 24 Blowdown via MS-accessible by plant personnel 67-H during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix C, Revision 2 Page C-12 of 47
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Steam Generator Blowdown (BD), Unit 2 2-BD-01: Steam Generator Blowdown to Sample Coolers and Blowdown Tank Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-BD-009-A Text19: 2 1 2 FP 2 3 1 2 No No This line exists in an area 9321-F-2729 P&ID SG 21 Blowdown accessible by plant personnel Upstream of Line Spec during operation, and a leak Change presents a burn risk to a passerby.
2-BD-010-A Text19: 2 1 2 FP 2 3 1 2 No No This line exists in an area 9321-F-2729 P&ID SG 22 Blowdown accessible by plant personnel Upstream of Line Spec during operation, and a leak Change presents a burn risk to a passerby.
2-BD-011-A Text19: 2 1 2 FP 2 3 1 2 No No This line exists in an area 9321-F-2729 P&ID SG 23 Blowdown accessible by plant personnel Upstream of Line Spec during operation, and a leak Change presents a burn risk to a passerby.
2-BD-012-A Text19: 2 1 2 FP 2 3 1 2 No No This line exists in an area 9321-F-2729 P&ID SG 24 Blowdown accessible by plant personnel Upstream of Line Spec during operation, and a leak Change presents a burn risk to a passerby.
2-BD-017 Text19: 1 1 2 FP 2 3 1 2 No No This line exists in an area 9321-F-2729 P&ID SG 23 1" Blowdown Line accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-BD-018 Text19: 1 1 2 FP 2 3 1 2 No No This line exists in an area 9321-F-2729 P&ID SG 24 1" Blowdown Line accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-BD-019 Text19: 18 1 2 FL 2 3 1 2 No No This large bore line is important to 9321-F-2729 P&ID Blowdown Tank vent to plant operation and/or is a Atmosphere personnel safety issue upon failure.
Report No. 0700.104-03, Appendix C, Revision 2 Page C-13 of 47
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Extraction Steam Traps (EST), Unit 2 2-1EST-01: Extraction Steam Trap Headers to the Drains Collecting Tank Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-1EST-013-A Text19: 4 1 2 FL 1 3 1 2 No No This large bore line is important to 9321-F-2031 P&ID Steam Trap Header from plant operation and/or is a EST-1 and 1A personnel safety issue upon failure.
2-6EST-01: Steam Trap lines from Extraction Steam to the #26 FWHs Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description Text19:
2-6EST-015-A 2 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2031 PEPSE Extraction Steam to EST-accessible by plant personnel 1 during operation, and a leak presents a burn risk to a passerby.
2-6EST-015-B Text19: 2 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2031 PEPSE Extraction Steam to EST-accessible by plant personnel 1A during operation, and a leak presents a burn risk to a passerby.
2-6EST-015-C Text19: 2 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2031 PEPSE EST-1 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-6EST-015-D Text19: 2 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2031 PEPSE EST-1A to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
Text19:
2-6EST-016-A 0.75 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2031 PEPSE Extraction Steam to EST-accessible by plant personnel 2 during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix C, Revision 2 Page C-14 of 47
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Extraction Steam (EX), Unit 2 2-3EX-01: Boiler Feed Pump Turbine Drains to Condensers Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-3EX-021 Text19: 1.5 1 2 FP 1 3 1 No No This line exists in an area A227780 PEPSE Continuous Drain from accessible by plant personnel #21 Steam Generator during operation, and a leak Feed Pump Turbine drain presents an injury risk to a to #21 Condenser passerby.
2-3EX-022 Text19: 1.5 1 2 FP 1 3 1 No No This line exists in an area A227780 PEPSE Continuous Drain from accessible by plant personnel #22 Steam Generator during operation, and a leak Feed Pump Turbine drain presents an injury risk to a to #22 Condenser passerby.
2-5EX-01: HP Turbine Crossunder Piping Drip Pots to the Condenser Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description Text19:
2-5EX-128 1 2 FL 1 3 1 2 No No This large bore line is important to B237145, PEPSE LP Leakoff Header to plant operation and/or is a B237144 Gland Condenser personnel safety issue upon failure.
Report No. 0700.104-03, Appendix C, Revision 2 Page C-15 of 47
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Feed Water (FW), Unit 2 2-FW-01: Feedwater Lines from the Boiler Feed Pumps to the Steam Generators Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-FW-062 Text19: 0.75 1 2 FP 2 3 1 2 No No This line exists in an area 9321-F-2019 P&ID Feedwater to Sampling accessible by plant personnel Upstream of BFD-1138 during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix C, Revision 2 Page C-16 of 47
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Gland Sealing Steam (GS), Unit 2 2-GS-01: Gland Steam to and from HP, LP, and BFP Turbines Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-GS-001 Text19: 12 1 2 FL 1 3 1 2 No No This large bore line is important to A235308 PEPSE Gland Seal Steam plant operation and/or is a Header to HP and LP personnel safety issue upon Turbines failure.
2-GS-002 Text19: 10 1 2 FL 1 3 1 2 No No This large bore line is important to A235308 PEPSE Gland Seal to HP Turbine plant operation and/or is a personnel safety issue upon failure.
2-GS-003 Text19: 10 1 2 FL 1 3 1 2 No No This large bore line is important to A235308 PEPSE Gland Seal to HP Turbine plant operation and/or is a personnel safety issue upon failure.
2-GS-004 Text19: 6 1 2 FL 1 3 1 2 No No This large bore line is important to A235308 PEPSE Gland Seal to LP Turbine plant operation and/or is a 21 personnel safety issue upon failure.
2-GS-005 Text19: 2 1 2 FT 1 3 1 2 No No Loss of sealing steam to the A235308 PEPSE Gland Seal to LP Turbine turbine will cause a plant 21 shutdown or downpower.
2-GS-006 Text19: 6 1 2 FL 1 3 1 2 No No This large bore line is important to A235308 PEPSE Gland Seal to LP Turbine plant operation and/or is a 21 personnel safety issue upon failure.
Text19:
2-GS-007 2 1 2 FT 1 3 1 2 No No Loss of sealing steam to the A235308 PEPSE Gland Seal to LP Turbine turbine will cause a plant 21 shutdown or downpower.
2-GS-008 Text19: 6 1 2 FL 1 3 1 2 No No This large bore line is important to A235308 PEPSE Gland Seal to LP Turbine plant operation and/or is a 22 personnel safety issue upon failure.
2-GS-009 Text19: 2 1 2 FT 1 3 1 2 No No Loss of sealing steam to the A235308 PEPSE Gland Seal to LP Turbine turbine will cause a plant 22 shutdown or downpower.
Report No. 0700.104-03, Appendix C, Revision 2 Page C-17 of 47
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Gland Sealing Steam (GS), Unit 2 2-GS-01: Gland Steam to and from HP, LP, and BFP Turbines Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-GS-010 Text19: 6 1 2 FL 1 3 1 2 No No This large bore line is important to A235308 PEPSE Gland Seal to LP Turbine plant operation and/or is a 22 personnel safety issue upon failure.
2-GS-011 Text19: 2 1 2 FT 1 3 1 2 No No Loss of sealing steam to the A235308 PEPSE Gland Seal to LP Turbine turbine will cause a trip or 22 downpower.
2-GS-012 Text19: 6 1 2 FL 1 3 1 2 No No This large bore line is important to A235308 PEPSE Gland Seal to LP Turbine plant operation and/or is a 23 personnel safety issue upon failure.
2-GS-013 Text19: 2 1 2 FT 1 3 1 2 No No Loss of sealing steam to the A235308 PEPSE Gland Seal to LP Turbine turbine will cause a plant 23 shutdown or downpower.
Text19:
2-GS-014 6 1 2 FL 1 3 1 2 No No This large bore line is important to A235308 PEPSE Gland Seal to LP Turbine plant operation and/or is a 23 personnel safety issue upon failure.
2-GS-015 Text19: 2 1 2 FT 1 3 1 2 No No Loss of sealing steam to the A235308 PEPSE Gland Seal to LP Turbine turbine will cause a plant 23 shutdown or downpower.
Text19:
2-GS-016 6 1 2 FL 1 3 1 2 No No This large bore line is important to 9321-H-2024 PEPSE Gland Seal supply to plant operation and/or is a BFP Turbines personnel safety issue upon failure.
2-GS-020 Text19: 4 1 2 FL 1 3 1 2 No No This large bore line is important to 9321-H-2024 PEPSE Steam to BFPT #22 plant operation and/or is a personnel safety issue upon failure.
2-GS-021 Text19: 4 1 2 FL 1 3 1 2 No No This large bore line is important to 9321-H-2024 PEPSE Steam to BFPT #21 plant operation and/or is a personnel safety issue upon failure.
Report No. 0700.104-03, Appendix C, Revision 2 Page C-18 of 47
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Gland Sealing Steam (GS), Unit 2 2-GS-01: Gland Steam to and from HP, LP, and BFP Turbines Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-GS-022 Text19: 3 1 2 FL 1 3 1 2 No No This large bore line is important to 9321-H-2024 PEPSE Steam to BFPT #22 plant operation and/or is a personnel safety issue upon failure.
2-GS-023 Text19: 3 1 2 FL 1 3 1 2 No No This large bore line is important to 9321-H-2024 PEPSE Steam to BFPT #21 plant operation and/or is a personnel safety issue upon failure.
2-GS-032 Text19: 3 1 2 FL 1 3 1 2 No No This large bore line is important to 9321-H-2024 PEPSE BFPT #22 Gland Steam plant operation and/or is a Discharge personnel safety issue upon failure.
2-GS-034 Text19: 3 1 2 FL 1 3 1 2 No No This large bore line is important to 9321-H-2024 PEPSE BFPT #21 Gland Steam plant operation and/or is a Discharge personnel safety issue upon failure.
2-GS-036 Text19: 6 1 2 FL 1 3 1 2 No No This large bore line is important to 9321-H-2024 PEPSE BFPT Gland Steam plant operation and/or is a Discharge Header to personnel safety issue upon Gland Condenser failure.
2-GS-038 Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-H-2024, PEPSE BFPT Gland Steam accessible by plant personnel B237144 Discharge Header drain during operation, and a leak to waste header presents a burn risk to a passerby.
2-GS-039 Text19: 2 1 2 FP 1 3 1 2 No No This line exists in an area 9321-H-2024 PEPSE BFPT #21 Exhaust accessible by plant personnel Cylinder Drain during operation, and a leak presents a burn risk to a passerby.
2-GS-040 Text19: 2 1 2 FP 1 3 1 2 No No This line exists in an area 9321-H-2024 PEPSE BFPT #22 Exhaust accessible by plant personnel Cylinder Drain during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix C, Revision 2 Page C-19 of 47
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Gland Sealing Steam (GS), Unit 2 2-GS-01: Gland Steam to and from HP, LP, and BFP Turbines Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-GS-041 Text19: 3 1 2 FL 1 3 1 2 No No This large bore line is important to 9321-H-2024 PEPSE BFPT Exhaust Cylinder plant operation and/or is a Drain header to Boiler personnel safety issue upon Feed Pump Drip Tank failure.
2-GS-042 Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-H-2024 PEPSE BFPT Exhaust Cylinder accessible by plant personnel Drain header line to during operation, and a leak Boiler Feed Pump Drip presents a burn risk to a passerby. Tank vent 2-GS-043 Text19: 3 1 2 FL 1 3 1 2 No No This large bore line is important to 9321-H-2024 PEPSE BFPT Drip Tank vent to plant operation and/or is a Condenser #21 personnel safety issue upon failure.
2-GS-047 Text19: 1 2 FL 1 3 1 2 No No This large bore line is important to B237145 PEPSE Gland Seal Return from plant operation and/or is a HP Turbine personnel safety issue upon failure.
2-GS-048 Text19: 1 2 FL 1 3 1 2 No No This large bore line is important to B237145 PEPSE Gland Seal Return from plant operation and/or is a HP Turbine personnel safety issue upon failure.
2-GS-049 Text19: 1 2 FL 1 3 1 2 No No This large bore line is important to B237144 PEPSE Gland Seal Return from plant operation and/or is a #21 LP Turbine personnel safety issue upon failure.
Text19:
2-GS-050 1 2 FL 1 3 1 2 No No This large bore line is important to B237144 PEPSE Gland Seal Return from plant operation and/or is a #21 LP Turbine personnel safety issue upon failure.
2-GS-051 Text19: 1 2 FL 1 3 1 2 No No This large bore line is important to B237144 PEPSE Gland Seal Return from plant operation and/or is a #22 LP Turbine personnel safety issue upon failure.
Report No. 0700.104-03, Appendix C, Revision 2 Page C-20 of 47
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Gland Sealing Steam (GS), Unit 2 2-GS-01: Gland Steam to and from HP, LP, and BFP Turbines Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-GS-052 Text19: 1 2 FL 1 3 1 2 No No This large bore line is important to B237144 PEPSE Gland Seal Return from plant operation and/or is a #22 LP Turbine personnel safety issue upon failure.
2-GS-053 Text19: 1 2 FL 1 3 1 2 No No This large bore line is important to B237144 PEPSE Gland Seal Return from plant operation and/or is a #23 LP Turbine personnel safety issue upon failure.
2-GS-054 Text19: 1 2 FL 1 3 1 2 No No This large bore line is important to B237144 PEPSE Gland Seal Return from plant operation and/or is a #23 LP Turbine personnel safety issue upon failure.
2-GS-055 Text19: 1 2 FL 1 3 1 2 No No This large bore line is important to B237145, PEPSE Gland Seal return header plant operation and/or is a B237144 to Gland Condenser personnel safety issue upon failure.
Report No. 0700.104-03, Appendix C, Revision 2 Page C-21 of 47
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Gland Steam Traps (GST), Unit 2 2-GST-01: Steam Trap Lines from the Gland Seal System Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-GST-017 Text19: 0.75 1 2 FP 1 3 1 2 No No This line exists in an area 9321-H-2024 PEPSE Steam to GST-1 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-GST-019 Text19: 0.75 1 2 FP 1 3 1 2 No No This line exists in an area 9321-H-2024 PEPSE GST-1 Discharge to accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-GST-024 Text19: 0.75 1 2 FP 1 3 1 2 No No This line exists in an area 9321-H-2024 PEPSE Steam to GST-3 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-GST-026 Text19: 0.75 1 2 FP 1 3 1 2 No No This line exists in an area 9321-H-2024 PEPSE GST-3 Discharge to accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-GST-027 Text19: 0.75 1 2 FP 1 3 1 2 No No This line exists in an area 9321-H-2024 PEPSE Steam to GST-2 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-GST-029 Text19: 0.75 1 2 FP 1 3 1 2 No No This line exists in an area 9321-H-2024 PEPSE GST-2 Discharge to accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
Text19:
2-GST-030 2 1 2 FP 1 3 1 2 No No This line exists in an area 9321-H-2024 PEPSE Header from GST-1 and 3 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-GST-031 Text19: 2 1 2 FP 1 3 1 2 No No This line exists in an area 9321-H-2024 PEPSE Gland Steam Trap accessible by plant personnel Header to Boiler Feed during operation, and a leak Pump Drip Tank presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix C, Revision 2 Page C-22 of 47
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Heater Drains & Vents (HD), Unit 2 2-1HD-02: #21 Feedwater Heater Vents Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-1HD-021 Text19: 6 1 2 FL 1 3 1 2 No No This large bore line is important to A235304 PEPSE FWH 21A High Level plant operation and/or is a Dump to Condenser 23 personnel safety issue upon failure.
2-1HD-022 Text19: 6 1 2 FL 1 3 1 2 No No This large bore line is important to A235304 PEPSE FWH 21B High Level plant operation and/or is a Dump to Condenser 22 personnel safety issue upon failure.
2-1HD-023 Text19: 6 1 2 FL 1 3 1 2 No No This large bore line is important to A235304 PEPSE FWH 21C High Level plant operation and/or is a Dump to Condenser 21 personnel safety issue upon failure.
2-1HD-024 Text19: 5 1 2 FL 1 3 1 2 No No This large bore line is important to A235304 PEPSE FWH 21A 5" Vent to plant operation and/or is a Condenser 23 personnel safety issue upon failure.
2-1HD-025 Text19: 5 1 2 FL 1 3 1 2 No No This large bore line is important to A235304 PEPSE FWH 21B 5" Vent to plant operation and/or is a Condenser 22 personnel safety issue upon failure.
2-1HD-026 Text19: 5 1 2 FL 1 3 1 2 No No This large bore line is important to A235304 PEPSE FWH 21C 5" Vent to plant operation and/or is a Condenser 21 personnel safety issue upon failure.
2-2HD-02: #22 Feedwater Heater Vents Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description Text19:
2-2HD-019 6 1 2 FL 1 3 1 2 No No This large bore line is important to A235304 P&ID FWH 22A High Level plant operation and/or is a Dump to Condenser 23 personnel safety issue upon failure.
Report No. 0700.104-03, Appendix C, Revision 2 Page C-23 of 47
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Heater Drains & Vents (HD), Unit 2 2-2HD-02: #22 Feedwater Heater Vents Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-2HD-020 Text19: 6 1 2 FL 1 3 1 2 No No This large bore line is important to A235304 P&ID FWH 22B High Level plant operation and/or is a Dump to Condenser 22 personnel safety issue upon failure.
2-2HD-021 Text19: 6 1 2 FL 1 3 1 2 No No This large bore line is important to A235304 P&ID FWH 22C High Level plant operation and/or is a Dump to Condenser 21 personnel safety issue upon failure.
2-2HD-022 Text19: 2.5 1 2 FL 1 3 1 2 No No This large bore line is important to A235304 P&ID FWH 22A 2-1/2" Vent to plant operation and/or is a Condenser 23 personnel safety issue upon failure.
2-2HD-023 Text19: 2.5 1 2 FL 1 3 1 2 No No This large bore line is important to A235304 P&ID FWH 22B 2-1/2" Vent to plant operation and/or is a Condenser 22 personnel safety issue upon failure.
2-2HD-024 Text19: 2.5 1 2 FL 1 3 1 2 No No This large bore line is important to A235304 P&ID FWH 22C 2-1/2" Vent to plant operation and/or is a Condenser 21 personnel safety issue upon failure.
2-2HD-025 Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area A235304 P&ID FWH 22A 1" Vent to accessible by plant personnel Condenser 23 during operation, and a leak presents a burn risk to a passerby.
Text19:
2-2HD-026 1 1 2 FP 1 3 1 2 No No This line exists in an area A235304 P&ID FWH 22B 1" Vent to accessible by plant personnel Condenser 22 during operation, and a leak presents a burn risk to a passerby.
2-2HD-027 Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area A235304 P&ID FWH 22C 1" Vent to accessible by plant personnel Condenser 21 during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix C, Revision 2 Page C-24 of 47
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Heater Drains & Vents (HD), Unit 2 2-HD-01: Heater Drain Pump discharge to Boiler Feed Pumps Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-HD-004-A Text19: 0.5 1 2 FP 2 2 1 2 No No This line exists in an area 9321-F-2022 PEPSE #21 HDP to HDP Water accessible by plant personnel Chem. Monitor Upstream during operation, and a leak of Root Isolation Valve presents a burn risk to a passerby.
2-HD-005-A Text19: 0.5 1 2 FP 2 2 1 2 No No This line exists in an area 9321-F-2022 PEPSE #22 HDP to HDP Water accessible by plant personnel Chem. Monitor Upstream during operation, and a leak of Root Isolation Valve presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix C, Revision 2 Page C-25 of 47
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam (MS), Unit 2 2-MS-01: Main Steam from Stm Gen to HP Turbine, BFP Turbine, MSRs, Aux. Steam, SJAEs, and Priming Ejectors.
Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MS-036-B Text19: 3 1 2 FL 1 3 1 2 No No This large bore line is important to A227780 SD No. 18.0 SJAE Steam Supply plant operation and/or is a Downstream of PCV 1132 personnel safety issue upon failure.
2-MS-037 Text19: 3 1 2 FL 1 3 1 2 No No This large bore line is important to A227780 SD No. 18.0 SJAE Header plant operation and/or is a personnel safety issue upon failure.
2-MS-038 Text19: 2 1 2 FT 1 3 1 2 No No This line is necessary for A227780 SD No. 18.0 Header to SJAE 21 removing non-condensable gases from the condenser. A failure in this line will cause a trip or a downpower 2-MS-039 Text19: 2 1 2 FT 1 3 1 2 No No This line is necessary for A227780 SD No. 18.0 Header to SJAE 22 removing non-condensable gases from the condenser. A failure in this line will cause a trip or a downpower Text19:
2-MS-040 2 1 2 FT 1 3 1 2 No No This line is necessary for A227780 SD No. 18.0 Header to SJAE 23 removing non-condensable gases from the condenser. A failure in this line will cause a trip or a downpower Text19:
2-MS-041 1 2 FT 1 3 1 2 No No This line is necessary for A227780 SD No. 18.0 SJAE Steam Supply via removing non-condensable gases MS-797 from the condenser. A failure in this line will cause a trip or a downpower 2-MS-042 Text19: 1 2 FT 1 3 1 2 No No This line is necessary for A227780 SD No. 18.0 SJAE Steam Supply via removing non-condensable gases MS-798 from the condenser. A failure in this line will cause a trip or a downpower Report No. 0700.104-03, Appendix C, Revision 2 Page C-26 of 47
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam (MS), Unit 2 2-MS-01: Main Steam from Stm Gen to HP Turbine, BFP Turbine, MSRs, Aux. Steam, SJAEs, and Priming Ejectors.
Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MS-043 Text19: 1 2 FT 1 3 1 2 No No This line is necessary for A227780 SD No. 18.0 SJAE Steam Supply via removing non-condensable gases MS-799 from the condenser. A failure in this line will cause a trip or a downpower 2-MS-044 Text19: 1 2 FT 1 3 1 2 No No This line is necessary for A227780 SD No. 18.0 SJAE Steam Supply via removing non-condensable gases MS-800 from the condenser. A failure in this line will cause a trip or a downpower 2-MS-045 Text19: 1 2 FT 1 3 1 2 No No This line is necessary for A227780 SD No. 18.0 SJAE Steam Supply via removing non-condensable gases MS-801 from the condenser. A failure in this line will cause a trip or a downpower Text19:
2-MS-046 1 2 FT 1 3 1 2 No No This line is necessary for A227780 SD No. 18.0 SJAE Steam Supply via removing non-condensable gases MS-802 from the condenser. A failure in this line will cause a trip or a downpower Text19:
2-MS-047 1 2 FT 1 3 1 2 No No This line is necessary for A227780 SD No. 18.0 SJAE Steam Supply via removing non-condensable gases MS-803 from the condenser. A failure in this line will cause a trip or a downpower Text19:
2-MS-048 1 2 FT 1 3 1 2 No No This line is necessary for A227780 SD No. 18.0 SJAE Steam Supply via removing non-condensable gases MS-804 from the condenser. A failure in this line will cause a trip or a downpower 2-MS-049 Text19: 1 2 FT 1 3 1 2 No No This line is necessary for A227780 SD No. 18.0 SJAE Steam Supply via removing non-condensable gases MS-805 from the condenser. A failure in this line will cause a trip or a downpower Report No. 0700.104-03, Appendix C, Revision 2 Page C-27 of 47
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam (MS), Unit 2 2-MS-01: Main Steam from Stm Gen to HP Turbine, BFP Turbine, MSRs, Aux. Steam, SJAEs, and Priming Ejectors.
Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MS-050 Text19: 1 2 FT 1 3 1 2 No No This line is necessary for A227780 SD No. 18.0 SJAE Steam Supply via removing non-condensable gases MS-806 from the condenser. A failure in this line will cause a trip or a downpower 2-MS-051 Text19: 1 2 FT 1 3 1 2 No No This line is necessary for A227780 SD No. 18.0 SJAE Steam Supply via removing non-condensable gases MS-807 from the condenser. A failure in this line will cause a trip or a downpower 2-MS-052 Text19: 1 2 FT 1 3 1 2 No No This line is necessary for A227780 SD No. 18.0 SJAE Steam Supply via removing non-condensable gases MS-808 from the condenser. A failure in this line will cause a trip or a downpower Text19:
2-MS-053 1 2 FT 1 3 1 2 No No This line is necessary for A227780 SD No. 18.0 SJAE Steam Supply via removing non-condensable gases MS-809 from the condenser. A failure in this line will cause a trip or a downpower Text19:
2-MS-054 1 2 FT 1 3 1 2 No No This line is necessary for A227780 SD No. 18.0 SJAE Steam Supply via removing non-condensable gases MS-810 from the condenser. A failure in this line will cause a trip or a downpower Text19:
2-MS-055 1 2 FT 1 3 1 2 No No This line is necessary for A227780 SD No. 18.0 SJAE Steam Supply via removing non-condensable gases MS-811 from the condenser. A failure in this line will cause a trip or a downpower 2-MS-056 Text19: 1 2 FT 1 3 1 2 No No This line is necessary for A227780 SD No. 18.0 SJAE Steam Supply via removing non-condensable gases MS-812 from the condenser. A failure in this line will cause a trip or a downpower Report No. 0700.104-03, Appendix C, Revision 2 Page C-28 of 47
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam (MS), Unit 2 2-MS-01: Main Steam from Stm Gen to HP Turbine, BFP Turbine, MSRs, Aux. Steam, SJAEs, and Priming Ejectors.
Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MS-057 Text19: 1 2 FT 1 3 1 2 No No This line is necessary for A227780 SD No. 18.0 SJAE Steam Supply via removing non-condensable gases MS-813 from the condenser. A failure in this line will cause a trip or a downpower 2-MS-058 Text19: 1 2 FT 1 3 1 2 No No This line is necessary for A227780 SD No. 18.0 SJAE Steam Supply via removing non-condensable gases MS-814 from the condenser. A failure in this line will cause a trip or a downpower 2-MS-059-B Text19: 6 1 2 FL 1 3 1 2 No No This large bore line is important to A227780 SD No. 18.0 Main Steam to Priming plant operation and/or is a Ejectors Header personnel safety issue upon Downstream of PCV 1133 failure.
2-MS-060 Text19: 6 1 2 FL 1 3 1 2 No No This large bore line is important to A227780 SD No. 18.0 Priming Ejectors Header plant operation and/or is a personnel safety issue upon failure.
Text19:
2-MS-061 3 1 2 FL 1 3 1 2 No No This large bore line is important to A227780 SD No. 18.0 Priming Ejectors Header plant operation and/or is a to PE 21 personnel safety issue upon failure.
2-MS-062 Text19: 3 1 2 FL 1 3 1 2 No No This large bore line is important to A227780 SD No. 18.0 Priming Ejectors Header plant operation and/or is a to PE 22 personnel safety issue upon failure.
2-MS-063 Text19: 3 1 2 FL 1 3 1 2 No No This large bore line is important to A227780 SD No. 18.0 Priming Ejectors Header plant operation and/or is a to PE 23 personnel safety issue upon failure.
2-MS-076 Text19: 3 1 2 FL 1 3 1 2 No No This large bore line is important to A235308 P&ID MS-863 Valve leakoff to plant operation and/or is a condenser.
personnel safety issue upon failure.
Report No. 0700.104-03, Appendix C, Revision 2 Page C-29 of 47
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam (MS), Unit 2 2-MS-01: Main Steam from Stm Gen to HP Turbine, BFP Turbine, MSRs, Aux. Steam, SJAEs, and Priming Ejectors.
Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MS-077 Text19: 3 1 2 FL 1 3 1 2 No No This large bore line is important to A235308 P&ID MS-864 Valve leakoff to plant operation and/or is a condenser.
personnel safety issue upon failure.
2-MS-078 Text19: 3 1 2 FL 1 3 1 2 No No This large bore line is important to A235308 P&ID MS-865 Valve leakoff to plant operation and/or is a condenser.
personnel safety issue upon failure.
2-MS-079 Text19: 3 1 2 FL 1 3 1 2 No No This large bore line is important to A235308 P&ID MS-866 Valve leakoff to plant operation and/or is a condenser.
personnel safety issue upon failure.
2-MS-143 Text19: 0.75 1 2 FP 1 3 1 2 No No This line exists in an area A235308 PEPSE Main Steam Stop Valve accessible by plant personnel drain to 23 Cond. West during operation, and a leak Side presents a burn risk to a passerby.
2-MS-144 Text19: 0.75 1 2 FP 1 3 1 2 No No This line exists in an area A235308 PEPSE Main Steam Stop Valve accessible by plant personnel drain to 23 Cond. East during operation, and a leak Side presents a burn risk to a passerby.
2-MS-198 Text19: 1 2 FP 1 3 1 2 No No This line exists in an area B237145 P&ID LH Control Valve Stem accessible by plant personnel Leak-off Lines during operation, and a leak presents a burn risk to a passerby.
Text19:
2-MS-199 1 2 FP 1 3 1 2 No No This line exists in an area B237145 P&ID RH Control Valve Stem accessible by plant personnel Leak-off Lines during operation, and a leak presents a burn risk to a passerby.
2-MS-200 Text19: 1.5 1 2 FP 1 3 1 2 No No This line exists in an area B237145 P&ID Upper LH HP Turbine accessible by plant personnel Feed Leakoff during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix C, Revision 2 Page C-30 of 47
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam (MS), Unit 2 2-MS-01: Main Steam from Stm Gen to HP Turbine, BFP Turbine, MSRs, Aux. Steam, SJAEs, and Priming Ejectors.
Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MS-201 Text19: 1.5 1 2 FP 1 3 1 2 No No This line exists in an area B237145 P&ID Lower LH HP Turbine accessible by plant personnel Feed Leakoff during operation, and a leak presents a burn risk to a passerby.
2-MS-202 Text19: 1.5 1 2 FP 1 3 1 2 No No This line exists in an area B237145 P&ID Upper RH HP Turbine accessible by plant personnel Feed Leakoff during operation, and a leak presents a burn risk to a passerby.
2-MS-203 Text19: 1.5 1 2 FP 1 3 1 2 No No This line exists in an area B237145 P&ID Lower LH HP Turbine accessible by plant personnel Feed Leakoff during operation, and a leak presents a burn risk to a passerby.
2-MS-06: Main Steam Supply to Gland Steam Header Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description Text19:
2-MS-188-B 12 1 2 FL 1 3 1 2 No No This large bore line is important to A235308 PEPSE Gland Seal Steam plant operation and/or is a Supply downstream of personnel safety issue upon PCV-1145-1 failure.
2-MS-189-B Text19: 12 1 2 FL 1 3 1 2 No No This large bore line is important to A235308 PEPSE Gland Seal Steam plant operation and/or is a Supply downstream of personnel safety issue upon PCV-1145-2 failure.
2-MS-191 Text19: 12 1 2 FL 1 3 1 2 No No This large bore line is important to A235308 PEPSE Main Steam to Gland plant operation and/or is a Seal Steam Header.
personnel safety issue upon failure.
Report No. 0700.104-03, Appendix C, Revision 2 Page C-31 of 47
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Moisture Separator Reheater Drains (MSD), Unit 2 2-MSD-02: Reheater Drains to #26 Feedwater Heaters and Condensers Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MSD-145 Text19: 2.5 1 2 FL 1 3 1 2 No No This large bore line is important to 9321-F-2023 PEPSE Reheater Drain Tank 21A plant operation and/or is a Vent to MSR personnel safety issue upon failure.
2-MSD-146 Text19: 2.5 1 2 FL 1 3 1 2 No No This large bore line is important to 9321-F-2023 PEPSE Reheater Drain Tank 22A plant operation and/or is a Vent to MSR personnel safety issue upon failure.
2-MSD-147 Text19: 2.5 1 2 FL 1 3 1 2 No No This large bore line is important to 9321-F-2023 PEPSE Reheater Drain Tank 23A plant operation and/or is a Vent to MSR personnel safety issue upon failure.
2-MSD-148 Text19: 2.5 1 2 FL 1 3 1 2 No No This large bore line is important to 9321-F-2023 PEPSE Reheater Drain Tank 21B plant operation and/or is a Vent to MSR personnel safety issue upon failure.
2-MSD-149 Text19: 2.5 1 2 FL 1 3 1 2 No No This large bore line is important to 9321-F-2023 PEPSE Reheater Drain Tank 22B plant operation and/or is a Vent to MSR personnel safety issue upon failure.
2-MSD-150 Text19: 2.5 1 2 FL 1 3 1 2 No No This large bore line is important to 9321-F-2023 PEPSE Reheater Drain Tank 23B plant operation and/or is a Vent to MSR personnel safety issue upon failure.
Text19:
2-MSD-175 8 1 2 FL 1 3 1 2 No No This large bore line is important to 9321-F-2023 PEPSE Reheater 21A to plant operation and/or is a Condenser 23 personnel safety issue upon failure.
2-MSD-176 Text19: 8 1 2 FL 1 3 1 2 No No This large bore line is important to 9321-F-2023 PEPSE Reheater 22A to plant operation and/or is a Condenser 22 personnel safety issue upon failure.
Report No. 0700.104-03, Appendix C, Revision 2 Page C-32 of 47
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Moisture Separator Reheater Drains (MSD), Unit 2 2-MSD-02: Reheater Drains to #26 Feedwater Heaters and Condensers Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MSD-177 Text19: 8 1 2 FL 1 3 1 2 No No This large bore line is important to 9321-F-2023 PEPSE Reheater 23A to plant operation and/or is a Condenser 23 personnel safety issue upon failure.
2-MSD-178 Text19: 6 1 2 FL 1 3 1 2 No No This large bore line is important to 9321-F-2023 PEPSE Reheater 21B to plant operation and/or is a Condenser 21 personnel safety issue upon failure.
2-MSD-179 Text19: 6 1 2 FL 1 3 1 2 No No This large bore line is important to 9321-F-2023 PEPSE Reheater 22B to plant operation and/or is a Condenser 22 personnel safety issue upon failure.
2-MSD-180 Text19: 6 1 2 FL 1 3 1 2 No No This large bore line is important to 9321-F-2023 PEPSE Reheater 23B to plant operation and/or is a Condenser 21 personnel safety issue upon failure.
Report No. 0700.104-03, Appendix C, Revision 2 Page C-33 of 47
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam Traps (MST), Unit 2 2-MST-01: Steam Trap Lines from the Main Steam System Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MST-080-B Text19: 1.5 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID MST-1 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-081-B Text19: 1.5 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID MST-2 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-082-B Text19: 1.5 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID MST-3 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-083-C Text19: 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID MST-4 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-084-B Text19: 1.25 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID MST-5 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-085-C Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID MST-6 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
Text19:
2-MST-086-B 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID MST-8 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-087-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID MST-9 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix C, Revision 2 Page C-34 of 47
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam Traps (MST), Unit 2 2-MST-01: Steam Trap Lines from the Main Steam System Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MST-088-C Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID MST-10 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-089-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID MST-12 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-090-B Text19: 1.25 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID MST-13 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-091-C Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID MST-14 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-092-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID MST-16 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-093-C Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID MST-18 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
Text19:
2-MST-094-B 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID MST-20 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-095-B Text19: 1.5 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID MST-21 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix C, Revision 2 Page C-35 of 47
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam Traps (MST), Unit 2 2-MST-01: Steam Trap Lines from the Main Steam System Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MST-096-B Text19: 1.5 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID MST-22 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-097-B Text19: 1.5 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID MST-23 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-099-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID MST-25 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-101-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID MST-27 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-104-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID MST-30 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-105-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID MST-31 to Header accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-105-D Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID Header to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-106-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID MST-32 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix C, Revision 2 Page C-36 of 47
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam Traps (MST), Unit 2 2-MST-01: Steam Trap Lines from the Main Steam System Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MST-107-A Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 SD No. 18.0 Steam to MST-33 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-107-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID MST-33 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-108-B Text19: 1.25 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID MST-34 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-109-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID MST-35 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-110-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID MST-36 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-111-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID MST-37 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
Text19:
2-MST-112-B 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID MST-38 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-113-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID MST-39 to Header accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix C, Revision 2 Page C-37 of 47
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam Traps (MST), Unit 2 2-MST-01: Steam Trap Lines from the Main Steam System Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MST-113-D Text19: 1.25 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID Header to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-114-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID MST-40 to Header accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-115-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID MST-41 to Header accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-122-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID MST-48 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-123-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID MST-49 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-124-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID MST-50 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
Text19:
2-MST-125-B 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID MST-51 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-126-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID MST-52 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix C, Revision 2 Page C-38 of 47
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam Traps (MST), Unit 2 2-MST-01: Steam Trap Lines from the Main Steam System Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MST-127-A Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID Steam to MST-56 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-127-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID MST-56 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-128-A Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID Steam to MST-57 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-128-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID MST-57 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-129-A Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID Steam to MST-58 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-129-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID MST-58 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
Text19:
2-MST-130-A 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID Steam to MST-59 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-130-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID MST-59 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix C, Revision 2 Page C-39 of 47
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam Traps (MST), Unit 2 2-MST-01: Steam Trap Lines from the Main Steam System Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MST-131-A Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID Steam to MST-60 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-131-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID MST-60 to Header accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-132-A Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID Steam to MST-61 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-132-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID MST-61 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
2-MST-133-A Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID Steam to MST-62 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-133-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID MST-62 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
Text19:
2-MST-134-A 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID Steam to MST-63 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-134-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2042 P&ID MST-63 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix C, Revision 2 Page C-40 of 47
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam Traps (MST), Unit 2 2-MST-01: Steam Trap Lines from the Main Steam System Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MST-135-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID MST-64 to Header accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-136-A Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID Steam to MST-65 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-136-B Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area 9321-F-2041 P&ID MST-65 to Header accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-193-B Text19: 0.75 1 2 FP 1 3 1 2 No No This line exists in an area A227780 PEPSE MST-100 to Steam Trap accessible by plant personnel Header during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix C, Revision 2 Page C-41 of 47
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Reheat Steam Traps (RST), Unit 2 2-RST-01: Reheat Steam Trap Lines Downstream of Reheater Steam Traps Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-RST-001 Text19: 0.75 1 2 FP 1 3 1 2 No No This line exists in an area 9321-H-2024 PEPSE RST-1 to BFP Turbine accessible by plant personnel Drip Tank Header during operation, and a leak presents a burn risk to a passerby.
2-RST-002 Text19: 0.75 1 2 FP 1 3 1 2 No No This line exists in an area 9321-H-2024 PEPSE RST-2 to BFP Turbine accessible by plant personnel Drip Tank Header during operation, and a leak presents a burn risk to a passerby.
2-RST-003 Text19: 0.75 1 2 FP 1 3 1 2 No No This line exists in an area 9321-H-2024 PEPSE RST-3 to BFP Turbine accessible by plant personnel Drip Tank Header during operation, and a leak presents a burn risk to a passerby.
2-RST-004 Text19: 2 1 2 FP 1 3 1 2 No No This line exists in an area 9321-H-2024 PEPSE Reheat Steam Trap accessible by plant personnel Header to BFP Turbine during operation, and a leak Drip Tank presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix C, Revision 2 Page C-42 of 47
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Service Boiler (SB), Unit 2 2-SB-01: Service Boiler Lines Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-SB-001 Text19: 6 1 2 FL 1 3 1 2 No No This large bore line is important to A227780, PEPSE Auxiliary Steam from plant operation and/or is a A209775 PCV-1015 personnel safety issue upon failure.
2-SB-015 Text19: 8 1 2 FL 1 3 1 2 No No This large bore line is important to A209775 P&ID Steam from Aux. Steam plant operation and/or is a Header personnel safety issue upon failure.
2-SB-016 Text19: 8 1 2 FL 1 3 1 2 No No This large bore line is important to A209775 P&ID Desuperheater Header plant operation and/or is a personnel safety issue upon failure.
2-SB-023 Text19: 4 1 2 FL 1 3 1 2 No No This large bore line is important to A209775 P&ID Header to Steam Traps plant operation and/or is a personnel safety issue upon failure.
2-SB-026 Text19: 1 1 2 FP 1 3 1 2 No No This line exists in an area A209775 P&ID Desuperheater Header accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-SB-030 Text19: 8 1 2 FL 1 3 1 2 No No This large bore line is important to A209775 P&ID Steam to Desuperheater plant operation and/or is a personnel safety issue upon failure.
2-SB-039 Text19: 4 1 2 FL 1 2 1 2 No No This large bore line is important to A209775 P&ID Service Boiler Header to plant operation and/or is a Air Tempering Units personnel safety issue upon failure.
2-SB-042 Text19: 6 1 2 FL 2 2 1 2 No No This large bore line is important to 9321-F-2021, P&ID Line from #10 House plant operation and/or is a B193201 Service Boiler Deaerator personnel safety issue upon failure.
Report No. 0700.104-03, Appendix C, Revision 2 Page C-43 of 47
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Condensate Return Unit Heaters to Service Boiler D (UH), Unit 2 2-UH-01: Condensate Return from Unit Heaters to the Deaerator Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-UH-001 Text19: 4 1 2 FL 2 1 1 2 No No This large bore line is important to A209775, 9321- P&ID Condensate return plant operation and/or is a F-2120 pumps to #20 House personnel safety issue upon Service Deaerator failure.
2-UH-002 Text19: 4 1 2 FL 2 1 1 2 No No This large bore line is important to 9321-F-2120, P&ID Condensate return to #10 plant operation and/or is a B193201 House Service Deaerator personnel safety issue upon failure.
2-UH-003 Text19: 10 1 2 FL 3 1 1 2 No No This large bore line is important to A209775 SD No. 29.01 Desuperheater outlet plant operation and/or is a header to various unit personnel safety issue upon heaters failure.
2-UH-004 Text19: 8 1 2 FL 3 1 1 2 No No This large bore line is important to A209775 SD No. 29.01 Desuperheater outlet plant operation and/or is a steam to Gland Seal personnel safety issue upon Steam Header failure.
2-UH-071 Text19: 6 1 2 FL 1 1 1 2 No No Based on engineering judgment, A209775 P&ID Unit Heater Drain Header these lines are not as susceptible to Condensate Receiver as the numbers may imply.
Susceptibility level was lowered accordingly. This large bore line is important to plant operation and/or is a personnel safety issue upon failure.
2-UH-072 Text19: 6 1 2 FL 1 1 1 2 No No Based on engineering judgment, A209775 P&ID Unit Heater Drain Header these lines are not as susceptible to Condensate Receiver as the numbers may imply.
Susceptibility level was lowered accordingly. This large bore line is important to plant operation and/or is a personnel safety issue upon failure.
Report No. 0700.104-03, Appendix C, Revision 2 Page C-44 of 47
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Condensate Return Unit Heaters to Service Boiler D (UH), Unit 2 2-UH-01: Condensate Return from Unit Heaters to the Deaerator Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-UH-073 Text19: 4 1 2 FL 1 1 1 2 No No Based on engineering judgment, A209775 P&ID Condensate Receiver these lines are not as susceptible Vent to Atmosphere as the numbers may imply.
Susceptibility level was lowered accordingly. This large bore line is important to plant operation and/or is a personnel safety issue upon failure.
2-UH-074 Text19: 3 1 2 FL 2 1 1 2 No No This large bore line is important to A209775 P&ID Condensate Receiver plant operation and/or is a Drain to Cond. Return personnel safety issue upon Pump #21 failure.
2-UH-075 Text19: 3 1 2 FL 2 1 1 2 No No This large bore line is important to A209775 P&ID Condensate Receiver plant operation and/or is a Drain to Cond. Return personnel safety issue upon Pump #22 failure.
2-UH-077 Text19: 4 1 2 FL 2 1 1 2 No No This large bore line is important to A209775 P&ID Cond. Return Pump #21 plant operation and/or is a Discharge personnel safety issue upon failure.
2-UH-078 Text19: 4 1 2 FL 2 1 1 2 No No This large bore line is important to A209775 P&ID Cond. Return Pump #21 plant operation and/or is a Discharge personnel safety issue upon failure.
Text19:
2-UH-079 2 1 2 FP 2 1 1 2 No No This line exists in an area B193201 P&ID Line from #20 House accessible by plant personnel Service Boiler to Service during operation, and a leak Boiler Deaerator presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix C, Revision 2 Page C-45 of 47
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Condensate Return Unit Heater Steam Traps (UHT), Unit 2 2-UHT-01: Steam Trap Lines from the Condensate Return from Unit Heaters to the Deaerator system Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-UHT-005 Text19: 1 1 2 FP 3 1 1 2 No No This line exists in an area A209775 SD No. 29.01 Steam to UHT-510 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-UHT-006 Text19: 1 1 2 FP 3 1 1 2 No No This line exists in an area A209775 SD No. 29.01 Steam to UHT-511 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-UHT-024-A Text19: 4 1 2 FL 1 3 1 2 No No This large bore line is important to A209775 P&ID Steam to UHT-512 and plant operation and/or is a 513 personnel safety issue upon failure.
Report No. 0700.104-03, Appendix C, Revision 2 Page C-46 of 47
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Report Header Legend:
F Consequence of Failure 1 = High Consequence of Failure (Category 1) 2 = Low Consequence of Failure (Category 2)
S Susceptibility level 1 = High Susceptibility 2 = Moderate Susceptibility 3 = Low Susceptibility F Crit. Consequence of Failure Criteria (see below)
Q Operating Quality code 1 = 30% to 99.5%
2 = < 30%
3 = > 99.5%
T Operating Temperature code 1 = 250 to 350 deg F 2 = 350 to 400 deg F 3 = < 250 deg F, > 400 deg F O Operating time code 1 = Lines operating frequently or w/ severe cond.
2 = Lines operating infrequently Priority Priority 1 = High Priority 2 = Moderate Priority 3 = Low Priority Plant Exp. Plant Experience Ind. Exp. Industry Experience Consequence of Failure Criteria (F Crit.) Legend:
FI High consequence of Failure: non-Isolable line FL High consequence of Failure: Large-bore line FP High consequence of Failure: Personnel safety issue (frequently accessed location)
FS High consequence of Failure: Safety-related line FT High consequence of Failure: shutdown or Trip upon failure Report No. 0700.104-03, Appendix C, Revision 2 Page C-47 of 47
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Appendix D SNM Program Lines Sorted by Susceptibility High Consequence of Failure - Low Susceptibility Indian Point Unit 2 Report No. 0700.104-03, Appendix D, Revision 2 Page D-1 of 16
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam (MS), Unit 2 2-MS-01: Main Steam from Stm Gen to HP Turbine, BFP Turbine, MSRs, Aux. Steam, SJAEs, and Priming Ejectors.
Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MS-001 Text19: 28 1 3 FL 3 3 1 3 No No High quality main steam line. 9321-F-2017, PEPSE Main Steam from Steam This large bore line is important to A235308 Generator 21 Shell plant operation and/or is a personnel safety issue upon failure.
2-MS-002 Text19: 28 1 3 FL 3 3 1 3 No No High quality main steam line. 9321-F-2017, PEPSE Main Steam from Steam This large bore line is important to A235308 Generator 22 Shell plant operation and/or is a personnel safety issue upon failure.
2-MS-003 Text19: 28 1 3 FL 3 3 1 3 No No High quality main steam line. 9321-F-2017, PEPSE Main Steam from Steam This large bore line is important to A235308 Generator 23 Shell plant operation and/or is a personnel safety issue upon failure.
Text19:
2-MS-004 28 1 3 FL 3 3 1 3 No No High quality main steam line. 9321-F-2017, PEPSE Main Steam from Steam This large bore line is important to A235308 Generator 24 Shell plant operation and/or is a personnel safety issue upon failure.
Text19:
2-MS-005 24 1 3 FL 3 3 1 3 No No High quality main steam line. A235308 PEPSE Line from 2-MS-001 to This large bore line is important to Seal Steam and MSR plant operation and/or is a Header.
personnel safety issue upon failure.
Text19:
2-MS-006 24 1 3 FL 3 3 1 3 No No High quality main steam line. A235308 PEPSE Line from 2-MS-002 to This large bore line is important to Gland Seal Steam and plant operation and/or is a MSR B Header.
personnel safety issue upon failure.
2-MS-007 Text19: 20 1 3 FL 3 3 1 3 No No High quality main steam line. A235308, PEPSE Gland Seal Steam, MSR This large bore line is important to A227780 B, and Aux. Steam plant operation and/or is a Header.
personnel safety issue upon failure.
Report No. 0700.104-03, Appendix D, Revision 2 Page D-2 of 16
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam (MS), Unit 2 2-MS-01: Main Steam from Stm Gen to HP Turbine, BFP Turbine, MSRs, Aux. Steam, SJAEs, and Priming Ejectors.
Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MS-008 Text19: 24 1 3 FL 3 3 1 3 No No High quality main steam line. A235308 PEPSE Line from 2-MS-001 (3) to This large bore line is important to MSR A Header plant operation and/or is a personnel safety issue upon failure.
2-MS-009 Text19: 24 1 3 FL 3 3 1 3 No No High quality main steam line. A235308 PEPSE Line from 2-MS-004 to This large bore line is important to MSR A Header plant operation and/or is a personnel safety issue upon failure.
2-MS-010 Text19: 20 1 3 FL 3 3 1 3 No No High quality main steam line. A235308, PEPSE MSR A, BFP Turbine, This large bore line is important to A227780 SJAE, and Priming plant operation and/or is a Ejector Header personnel safety issue upon failure.
Text19:
2-MS-011 28 1 3 FL 3 3 1 3 No No High quality main steam line. A235308 PEPSE Main Steam to NE HP This large bore line is important to Turbine Inlet plant operation and/or is a personnel safety issue upon failure.
Text19:
2-MS-011-A 4 1 3 FL 3 3 1 3 No No High quality main steam line. A235308 PEPSE MS-863 Bypass This large bore line is important to plant operation and/or is a personnel safety issue upon failure.
Text19:
2-MS-012 28 1 3 FL 3 3 1 3 No No High quality main steam line. A235308 PEPSE Main Steam to SE HP This large bore line is important to Turbine Inlet plant operation and/or is a personnel safety issue upon failure.
2-MS-012-A Text19: 4 1 3 FL 3 3 1 3 No No High quality main steam line. A235308 PEPSE MS-864 Bypass This large bore line is important to plant operation and/or is a personnel safety issue upon failure.
Report No. 0700.104-03, Appendix D, Revision 2 Page D-3 of 16
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam (MS), Unit 2 2-MS-01: Main Steam from Stm Gen to HP Turbine, BFP Turbine, MSRs, Aux. Steam, SJAEs, and Priming Ejectors.
Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MS-013 Text19: 28 1 3 FL 3 3 1 3 No No High quality main steam line. A235308 PEPSE Main Steam to NW HP This large bore line is important to Turbine Inlet plant operation and/or is a personnel safety issue upon failure.
2-MS-013-A Text19: 4 1 3 FL 3 3 1 3 No No High quality main steam line. A235308 PEPSE MS-865 Bypass This large bore line is important to plant operation and/or is a personnel safety issue upon failure.
2-MS-014 Text19: 28 1 3 FL 3 3 1 3 No No High quality main steam line. A235308 PEPSE Main Steam to SW HP This large bore line is important to Turbine Inlet plant operation and/or is a personnel safety issue upon failure.
Text19:
2-MS-014-A 4 1 3 FL 3 3 1 3 No No High quality main steam line. A235308 PEPSE MS-866 Bypass This large bore line is important to plant operation and/or is a personnel safety issue upon failure.
Text19:
2-MS-015 20 1 3 FL 3 3 1 3 No No High quality main steam line. A235308 PEPSE Main Steam Balancing This large bore line is important to Line between 2-MS-001 plant operation and/or is a and 2-MS-003 personnel safety issue upon failure.
Text19:
2-MS-016 12 1 3 FL 3 3 1 3 No No High quality main steam line. A227780 PEPSE Main Steam to Reheater This large bore line is important to Steam Control Station A.
plant operation and/or is a personnel safety issue upon failure.
2-MS-017 Text19: 8 1 3 FL 3 3 1 3 No No High quality main steam line. A227780 PEPSE Reheater Steam Control This large bore line is important to Station A line to PCV plant operation and/or is a 1175-1 personnel safety issue upon failure.
Report No. 0700.104-03, Appendix D, Revision 2 Page D-4 of 16
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam (MS), Unit 2 2-MS-01: Main Steam from Stm Gen to HP Turbine, BFP Turbine, MSRs, Aux. Steam, SJAEs, and Priming Ejectors.
Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MS-018 Text19: 8 1 3 FL 3 3 1 3 No No High quality main steam line. A227780 PEPSE Reheater Steam Control This large bore line is important to Station A line to PCV plant operation and/or is a 1175-2 personnel safety issue upon failure.
2-MS-019 Text19: 1 1 3 FP 3 3 1 3 No No High quality main steam line. A227780 PEPSE Reheater Steam Control This line exists in an area Station A line to PCV accessible by plant personnel 1108 during operation, and a leak presents a burn risk to a passerby.
2-MS-020 Text19: 12 1 3 FL 3 3 1 3 No No High quality main steam line. A227780 PEPSE Reheater Steam Header This large bore line is important to A plant operation and/or is a personnel safety issue upon failure.
Text19:
2-MS-021 6 1 3 FL 3 3 1 3 No No High quality main steam line. A227780 PEPSE Reheater Header to MSR This large bore line is important to 21A plant operation and/or is a personnel safety issue upon failure.
Text19:
2-MS-022 6 1 3 FL 3 3 1 3 No No High quality main steam line. A227780 PEPSE Reheater Header to MSR This large bore line is important to 22A plant operation and/or is a personnel safety issue upon failure.
Text19:
2-MS-023 6 1 3 FL 3 3 1 3 No No High quality main steam line. A227780 PEPSE Reheater Header to MSR This large bore line is important to 23A plant operation and/or is a personnel safety issue upon failure.
2-MS-024 Text19: 12 1 3 FL 3 3 1 3 No No High quality main steam line. A227780 PEPSE Main Steam to Reheater This large bore line is important to Steam Control Station B.
plant operation and/or is a personnel safety issue upon failure.
Report No. 0700.104-03, Appendix D, Revision 2 Page D-5 of 16
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam (MS), Unit 2 2-MS-01: Main Steam from Stm Gen to HP Turbine, BFP Turbine, MSRs, Aux. Steam, SJAEs, and Priming Ejectors.
Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MS-025 Text19: 8 1 3 FL 3 3 1 3 No No High quality main steam line. A227780 PEPSE Reheater Steam Control This large bore line is important to Station B line to PCV plant operation and/or is a 1175-3 personnel safety issue upon failure.
2-MS-026 Text19: 8 1 3 FL 3 3 1 3 No No High quality main steam line. A227780 PEPSE Reheater Steam Control This large bore line is important to Station B line to PCV plant operation and/or is a 1175-4 personnel safety issue upon failure.
2-MS-027 Text19: 1 1 3 FP 3 3 1 3 No No High quality main steam line. A227780 PEPSE Reheater Steam Control This line exists in an area Station B line to PCV accessible by plant personnel 1109 during operation, and a leak presents a burn risk to a passerby.
Text19:
2-MS-028 12 1 3 FL 3 3 1 3 No No High quality main steam line. A227780 PEPSE Reheater Steam Header This large bore line is important to B plant operation and/or is a personnel safety issue upon failure.
Text19:
2-MS-029 6 1 3 FL 3 3 1 3 No No High quality main steam line. A227780 PEPSE Reheater Header to MSR This large bore line is important to 21B plant operation and/or is a personnel safety issue upon failure.
Text19:
2-MS-030 6 1 3 FL 3 3 1 3 No No High quality main steam line. A227780 PEPSE Reheater Header to MSR This large bore line is important to 22B plant operation and/or is a personnel safety issue upon failure.
2-MS-031 Text19: 6 1 3 FL 3 3 1 3 No No High quality main steam line. A227780 PEPSE Reheater Header to MSR This large bore line is important to 23B plant operation and/or is a personnel safety issue upon failure.
Report No. 0700.104-03, Appendix D, Revision 2 Page D-6 of 16
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam (MS), Unit 2 2-MS-01: Main Steam from Stm Gen to HP Turbine, BFP Turbine, MSRs, Aux. Steam, SJAEs, and Priming Ejectors.
Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MS-032 Text19: 1 1 3 FP 3 3 1 3 No No High quality main steam line. A227780 PEPSE Reheater Cal. Line This line exists in an area accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MS-033 Text19: 4 1 3 FL 3 3 1 3 No No High quality main steam line. A227780 PEPSE Main Steam to BFP #21 This large bore line is important to Turbine plant operation and/or is a personnel safety issue upon failure.
2-MS-034 Text19: 4 1 3 FL 3 3 1 3 No No High quality main steam line. A227780 PEPSE Main Steam to BFP #22 This large bore line is important to Turbine plant operation and/or is a personnel safety issue upon failure.
Text19:
2-MS-035 6 1 3 FL 3 3 1 3 No No High quality main steam line. A227780 PEPSE Main Steam to SJAEs This large bore line is important to and Priming Ejectors plant operation and/or is a personnel safety issue upon failure.
Text19:
2-MS-036-A 3 1 3 FL 3 3 1 3 No No High quality main steam line. A227780 PEPSE SJAE Steam Supply This large bore line is important to Upstream of PCV 1132 plant operation and/or is a personnel safety issue upon failure.
Text19:
2-MS-059-A 6 1 3 FL 3 3 1 3 No No High quality main steam line. A227780 PEPSE Main Steam to Priming This large bore line is important to Ejectors Header plant operation and/or is a Upstream of PCV 1133 personnel safety issue upon failure.
2-MS-064 Text19: 12 1 3 FL 3 3 1 3 No No High quality main steam line. A235308 PEPSE Balancing line between This large bore line is important to SE and SW HP Turbine plant operation and/or is a Steam Feed Lines.
personnel safety issue upon failure.
Report No. 0700.104-03, Appendix D, Revision 2 Page D-7 of 16
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam (MS), Unit 2 2-MS-01: Main Steam from Stm Gen to HP Turbine, BFP Turbine, MSRs, Aux. Steam, SJAEs, and Priming Ejectors.
Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MS-192 Text19: 4 1 3 FL 3 3 1 3 No No High quality main steam line. A227780 PEPSE Main Steam Header to This large bore line is important to Aux. Steam Upstream of plant operation and/or is a PCV-1015 personnel safety issue upon failure.
2-MS-06: Main Steam Supply to Gland Steam Header Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description Text19:
2-MS-187 4 1 3 FL 3 3 1 3 No No High quality main steam line. A235308 PEPSE Main Steam Supply to This large bore line is important to Gland Seal Regulator plant operation and/or is a Station personnel safety issue upon failure.
2-MS-188-A Text19: 3 1 3 FL 3 3 1 3 No No High quality main steam line. A235308 PEPSE Gland Seal Steam This large bore line is important to Supply upstream of PCV-plant operation and/or is a 1145-1 personnel safety issue upon failure.
Text19:
2-MS-189-A 3 1 3 FL 3 3 1 3 No No High quality main steam line. A235308 PEPSE Gland Seal Steam This large bore line is important to Supply upstream of PCV-plant operation and/or is a 1145-2 personnel safety issue upon failure.
Report No. 0700.104-03, Appendix D, Revision 2 Page D-8 of 16
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam Traps (MST), Unit 2 2-MST-01: Steam Trap Lines from the Main Steam System Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MST-080-A Text19: 1.5 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main steam to MST-1 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-081-A Text19: 1.5 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main steam to MST-2 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-082-A Text19: 1.5 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main steam to MST-3 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-083-A Text19: 1.5 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main Steam from Drain accessible by plant personnel Pot to MST-4 during operation, and a leak presents a burn risk to a passerby.
2-MST-083-B Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main Steam from MS accessible by plant personnel 24 US Leakoff to MST-4.
during operation, and a leak presents a burn risk to a passerby.
2-MST-084-A Text19: 1.25 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main Steam from MS accessible by plant personnel 21 US Leakoff to MST-5 during operation, and a leak presents a burn risk to a passerby.
Text19:
2-MST-085-A 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main Steam from MS-2A accessible by plant personnel US Leakoff to MST-6 during operation, and a leak presents a burn risk to a passerby.
2-MST-085-B Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main Steam from MS accessible by plant personnel 21 DS Leakoff to MST-6 during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix D, Revision 2 Page D-9 of 16
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam Traps (MST), Unit 2 2-MST-01: Steam Trap Lines from the Main Steam System Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MST-086-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main Steam from MS-2A accessible by plant personnel DS Leakoff to MST-8 during operation, and a leak presents a burn risk to a passerby.
2-MST-087-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main Steam from MS-2B accessible by plant personnel DS Leakoff to MST-9 during operation, and a leak presents a burn risk to a passerby.
2-MST-088-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main Steam from MS accessible by plant personnel 22 DS Leakoff to MST-10 during operation, and a leak presents a burn risk to a passerby.
2-MST-088-B Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main Steam from MS-2B accessible by plant personnel US Leakoff to MST-10 during operation, and a leak presents a burn risk to a passerby.
2-MST-089-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main Steam from MS accessible by plant personnel 22 US Leakoff to MST-12 during operation, and a leak presents a burn risk to a passerby.
2-MST-090-A Text19: 1.25 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main Steam from MS accessible by plant personnel 23 US Leakoff to MST-13 during operation, and a leak presents a burn risk to a passerby.
Text19:
2-MST-091-A 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main Steam from MS accessible by plant personnel 23 DS Leakoff to MST-14 during operation, and a leak presents a burn risk to a passerby.
2-MST-091-B Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main Steam from MS-2C accessible by plant personnel US Leakoff to MST-14 during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix D, Revision 2 Page D-10 of 16
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam Traps (MST), Unit 2 2-MST-01: Steam Trap Lines from the Main Steam System Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MST-092-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main Steam from MS-2C accessible by plant personnel DS Leakoff to MST-16 during operation, and a leak presents a burn risk to a passerby.
2-MST-093-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main Steam from MS accessible by plant personnel 24 DS Leakoff to MST-18 during operation, and a leak presents a burn risk to a passerby.
2-MST-093-B Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main Steam from MS-2D accessible by plant personnel US Leakoff to MST-18 during operation, and a leak presents a burn risk to a passerby.
2-MST-094-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main Steam from MS-2D accessible by plant personnel DS Leakoff to MST-20 during operation, and a leak presents a burn risk to a passerby.
2-MST-095-A Text19: 1.5 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main Steam to MST-21 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-096-A Text19: 1.5 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main Steam to MST-22 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-097-A Text19: 1.5 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main Steam to MST-23 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-098-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Exit Nozzle US of Valve accessible by plant personnel MS-90-1 during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix D, Revision 2 Page D-11 of 16
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam Traps (MST), Unit 2 2-MST-01: Steam Trap Lines from the Main Steam System Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MST-099-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main Steam to MST-25 accessible by plant personnel via Steam Dump Lines during operation, and a leak presents a burn risk to a passerby.
2-MST-100-A Text19: 1.25 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2042 PEPSE Main Steam to MST-26 accessible by plant personnel via Steam Dump Lines during operation, and a leak presents a burn risk to a passerby.
2-MST-101-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main Steam to MST-27 accessible by plant personnel via Steam Dump Lines during operation, and a leak presents a burn risk to a passerby.
2-MST-102-A Text19: 1.25 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2042 PEPSE Main Steam to MST-28 accessible by plant personnel via Steam Dump Lines during operation, and a leak presents a burn risk to a passerby.
2-MST-103-A Text19: 1.25 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2042 PEPSE Main Steam to MST-29 accessible by plant personnel via Steam Dump Lines during operation, and a leak presents a burn risk to a passerby.
2-MST-104-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2042 PEPSE Main Steam to MST-30 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-105-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2042 PEPSE Main Steam to MST-31 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-106-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2042 PEPSE Main Steam to MST-32 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix D, Revision 2 Page D-12 of 16
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam Traps (MST), Unit 2 2-MST-01: Steam Trap Lines from the Main Steam System Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MST-108-A Text19: 1.25 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2042 PEPSE Main Steam to MST-34 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-109-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2042 PEPSE Main Steam to MST-35 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-110-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main Steam to MST-36 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-111-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2042 PEPSE Main Steam to MST-37 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-112-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2042 PEPSE Main Steam to MST-38 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-113-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2042 PEPSE Main Steam to MST-39 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-114-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2042 PEPSE Main Steam to MST-40 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-115-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Main Steam to MST-41 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix D, Revision 2 Page D-13 of 16
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam Traps (MST), Unit 2 2-MST-01: Steam Trap Lines from the Main Steam System Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MST-116-A Text19: 1.25 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2042 PEPSE Main Steam to MST-42 accessible by plant personnel via Steam Dump Lines during operation, and a leak presents a burn risk to a passerby.
2-MST-117-A Text19: 1.25 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2042 PEPSE Main Steam to MST-43 accessible by plant personnel via Steam Dump Lines during operation, and a leak presents a burn risk to a passerby.
2-MST-118-A Text19: 1.25 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2042 PEPSE Main Steam to MST-44 accessible by plant personnel via Steam Dump Lines during operation, and a leak presents a burn risk to a passerby.
2-MST-119-A Text19: 1.25 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2042 PEPSE Main Steam to MST-45 accessible by plant personnel via Steam Dump Lines during operation, and a leak presents a burn risk to a passerby.
2-MST-120-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2042 PEPSE Main Steam to MST-46 accessible by plant personnel via Steam Dump Lines during operation, and a leak presents a burn risk to a passerby.
2-MST-121-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2042 PEPSE Main Steam to MST-47 accessible by plant personnel via Steam Dump Lines during operation, and a leak presents a burn risk to a passerby.
Text19:
2-MST-122-A 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2042 PEPSE Main Steam to MST-48 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-123-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2042 PEPSE Main Steam to MST-49 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix D, Revision 2 Page D-14 of 16
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Main Steam Traps (MST), Unit 2 2-MST-01: Steam Trap Lines from the Main Steam System Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-MST-124-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2042 PEPSE Main Steam to MST-50 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-125-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2042 PEPSE Main Steam to MST-51 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-126-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2042 PEPSE Main Steam to MST-52 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-135-A Text19: 1 1 3 FP 3 3 1 3 No No This line exists in an area 9321-F-2041 PEPSE Steam to MST-64 accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
2-MST-193-A Text19: 0.75 1 3 FP 3 3 1 3 No No High quality main steam line. A227780 PEPSE Main Steam to MST-100 This line exists in an area accessible by plant personnel during operation, and a leak presents a burn risk to a passerby.
Report No. 0700.104-03, Appendix D, Revision 2 Page D-15 of 16
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Report Header Legend:
F Consequence of Failure 1 = High Consequence of Failure (Category 1) 2 = Low Consequence of Failure (Category 2)
S Susceptibility level 1 = High Susceptibility 2 = Moderate Susceptibility 3 = Low Susceptibility F Crit. Consequence of Failure Criteria (see below)
Q Operating Quality code 1 = 30% to 99.5%
2 = < 30%
3 = > 99.5%
T Operating Temperature code 1 = 250 to 350 deg F 2 = 350 to 400 deg F 3 = < 250 deg F, > 400 deg F O Operating time code 1 = Lines operating frequently or w/ severe cond.
2 = Lines operating infrequently Priority Priority 1 = High Priority 2 = Moderate Priority 3 = Low Priority Plant Exp. Plant Experience Ind. Exp. Industry Experience Consequence of Failure Criteria (F Crit.) Legend:
FI High consequence of Failure: non-Isolable line FL High consequence of Failure: Large-bore line FP High consequence of Failure: Personnel safety issue (frequently accessed location)
FS High consequence of Failure: Safety-related line FT High consequence of Failure: shutdown or Trip upon failure Report No. 0700.104-03, Appendix D, Revision 2 Page D-16 of 16
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Appendix E SNM Program Lines Sorted by Susceptibility Low Consequence of Failure Indian Point Unit 2 Report No. 0700.104-03, Appendix E, Revision 2 Page E-1 of 15
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Auxiliary Feedwater (AF), Unit 2 2-AF-01: Service Boiler Auxiliary Feedwater Lines Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-AF-007 Text19: 1.5 2 N/A No No 9321-F-2120 P&ID Boiler Feed Pump overflow header to Deaerator 2-AF-008 Text19: 1.5 2 N/A No No 9321-F-2120 P&ID Boiler Feed Pump discharge Unit #3 tie-in.
2-AF-011-B Text19: 1 2 N/A No No 9321-F-2120 P&ID #21 BFP discharge overflow line downstream of orifice 2-AF-012-B Text19: 1 2 N/A No No 9321-F-2120 P&ID #22 BFP discharge overflow line downstream of orifice Text19:
2-AF-013-B 1 2 N/A No No 9321-F-2120 P&ID #23 BFP discharge overflow line downstream of orifice Text19:
2-AF-024 0.75 2 N/A No No 9321-F-2120 P&ID RH Boiler #21 Continuous Blowdown Line Text19:
2-AF-025 1.5 2 N/A No No 9321-F-2120 P&ID RH Boiler #21 Intermittent Blowdown Line Text19:
2-AF-026 0.75 2 N/A No No 9321-F-2120 P&ID LH Boiler #22 Continuous Blowdown Line 2-AF-027 Text19: 1.5 2 N/A No No 9321-F-2120 P&ID LH Boiler #22 Intermittent Blowdown Line 2-AF-028 Text19: 0.75 2 N/A No No 9321-F-2120 P&ID Continuous Blowdown line to HSBSPCLs 2-AF-029 Text19: 1.5 2 N/A No No 9321-F-2120 P&ID Boiler Blowdown Tank Bottom Drain 2-AF-030 Text19: 1.5 2 N/A No No 9321-F-2120 P&ID Boiler Blowdown Tank Drain Bypass 2-AF-031 Text19: 1.25 2 N/A No No 9321-F-2120 P&ID Boiler Blowdown Tank Drain Vent Report No. 0700.104-03, Appendix E, Revision 2 Page E-2 of 15
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Auxiliary Feedwater (AF), Unit 2 2-AF-01: Service Boiler Auxiliary Feedwater Lines Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-AF-033 Text19: 2 N/A No No B193201, 9321- P&ID ABSPCLB Aux. Feed Inlet F-2120 2-AF-034 Text19: 2 N/A No No 9321-F-2120 P&ID ABSPCLB Aux. Feed Outlet to Dissolved O2 Analyzer 2-AF-035 Text19: 2 N/A No No 9321-F-2120 P&ID ABSPCLB Aux. Feed Outlet to Cooling Bath 2-AF-038 Text19: 1.25 2 N/A No No B193201 P&ID Service Boiler Deaerator Vent 2-AF-042 Text19: 0.75 2 N/A No No B193201 P&ID Drain from multiport valve.
Text19:
2-AF-051 1.5 2 N/A No No B193201 P&ID AF59 Vent to Service Boiler Deaerator 2-AF-052 Text19: 1.5 2 N/A No No B193201 P&ID AF58 Vent to Service Boiler Deaerator 2-AF-053 Text19: 1.5 2 N/A No No B193201 P&ID AF57 Vent to Service Boiler Deaerator 2-AF-054 Text19: 1.5 2 N/A No No B193201 P&ID Check valve vent header to Service Boiler Deaerator Text19:
2-AF-057 2 N/A No No 9321-F-2120 P&ID Chemical Bench Sink Report No. 0700.104-03, Appendix E, Revision 2 Page E-3 of 15
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Auxiliary Steam (AS), Unit 2 2-AS-03: Remainder of Auxiliary Steam Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-AS-018 Text19: 1 2 N/A No No 9321-F-2120 P&ID RH Boiler #21 Atomizing Steam bleed-off line 2-AS-019 Text19: 1 2 N/A No No 9321-F-2120 P&ID LH Boiler #22 Atomizing Steam bleed-off line 2-AS-025 Text19: 1 2 N/A No No 9321-F-2120 P&ID Oil Separator Tank outlet Text19:
2-AS-026 1 2 N/A No No 9321-F-2120 P&ID Oil Separator Tank outlet to Carbon Filter Tank 2-AS-027 Text19: 1 2 N/A No No 9321-F-2120 P&ID Oil Separator Tank outlet to Floor Drain Text19:
2-AS-030 2 2 N/A No No B192490 P&ID Steam to Water Heater Text19:
2-AS-033 1.5 2 N/A No No B192490 P&ID Steam to AS840 Text19:
2-AS-037 1 2 N/A No No B192490 P&ID PRV-7343 Bypass Text19:
2-AS-039 2 N/A No No B192490 P&ID Steam to Screens Text19:
2-AS-048 2 2 N/A No No 192491 P&ID Steam to Service Boiler Phosphate Mix Tanks and Continuous Heaters Text19:
2-AS-060 2 2 N/A No No 192491 P&ID Steam from Heating and Ventilation Pressure Reducing Station Text19:
2-AS-073 2 2 N/A No No 192491 P&ID Header to Service Boiler Phosphate Mix Tanks 2-AS-074 Text19: 0.75 2 N/A No No 192491 P&ID Steam to Service Boiler Phosphate Mix Tank No.
11 2-AS-075 Text19: 0.75 2 N/A No No 192491 P&ID Steam to Service Boiler Phosphate Mix Tank No.
12 2-AS-076 Text19: 2 2 N/A No No 192491 P&ID Steam to Continuous Heaters via AS568 Report No. 0700.104-03, Appendix E, Revision 2 Page E-4 of 15
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Auxiliary Steam (AS), Unit 2 2-AS-03: Remainder of Auxiliary Steam Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-AS-077 Text19: 2 2 N/A No No 192491 P&ID Steam to Continuous Heaters via AS112 2-AS-079 Text19: 2 2 N/A No No 192491 P&ID Steam header to Continuous Heaters via AS568 2-AS-080 Text19: 1 2 N/A No No 192491 P&ID Steam to Continuous Heater No. 11 2-AS-081 Text19: 1 2 N/A No No 192491 P&ID Steam to Continuous Heater No. 12 2-AS-082-B Text19: 1.5 2 N/A No No 192491 P&ID Floor trench drain downstream of cap 2-AS-091 Text19: 0.75 2 N/A No No B227209 P&ID Port Basin drain from Aux. Steam supply to ACFTs Text19:
2-AS-093 1.5 2 N/A No No B227209 P&ID PRV-5245 Bypass Report No. 0700.104-03, Appendix E, Revision 2 Page E-5 of 15
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Auxiliary Steam Traps (AST), Unit 2 2-AST-01: Steam Trap Lines from Auxiliary Steam Lines Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-AST-006 Text19: 1.5 2 N/A No No 9321-F-2120 P&ID Steam to Hot Water Heat Exchangers 2-AST-007 Text19: 0.75 2 N/A No No 9321-F-2120 P&ID Steam to and from AS-1176 2-AST-007-A Text19: 1 2 N/A No No 9321-F-2120 P&ID Steam to Condensate Return via AST-35 2-AST-009 Text19: 2 2 N/A No No 9321-F-2120 P&ID Hot Water Heat Exchangers Discharge Line 2-AST-011 Text19: 0.75 2 N/A No No 9321-F-2120 P&ID Steam to and from AS-1093 2-AST-013 Text19: 2 N/A No No 9321-F-2120 P&ID Steam Supply Drain to Condensate Return via AST-31 Text19:
2-AST-019 1 2 N/A No No A209775 P&ID AST-33 Discharge Text19:
2-AST-021-A 1 2 N/A No No A209775 P&ID AST-20 Discharge Text19:
2-AST-024 1 2 N/A No No 9321-F-2120 P&ID Fuel Oil heating steam outlet from steam traps to oil separator tank Text19:
2-AST-034 0.75 2 N/A No No B192490 P&ID Steam to and from AS849 Text19:
2-AST-035-A 0.75 2 N/A No No A209775 P&ID AST-6 Discharge Text19:
2-AST-036 0.75 2 N/A No No A209775 P&ID AST-7 Discharge Text19:
2-AST-037 1.5 2 N/A No No A209775 P&ID AST-4 Discharge Text19:
2-AST-038 0.75 2 N/A No No B192490 P&ID Steam to and from UH-1238 2-AST-038-A Text19: 0.75 2 N/A No No A209775 P&ID AST-5 Discharge Text19:
2-AST-041 1 2 N/A No No B192490 P&ID Steam to and from AST-27 Report No. 0700.104-03, Appendix E, Revision 2 Page E-6 of 15
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Auxiliary Steam Traps (AST), Unit 2 2-AST-01: Steam Trap Lines from Auxiliary Steam Lines Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-AST-042 Text19: 1 2 N/A No No B192490 P&ID AST-27 Bypass Text19:
2-AST-043 1 2 N/A No No B192490 P&ID Steam to and from AST-42 2-AST-044 Text19: 1 2 N/A No No B192490 P&ID AST-42 Bypass Text19:
2-AST-049-A 0.5 2 N/A No No 192491 P&ID Steam to and from AST-38 2-AST-050-A Text19: 0.5 2 N/A No No 192491 P&ID Steam to and from AST-37 2-AST-052 Text19: 0.75 2 N/A No No 192491 P&ID Steam to and from AST-45 Text19:
2-AST-058 1 2 N/A No No A209775 P&ID AST-2 Discharge Text19:
2-AST-059 1 2 N/A No No A209775 P&ID AST-3 Discharge Text19:
2-AST-061 1 2 N/A No No 192491 P&ID Steam to and from AST-39 2-AST-063 Text19: 1 2 N/A No No 192491 P&ID Steam to and from AST-32 Text19:
2-AST-065 1 2 N/A No No 192491 P&ID AST-32 and 39 drain to Cond. Return Header Text19:
2-AST-066 2 2 N/A No No 192491 P&ID Steam to and from FP-1198 2-AST-067 Text19: 2 2 N/A No No 192491 P&ID Steam to and from UH-1300 2-AST-069-B Text19: 1 2 N/A No No 192491 P&ID Steam to and from AST-30 Report No. 0700.104-03, Appendix E, Revision 2 Page E-7 of 15
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Heater Drains & Vents (HD), Unit 2 2-1HD-02: #21 Feedwater Heater Vents Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-1HD-027 Text19: 1 2 N/A No No Low Temp and Press. Leak- A235304 PEPSE FWH 21A 1" Vent to before-break situation. Condenser 23 2-1HD-028 Text19: 1 2 N/A No No Low Temp and Press. Leak- A235304 PEPSE FWH 21B 1" Vent to before-break situation. Condenser 22 2-1HD-029 Text19: 1 2 N/A No No Low Temp and Press. Leak- A235304 PEPSE FWH 21C 1" Vent to before-break situation. Condenser 21 Report No. 0700.104-03, Appendix E, Revision 2 Page E-8 of 15
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Service Boiler (SB), Unit 2 2-SB-01: Service Boiler Lines Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-SB-004 Text19: 2 2 N/A No No 9321-F-2120 P&ID Steam to Condensate Return, Hot Water Heat Exchangers, and Office Unit Heaters 2-SB-005 Text19: 2 2 N/A No No 9321-F-2120 P&ID Steam to Hot Water Heat Exchangers and Office Unit Heaters 2-SB-011 Text19: 1 2 N/A No No 9321-F-2120 P&ID Header Drain to AST-35 Text19:
2-SB-012 1.5 2 N/A No No 9321-F-2120 P&ID Steam to Office Unit Heaters 2-SB-022 Text19: 2 2 N/A No No A209775 P&ID Steam trap header to Cond. Receiver Text19:
2-SB-043 1.5 2 N/A No No 9321-F-2021, P&ID Line from #10 House B193201 Service Boiler Deaerator Report No. 0700.104-03, Appendix E, Revision 2 Page E-9 of 15
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Condensate Return Unit Heater Steam Traps (UHT), Unit 2 2-UHT-01: Steam Trap Lines from the Condensate Return from Unit Heaters to the Deaerator system Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-UHT-007 Text19: 2 2 N/A No No A209775 P&ID Steam trap header to Cond. Receiver from UHT-510.
2-UHT-008 Text19: 1 2 N/A No No A209775 P&ID Steam from gland steam supply steam traps 2-UHT-009 Text19: 2 2 N/A No No A209775 P&ID Steam to and from 215UHR 2-UHT-010 Text19: 2 2 N/A No No A209775 P&ID Steam to and from 217UHR 2-UHT-011 Text19: 2 2 N/A No No A209775 P&ID Steam to and from 29UHR 2-UHT-012 Text19: 2 2 N/A No No A209775 P&ID Steam to and from 22UHR Text19:
2-UHT-013 1 2 N/A No No A209775 P&ID Steam to and from UHT-2-1 2-UHT-014 Text19: 2 2 N/A No No A209775 P&ID Steam to and from 221UHR 2-UHT-015 Text19: 2 2 N/A No No A209775 P&ID Steam to and from 219UHR Text19:
2-UHT-016 2 2 N/A No No A209775 P&ID Steam to and from 211UHR 2-UHT-017 Text19: 2 2 N/A No No A209775 P&ID Steam to and from 24UHR 2-UHT-018 Text19: 1 2 N/A No No A209775 P&ID Steam to and from UHT-2-2 2-UHT-019 Text19: 2 2 N/A No No A209775 P&ID Steam to and from 225UHR 2-UHT-020 Text19: 2 2 N/A No No A209775 P&ID Steam to and from 224UHR Report No. 0700.104-03, Appendix E, Revision 2 Page E-10 of 15
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Condensate Return Unit Heater Steam Traps (UHT), Unit 2 2-UHT-01: Steam Trap Lines from the Condensate Return from Unit Heaters to the Deaerator system Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-UHT-021 Text19: 2 2 N/A No No A209775 P&ID Steam to and from 223UHR 2-UHT-022 Text19: 2 2 N/A No No A209775 P&ID Steam to and from 213UHR 2-UHT-023 Text19: 2 2 N/A No No A209775 P&ID Steam to and from 27UHR 2-UHT-024 Text19: 1 2 N/A No No A209775 P&ID Steam to and from UHT-1-1 2-UHT-025 Text19: 1 2 N/A No No A209775 P&ID Steam to and from Oil Preheater Text19:
2-UHT-026 1 2 N/A No No A209775 P&ID Steam to and from UHT-4-1 2-UHT-027 Text19: 2 2 N/A No No A209775 P&ID Steam to and from 24AUHR 2-UHT-028 Text19: 1.5 2 N/A No No A209775 P&ID Steam to and from UHT-2-3 2-UHT-029 Text19: 1 2 N/A No No A209775 P&ID Steam to and from 248UHR Text19:
2-UHT-030 1 2 N/A No No A209775 P&ID Steam to and from 250UHR 2-UHT-031 Text19: 1 2 N/A No No A209775 P&ID Steam to and from 249UHR 2-UHT-032 Text19: 1 2 N/A No No A209775 P&ID Steam to and from 252UHR 2-UHT-033 Text19: 1 2 N/A No No A209775 P&ID Steam to and from 251UHR 2-UHT-034 Text19: 1 2 N/A No No A209775 P&ID Steam to and from UHT-11-3 2-UHT-035 Text19: 1 2 N/A No No A209775 P&ID Steam to and from 247UHR Report No. 0700.104-03, Appendix E, Revision 2 Page E-11 of 15
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Condensate Return Unit Heater Steam Traps (UHT), Unit 2 2-UHT-01: Steam Trap Lines from the Condensate Return from Unit Heaters to the Deaerator system Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-UHT-036 Text19: 1 2 N/A No No A209775 P&ID Steam to and from 246UHR 2-UHT-037 Text19: 1 2 N/A No No A209775 P&ID Steam to and from 245UHR 2-UHT-038 Text19: 1 2 N/A No No A209775 P&ID Steam to and from UHT-11-2 2-UHT-039 Text19: 2 2 N/A No No A209775 P&ID UHT-511 outlet Text19:
2-UHT-040 2 2 N/A No No A209775 P&ID Steam to and from 214UHR Text19:
2-UHT-041 2 2 N/A No No A209775 P&ID Steam to and from 216UHR 2-UHT-042 Text19: 2 2 N/A No No A209775 P&ID Steam to and from 218UHR 2-UHT-043 Text19: 2 2 N/A No No A209775 P&ID Steam to and from 220UHR 2-UHT-044 Text19: 2 2 N/A No No A209775 P&ID Steam to and from 222UHR Text19:
2-UHT-045 1 2 N/A No No A209775 P&ID Steam to and from 260UHR Text19:
2-UHT-046 1 2 N/A No No A209775 P&ID Steam to and from UHT-4-2 2-UHT-047 Text19: 2 2 N/A No No A209775 P&ID Steam to and from 21UHR 2-UHT-048 Text19: 2 2 N/A No No A209775 P&ID Steam to and from 28UHR 2-UHT-049 Text19: 2 2 N/A No No A209775 P&ID Steam to and from 23UHR 2-UHT-050 Text19: 2 2 N/A No No A209775 P&ID Steam to and from 210UHR Report No. 0700.104-03, Appendix E, Revision 2 Page E-12 of 15
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Condensate Return Unit Heater Steam Traps (UHT), Unit 2 2-UHT-01: Steam Trap Lines from the Condensate Return from Unit Heaters to the Deaerator system Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-UHT-051 Text19: 2 2 N/A No No A209775 P&ID Steam to and from 212UHR 2-UHT-052 Text19: 2 2 N/A No No A209775 P&ID Steam to and from 25UHR 2-UHT-053 Text19: 0.75 2 N/A No No A209775 P&ID Steam to and from UHT-11-1 2-UHT-056 Text19: 1 2 N/A No No A209775 P&ID UHT-513 Discharge Text19:
2-UHT-057 0.5 2 N/A No No A209775 P&ID UHT-512 Discharge Text19:
2-UHT-060 0.75 2 N/A No No A209775 P&ID 21 Air Tempering Unit Discharge Text19:
2-UHT-061 0.75 2 N/A No No A209775 P&ID 22 Air Tempering Unit Discharge 2-UHT-062 Text19: 1 2 N/A No No A209775 P&ID Steam to various unit heaters 2-UHT-063 Text19: 0.75 2 N/A No No A209775 P&ID Steam to and from UH-TSC-1 2-UHT-064 Text19: 0.75 2 N/A No No A209775 P&ID Steam to and from 242UHR Text19:
2-UHT-065 0.75 2 N/A No No A209775 P&ID Steam to and from 243UHR 2-UHT-066 Text19: 0.75 2 N/A No No A209775 P&ID Steam to and from 244UHR 2-UHT-067 Text19: 0.75 2 N/A No No A209775 P&ID Steam to and from UHT-8-246 2-UHT-068 Text19: 0.75 2 N/A No No A209775 P&ID Steam to and from 253UHR 2-UHT-069 Text19: 2 2 N/A No No A209775 P&ID Unit Heater Drain to Discharge Tunnel Report No. 0700.104-03, Appendix E, Revision 2 Page E-13 of 15
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Condensate Return Unit Heater Steam Traps (UHT), Unit 2 2-UHT-01: Steam Trap Lines from the Condensate Return from Unit Heaters to the Deaerator system Size F Plant Ind.
Line Number (in.) F S Crit. Q T O Priority Exp. Exp. Comments P&ID No. Reference Line Description 2-UHT-089 Text19: 0.75 2 N/A No No B227209 P&ID Steam to and from UH-1020 2-UHT-090 Text19: 0.75 2 N/A No No B227209 P&ID Steam to and from UH-1019 2-UHT-092 Text19: 0.75 2 N/A No No B227209 P&ID Steam to and from UH-1021 Report No. 0700.104-03, Appendix E, Revision 2 Page E-14 of 15
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Report Header Legend:
F Consequence of Failure 1 = High Consequence of Failure (Category 1) 2 = Low Consequence of Failure (Category 2)
S Susceptibility level 1 = High Susceptibility 2 = Moderate Susceptibility 3 = Low Susceptibility F Crit. Consequence of Failure Criteria (see below)
Q Operating Quality code 1 = 30% to 99.5%
2 = < 30%
3 = > 99.5%
T Operating Temperature code 1 = 250 to 350 deg F 2 = 350 to 400 deg F 3 = < 250 deg F, > 400 deg F O Operating time code 1 = Lines operating frequently or w/ severe cond.
2 = Lines operating infrequently Priority Priority 1 = High Priority 2 = Moderate Priority 3 = Low Priority Plant Exp. Plant Experience Ind. Exp. Industry Experience Consequence of Failure Criteria (F Crit.) Legend:
FI High consequence of Failure: non-Isolable line FL High consequence of Failure: Large-bore line FP High consequence of Failure: Personnel safety issue (frequently accessed location)
FS High consequence of Failure: Safety-related line FT High consequence of Failure: shutdown or Trip upon failure Report No. 0700.104-03, Appendix E, Revision 2 Page E-15 of 15
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Appendix F Revision History Report No. 0700.104-03, Appendix F, Revision 2 Page F-1 of 2
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Revision 0 Initial Issue of document.
Revision 1 System, subsystem, and line names were updated to incorporate the new system list.
Revision 2 Lines were updated to incorporate line replacement history. Table F.1 below details the changes:
Table F.1 Line Changes
>E Z
y ŽŽ ^&
y ŽŽ ^&
y ŽŽ ^&
y ŽŽ ^&
y ŽŽ ^&
D^ ŽŽ ^&
D^ ŽŽ ^&
D^ ŽŽ ^&
D^ ŽŽ ^&
D^ ŽŽ ^&
D^ ŽŽ ^&
D^ ŽŽ ^&
D^ ŽŽ ^&
D^ ŽŽ ^&
D^ ŽŽ ^&
D^ ŽŽ ^&
D^ ŽŽ ^&
W ŽŽ ^&
W ŽŽ ^&
Report No. 0700.104-03, Appendix F, Revision 2 Page F-2 of 2
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Attachment A CHECWORKS Parametric Analysis Report No. 0700.104-03, Attachment A, Revision 2 Page Attach A-1 of 4
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program The EPRI computer program CHECWORKS is used to predict corrosion rates for large bore FAC-susceptible conventional piping with known operating conditions. Operating conditions such as temperature, qualities, and flow rate, along with component data such as type of fitting and material, are all inputs to CHECWORKS. The output includes a predicted corrosion rate for each component, which can then be used in the selection process of inspecting components.
In some cases, however, CHECWORKS is of less value. For example, if the operating conditions in a particular line are unknown, the CHECWORKS predicted corrosion rates are highly uncertain. Also, most small-bore lines are socket-welded, and the uncertainty in the fit-up gap makes the CHECWORKS predictions less accurate. In cases like these, it is difficult to predict the absolute wear rates with any accuracy. However, a simplified analytical method of ranking geometries in order of susceptibility is useful in identifying those components that are most likely to experience wall thinning. The method used to rank components in order of relative susceptibility was a parametric CHECWORKS analysis.
For this parametric analysis, it was assumed that for a set of carbon steel components experiencing identical flow conditions (temperature, mass flow rate, and quality), the only difference in predicted corrosion rate would be due to the different geometries. It was further assumed that a uniform change in operating conditions would result in a uniform change in predicted corrosion rates. These assumptions are based on conversations with EPRI personnel.
These assumptions were tested by running several sample CHECWORKS lines. A sample line was created which included every CHECWORKS geometry code. In addition, both short radius (1 R/D) and long radius (1.5 R/D) elbows were included.
The CHECWORKS geometry codes differ for different kinds of tees, elbows, and other fittings.
For example, a fitting with another fitting within one pipe diameter upstream will have a different geometry code than one without a close upstream fitting. A detailed description of the geometry codes is provided in the CHECWORKS User's Guide.
To eliminate variables, the input data was held constant as much as possible. As a baseline case, typical feedwater operating conditions were entered. An outside diameter of 10.75 inches was used for all geometry codes. Also, the same flow rate was used for all geometry codes. An orifice size equal to one half of the inside diameter of the pipe was used. The CHECWORKS default values were used for all other input data. CHECWORKS predicts separate wear rates for the large end and small ends of a reducer as well as the upstream main, downstream main, and branch sections of tees. This necessitated that these geometry codes be modeled multiple times to obtain consistent wear rates. For example, reducers were modeled as both 12-inch by 10 inch and 10 inch by 8 inch. Only the wear rates from the 10 inch sections were used for comparison.
An FAC analysis was performed where the temperature, flow rate, quality, and water chemistry were individually varied. At each set of conditions the predicted corrosion rates were recorded.
The predicted corrosion rates were then normalized. For the single-phase conditions, the wear rate for orifices was significantly higher than the other geometry codes. For the dual-phase conditions, control valves were ranked significantly higher than the other geometry codes. Since the orifice sizes and the throttle positions typically vary, the wear rates for these geometry codes were not used to normalize the wear rates. Instead, the wear rate from the second most highly ranked geometry code was used.
A total of six sets of conditions were run, as listed in Table A.1:
Report No. 0700.104-03, Attachment A, Revision 2 Page Attach A-2 of 4
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Table A.1 CHECWORKS Parametric Analysis Run Conditions Run Temperature Flow Rate Quality Type of Run No. (ºF) (Mlb/hr) 1 500 3 0 Baseline single-phase case 2 350 3 0 Variation of temp 3 500 1.5 0 Variation of flow 4 500 3 50% Two-phase 5 500 3 75% Two-phase 6 500 3 96% Two-phase As expected, altering the water chemistry did not alter the relative ranking of components within the single-phase and two-phase environments. Based on these results, future changes to the secondary water chemistry should not require a revision to the parametric CHECWORKS analysis. The normalized wear rates are presented in Table A.2 of the CHECWORKS parametric analysis.
It was observed that the relative ranking of the various geometries did not change with changes in operating conditions for single-phase conditions. Moreover, the normalized values of predicted corrosion rates did not change for single phase. However, there were slight variations in the relative rankings when the operating quality was varied for dual-phase conditions.
Naturally, the normalized values of wear rate also varied, but this variation was minor. The normalized wear rate varied the most for Type-9 Pipe (>15D). It varied by 0.042, which resulted in its ranking changing by 9 components. However, this was the exception. Most other components varied by less than 0.010. More importantly, the relative ranking for two-phase conditions varied significantly compared to the single-phase conditions. Therefore, the normalized wear rates were averaged to obtain a single ranking for dual-phase condition.
Note that this ranking method is not valid for orifices or pipe downstream of orifices because the predicted corrosion rate for these components strongly depends on the orifice size, which varies independently of the operating conditions. Orifices and pipe downstream of orifices were included only for information purposes and these results should be applied with caution. In addition, control valves may have different flow areas depending on the degree of throttling taking place, and therefore these results should also be applied with caution.
Report No. 0700.104-03, Attachment A, Revision 2 Page Attach A-3 of 4
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Table A.2 CHECWORKS Parametric Analysis Results SINGLE-PHASE CONDITIONS TWO-PHASE CONDITIONS Geometry Normalized Geometry Normalized Component Type Component Type Code Wear Factor Code Wear Factor ORIFICE 6 1.993 CONTROL VALVE 24 1.040 180 BEND, S.R. 5 1.000 GLOBE VALVE 21 1.000 180 BEND, L.R. 5 1.000 TEE, TYPE 14 14 0.769 TEE, TYPE 14 14 0.917 ORIFICE 6 0.724 TEE, TYPE 13 13 0.833 TEE, TYPE 13 13 0.699 TEE, TYPE 11 11 0.833 TEE, TYPE 12 12 0.655 GLOBE VALVE 21 0.833 EXIT NOZZLE 31 0.602 ANGLE VALVE 20 0.833 TEE, TYPE 11 11 0.600 CHECK VALVE 25 0.833 PIPE DS EXP. ELBOW 69 0.600 TEE, TYPE 10 10 0.833 180 BEND, S.R. 5 0.510 CONTROL VALVE 24 0.833 TEE, TYPE 10 10 0.501 GATE VALVE 22 0.833 CHECK VALVE 25 0.482 EXIT NOZZLE 31 0.833 EXP. ELBOW, L.R. 19 0.480 GENERIC VALVE 8 0.833 EXP. ELBOW, S.R. 19 0.480 PIPE DS ANGLE VALVE 70 0.833 180 BEND, L.R. 5 0.480 BUTTERFLY VALVE 23 0.833 GATE VALVE 22 0.442 TEE, TYPE 12 12 0.683 PIPE DS TEE 61 0.432 EXP. ELBOW, L.R. 19 0.668 GENERIC VALVE 8 0.422 EXP. ELBOW, S.R. 19 0.668 INLET NOZZLE 30 0.402 INLET NOZZLE 30 0.667 90 ELBOW, S.R. (>1D) 2 0.397 90 ELBOW, L.R. (<1D) 4 0.617 90 ELBOW, S.R. (<1D) 4 0.397 90 ELBOW, S.R. (>1D) 2 0.617 PIPE DS 90 ELBOW 54 0.385 90 ELBOW, S.R. (<1D) 4 0.617 90 ELBOW, L.R. (>1D) 2 0.369 90 ELBOW, L.R. (>1D) 2 0.617 90 ELBOW, L.R. (<1D) 4 0.369 REDUCER (<1D) 7 0.583 45 ELBOW, S.R. (<1D) 3 0.360 45 ELBOW, L.R. (<1D) 3 0.583 45 ELBOW, S.R. (>1D) 1 0.339 45 ELBOW, S.R. (<1D) 3 0.583 45 ELBOW, L.R. (<1D) 3 0.335 PIPE DS 180 BEND 55 0.583 REDUCER (<1D) 7 0.335 45 ELBOW, S.R. (>1D) 1 0.550 45 ELBOW, L.R. (>1D) 1 0.316 45 ELBOW, L.R. (>1D) 1 0.550 PIPE DS 180 BEND 55 0.310 PIPE DS 90 ELBOW 54 0.533 PIPE (>15D) 9 0.309 RED. ELBOW, L.R. 16 0.518 BUTTERFLY VALVE 23 0.303 RED. ELBOW, S.R. 16 0.518 PIPE DS ANGLE VALVE 70 0.303 EXPANDER 18 0.500 ANGLE VALVE 20 0.302 TEE, TYPE 15 15 0.500 TEE, TYPE 15 15 0.301 PIPE DS TEE 60 0.500 PIPE DS TEE 57 0.301 PIPE DS TEE 61 0.450 PIPE DS 45 ELBOW 53 0.301 PIPE DS 90 ELBOW 52 0.417 PIPE DS TEE 65 0.296 PIPE DS TEE 57 0.417 PIPE DS REDUCER 67 0.280 REDUCER (>1D) 17 0.417 EXPANDER 18 0.265 PIPE DS 45 ELBOW 53 0.417 PIPE DS 90 ELBOW 52 0.251 PIPE DS EXP. ELBOW 69 0.417 RED. ELBOW, L.R. 16 0.250 PIPE DS EXPANDER 68 0.417 RED. ELBOW, S.R. 16 0.250 PIPE DS ORIFICE 56 0.399 PIPE DS 45 ELBOW 51 0.221 PIPE DS 45 ELBOW 51 0.367 PIPE DS EXPANDER 68 0.201 PIPE DS VALVE 58 0.367 REDUCER (>1D) 17 0.201 PIPE DS TEE 64 0.333 PIPE DS ORIFICE 56 0.192 PIPE DS TEE 65 0.333 PIPE DS TEE 60 0.182 PIPE DS RED. ELBOW 66 0.333 PIPE DS VALVE 58 0.177 PIPE DS TEE 62 0.333 PIPE DS TEE 64 0.161 PIPE DS REDUCER 67 0.333 PIPE DS RED. ELBOW 66 0.137 PIPE DS TEE 63 0.333 PIPE DS TEE 62 0.121 PIPE (>15D) 9 0.260 PIPE DS TEE 63 0.121 Report No. 0700.104-03, Attachment A, Revision 2 Page Attach A-4 of 4
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Attachment B Referenced Correspondence and Communication Report No. 0700.104-03, Attachment B, Revision 2 Page Attach B-1 of 7
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Email from Ryan Doremus (CSI) to Ian Mew (IPEC) regarding a Line Naming Convention, dated 7/27/2009.
- Ian, Im close to the point where I will have to start assigning line names for categorization purposes. Since the P&IDs seem to be very good at giving line information (size, pipe class, etc.), I want to propose a simple naming convention that consists of Unit #, System Abbreviation, a sequential number, and if needed a sequential letter that would be used if susceptibility changes within a line.
U-SSS-000-A U = Unit Number SSS = System Abbreviation 000 = Sequential Number A = Section of line that is split for susceptibility.
For example: 2-6EX-003 or 2-BFD-002-A Let me know what you think.
Thank you, Ryan D. Doremus Engineer CSI Technologies, Inc.
(847) 836-3000 x796 rdoremus@csitechnologies.com Report No. 0700.104-03, Attachment B, Revision 2 Page Attach B-2 of 7
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Email from Ian Mew (IPEC) to Ryan Doremus (CSI) regarding responses to information requests, dated 8/10/2009.
- Ryan, Answers to item 6, 9 & 10 will be sent shortly.
,DQ'0HZ
IPEC FAC Engineer Phone 914-827-7741
)URP.RXWVDNRV0LFKDHO
6HQW0RQGD\$XJXVW$0
7R0HZ,DQ
&F.RXWVDNRV0LFKDHO
6XEMHFW5(,3(&8QLW66(610,QIRUPDWLRQ5HTXHVW
/LQHVDFWXDOO\H[LVW7KH\VKRXOGEHLQFOXGHGLQWKH&KHFZRUNVPRGHO
8QGHUQRUPDORSHUDWLRQDOO06WUDSE\SDVVHVDUHQRUPDOO\FORVHGXQOHVVWKHWUDSKDVEHHQ
LGHQWLILHGDVGHILFLHQW
8QGHUQRUPDORSHUDWLRQOHVVWKDQRIWKHWLPH
8QGHUQRUPDORSHUDWLRQOHVVWKDQRIWKHWLPH
8QGHUQRUPDORSHUDWLRQOHVVWKDQRIWKHWLPH
7DONWR-DPHV3HWHUV &KHPLVWU\6XSHUYLVRU
8QGHUQRUPDORSHUDWLRQOHVVWKDQRIWKHWLPH
8QGHUQRUPDORSHUDWLRQOHVVWKDQRIWKHWLPH
7DONWR-DPHV3HWHUV &KHPLVWU\6XSHUYLVRU
7DONWR-DPHV3HWHUV &KHPLVWU\6XSHUYLVRU
)URP0HZ,DQ
6HQW7KXUVGD\$XJXVW$0
7R.RXWVDNRV0LFKDHO
6XEMHFW):,3(&8QLW66(610,QIRUPDWLRQ5HTXHVW Can you answer Questions 1-10 or point me to a person who can.
,DQ'0HZ
IPEC FAC Engineer Phone 914-827-7741
)URP5\DQ'RUHPXV>PDLOWR5'RUHPXV#FVLWHFKQRORJLHVFRP@
6HQW)ULGD\-XO\30
7R0HZ,DQ
6XEMHFW,3(&8QLW66(610,QIRUPDWLRQ5HTXHVW CSI Document No. 0700.104.C.004
- Ian, I completed a cursory review of the SSE/SNM IP2 and have a few pieces of information that would be helpful:
Report No. 0700.104-03, Attachment B, Revision 2 Page Attach B-3 of 7
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program
- 1. Do actual lines exist from the HP Turbine to the Moisture Preseparators or are the Preseparators connected directly to the turbine? If they exist, are they inspected visually or should they be included in the CHECWORKS model?
- 2. Is it safe to assume that all Main Steam steam trap bypass valves on 9321-F-2041 and 9321-F-2042 are normally closed despite the fact that some are shown open?
- 3. Does the Feedwater Heater Bypass line (A235307, G-5) operate more or less than 2% of the time?
- 4. Do the Boiler Feed Pump discharge lines to the Drains Collecting Tank (9321-F-2017, H-6) operate more or less than 2% of the time?
- 5. Does the 18 HP Feedwater Heater Bypass line (9321-F-2019, F-3) operate more or less than 2%
of the time?
- 6. Do the lines from the Heater Drain Pump Discharge to the HDP Water Chemistry Monitor (9321-F-2022, A2) operate more or less than 2% of the time?
- 7. Do the level control lines from the Heater Drain Tank to the Condenser (A235304, A-1 C-1 F-1) operate more or less than 2% of the time?
- 8. Do the Moisture Separator drains to the Drains Collecting Tank (9321-F-2023, H4) operate more or less than 2% of the time?
- 9. Do the SG Blowdown lines to the sample coolers (9321-F-2729, D-6) operate more or less than 2% of the time?
- 10. What is the outlet temperature of the SG Blowdown sample coolers (9321-F-2729, E-6)?
Any information on these would be helpful. Feel free to forward these questions on to system engineers or to send me operating procedures that might answer the questions. To maintain the integrity of the project schedule, we will need these answers by Wednesday, August 5.
In addition to the above, please send the Aux. Steam operating procedures (SOP 29.1.1, 29.1.2, and 29.1.3) and the following drawings:
9321-F-2027 9321-F-2028 9321-F-2033 9321-F-2067 9321-F-2720 9321-F-2722 9321-F-2723 9321-F-2745 9321-F-7020 A205957 B237144 192491 If its possible, I would like to have these drawings and the Aux. Steam OPs by next week, even if they come separately from the questions, to give me time to analyze them. If you have any questions, please feel free to contact me.
Thank you, Ryan D. Doremus Engineer CSI Technologies, Inc.
(847) 836-3000 x796 rdoremus@csitechnologies.com Report No. 0700.104-03, Attachment B, Revision 2 Page Attach B-4 of 7
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Email from Ian Mew (IPEC) to Ryan Doremus (CSI) regarding responses to information requests, dated 8/13/2009.
See Answers below.
,DQ'0HZ
IPEC FAC Engineer Phone 914-827-7741
)URP0HZ,DQ
6HQW0RQGD\$XJXVW$0
7R3HWHUV-DPHV*
6XEMHFW):,3(&8QLW66(610,QIRUPDWLRQ5HTXHVW
- Jim, Can you answer the following questions? I need the answer to develop a System Susceptibility Evaluation for the FAC program for IP2.
- 11. Do the lines from the Heater Drain Pump Discharge to the HDP Water Chemistry Monitor (9321-F-2022, A2) operate more or less than 2% of the time? Yes 1 month a year - all material is SS after the root isolation valve which is less than 1 foot long
- 12. Do the SG Blowdown lines to the sample coolers (9321-F-2729, D-6) operate more or less than 2% of the time? Sample lines are all SS from the blowdown lines thru the coolers
- 13. What is the outlet temperature of the SG Blowdown sample coolers (9321-F-2729, E-6)? - from CCW heat exchanger outlet temp is <140F
,DQ'0HZ
IPEC FAC Engineer Phone 914-827-7741
)URP5\DQ'RUHPXV>PDLOWR5'RUHPXV#FVLWHFKQRORJLHVFRP@
6HQW)ULGD\-XO\30
7R0HZ,DQ
6XEMHFW,3(&8QLW66(610,QIRUPDWLRQ5HTXHVW CSI Document No. 0700.104.C.004
- Ian, I completed a cursory review of the SSE/SNM IP2 and have a few pieces of information that would be helpful:
- 14. Do actual lines exist from the HP Turbine to the Moisture Preseparators or are the Preseparators connected directly to the turbine? If they exist, are they inspected visually or should they be included in the CHECWORKS model?
- 15. Is it safe to assume that all Main Steam steam trap bypass valves on 9321-F-2041 and 9321-F-2042 are normally closed despite the fact that some are shown open?
- 16. Does the Feedwater Heater Bypass line (A235307, G-5) operate more or less than 2% of the time?
- 17. Do the Boiler Feed Pump discharge lines to the Drains Collecting Tank (9321-F-2017, H-6) operate more or less than 2% of the time?
Report No. 0700.104-03, Attachment B, Revision 2 Page Attach B-5 of 7
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program
- 18. Does the 18 HP Feedwater Heater Bypass line (9321-F-2019, F-3) operate more or less than 2%
of the time?
- 19. Do the lines from the Heater Drain Pump Discharge to the HDP Water Chemistry Monitor (9321-F-2022, A2) operate more or less than 2% of the time?
- 20. Do the level control lines from the Heater Drain Tank to the Condenser (A235304, A-1 C-1 F-1) operate more or less than 2% of the time?
- 21. Do the Moisture Separator drains to the Drains Collecting Tank (9321-F-2023, H4) operate more or less than 2% of the time?
- 22. Do the SG Blowdown lines to the sample coolers (9321-F-2729, D-6) operate more or less than 2% of the time?
- 23. What is the outlet temperature of the SG Blowdown sample coolers (9321-F-2729, E-6)?
Any information on these would be helpful. Feel free to forward these questions on to system engineers or to send me operating procedures that might answer the questions. To maintain the integrity of the project schedule, we will need these answers by Wednesday, August 5.
In addition to the above, please send the Aux. Steam operating procedures (SOP 29.1.1, 29.1.2, and 29.1.3) and the following drawings:
9321-F-2027 9321-F-2028 9321-F-2033 9321-F-2067 9321-F-2720 9321-F-2722 9321-F-2723 9321-F-2745 9321-F-7020 A205957 B237144 192491 If its possible, I would like to have these drawings and the Aux. Steam OPs by next week, even if they come separately from the questions, to give me time to analyze them. If you have any questions, please feel free to contact me.
Thank you, Ryan D. Doremus Engineer CSI Technologies, Inc.
(847) 836-3000 x796 rdoremus@csitechnologies.com Report No. 0700.104-03, Attachment B, Revision 2 Page Attach B-6 of 7
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Email from Brian Trudeau (CSI) to Ian Mew (IPEC) regarding report comments, dated 11/23/2009.
CSI Doc. No. 0700.104.C.019
- Ian, This email captures our discussion today concerning your comments on the Unit 2 SSE & SNM. I understand that these two items are the extent of your comments. We will give you a call to go over these and inform you how we have incorporated them prior to sending the final version of the SSE & SNM on or before Dec 4.
- 1) Ian sent new data to CSIs Ryan Doremus on historical inspections and replacements that he would like incorporated. This may impact plant experience for SNM lines and susceptibility if the entire line has been replaced with FAC resistant material. CSI will assess this data, make the appropriate changes, and provide Ian with a list of impacted lines.
- 2) Ian requested that CSI provide comments on why SNM lines were evaluated for high consequence of failure. A reason code is given, such as plant shutdown (FT) or unable to isolate (FI), but Ian would like further comments/discussion of this reason. For example, Ian would like to know why a line would cause the plant to shutdown if it fails. For large bore SNM lines, CSI will add the note This large bore line is important to plant operation and/or may be a personnel safety issue upon failure.
CSI will apply comment 2, above to applicable lines in the Unit 3 SNM.
- Thanks,
Report No. 0700.104-03, Attachment B, Revision 2 Page Attach B-7 of 7
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Attachment C Industry FAC Experience Table Report No. 0700.104-03, Attachment C, Revision 2 Page Attach C-1 of 6
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Industry experience is an important factor in the identification of systems, subsystems, and lines susceptible to Flow-Accelerated Corrosion (FAC). A table of important industry events and their applicability to Indian Point 2 was compiled using the following sources:
- CHUG Plant Experience Database, Revision 2, December 1995.
- 26th CHUG Meeting Presentation by Jeff Horowitz "Review and Lessons Learned from Historical FAC Failures".
- 32th CHUG Meeting Presentation by Doug Munson "Update on Mihama-3".
- 33rd CHUG Meeting Presentation by Aaron Kelley "Results of L2R10 Inspections at LaSalle Unit 2".
- 33rd CHUG Meeting Presentation by Whit Gallman "Unisolable Steam Leak Downstream of Valve 2HM-23".
- CHUG Conference Meeting Minutes, FAC Experience Reports, and Presentations.
- FACnet Email Message Archive.
- Secondary Pipe Rupture (9 August 2004, Mihama Unit 3, Kansai EPC), WANO EAR TYO 04-013, October 8, 2004.
- Information Notice 82-2: Failures in Turbine Exhaust Lines, U.S. Nuclear Regulatory Commission (NRC), July 9, 1982.
- Information Notice 86-106: Feedwater Line Break, U.S. Nuclear Regulatory Commission (NRC), December 16, 1986.
- Information Notice 86-106, Supplement 1: Feedwater Line Break, U.S. Nuclear Regulatory Commission (NRC), February 13, 1987.
- Information Notice 86-106, Supplement 2: Feedwater Line Break, U.S. Nuclear Regulatory Commission (NRC), March 18, 1987.
- NRC Bulletin No. 87-01: Thinning of Pipe Walls in Nuclear Power Plants, U.S.
Nuclear Regulatory Commission (NRC), July 9, 1987.
- Information Notice 87-36, Significant Unexpected Erosion of Feedwater Lines, U.S.
Nuclear Regulatory Commission (NRC), August 4, 1987.
- Information Notice 88-17, Summary of Responses to NRC Bulletin 87-01, Thinning of Pipe Walls in Nuclear Power Plants, U.S. Nuclear Regulatory Commission (NRC),
April 22, 1988.
Report No. 0700.104-03, Attachment C, Revision 2 Page Attach C-2 of 6
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program
- Information Notice 86-106, Supplement 3: Feedwater Line Break, U.S. Nuclear Regulatory Commission (NRC), November 10, 1988.
- Erosion/Corrosion-Induced Pipe Wall Thinning, Generic Letter 89-08, U.S. Nuclear Regulatory Commission (NRC), May 2, 1989.
- Investigation into Flow-Accelerated Corrosion at Low Temperatures, Technical Update 1015070, Electric Power Research Institute (EPRI), November 2007.
- Flow-Accelerated Corrosion - The Entrance Effect, Technical Update 1015072, Electric Power Research Institute (EPRI), November 2007.
- Erosive Attack, Technical Update 1015071, Electric Power Research Institute (EPRI),
November 2007.
Report No. 0700.104-03, Attachment C, Revision 2 Page Attach C-3 of 6
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Item Plant System Location/Area Plant Year Notes Number Type Downstream of Flow BWR, Failures reported in piping immediately downstream of orifices and flow 1 All Orifices and Flow Meters Many PWR meters. This is a generic issue applicable to all systems.
Downstream of Control Many plants reported instances of FAC degradation and some Valves (level control Millstone 2&3, BWR, significant failures (Millstone 2&3, Surry). This is a generic issue 2 All valves) Surry PWR applicable to all systems.
Leaking valves and steam traps may be found by plant thermal performance evaluation. Downstream piping may experience severe Downstream of Leaking conditions and may have been excluded from FAC Program due to 3 All Valves and Steam Traps Many All infrequent operation. This is a generic issue applicable to all systems.
Extensive industry exp in miscellaneous drain headers from steam Miscellaneous Drains to drains to the condenser. In addition to FAC, these headers are Common Headers into susceptible to liquid impingement erosion and/or flashing/cavitation as 4 All Condenser Many All explained in EPRI Erosive Attack Technical Update 1015071.
Pipe rupture at Surry Unit 2. Occurred in 18" OD, Tnom = 0.5" elbow upstream of feedwater pumps (first elbow off header to FWP). T=374 5 Condensate Feedwater Pump Suction Surry Unit 2 PWR 1986 deg F.
Condensate (between 4th highest pressure Failure in condensate system at Mihama. Occurred in 22" pipe 6 Condensate FWH and dearator) Mihama PWR 2004 downstream of flow measuring orifice. 284 deg F Oconee, Vermont Failures in steam lines due to FAC. All extraction stages carrying wet Extraction Extraction Steam (All Yankee, steam are susceptible to FAC. In general, all plants have experience Steam (or stages carrying wet Trojan, Zion, BWR, with thinning in the extraction steam system (plants listed appeared in 7 Bleed Steam) steam) Browns Ferry PWR 1982 NRC Information Notice 82-22)
Extraction Steam (or Fishmouth failure at ANO 2. Occurred in 14" OD, 2-phase flow. Failure 8 Bleed Steam) HP Extraction 2nd Stage ANO 2 PWR 1989 at Zion (1988), Oconee (1982).
Extraction Steam (or Fishmouth failure at Sequoyah 2. Occurred in 10" straight pipe 9 Bleed Steam) HP Extraction Sequoyah 2 PWR 1993 downstream of tee in HP extraction.
Report No. 0700.104-03, Attachment C, Revision 2 Page Attach C-4 of 6
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Item Plant System Location/Area Plant Year Notes Number Type Fishmouth rupture at Fort Calhoun in third elbow (12" bent pipe R/D =
Extraction 5) downstream of turbine in extraction steam system. Section of Steam (or upstream piping had been replaced in 1985 due to FAC; this 10 Bleed Steam) Extraction (4th Stage) Fort Calhoun PWR 1997 downstream section was not inspected. 411 deg F, 2 phase Failure of LP Heater inlet nozzles (carbon steel nozzles in Cr-Mo line).
Also through-walls on carbon steel pup piece on bellows assembly in Extraction Extraction (carbon steel Cr-Mo line (bellows was stainless steel). The conclusion from these Steam (or components in Cr- events is that to be non-susceptible to FAC the entire line (incl. nozzles, 11 Bleed Steam) Mo/Stainless/etc line) LaSalle BWR 2004 valves, pup pieces, etc.) must be of FAC-resistant material.
Feedwater Pump Outlet Thinning caused by FAC at Oyster Creek in 1978. Cracking observed 12 Feedwater & DS of CVs Oyster Creek BWR 1978 at feedwater pump outlet and downstream of flow/level control valves.
Feedwater Pump Pipe rupture at Navajo. Occurred in 10" OD, Tnom = 0.365" elbow 13 Feedwater Discharge Navajo Fossil 1982 downstream of boiler feed pump. T=360 deg F.
Extensive thinning to min acceptable wall thickness at Trojan in safety Final Feedwater (Safety- related feedwater (and non-safety related). High velocity and large 14 Feedwater Related) Trojan PWR 1987 counterbores exacerbated FAC.
Feedwater at Flow Rupture at Loviisa. Occurred in feedwater system at flow measurement 15 Feedwater Measurement Orifice Loviisa PWR 1990 orifice.
Instantaneous double-ended pipe break at Pleasant Prairie. Occurred Pleasant in 12" feedwater line downstream of valve station and upstream of 16 Feedwater Feedwater Prairie Fossil 1995 economizer and boiler.
San Onofre Serious thinning at San Onofre and Diablo Canyon (could be valve Control Valve Bypass and Diablo BWR, leakage, left open at full power-high velocity, or infrequent but severe 17 Feedwater Lines Canyon PWR conditions).
Feedwater Pump Min Flow (Recirculation) Feedwater pump min flow lines to condenser have experienced 18 Feedwater Lines Many All significant degradation.
Heater Drain Pump Failure at Millstone 2. Occurred in 8" recirc line from heater drain pump 19 Heater Drain Recirc (Bypass) Millstone 2 PWR 1995 to heater drain tank. Line operated during startup only (0-30% power).
Report No. 0700.104-03, Attachment C, Revision 2 Page Attach C-5 of 6
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Item Plant System Location/Area Plant Year Notes Number Type ANO, Kewaunee, McGuire, Extensive FAC-induced thinning found throughout this system at many Feedwater Heater Vents Point Beach, PWR, plants. Some plants have replaced the entire system with non-20 Heater Vents to Condenser Waterford BWR susceptible material (stainless steel or Cr-Mo).
Cross-Under Piping (also North Anna, called Cold Reheat, HP ANO, Point Significant FAC in cross-under piping at North Anna, ANO, and Point Turbine to Moisture Beach, D.C. BWR, Beach. Some plants have small amounts of Cu/Cr in this lines which 21 Main Steam Separator) Cook PWR significantly reduces FAC.
Moisture Catastrophic failure at Millstone 3. Occurred in 6" OD Moisture Sep.
Separator Moisture Separator Drain Drain Tank drain immediately downstream of level CV. 380 deg F, 0%
22 Drain Tank Drain Millstone 3 PWR 1990 quality.
Reheater Reheater Drain Tank Rupture at Millstone 2. Occurred in 8" Reheater Drain Tank drain 23 Drain Drain Millstone 2 PWR 1991 immediately downstream of level CV. 463 deg F, 0% quality.
Reheater First Stage Reheater Failure at Callaway just downstream of long horizontal section in first 24 Drain Drain Callaway PWR 1999 stage reheater drain. 417 deg F, 4.5% quality Moisture Separator Reheater Drain/Vent to Unisolable steam leak occurred in 2" line that vents wet steam from Reheater Drain Tank (Scavenging MSR to drain tank. Flashing contributed to wear (pressure drop caused 25 Drain Steam) McGuire PWR 2005 by "tortuous path" through many fittings in line). 540 deg F, wet steam Some plants have experienced Low-Temperature FAC wear in South Texas deoxygenated, neutral water at about 120ºF as per EPRI Technical Multiple Deoxygenated lines Project, Palo PWR, Report 1015170 Investigation into Flow-Accelerated Corrosion at Low 26 Systems operating at 120ºF Verde, Surry BWR Temperatures.
Diablo Canyon, Pipes made of corrosive material have shown high corrosion rates Multiple Salem, V. C. PWR, downstream of welds connecting non-resistant material to the resistant 27 Systems Multiple Locations Summer BWR material.
Report No. 0700.104-03, Attachment C, Revision 2 Page Attach C-6 of 6
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Attachment D SNM Small Bore Inspections Report No. 0700.104-03, Attachment D, Revision 2 Page Attach D-1 of 7
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Table D.1 below lists all small bore FAC Manager Web Edition Components that have been associated with an SNM Line. If the component is not linked to an SNM line in FAC Manager it will not appear in this table. Due to a lack of documentation from previous inspections, some inspections are missing from this table, and others did not have enough information to be properly trended. Components that have not been properly trended have N/A in the Limiting NSI column and will be updated after enough information is found to properly calculate a reinspection interval. The table is sorted by relative susceptibility, then alphabetically by System, Subsystem, Line, and Component. If a field reads N/A, there is not enough information in FAC Manager to populate this field.
Table D.1 Small Bore SNM Inspections from FAC Manager Line Size Last System Subsystem Line Number Component (in) F S Inspection NSI EST 2-3EST-01 2-3EST-016-B EST-18 0.75 1 1 8/11/2004 42 EX 2-5EX-01 2-5EX-026-A 227-1P 2 1 1 5/5/1997 46 EX 2-5EX-01 2-5EX-026-A 227-2C 2 1 1 5/5/1997 24 EX 2-5EX-01 2-5EX-026-A 241-1N 2 1 1 5/15/1997 82 EX 2-5EX-01 2-5EX-026-A 241-2C 2 1 1 5/15/1997 51 EX 2-5EX-01 2-5EX-026-A 241-3R 2 1 1 5/15/1997 20 EX 2-5EX-01 2-5EX-026-A 241-4P DS 2 1 1 5/15/1997 69 EX 2-5EX-01 2-5EX-026-A 241-4P US 2 1 1 5/15/1997 37 EX 2-5EX-01 2-5EX-026-A 241-5E 2 1 1 5/15/1997 33 EX 2-5EX-01 2-5EX-028-A 241-10P 2 1 1 5/15/1997 20 EX 2-5EX-01 2-5EX-028-A 241-11E 2 1 1 5/15/1997 34 EX 2-5EX-01 2-5EX-028-A 241-12P US 2 1 1 5/15/1997 61 HD 2-3HD-02 2-3HD-027 240-35P US 2 1 1 5/8/1997 58 HD 2-3HD-02 2-3HD-028 240-10P US 2 1 1 5/8/1997 50 HD 2-3HD-02 2-3HD-029 239-35P US 2 1 1 5/8/1997 70 HD 2-3HD-02 2-3HD-030 239-10P US 2 1 1 5/8/1997 80 HD 2-3HD-02 2-3HD-030 239-11E 2 1 1 4/9/2008 42 HD 2-3HD-02 2-3HD-030 239-2P 2 1 1 9/25/2002 99 HD 2-3HD-02 2-3HD-030 239-3E 2 1 1 9/25/2002 45 HD 2-3HD-02 2-3HD-030 239-4P 2 1 1 9/25/2002 99 HD 2-3HD-02 2-3HD-031 238-35P US 2 1 1 5/8/1997 82 HD 2-3HD-02 2-3HD-032 238-10P US 2 1 1 5/8/1997 73 HD 2-4HD-02 2-4HD-021 274-1C 2 1 1 5/18/2000 99 HD 2-4HD-02 2-4HD-021 274-1N 2 1 1 5/18/2000 71 HD 2-4HD-02 2-4HD-021 274-1P 2 1 1 5/18/2000 99 HD 2-5HD-03 2-5HD-057 5EX-24P DS 2 1 1 4/22/2006 20 HD 2-5HD-03 2-5HD-058 5EX-29 2 1 1 3/11/2010 50 HD 2-5HD-03 2-5HD-058 5EX-29P DS 2 1 1 4/11/2000 90 HD 2-5HD-03 2-5HD-058 5EX-30 2 1 1 4/11/2000 40 HD 2-5HD-03 2-5HD-058 5EX-30P 2 1 1 4/11/2000 74 HD 2-6HD-02 2-6HD-028 278-1C 1 1 1 3/14/2000 99 HD 2-6HD-02 2-6HD-028 278-1E 1 1 1 3/14/2000 71 HD 2-6HD-02 2-6HD-028 278-1N 1 1 1 3/14/2000 99 HD 2-6HD-02 2-6HD-028 278-1P 1 1 1 3/14/2000 99 Report No. 0700.104-03, Attachment D, Revision 2 Page Attach D-2 of 7
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Line Size Last System Subsystem Line Number Component (in) F S Inspection NSI HD 2-6HD-02 2-6HD-028 278-2P 1 1 1 3/14/2000 99 MST 2-MST-01 2-MST-117-B MST43-Pipe 1 1.25 1 1 10/7/2002 47 MST 2-MST-01 2-MST-117-B MST43-Pipe 2 DS 1.25 1 1 10/7/2002 57 MST 2-MST-01 2-MST-117-B MST43-Pipe 2 US 1.25 1 1 10/7/2002 48 MST 2-MST-01 2-MST-117-B MST43-Pipe 3 DS 1.25 1 1 10/7/2002 35 MST 2-MST-01 2-MST-117-B MST43-Pipe 3 US 1.25 1 1 10/7/2002 26 MST 2-MST-01 2-MST-117-B MST43-Pipe 4 1.25 1 1 10/7/2002 99 MST 2-MST-01 2-MST-117-B MST43-Tee 1 1.25 1 1 10/7/2002 99 MST 2-MST-01 2-MST-118-B MST44-Pipe 1 1.25 1 1 10/8/2002 99 MST 2-MST-01 2-MST-118-B MST44-Pipe 2 DS 1.25 1 1 10/8/2002 99 MST 2-MST-01 2-MST-118-B MST44-Pipe 2 US 1.25 1 1 10/8/2002 99 MST 2-MST-01 2-MST-118-B MST44-Pipe 3 DS 1.25 1 1 10/8/2002 86 MST 2-MST-01 2-MST-118-B MST44-Pipe 3 US 1.25 1 1 10/8/2002 78 MST 2-MST-01 2-MST-118-B MST44-Pipe 4 1.25 1 1 10/8/2002 54 MST 2-MST-01 2-MST-118-B MST44-Tee 1 1.25 1 1 10/8/2002 84 MST 2-MST-01 2-MST-119-B MST45-Pipe 1 DS 1.25 1 1 10/8/2002 36 MST 2-MST-01 2-MST-119-B MST45-Pipe 1 US 1.25 1 1 10/8/2002 37 MST 2-MST-01 2-MST-119-B MST45-Pipe 2 DS 1.25 1 1 10/8/2002 64 MST 2-MST-01 2-MST-119-B MST45-Pipe 2 US 1.25 1 1 10/8/2002 54 MST 2-MST-01 2-MST-119-B MST45-Pipe 3 DS 1.25 1 1 10/8/2002 64 MST 2-MST-01 2-MST-119-B MST45-Pipe 3 US 1.25 1 1 10/8/2002 49 MST 2-MST-01 2-MST-119-B MST45-Pipe 4 1.25 1 1 10/8/2002 81 MST 2-MST-01 2-MST-119-B MST45-Tee 1 1.25 1 1 10/8/2002 77 MST 2-MST-01 2-MST-120-B MST46-Pipe 1 1 1 1 10/8/2002 50 MST 2-MST-01 2-MST-120-B MST46-Pipe 2 DS 1 1 1 10/8/2002 45 MST 2-MST-01 2-MST-120-B MST46-Pipe 2 US 1 1 1 10/8/2002 53 MST 2-MST-01 2-MST-120-B MST46-Pipe 3 DS 1 1 1 10/8/2002 64 MST 2-MST-01 2-MST-120-B MST46-Pipe 3 US 1 1 1 10/8/2002 52 MST 2-MST-01 2-MST-120-B MST46-Pipe 4 1 1 1 10/8/2002 33 MST 2-MST-01 2-MST-120-B MST46-Tee 1 1 1 1 10/8/2002 97 BD 2-BD-01 2-BD-005 256-28P 2 1 2 5/27/1997 99 BD 2-BD-01 2-BD-006 256-37P DS 2 1 2 5/27/1997 85 BD 2-BD-01 2-BD-006 256-38E 2 1 2 5/27/1997 20 BD 2-BD-01 2-BD-006 256-39P DS 2 1 2 5/27/1997 41 BD 2-BD-01 2-BD-006 256-39P US 2 1 2 5/27/1997 99 BD 2-BD-01 2-BD-009-A MS46-1 2 1 2 1/31/1993 25 BD 2-BD-01 2-BD-009-A MS46-1P DS 2 1 2 1/31/1993 31 BD 2-BD-01 2-BD-009-A MS46-1P US 2 1 2 1/31/1993 31 BD 2-BD-01 2-BD-009-A MS46-1P-1 2 1 2 1/31/1993 20 BD 2-BD-01 2-BD-009-A MS46-2 2 1 2 1/31/1993 25 BD 2-BD-01 2-BD-009-A MS46-2P-2 2 1 2 1/31/1993 40 BD 2-BD-01 2-BD-009-A MS46-2P-3 2 1 2 1/31/1993 50 BD 2-BD-01 2-BD-009-A MS46-3 2 1 2 1/31/1993 32 BD 2-BD-01 2-BD-009-A MS46-3P 2 1 2 1/31/1993 40 BD 2-BD-01 2-BD-009-A MS46-4 2 1 2 11/12/2002 75 BD 2-BD-01 2-BD-009-A MS46-4P US 2 1 2 11/12/2002 63 Report No. 0700.104-03, Attachment D, Revision 2 Page Attach D-3 of 7
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Line Size Last System Subsystem Line Number Component (in) F S Inspection NSI BD 2-BD-01 2-BD-009-A MS46-4P-1 DS 2 1 2 11/12/2002 62 BD 2-BD-01 2-BD-009-A MS46-4P-1 US 2 1 2 5/8/2006 99 BD 2-BD-01 2-BD-009-A MS46-4P-1DS 2 1 2 N/A 23 BD 2-BD-01 2-BD-009-A MS46-5 2 1 2 4/4/1995 42 BD 2-BD-01 2-BD-009-A MS46-5P 2 1 2 10/23/2004 99 BD 2-BD-01 2-BD-009-A MS46-6 2 1 2 4/5/1995 99 BD 2-BD-01 2-BD-009-A MS46-6P 2 1 2 N/A 23 BD 2-BD-01 2-BD-009-A MS46-6P US 2 1 2 4/5/1995 82 BD 2-BD-01 2-BD-009-A MS46-7P2 2 1 2 4/26/2000 99 BD 2-BD-01 2-BD-009-A MS46-7R 2 1 2 4/26/2000 99 BD 2-BD-01 2-BD-010-A MS45-1 2 1 2 1/31/1993 33 BD 2-BD-01 2-BD-010-A MS45-1P 2 1 2 1/31/1993 34 BD 2-BD-01 2-BD-010-A MS45-1P-1 2 1 2 1/31/1993 32 BD 2-BD-01 2-BD-010-A MS45-2P-1 2 1 2 N/A 42 BD 2-BD-01 2-BD-010-A MS45-2P-3 2 1 2 N/A 42 BD 2-BD-01 2-BD-010-A MS45-2R 2 1 2 5/8/2006 99 BD 2-BD-01 2-BD-010-A MS45-3 2 1 2 5/8/2006 70 BD 2-BD-01 2-BD-010-A MS45-3P-1 2 1 2 2/9/1996 47 BD 2-BD-01 2-BD-010-A MS-45-3P-1 2 1 2 N/A 23 BD 2-BD-01 2-BD-010-A MS45-6 2 1 2 4/4/1995 20 BD 2-BD-01 2-BD-010-A MS45-7 2 1 2 N/A 23 BD 2-BD-01 2-BD-010-A MS45-7P2 2 1 2 4/26/2000 99 BD 2-BD-01 2-BD-010-A MS45-7R 2 1 2 4/26/2000 99 BD 2-BD-01 2-BD-011-A MS47-1 2 1 2 1/31/1993 36 BD 2-BD-01 2-BD-011-A MS47-10P1 2 1 2 N/A 23 BD 2-BD-01 2-BD-011-A MS47-1P 2 1 2 1/31/1993 31 BD 2-BD-01 2-BD-011-A MS47-1P-1 2 1 2 1/31/1993 64 BD 2-BD-01 2-BD-011-A MS47-2P-2 2 1 2 1/31/1993 35 BD 2-BD-01 2-BD-011-A MS47-3 2 1 2 1/31/1993 51 BD 2-BD-01 2-BD-011-A MS47-3P 2 1 2 1/31/1993 20 BD 2-BD-01 2-BD-011-A MS47-4P 2 1 2 N/A 21 BD 2-BD-01 2-BD-011-A MS47-4P DS 2 1 2 1/31/1993 31 BD 2-BD-01 2-BD-011-A MS47-4P-1 2 1 2 5/8/2006 87 BD 2-BD-01 2-BD-011-A MS47-5 2 1 2 1/31/1993 55 BD 2-BD-01 2-BD-011-A MS47-5P 2 1 2 N/A 23 BD 2-BD-01 2-BD-011-A MS47-5P US 2 1 2 1/31/1993 50 BD 2-BD-01 2-BD-011-A MS47-8VP 2 1 2 4/4/1995 38 BD 2-BD-01 2-BD-011-A MS47-9P 2 1 2 N/A 23 BD 2-BD-01 2-BD-012-A 256-40T 2 1 2 5/27/1997 82 BD 2-BD-01 2-BD-012-A 256-41P US 2 1 2 5/27/1997 61 BD 2-BD-01 2-BD-012-A MS48-1 2 1 2 1/31/1993 36 BD 2-BD-01 2-BD-012-A MS48-10P1 2 1 2 N/A 23 BD 2-BD-01 2-BD-012-A MS48-10P2 2 1 2 N/A 23 BD 2-BD-01 2-BD-012-A MS48-1P 2 1 2 1/31/1993 36 BD 2-BD-01 2-BD-012-A MS48-1P-1 2 1 2 1/31/1993 20 BD 2-BD-01 2-BD-012-A MS48-2P-2 2 1 2 1/31/1993 20 Report No. 0700.104-03, Attachment D, Revision 2 Page Attach D-4 of 7
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Line Size Last System Subsystem Line Number Component (in) F S Inspection NSI BD 2-BD-01 2-BD-012-A MS48-3 2 1 2 1/31/1993 30 BD 2-BD-01 2-BD-012-A MS48-3P 2 1 2 1/31/1993 49 BD 2-BD-01 2-BD-012-A MS48-4P-1 2 1 2 5/8/2006 50 BD 2-BD-01 2-BD-012-A MS48-8VP 2 1 2 4/4/1995 42 BD 2-BD-01 2-BD-012-A MS48-9P 2 1 2 N/A 23 GS 2-GS-01 2-GS-039 215-1P 2 1 2 4/22/1997 31 GS 2-GS-01 2-GS-039 215-1P DS 2 1 2 10/30/2002 38 GS 2-GS-01 2-GS-039 215-2E 2 1 2 4/8/2008 29 GS 2-GS-01 2-GS-039 215-2P US 2 1 2 10/30/2002 43 GS 2-GS-01 2-GS-039 215-6P 2 1 2 4/23/1997 42 GS 2-GS-01 2-GS-039 21BFPT 2 1 2 4/27/2006 89 GS 2-GS-01 2-GS-040 215-10E 2 1 2 10/30/2002 30 GS 2-GS-01 2-GS-040 215-10P US 2 1 2 10/30/2002 51 GS 2-GS-01 2-GS-040 215-7P 2 1 2 N/A 22 GS 2-GS-01 2-GS-040 215-7P DS 2 1 2 4/22/1997 45 GS 2-GS-01 2-GS-040 215-8E 2 1 2 4/18/2000 25 GS 2-GS-01 2-GS-040 215-8P US 2 1 2 4/18/2000 36 GS 2-GS-01 2-GS-040 215-9P DS 2 1 2 10/30/2002 46 GS 2-GS-01 2-GS-040 22BFPT 2 1 2 10/23/2004 22 GS 2-GS-01 2-GS-042 215-18P DS 1 1 2 4/22/1997 70 GS 2-GS-01 2-GS-042 215-19E 1 1 2 4/22/1997 35 GS 2-GS-01 2-GS-042 215-19P 1 1 2 4/22/1997 57 GS 2-GS-01 2-GS-042 215-20E 1 1 2 4/22/1997 62 GS 2-GS-01 2-GS-042 215-20P US 1 1 2 4/22/1997 40 HD 2-2HD-02 2-2HD-025 222-10E 1 1 2 5/22/1997 38 HD 2-2HD-02 2-2HD-025 222-10P DS 1 1 2 4/28/1997 71 HD 2-2HD-02 2-2HD-025 222-10P US 1 1 2 5/22/1997 56 HD 2-2HD-02 2-2HD-025 222-11E 1 1 2 4/28/1997 44 HD 2-2HD-02 2-2HD-025 222-11P US 1 1 2 4/28/1997 57 HD 2-2HD-02 2-2HD-025 222-1P DS 1 1 2 5/22/1997 66 HD 2-2HD-02 2-2HD-025 222-2E 1 1 2 5/22/1997 34 HD 2-2HD-02 2-2HD-025 222-3P 1 1 2 5/22/1997 60 HD 2-2HD-02 2-2HD-025 222-4E 1 1 2 5/22/1997 44 HD 2-2HD-02 2-2HD-025 222-6E 1 1 2 5/22/1997 38 HD 2-2HD-02 2-2HD-025 222-6P US 1 1 2 5/22/1997 36 HD 2-2HD-02 2-2HD-025 222-9P DS 1 1 2 5/22/1997 60 MS 2-MS-01 2-MS-039 252-18P US 2 1 2 5/14/1997 50 MS 2-MS-01 2-MS-058 252-30E N/A 1 2 6/6/1997 33 MS 2-MS-01 2-MS-144 250-1P 0.75 1 2 5/22/1997 70 MST 2-MST-01 2-MST-101-B MST27-Pipe 1 1 1 2 10/7/2002 61 MST 2-MST-01 2-MST-101-B MST27-Pipe 2 DS 1 1 2 10/7/2002 55 MST 2-MST-01 2-MST-101-B MST27-Pipe 2 US 1 1 2 10/7/2002 51 MST 2-MST-01 2-MST-101-B MST27-Pipe 3 DS 1 1 2 10/7/2002 85 MST 2-MST-01 2-MST-101-B MST27-Pipe 3 US 1 1 2 10/7/2002 57 MST 2-MST-01 2-MST-101-B MST27-Pipe 4 1 1 2 10/7/2002 94 MST 2-MST-01 2-MST-101-B MST27-Tee 1 1 1 2 10/7/2002 99 Report No. 0700.104-03, Attachment D, Revision 2 Page Attach D-5 of 7
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Line Size Last System Subsystem Line Number Component (in) F S Inspection NSI MST 2-MST-01 2-MST-123-B MST-49 1 1 2 8/11/2004 28 MST 2-MST-01 2-MST-124-B MST50-Pipe 1 1 1 2 10/9/2002 75 MST 2-MST-01 2-MST-124-B MST50-Pipe 2 DS 1 1 2 10/9/2002 77 MST 2-MST-01 2-MST-124-B MST50-Pipe 2 US 1 1 2 10/9/2002 74 MST 2-MST-01 2-MST-124-B MST50-Pipe 3 1 1 2 10/9/2002 40 MST 2-MST-01 2-MST-124-B MST50-Pipe 4 1 1 2 10/9/2002 54 MST 2-MST-01 2-MST-124-B MST50-Tee 1 1 1 2 10/9/2002 66 MST 2-MST-01 2-MST-125-B MST51-Pipe 1 1 1 2 10/9/2002 39 MST 2-MST-01 2-MST-125-B MST51-Pipe 2 DS 1 1 2 10/9/2002 99 MST 2-MST-01 2-MST-125-B MST51-Pipe 2 US 1 1 2 10/9/2002 77 MST 2-MST-01 2-MST-125-B MST51-Pipe 3 1 1 2 10/9/2002 76 MST 2-MST-01 2-MST-125-B MST51-Pipe 4 1 1 2 10/9/2002 99 MST 2-MST-01 2-MST-125-B MST51-Tee 1 1 1 2 10/9/2002 63 MST 2-MST-01 2-MST-131-A 252-1T 1 1 2 4/9/2008 28 MST 2-MST-01 2-MST-101-A MST27-Elbow 1 1 1 3 10/7/2002 51 MST 2-MST-01 2-MST-101-A MST27-Elbow 2 1 1 3 10/7/2002 40 MST 2-MST-01 2-MST-113-A 248-14P 1 1 3 5/7/1997 48 MST 2-MST-01 2-MST-113-A 248-15C 1 1 3 5/7/1997 76 MST 2-MST-01 2-MST-117-A MST43-Elbow 1 1.25 1 3 10/7/2002 47 MST 2-MST-01 2-MST-117-A MST43-Elbow 2 1.25 1 3 10/7/2002 29 MST 2-MST-01 2-MST-117-A MST43-PIPE US 1.25 1 3 3/16/2010 80 MST 2-MST-01 2-MST-118-A MST44-Elbow 1 1.25 1 3 10/8/2002 62 MST 2-MST-01 2-MST-118-A MST44-Elbow 2 1.25 1 3 10/8/2002 29 MST 2-MST-01 2-MST-119-A MST45-Elbow 1 1.25 1 3 10/8/2002 52 MST 2-MST-01 2-MST-119-A MST45-Elbow 2 1.25 1 3 10/8/2002 30 MST 2-MST-01 2-MST-120-A MST46-Elbow 1 1 1 3 10/8/2002 42 MST 2-MST-01 2-MST-120-A MST46-Elbow 2 1 1 3 10/8/2002 56 MST 2-MST-01 2-MST-124-A MST50-Elbow 1 1 1 3 10/9/2002 34 MST 2-MST-01 2-MST-125-A MST51-Elbow 1 1 1 3 10/9/2002 77 AS 2-AS-03 2-AS-018 279-6P 1 2 5/18/2000 55 AS 2-AS-03 2-AS-018 279-6R 1 2 5/18/2000 99 Report No. 0700.104-03, Attachment D, Revision 2 Page Attach D-6 of 7
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Table D.2 below lists all small bore replacements from FAC Manager Web Edition Components that have been associated with an SNM Line. If the component is not linked to an SNM line in FAC Manager it will not appear in this table. Components may be missing from this table due to the lack of this link. The table is sorted by relative susceptibility, then alphabetically by System, Subsystem, Line, and Component.
Table D.2 Small Bore SNM Replacements from FAC Manager Line System Subsystem Line Number Component Size F S Install Date EX 2-5EX-01 2-5EX-028-A 241-10P 2 1 1 4/28/1997 EX 2-5EX-01 2-5EX-028-A 241-11E 2 1 1 4/28/1997 HD 2-2HD-02 2-2HD-025 222-10E 1 1 2 2/16/2000 HD 2-2HD-02 2-2HD-025 222-10P DS 1 1 2 2/16/2000 HD 2-2HD-02 2-2HD-025 222-10P US 1 1 2 2/16/2000 HD 2-2HD-02 2-2HD-025 222-11E 1 1 2 2/16/2000 HD 2-2HD-02 2-2HD-025 222-11P US 1 1 2 2/16/2000 HD 2-2HD-02 2-2HD-025 222-1P DS 1 1 2 2/16/2000 HD 2-2HD-02 2-2HD-025 222-2E 1 1 2 2/16/2000 HD 2-2HD-02 2-2HD-025 222-3P 1 1 2 2/16/2000 HD 2-2HD-02 2-2HD-025 222-4E 1 1 2 2/16/2000 HD 2-2HD-02 2-2HD-025 222-6E 1 1 2 2/16/2000 HD 2-2HD-02 2-2HD-025 222-6P US 1 1 2 2/16/2000 HD 2-2HD-02 2-2HD-025 222-9P DS 1 1 2 2/16/2000 N/A N/A N/A 250-17P 1.5 N/A N/A 4/28/1997 N/A N/A N/A EST4-Pipe 1 0.75 N/A N/A 10/26/2002 N/A N/A N/A 245-7P 1 N/A N/A 2/24/1995 Report No. 0700.104-03, Attachment D, Revision 2 Page Attach D-7 of 7
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Attachment E SNM Large Bore Inspections Report No. 0700.104-03, Attachment E, Revision 2 Page Attach E-1 of 15
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Table E.1 below lists all large bore FAC Manager Web Edition Components that have been associated with an SNM Line. If the component is not linked to an SNM line in FAC Manager it will not appear in this table. Due to a lack of documentation from previous inspections, some inspections are missing from this table, and others did not have enough information to be properly trended. Components that have not been properly trended have N/A in the Limiting NSI column and will be updated after enough information is found to properly calculate a reinspection interval. The table is sorted by relative susceptibility, then alphabetically by System, Subsystem, Line, and Component. If a field reads N/A, there is not enough information in FAC Manager to populate this field.
Table E.1 Large Bore SNM Inspections from FAC Manager Line Size Last System Subsystem Line Number Component (in) F S Inspection NSI EST 2-1EST-01 2-1EST-013-B EST-14 4 1 1 4/28/1997 23 EST 2-1EST-01 2-1EST-013-B EST-14P 4 1 1 4/28/1997 22 EST 2-1EST-01 2-1EST-013-B EST-15 4 1 1 4/28/1997 21 EST 2-1EST-01 2-1EST-013-B EST-16P 4 1 1 N/A 23 EST 2-1EST-01 2-1EST-013-B EST-17 4 1 1 N/A 23 EST 2-1EST-01 2-1EST-013-B EST-17P 4 1 1 N/A 23 EST 2-1EST-01 2-1EST-013-B EST-20P US 4 1 1 3/3/1995 33 EST 2-1EST-01 2-1EST-013-B EST-21 4 1 1 3/3/1995 34 EST 2-1EST-01 2-1EST-013-B EST-21P DS 4 1 1 3/3/1995 28 EST 2-1EST-01 2-1EST-013-B EST-21P US 4 1 1 3/1/1995 20 EST 2-1EST-01 2-1EST-013-B EST-22 4 1 1 3/1/1995 20 EST 2-1EST-01 2-1EST-013-B EST-22P 4 1 1 3/1/1995 24 EST 2-1EST-01 2-1EST-013-B EST-23P 4 1 1 3/3/1995 20 EST 2-1EST-01 2-1EST-013-B EST-23P US 4 1 1 N/A 23 EST 2-1EST-01 2-1EST-013-B EST-24 4 1 1 3/3/1995 99 EST 2-1EST-01 2-1EST-013-B EST-24P 4 1 1 3/3/1995 20 EST 2-1EST-01 2-1EST-013-B EST-29P 4 1 1 4/13/1995 30 EST 2-1EST-01 2-1EST-013-B EST-29P US 4 1 1 N/A 23 EST 2-1EST-01 2-1EST-013-B EST-30A 4 1 1 4/13/1995 22 EST 2-1EST-01 2-1EST-013-B EST-30AP 4 1 1 4/13/1995 21 EST 2-1EST-01 2-1EST-013-B EST-30B 4 1 1 4/13/1995 20 EST 2-1EST-01 2-1EST-013-B EST-30P DS 4 1 1 N/A 25 EST 2-1EST-01 2-1EST-013-B EST-31 4 1 1 3/1/1995 99 EST 2-1EST-01 2-1EST-013-B EST-31P DS 4 1 1 3/1/1995 99 EST 2-1EST-01 2-1EST-013-B EST-31P US 4 1 1 4/13/1995 99 EST 2-1EST-01 2-1EST-013-B EST-31P-1 4 1 1 4/13/1995 99 EST 2-1EST-01 2-1EST-013-B EST-31T 4 1 1 4/13/1995 99 EST 2-1EST-01 2-1EST-014 EST-1P-1 6 1 1 4/23/1997 21 EST 2-1EST-01 2-1EST-014 EST-1T 6 1 1 4/28/1997 25 EST 2-1EST-01 2-1EST-014 EST-2P 6 1 1 N/A 23 EST 2-1EST-01 2-1EST-014 EST-3P 6 1 1 N/A 23 FW 2-FW-03 2-FW-063 213-4P 6 1 1 4/24/1997 43 FW 2-FW-03 2-FW-063 213-6P 6 1 1 4/24/1997 31 FW 2-FW-03 2-FW-063 213-6R 6 1 1 4/28/1997 57 Report No. 0700.104-03, Attachment E, Revision 2 Page Attach E-2 of 15
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Line Size Last System Subsystem Line Number Component (in) F S Inspection NSI FW 2-FW-03 2-FW-063 Valve FCV-1115 6 1 1 3/23/2010 99 FW 2-FW-03 2-FW-064 213-1P 6 1 1 4/24/1997 99 FW 2-FW-03 2-FW-064 213-3P 6 1 1 4/24/1997 31 FW 2-FW-03 2-FW-064 213-3R 6 1 1 4/28/1997 44 HD 2-3HD-02 2-3HD-039 223-9R 3 1 1 4/29/1997 28 HD 2-3HD-02 2-3HD-040 223-10P1 DS 3 1 1 4/29/1997 99 HD 2-3HD-02 2-3HD-041 223-11P1 DS 3 1 1 4/29/1997 85 HD 2-3HD-02 2-3HD-042 223-10P DS 4 1 1 4/29/1997 99 HD 2-3HD-02 2-3HD-042 223-10P US 4 1 1 4/29/1997 98 HD 2-3HD-02 2-3HD-042 223-10T 4 1 1 4/29/1997 50 HD 2-3HD-02 2-3HD-042 223-11T 4 1 1 4/29/1997 44 HD 2-3HD-02 2-3HD-043 223-11P US 4 1 1 4/29/1997 54 HD 2-3HD-02 2-3HD-043 223-13P DS 4 1 1 5/9/2000 85 HD 2-3HD-02 2-3HD-043 223-14E 4 1 1 5/9/2000 40 HD 2-3HD-02 2-3HD-043 223-14P DS 4 1 1 4/6/2000 21 HD 2-3HD-02 2-3HD-043 223-14P US 4 1 1 5/9/2000 60 HD 2-3HD-02 2-3HD-043 223-15E 4 1 1 4/6/2000 22 HD 2-3HD-02 2-3HD-043 223-15P DS 4 1 1 5/9/2000 47 HD 2-3HD-02 2-3HD-043 223-15P US 4 1 1 4/6/2000 41 HD 2-3HD-02 2-3HD-043 223-16E 4 1 1 5/9/2000 25 HD 2-3HD-02 2-3HD-043 223-16P DS 4 1 1 5/14/1997 42 HD 2-3HD-02 2-3HD-043 223-16P US 4 1 1 5/9/2000 32 HD 2-3HD-02 2-3HD-043 223-17E 4 1 1 5/14/1997 26 HD 2-3HD-02 2-3HD-043 223-17P DS 4 1 1 5/14/1997 46 HD 2-3HD-02 2-3HD-043 223-17P US 4 1 1 5/14/1997 26 HD 2-3HD-02 2-3HD-043 223-18E 4 1 1 5/14/1997 26 HD 2-3HD-02 2-3HD-043 223-18P 4 1 1 4/28/1997 39 HD 2-3HD-02 2-3HD-043 223-19E 4 1 1 4/28/1997 26 HD 2-3HD-02 2-3HD-043 223-19P US 4 1 1 4/28/1997 30 HD 2-4HD-02 2-4HD-025 274-25N 3 1 1 4/13/2000 38 HD 2-4HD-02 2-4HD-025 274-25P DS 3 1 1 4/13/2000 78 HD 2-5HD-02 2-5HD-044 5EXV-11 10 1 1 3/13/2010 44 HD 2-5HD-02 2-5HD-044 5EXV-11P 10 1 1 N/A 23 HD 2-5HD-02 2-5HD-044 5EXV-11P-1 10 1 1 N/A 23 HD 2-5HD-02 2-5HD-044 5EXV-12P 10 1 1 3/14/1995 36 HD 2-5HD-02 2-5HD-044 5EXV-13 10 1 1 3/14/1995 36 HD 2-5HD-02 2-5HD-044 5EXV-13N 10 1 1 11/2/2002 73 HD 2-5HD-02 2-5HD-044 5EXV-13P DS 10 1 1 3/14/1995 52 HD 2-5HD-02 2-5HD-044 5EXV-13P US 10 1 1 11/2/2002 56 HD 2-5HD-02 2-5HD-044 5EXV-3 10 1 1 N/A 20 HD 2-5HD-02 2-5HD-045 5EXV-10 10 1 1 3/14/1995 37 HD 2-5HD-02 2-5HD-045 5EXV-10N 10 1 1 5/30/1997 48 HD 2-5HD-02 2-5HD-045 5EXV-10P 10 1 1 3/14/1995 49 HD 2-5HD-02 2-5HD-045 5EXV-2 10 1 1 N/A 20 HD 2-5HD-02 2-5HD-045 5EXV-8 10 1 1 N/A 21 HD 2-5HD-02 2-5HD-045 5EXV-8P 10 1 1 N/A 23 Report No. 0700.104-03, Attachment E, Revision 2 Page Attach E-3 of 15
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Line Size Last System Subsystem Line Number Component (in) F S Inspection NSI HD 2-5HD-02 2-5HD-045 5EXV-9P 10 1 1 3/14/1995 44 HD 2-5HD-02 2-5HD-046 5EXV-1 10 1 1 N/A 20 HD 2-5HD-02 2-5HD-046 5EXV-4 10 1 1 N/A 20 HD 2-5HD-02 2-5HD-046 5EXV-5 10 1 1 N/A 20 HD 2-5HD-02 2-5HD-046 5EXV-5P 10 1 1 N/A 20 HD 2-5HD-02 2-5HD-046 5EXV-6 10 1 1 N/A 20 HD 2-5HD-02 2-5HD-046 5EXV-6P 10 1 1 3/14/1995 75 HD 2-5HD-02 2-5HD-046 5EXV-7 10 1 1 3/14/1995 42 HD 2-5HD-02 2-5HD-046 5EXV-7P 10 1 1 3/14/1995 41 HD 2-5HD-02 2-5HD-051 277-18P DS 2.5 1 1 5/9/2000 99 HD 2-5HD-02 2-5HD-051 277-19E 2.5 1 1 5/9/2000 31 HD 2-5HD-02 2-5HD-051 277-20P DS 2.5 1 1 5/9/2000 87 HD 2-5HD-02 2-5HD-051 277-20P US 2.5 1 1 5/9/2000 96 HD 2-5HD-02 2-5HD-051 277-21E 2.5 1 1 5/9/2000 58 HD 2-5HD-02 2-5HD-051 277-22P DS 2.5 1 1 4/12/2000 68 HD 2-5HD-02 2-5HD-051 277-22P US 2.5 1 1 5/9/2000 92 HD 2-5HD-02 2-5HD-051 277-23N 2.5 1 1 4/12/2000 28 HD 2-5HD-03 2-5HD-059 5EXC-1 24 1 1 11/9/2002 59 HD 2-5HD-03 2-5HD-059 5EXC-1P DS 24 1 1 11/9/2002 39 HD 2-5HD-03 2-5HD-059 5EXC-2 24 1 1 2/6/1995 43 HD 2-5HD-03 2-5HD-059 5EXC-2A 24 1 1 3/1/1995 29 HD 2-5HD-03 2-5HD-059 5EXC-2P DS 24 1 1 3/1/1995 24 HD 2-5HD-03 2-5HD-059 5EXC-2P US 24 1 1 11/9/2002 43 HD 2-5HD-03 2-5HD-061-A 5EXC-21 14 1 1 4/1/2008 37 HD 2-5HD-03 2-5HD-061-A 5EXC-21P-1 DS 14 1 1 11/12/2002 50 HD 2-5HD-03 2-5HD-061-A 5EXC-21P-1 US 14 1 1 4/27/2000 28 HD 2-5HD-03 2-5HD-061-B 205-22P US 8 1 1 4/9/1997 26 HD 2-5HD-03 2-5HD-061-B 205-22P-1 8 1 1 11/11/2002 47 HD 2-5HD-03 2-5HD-061-B 205-22R 8 1 1 4/28/1997 43 HD 2-5HD-03 2-5HD-061-B 205-23P DS 8 1 1 4/28/2000 76 HD 2-5HD-03 2-5HD-061-B 205-23P US 8 1 1 4/28/2000 43 HD 2-5HD-03 2-5HD-061-B 205-23T 8 1 1 4/28/2000 53 HD 2-5HD-03 2-5HD-061-B 205-24P US 8 1 1 4/28/2000 26 HD 2-5HD-03 2-5HD-061-B 205-24T 8 1 1 4/28/2000 46 HD 2-5HD-03 2-5HD-061-B 5EXC-27 8 1 1 4/30/1997 24 HD 2-5HD-03 2-5HD-061-B 5EXC-27P 8 1 1 5/30/1997 24 HD 2-5HD-03 2-5HD-061-B 5EXC-29 8 1 1 2/25/1995 31 HD 2-5HD-03 2-5HD-061-B 5EXC-29P DS 8 1 1 2/25/1995 34 HD 2-5HD-03 2-5HD-061-B 5EXC-30P 8 1 1 2/25/1995 29 HD 2-5HD-03 2-5HD-062-A 205-15PUS 14 1 1 N/A 23 HD 2-5HD-03 2-5HD-062-B 205-13P US 8 1 1 4/10/1997 32 HD 2-5HD-03 2-5HD-062-B 205-13R 8 1 1 4/28/1997 44 HD 2-5HD-03 2-5HD-062-B 205-14P DS 8 1 1 11/9/2002 94 HD 2-5HD-03 2-5HD-062-B 205-15P US 8 1 1 11/9/2002 37 HD 2-5HD-03 2-5HD-062-B 205-15T 8 1 1 11/9/2002 54 HD 2-5HD-03 2-5HD-062-B 5EXC-17 8 1 1 4/29/1997 36 Report No. 0700.104-03, Attachment E, Revision 2 Page Attach E-4 of 15
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Line Size Last System Subsystem Line Number Component (in) F S Inspection NSI HD 2-5HD-03 2-5HD-062-B 5EXC-17P US 8 1 1 4/29/1997 28 HD 2-5HD-03 2-5HD-062-B 5EXC-19 8 1 1 4/28/1997 61 HD 2-5HD-03 2-5HD-062-B 5EXC-19N 8 1 1 4/28/1997 45 HD 2-5HD-03 2-5HD-062-B 5EXC-19P DS 8 1 1 4/28/1997 39 HD 2-5HD-03 2-5HD-062-B 5EXC-19P-1 8 1 1 4/28/1997 41 HD 2-5HD-03 2-5HD-063-B 205-5P US 8 1 1 5/2/1997 32 HD 2-5HD-03 2-5HD-063-B 205-5P-1 DS 8 1 1 4/28/2000 44 HD 2-5HD-03 2-5HD-063-B 205-5R 8 1 1 5/2/1997 27 HD 2-5HD-03 2-5HD-063-B 5EXC-10 8 1 1 N/A 23 HD 2-5HD-03 2-5HD-063-B 5EXC-11 8 1 1 5/6/1997 40 HD 2-5HD-03 2-5HD-063-B 5EXC-11N 8 1 1 5/6/1997 30 HD 2-5HD-03 2-5HD-063-B 5EXC-11P 8 1 1 N/A 23 HD 2-5HD-03 2-5HD-063-B 5EXC-11P DS 8 1 1 5/6/1997 33 HD 2-5HD-03 2-5HD-063-B 5EXC-9 8 1 1 N/A 23 HD 2-5HD-03 2-5HD-063-B 5EXC-9P DS 8 1 1 N/A 20 HD 2-5HD-03 2-5HD-063-B 5EXC-9P US 8 1 1 N/A 23 MSD 2-MSD-01 2-MSD-097 288-2P DS 2.5 1 1 11/8/2002 78 MSD 2-MSD-01 2-MSD-097 288-4P US 2.5 1 1 11/8/2002 81 288-5EXV-DS-MSD 2-MSD-01 2-MSD-097 MS21A 2.5 1 1 11/8/2002 79 MSD 2-MSD-01 2-MSD-100 231-2P DS 2.5 1 1 5/6/1997 79 MSD 2-MSD-01 2-MSD-100 231-3E 2.5 1 1 5/6/1997 32 MSD 2-MSD-01 2-MSD-100 231-3P 2.5 1 1 5/6/1997 37 MSD 2-MSD-01 2-MSD-100 231-4E 2.5 1 1 5/6/1997 99 MSD 2-MSD-01 2-MSD-100 231-4P US 2.5 1 1 5/6/1997 99 MSD 2-MSD-01 2-MSD-106-A 1B-1 6 1 1 N/A 23 MSD 2-MSD-01 2-MSD-106-A 1B-10 6 1 1 3/2/1995 42 MSD 2-MSD-01 2-MSD-106-A 1B-10P DS 6 1 1 3/2/1995 51 MSD 2-MSD-01 2-MSD-106-A 1B-10P US 6 1 1 3/2/1995 42 MSD 2-MSD-01 2-MSD-106-A 1B-11 6 1 1 3/2/1995 34 MSD 2-MSD-01 2-MSD-106-A 1B-11P DS 6 1 1 3/2/1995 38 MSD 2-MSD-01 2-MSD-106-A 1B-11P US 6 1 1 3/2/1995 41 MSD 2-MSD-01 2-MSD-106-A 1B-12 6 1 1 3/2/1995 32 MSD 2-MSD-01 2-MSD-106-A 1B-12P DS 6 1 1 4/5/1995 36 MSD 2-MSD-01 2-MSD-106-A 1B-12P US 6 1 1 3/2/1995 45 MSD 2-MSD-01 2-MSD-106-A 1B-13 6 1 1 N/A 23 MSD 2-MSD-01 2-MSD-106-A 1B-13P 6 1 1 N/A 23 MSD 2-MSD-01 2-MSD-106-A 1B-14 6 1 1 4/5/1995 29 MSD 2-MSD-01 2-MSD-106-A 1B-15 6 1 1 N/A 23 MSD 2-MSD-01 2-MSD-106-A 1B-2 6 1 1 N/A 23 MSD 2-MSD-01 2-MSD-106-A 1B-3 6 1 1 N/A 23 MSD 2-MSD-01 2-MSD-106-A 1B-3N 6 1 1 5/19/1997 29 MSD 2-MSD-01 2-MSD-106-A 1B-4 6 1 1 3/20/1995 25 MSD 2-MSD-01 2-MSD-106-A 1B-4P 6 1 1 3/8/1995 59 MSD 2-MSD-01 2-MSD-106-A 1B-5 6 1 1 3/21/1995 39 MSD 2-MSD-01 2-MSD-106-A 1B-5P 6 1 1 3/16/1995 45 Report No. 0700.104-03, Attachment E, Revision 2 Page Attach E-5 of 15
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Line Size Last System Subsystem Line Number Component (in) F S Inspection NSI MSD 2-MSD-01 2-MSD-106-A 1B-5R 6 1 1 3/15/1995 29 MSD 2-MSD-01 2-MSD-106-A 1B-6 6 1 1 N/A 23 MSD 2-MSD-01 2-MSD-106-A 1B-6P 6 1 1 3/7/1995 30 MSD 2-MSD-01 2-MSD-106-A 1B-7 6 1 1 N/A 23 MSD 2-MSD-01 2-MSD-106-A 1B-8 6 1 1 N/A 23 MSD 2-MSD-01 2-MSD-106-A 1B-9 6 1 1 N/A 23 MSD 2-MSD-01 2-MSD-106-A 1B-9P 6 1 1 3/2/1995 57 MST 2-MST-01 2-MST-019-A 217-10P 12 1 1 4/28/1997 36 MST 2-MST-01 2-MST-019-A 217-11P 12 1 1 4/28/1997 46 MST 2-MST-01 2-MST-019-A 217-11R 12 1 1 4/28/1997 50 MST 2-MST-01 2-MST-019-A 217-12E 12 1 1 4/28/1997 73 MST 2-MST-01 2-MST-019-A 217-12P 12 1 1 4/28/1997 53 MST 2-MST-01 2-MST-019-A 220-10E 12 1 1 5/10/2000 35 MST 2-MST-01 2-MST-019-A 220-10P US 12 1 1 5/11/2000 48 MST 2-MST-01 2-MST-019-A 220-13P DS 12 1 1 5/10/2000 50 MST 2-MST-01 2-MST-019-A 220-14E 12 1 1 5/10/2000 37 MST 2-MST-01 2-MST-019-A 220-14P US 12 1 1 5/10/2000 55 MST 2-MST-01 2-MST-019-A 220-1P DS 12 1 1 11/5/2002 59 MST 2-MST-01 2-MST-019-A 220-2E 12 1 1 11/5/2002 49 MST 2-MST-01 2-MST-019-A 220-2P US 12 1 1 11/5/2002 56 MST 2-MST-01 2-MST-019-A 220-9R 12 1 1 5/7/1997 42 MST 2-MST-01 2-MST-021-A 219-10P DS 12 1 1 10/1/2002 82 MST 2-MST-01 2-MST-021-A 219-11E 12 1 1 10/1/2002 62 MST 2-MST-01 2-MST-021-A 219-11P US 12 1 1 10/1/2002 37 MST 2-MST-01 2-MST-021-A 219-13P 12 1 1 5/12/2000 37 MST 2-MST-01 2-MST-021-A 219-14E 12 1 1 5/12/2000 43 MST 2-MST-01 2-MST-021-A 219-14P 12 1 1 5/12/2000 49 MST 2-MST-01 2-MST-021-A 219-15N 12 1 1 5/12/2000 47 MST 2-MST-01 2-MST-021-A 219-7P DS 12 1 1 5/12/2000 59 MST 2-MST-01 2-MST-021-A 219-7P US 12 1 1 5/7/1997 56 MST 2-MST-01 2-MST-021-A 219-7R 12 1 1 5/7/1997 32 MST 2-MST-01 2-MST-021-A 219-8E 12 1 1 5/12/2000 50 MST 2-MST-01 2-MST-021-A 219-8P US 12 1 1 5/12/2000 31 MST 2-MST-01 2-MST-021-A 226-7P DS 12 1 1 3/15/2000 59 MST 2-MST-01 2-MST-021-A 226-7P US 12 1 1 4/28/1997 33 MST 2-MST-01 2-MST-021-A 226-7R 12 1 1 4/28/1997 61 MST 2-MST-01 2-MST-021-A 226-8E 12 1 1 3/15/2000 67 MST 2-MST-01 2-MST-021-A 226-8P DS 12 1 1 3/17/2000 69 MST 2-MST-01 2-MST-021-A 226-8P US 12 1 1 3/15/2000 66 MST 2-MST-01 2-MST-021-A 226-9E 12 1 1 3/17/2000 67 MST 2-MST-01 2-MST-021-A 226-9N 12 1 1 3/17/2000 54 MST 2-MST-01 2-MST-023-A 218-9R 12 1 1 4/30/1997 46 MST 2-MST-01 2-MST-023-A 225-14R 12 1 1 5/7/1997 91 MST 2-MST-01 2-MST-023-A 225-15P US 12 1 1 5/7/1997 52 DS of Valve AF 2-AF-01 2-AF-022 AF138 2.5 1 2 10/26/2002 21 Report No. 0700.104-03, Attachment E, Revision 2 Page Attach E-6 of 15
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Line Size Last System Subsystem Line Number Component (in) F S Inspection NSI AS 2-AS-03 2-AS-003 280-8P US 8 1 2 5/19/2000 72 BD 2-BD-01 2-BD-019 SGBTV-2E 18 1 2 11/4/2002 65 SGBTV-2E US BD 2-BD-01 2-BD-019 Pipe 18 1 2 11/4/2002 83 EX 2-5EX-01 2-5EX-128 267-29E N/A 1 2 10/23/2004 82 EX 2-5EX-01 2-5EX-128 267-30P N/A 1 2 10/23/2004 53 EX 2-5EX-01 2-5EX-128 267-31R N/A 1 2 6/3/1997 42 EX 2-5EX-01 2-5EX-128 267-32E N/A 1 2 6/3/1997 68 EX 2-5EX-01 2-5EX-128 267-33P N/A 1 2 6/3/1997 27 EX 2-5EX-01 2-5EX-128 267-6E1 N/A 1 2 6/6/1997 35 EX 2-5EX-01 2-5EX-128 267-6P DS N/A 1 2 6/6/1997 38 EX 2-5EX-01 2-5EX-128 267-6T N/A 1 2 6/6/1997 28 GS 2-GS-01 2-GS-002 263-24R 10 1 2 6/9/1997 55 GS 2-GS-01 2-GS-002 263-25P US 10 1 2 6/9/1997 51 GS 2-GS-01 2-GS-016 262-17P DS 6 1 2 6/3/1997 93 GS 2-GS-01 2-GS-016 262-18T 6 1 2 6/3/1997 33 GS 2-GS-01 2-GS-016 262-19R 6 1 2 6/3/1997 67 GS 2-GS-01 2-GS-016 262-33P US 6 1 2 6/3/1997 99 3EX-TELO-23P GS 2-GS-01 2-GS-016 DS 6 1 2 5/7/1997 77 GS 2-GS-01 2-GS-016 3EX-TELO-24 6 1 2 5/7/1997 67 3EX-TELO-25P GS 2-GS-01 2-GS-016 US 6 1 2 5/7/1997 89 GS 2-GS-01 2-GS-020 262-20E 4 1 2 6/3/1997 62 GS 2-GS-01 2-GS-020 3EX-TELO9 4 1 2 3/19/1995 26 GS 2-GS-01 2-GS-020 3EX-TELO9P 4 1 2 3/19/1995 76 GS 2-GS-01 2-GS-021 3EX-TELO2 4 1 2 3/25/1995 48 GS 2-GS-01 2-GS-032 3EX-TELO14P 3 1 2 N/A 23 GS 2-GS-01 2-GS-032 3EX-TELO15 3 1 2 N/A 23 GS 2-GS-01 2-GS-032 3EX-TELO15P 3 1 2 N/A 23 GS 2-GS-01 2-GS-034 3EX-TELO3P 3 1 2 N/A 23 GS 2-GS-01 2-GS-034 3EX-TELO4 3 1 2 N/A 23 GS 2-GS-01 2-GS-034 3EX-TELO4P 3 1 2 N/A 23 GS 2-GS-01 2-GS-034 3EX-TELO8 3 1 2 N/A 23 GS 2-GS-01 2-GS-036 3EX-TELO16P 6 1 2 N/A 23 GS 2-GS-01 2-GS-036 3EX-TELO17 6 1 2 N/A 23 GS 2-GS-01 2-GS-036 3EX-TELO17P 6 1 2 N/A 23 GS 2-GS-01 2-GS-041 215-14R 3 1 2 4/28/1997 31 GS 2-GS-01 2-GS-041 215-15P US 3 1 2 4/23/1997 39 GS 2-GS-01 2-GS-041 215-15T 3 1 2 4/23/1997 57 HD 2-1HD-02 2-1HD-021 212-1E 6 1 2 4/21/1997 44 HD 2-1HD-02 2-1HD-021 212-1P US 6 1 2 4/21/1997 46 HD 2-1HD-02 2-1HD-022 212-2P US 6 1 2 4/18/1997 33 HD 2-1HD-02 2-1HD-023 212-3P US 6 1 2 4/18/1997 41 HD 2-1HD-02 2-1HD-024 221-10P DS 5 1 2 4/25/1997 58 HD 2-1HD-02 2-1HD-024 221-11E 5 1 2 4/25/1997 52 Report No. 0700.104-03, Attachment E, Revision 2 Page Attach E-7 of 15
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Line Size Last System Subsystem Line Number Component (in) F S Inspection NSI HD 2-1HD-02 2-1HD-024 221-12E 5 1 2 4/25/1997 47 HD 2-1HD-02 2-1HD-024 221-13P US 5 1 2 4/25/1997 59 HD 2-1HD-02 2-1HD-025 247-1N 5 1 2 5/10/1997 56 HD 2-1HD-02 2-1HD-025 247-2P US 5 1 2 5/10/1997 68 HD 2-1HD-02 2-1HD-026 286-3P DS 5 1 2 10/10/2002 48 HD 2-1HD-02 2-1HD-026 286-5P US 5 1 2 10/10/2002 64 HD 2-1HD-02 2-1HD-026 286-HV21C-1E 5 1 2 10/10/2002 53 HD 2-2HD-02 2-2HD-019 209-1E 6 1 2 4/14/1997 46 HD 2-2HD-02 2-2HD-019 209-1P US 6 1 2 4/14/1997 36 HD 2-2HD-02 2-2HD-020 209-3E 6 1 2 4/18/1997 43 HD 2-2HD-02 2-2HD-020 209-3P US 6 1 2 4/18/1997 42 HD 2-2HD-02 2-2HD-021 209-5E 6 1 2 4/14/1997 37 HD 2-2HD-02 2-2HD-021 209-5P US 6 1 2 4/14/1997 30 HD 2-2HD-02 2-2HD-023 246-17P DS 2.5 1 2 5/22/1997 52 HD 2-2HD-02 2-2HD-023 246-18E 2.5 1 2 5/22/1997 40 HD 2-2HD-02 2-2HD-023 246-19P US 2.5 1 2 5/22/1997 66 HD 2-2HD-02 2-2HD-023 246-1N 2.5 1 2 5/14/1997 51 HD 2-2HD-02 2-2HD-023 246-21P DS 2.5 1 2 5/27/1997 42 HD 2-2HD-02 2-2HD-023 246-22E 2.5 1 2 5/27/1997 28 HD 2-2HD-02 2-2HD-023 246-23P US 2.5 1 2 5/27/1997 34 HD 2-2HD-02 2-2HD-023 246-2P 2.5 1 2 5/14/1997 66 HD 2-2HD-02 2-2HD-023 246-3E 2.5 1 2 5/14/1997 20 HD 2-2HD-02 2-2HD-023 246-4P DS 2.5 1 2 5/21/1997 70 HD 2-2HD-02 2-2HD-023 246-5E 2.5 1 2 5/21/1997 42 HD 2-2HD-02 2-2HD-023 246-6P DS 2.5 1 2 5/21/1997 66 HD 2-2HD-02 2-2HD-023 246-6P US 2.5 1 2 5/21/1997 66 HD 2-2HD-02 2-2HD-023 246-7E 2.5 1 2 5/21/1997 26 HD 2-2HD-02 2-2HD-024 229-10E 2.5 1 2 5/22/1997 24 HD 2-2HD-02 2-2HD-024 229-10P DS 2.5 1 2 4/30/1997 38 HD 2-2HD-02 2-2HD-024 229-10P US 2.5 1 2 5/22/1997 54 HD 2-2HD-02 2-2HD-024 229-11E 2.5 1 2 4/30/1997 20 HD 2-2HD-02 2-2HD-024 229-11P US 2.5 1 2 4/30/1997 34 HD 2-2HD-02 2-2HD-024 229-2P DS 2.5 1 2 5/22/1997 52 HD 2-2HD-02 2-2HD-024 229-3E 2.5 1 2 5/22/1997 26 HD 2-2HD-02 2-2HD-024 229-3P 2.5 1 2 5/22/1997 48 HD 2-2HD-02 2-2HD-024 229-4E 2.5 1 2 5/22/1997 34 HD 2-2HD-02 2-2HD-024 229-6E 2.5 1 2 5/22/1997 34 HD 2-2HD-02 2-2HD-024 229-6P US 2.5 1 2 5/22/1997 44 HD 2-2HD-02 2-2HD-024 229-9P DS 2.5 1 2 5/22/1997 40 MS 2-MS-01 2-MS-036-B 252-2T 3 1 2 5/12/1997 40 MS 2-MS-01 2-MS-036-B 252-3T 3 1 2 5/12/1997 35 MS 2-MS-01 2-MS-036-B 252-4P US 3 1 2 5/12/1997 27 MS 2-MS-01 2-MS-036-B 252-5E 3 1 2 4/1/2008 34 MS 2-MS-01 2-MS-036-B 252-7E 3 1 2 4/1/2008 35 MS 2-MS-01 2-MS-036-B 252-9P DS 3 1 2 5/14/1997 41 MS 2-MS-01 2-MS-036-B 252-9T 3 1 2 5/14/1997 33 Report No. 0700.104-03, Attachment E, Revision 2 Page Attach E-8 of 15
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Line Size Last System Subsystem Line Number Component (in) F S Inspection NSI MS 2-MS-01 2-MS-076 275-10P DS 3 1 2 3/18/2000 35 MS 2-MS-01 2-MS-076 275-10P US 3 1 2 11/6/2002 37 MS 2-MS-01 2-MS-076 275-11E 3 1 2 3/18/2000 74 MS 2-MS-01 2-MS-076 275-12P DS 3 1 2 3/18/2000 57 MS 2-MS-01 2-MS-076 275-12P US 3 1 2 3/18/2000 44 MS 2-MS-01 2-MS-076 275-13E 3 1 2 3/18/2000 60 MS 2-MS-01 2-MS-076 275-14N 3 1 2 3/18/2000 28 MS 2-MS-01 2-MS-076 275-8P DS 3 1 2 11/6/2002 72 MS 2-MS-01 2-MS-076 275-9E 3 1 2 11/6/2002 66 MS 2-MS-01 2-MS-076 276-1N 3 1 2 5/18/2000 99 MS 2-MS-01 2-MS-076 276-1P 3 1 2 5/18/2000 70 MS 2-MS-01 2-MS-079 235-2E 3 1 2 4/26/2006 95 MS 2-MS-01 2-MS-079 235-3P DS 3 1 2 5/9/1997 49 MS 2-MS-01 2-MS-079 235-4E 3 1 2 5/9/1997 66 MS 2-MS-01 2-MS-079 235-5P DS 3 1 2 5/9/1997 33 MS 2-MS-01 2-MS-079 235-5P US 3 1 2 5/9/1997 23 MS 2-MS-01 2-MS-079 235-6E 3 1 2 5/9/1997 82 MS 2-MS-01 2-MS-079 235-7P 3 1 2 5/9/1997 32 MS 2-MS-07 2-MS-188-B 263-17E 12 1 2 6/2/1997 48 MS 2-MS-07 2-MS-188-B 263-18P 12 1 2 6/2/1997 47 MS 2-MS-07 2-MS-188-B 263-19R 12 1 2 6/2/1997 25 MS 2-MS-07 2-MS-189-B 263-5P US 12 1 2 9/27/2002 58 MS 2-MS-07 2-MS-189-B 263-6R 12 1 2 10/26/2002 42 MS 2-MS-07 2-MS-191 263-21P DS 12 1 2 6/9/1997 60 MS 2-MS-07 2-MS-191 263-22T 12 1 2 6/9/1997 45 MS 2-MS-07 2-MS-191 263-23P US 12 1 2 6/9/1997 35 MSD 2-MSD-02 2-MSD-145 MS-1A1 2.5 1 2 4/26/2006 99 MSD 2-MSD-02 2-MSD-145 MS-1A1P 2.5 1 2 4/26/2006 70 MSD 2-MSD-02 2-MSD-145 MS-1A2 2.5 1 2 11/19/2004 99 MSD 2-MSD-02 2-MSD-145 MS-1A2P 2.5 1 2 4/26/2006 52 MSD 2-MSD-02 2-MSD-145 MS-1A3P US 2.5 1 2 9/25/2002 64 MSD 2-MSD-02 2-MSD-146 MS-2A3P 2.5 1 2 N/A 23 MSD 2-MSD-02 2-MSD-146 MS-2A4 2.5 1 2 N/A 23 MSD 2-MSD-02 2-MSD-146 MS-2A4P 2.5 1 2 N/A 23 MSD 2-MSD-02 2-MSD-148 MS-1B2 2.5 1 2 4/13/2000 31 MSD 2-MSD-02 2-MSD-148 MS-1B2P DS 2.5 1 2 4/13/2000 77 MSD 2-MSD-02 2-MSD-148 MS-1B3P US 2.5 1 2 4/13/2000 42 MSD 2-MSD-02 2-MSD-149 MS-2B1 2.5 1 2 4/26/2006 91 MSD 2-MSD-02 2-MSD-149 MS-2B1N 2.5 1 2 4/26/2006 99 MSD 2-MSD-02 2-MSD-149 MS-2B2 2.5 1 2 4/26/2006 93 MSD 2-MSD-02 2-MSD-149 MS-2B2P 2.5 1 2 4/26/2006 99 MSD 2-MSD-02 2-MSD-149 MS-2B3 2.5 1 2 4/26/2006 99 MSD 2-MSD-02 2-MSD-149 MS-2B4 2.5 1 2 4/26/2006 99 MSD 2-MSD-02 2-MSD-149 MS-2B4N 2.5 1 2 4/26/2006 80 MSD 2-MSD-02 2-MSD-149 MS-2B4R 2.5 1 2 4/26/2006 99 MSD 2-MSD-02 2-MSD-150 MS-3B4 2.5 1 2 5/24/1997 46 Report No. 0700.104-03, Attachment E, Revision 2 Page Attach E-9 of 15
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Line Size Last System Subsystem Line Number Component (in) F S Inspection NSI MSD 2-MSD-02 2-MSD-150 MS-3B4P 2.5 1 2 5/24/1997 99 MSD 2-MSD-02 2-MSD-175 MS-1A25R 8 1 2 3/17/1995 87 MSD 2-MSD-02 2-MSD-175 MS-1A27P DS 8 1 2 N/A 23 MSD 2-MSD-02 2-MSD-175 MS-1A33 8 1 2 3/18/1995 33 MSD 2-MSD-02 2-MSD-175 MS-1A33P DS 8 1 2 3/18/1995 35 MSD 2-MSD-02 2-MSD-175 MS-1A33P US 8 1 2 3/18/1995 36 MSD 2-MSD-02 2-MSD-175 MS-1A34 8 1 2 3/18/1995 27 MSD 2-MSD-02 2-MSD-175 MS-1A34P-1 8 1 2 4/17/1997 38 MSD 2-MSD-02 2-MSD-175 MS-1A34P-2 8 1 2 3/18/1995 33 MSD 2-MSD-02 2-MSD-175 MS-1A34R-2 8 1 2 4/28/1997 37 MSD 2-MSD-02 2-MSD-176 MS-2A26 8 1 2 3/17/1995 30 MSD 2-MSD-02 2-MSD-176 MS-2A26P 8 1 2 3/17/1995 45 MSD 2-MSD-02 2-MSD-176 MS-2A26P-1 DS 8 1 2 2/5/1995 49 MSD 2-MSD-02 2-MSD-176 MS-2A26P-1 US 8 1 2 3/17/1995 48 MSD 2-MSD-02 2-MSD-176 MS-2A27 8 1 2 3/16/1995 34 MSD 2-MSD-02 2-MSD-176 MS-2A27P DS 8 1 2 2/5/1995 34 MSD 2-MSD-02 2-MSD-176 MS-2A27P US 8 1 2 3/16/1995 38 MSD 2-MSD-02 2-MSD-176 MS-2A28 8 1 2 3/17/1995 34 MSD 2-MSD-02 2-MSD-176 MS-2A28P 8 1 2 3/16/1995 41 MSD 2-MSD-02 2-MSD-176 MS-2A28P DS 8 1 2 N/A 23 MSD 2-MSD-02 2-MSD-176 MS-2A29 8 1 2 3/16/1995 25 MSD 2-MSD-02 2-MSD-176 MS-2A29P 8 1 2 3/16/1995 46 MSD 2-MSD-02 2-MSD-176 MS-2A30 8 1 2 3/17/1995 43 MSD 2-MSD-02 2-MSD-176 MS-2A30P DS 8 1 2 3/16/1995 45 MSD 2-MSD-02 2-MSD-176 MS-2A30P US 8 1 2 2/5/1995 42 MSD 2-MSD-02 2-MSD-176 MS-2A31 8 1 2 3/16/1995 52 MSD 2-MSD-02 2-MSD-176 MS-2A31P 8 1 2 3/18/1995 50 MSD 2-MSD-02 2-MSD-176 MS-2A32 8 1 2 3/18/1995 23 MSD 2-MSD-02 2-MSD-176 MS-2A32P 8 1 2 3/18/1995 34 MSD 2-MSD-02 2-MSD-176 MS-2A33 8 1 2 3/27/2008 32 MSD 2-MSD-02 2-MSD-176 MS-2A33P 8 1 2 3/19/1995 39 MSD 2-MSD-02 2-MSD-176 MS-2A33R 8 1 2 4/28/1997 48 MSD 2-MSD-02 2-MSD-176 MS-2A34 8 1 2 3/27/2008 26 MSD 2-MSD-02 2-MSD-176 MS-2A34P 8 1 2 3/18/1995 42 MSD 2-MSD-02 2-MSD-177 MS-3A28 8 1 2 N/A 20 MSD 2-MSD-02 2-MSD-177 MS-3A28R 8 1 2 4/28/1997 33 MSD 2-MSD-02 2-MSD-177 MS-3A29 8 1 2 N/A 20 MSD 2-MSD-02 2-MSD-177 MS-3A29P 8 1 2 11/2/2002 89 MSD 2-MSD-02 2-MSD-177 MS-3A30N 8 1 2 11/2/2002 30 MSD 2-MSD-02 2-MSD-178 MS-1B41P 6 1 2 4/16/1997 41 MSD 2-MSD-02 2-MSD-178 MS-1B41R 6 1 2 4/28/1997 33 MSD 2-MSD-02 2-MSD-178 MS-1B42P 6 1 2 4/15/1997 31 MSD 2-MSD-02 2-MSD-179 MS-2B27P 6 1 2 3/27/1995 51 MSD 2-MSD-02 2-MSD-179 MS-2B56 6 1 2 3/27/1995 25 MSD 2-MSD-02 2-MSD-179 MS-2B62P 6 1 2 4/15/1997 34 MSD 2-MSD-02 2-MSD-179 MS-2B62R 6 1 2 4/28/1997 42 Report No. 0700.104-03, Attachment E, Revision 2 Page Attach E-10 of 15
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Line Size Last System Subsystem Line Number Component (in) F S Inspection NSI MSD 2-MSD-02 2-MSD-180 MS-3B44P 6 1 2 4/16/1997 30 MSD 2-MSD-02 2-MSD-180 MS-3B44P1 6 1 2 5/15/1997 38 MSD 2-MSD-02 2-MSD-180 MS-3B44R 6 1 2 5/15/1997 54 SB 2-SB-01 2-SB-030 284-7R 8 1 2 5/11/2000 23 UH 2-UH-01 2-UH-003 282-22P DS 10 1 2 5/19/2000 79 UH 2-UH-01 2-UH-003 282-23T 10 1 2 5/19/2000 30 UH 2-UH-01 2-UH-003 282-24R 10 1 2 5/19/2000 61 UH 2-UH-01 2-UH-003 282-31P 10 1 2 5/19/2000 51 UH 2-UH-01 2-UH-003 283-20R 10 1 2 5/15/2000 22 UH 2-UH-01 2-UH-003 283-21P US 10 1 2 5/15/2000 52 UH 2-UH-01 2-UH-003 283-6P DS 10 1 2 5/15/2000 64 UH 2-UH-01 2-UH-003 283-7T 10 1 2 5/15/2000 34 UH 2-UH-01 2-UH-003 283-8R 10 1 2 5/15/2000 39 UH 2-UH-01 2-UH-003 283-9P US 10 1 2 5/15/2000 53 UH 2-UH-01 2-UH-071 281-11P US 6 1 2 4/26/2000 64 UH 2-UH-01 2-UH-071 281-12E 6 1 2 4/26/2000 66 UH 2-UH-01 2-UH-071 281-13P DS 6 1 2 4/26/2000 68 UH 2-UH-01 2-UH-071 281-2P US 6 1 2 4/26/2000 87 UH 2-UH-01 2-UH-071 281-3E 6 1 2 4/26/2000 93 UH 2-UH-01 2-UH-071 281-4P 6 1 2 4/26/2000 41 MS 2-MS-01 2-MS-011-A 259-15E 4 1 3 4/1/2008 54 MS 2-MS-01 2-MS-011-A 259-16P US 4 1 3 5/8/1997 39 MS 2-MS-01 2-MS-012-A 254-15E 4 1 3 4/9/2008 34 MS 2-MS-01 2-MS-012-A 254-16P US 4 1 3 5/8/1997 59 MS 2-MS-01 2-MS-012-A 254-20P DS 4 1 3 5/6/2000 49 MS 2-MS-01 2-MS-012-A 254-21E 4 1 3 5/6/2000 53 MS 2-MS-01 2-MS-012-A 254-22P US 4 1 3 5/6/2000 48 MS 2-MS-01 2-MS-013-A 259-10P US 4 1 3 2/16/2000 37 MS 2-MS-01 2-MS-013-A 259-3E 4 1 3 5/8/1997 69 MS 2-MS-01 2-MS-013-A 259-4P US 4 1 3 5/9/1997 34 MS 2-MS-01 2-MS-013-A 259-8P DS 4 1 3 2/16/2000 40 MS 2-MS-01 2-MS-013-A 259-9E 4 1 3 4/8/2008 20 MS 2-MS-01 2-MS-014-A 254-10P US 4 1 3 N/A 23 MS 2-MS-01 2-MS-014-A 254-3E 4 1 3 4/3/2008 41 MS 2-MS-01 2-MS-014-A 254-4P US 4 1 3 5/7/1997 45 MS 2-MS-01 2-MS-014-A 254-7E 4 1 3 11/12/2002 38 MS 2-MS-01 2-MS-014-A 254-8P DS 4 1 3 N/A 23 MS 2-MS-01 2-MS-014-A 254-9E 4 1 3 3/24/2010 32 MS 2-MS-01 2-MS-017 251-12E 8 1 3 5/20/1997 58 MS 2-MS-01 2-MS-017 251-13P US 8 1 3 5/20/1997 40 MS 2-MS-01 2-MS-018 251-21P 8 1 3 5/20/1997 46 MS 2-MS-01 2-MS-018 251-22E 8 1 3 5/20/1997 93 MS 2-MS-01 2-MS-018 251-23P US 8 1 3 5/20/1997 46 MS 2-MS-01 2-MS-034 248-12P DS 4 1 3 5/7/1997 50 MS 2-MS-01 2-MS-034 248-13T 4 1 3 10/23/2004 30 MS 2-MS-01 2-MS-034 248-16P US 4 1 3 5/7/1997 27 Report No. 0700.104-03, Attachment E, Revision 2 Page Attach E-11 of 15
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Line Size Last System Subsystem Line Number Component (in) F S Inspection NSI MS 2-MS-01 2-MS-035 252-10P US 6 1 3 5/14/1997 40 MS 2-MS-01 2-MS-035 252-10T 6 1 3 5/13/1997 39 MS 2-MS-01 2-MS-035 252-11P 6 1 3 5/15/1997 52 Report No. 0700.104-03, Attachment E, Revision 2 Page Attach E-12 of 15
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Table E.2 below lists all large bore replacements from FAC Manager Web Edition Components that have been associated with an SNM Line. If the component is not linked to an SNM line in FAC Manager it will not appear in this table. Components may be missing from this table due to the lack of this link. The table is sorted by relative susceptibility, then alphabetically by System, Subsystem, Line, and Component.
Table E.2 Large Bore SNM Replacements from FAC Manager Line System Subsystem Line Number Component Size F S Install Date EST 2-1EST-01 2-1EST-013-B EST-14 4 1 1 4/28/1997 EST 2-1EST-01 2-1EST-013-B EST-14P 4 1 1 4/28/1997 EST 2-1EST-01 2-1EST-013-B EST-15 4 1 1 4/28/1997 EST 2-1EST-01 2-1EST-013-B EST-20P US 4 1 1 4/28/1997 EST 2-1EST-01 2-1EST-013-B EST-21 4 1 1 4/28/1997 EST 2-1EST-01 2-1EST-013-B EST-21P DS 4 1 1 4/28/1997 EST 2-1EST-01 2-1EST-013-B EST-21P US 4 1 1 4/28/1997 EST 2-1EST-01 2-1EST-013-B EST-22 4 1 1 4/28/1997 EST 2-1EST-01 2-1EST-013-B EST-22P 4 1 1 4/28/1997 EST 2-1EST-01 2-1EST-013-B EST-23P 4 1 1 6/30/1997 EST 2-1EST-01 2-1EST-013-B EST-24 4 1 1 4/28/1997 EST 2-1EST-01 2-1EST-013-B EST-24P 4 1 1 4/28/1997 EST 2-1EST-01 2-1EST-013-B EST-29P 4 1 1 6/30/1997 EST 2-1EST-01 2-1EST-013-B EST-30A 4 1 1 4/28/1997 EST 2-1EST-01 2-1EST-013-B EST-30AP 4 1 1 4/28/1997 EST 2-1EST-01 2-1EST-013-B EST-30B 4 1 1 4/28/1997 EST 2-1EST-01 2-1EST-013-B EST-30P DS 4 1 1 6/30/1997 EST 2-1EST-01 2-1EST-013-B EST-31 4 1 1 4/28/1997 EST 2-1EST-01 2-1EST-013-B EST-31P DS 4 1 1 4/28/1997 EST 2-1EST-01 2-1EST-013-B EST-31P US 4 1 1 4/28/1997 EST 2-1EST-01 2-1EST-013-B EST-31P-1 4 1 1 4/28/1997 EST 2-1EST-01 2-1EST-013-B EST-31T 4 1 1 4/28/1997 EST 2-1EST-01 2-1EST-014 EST-1T 6 1 1 4/28/1997 HD 2-3HD-02 2-3HD-039 223-9R 3 1 1 10/26/2002 HD 2-3HD-02 2-3HD-042 223-10P DS 4 1 1 10/26/2002 HD 2-3HD-02 2-3HD-042 223-10P US 4 1 1 10/26/2002 HD 2-3HD-02 2-3HD-042 223-10T 4 1 1 10/26/2002 HD 2-3HD-02 2-3HD-042 223-11T 4 1 1 10/26/2002 HD 2-3HD-02 2-3HD-043 223-11P US 4 1 1 10/26/2002 HD 2-3HD-02 2-3HD-043 223-13P DS 4 1 1 10/26/2002 HD 2-3HD-02 2-3HD-043 223-14E 4 1 1 10/26/2002 HD 2-3HD-02 2-3HD-043 223-14P DS 4 1 1 10/26/2002 HD 2-3HD-02 2-3HD-043 223-14P US 4 1 1 10/26/2002 HD 2-3HD-02 2-3HD-043 223-15E 4 1 1 10/26/2002 HD 2-3HD-02 2-3HD-043 223-15P DS 4 1 1 10/26/2002 HD 2-3HD-02 2-3HD-043 223-15P US 4 1 1 10/26/2002 HD 2-3HD-02 2-3HD-043 223-16E 4 1 1 10/26/2002 HD 2-3HD-02 2-3HD-043 223-16P DS 4 1 1 10/26/2002 HD 2-3HD-02 2-3HD-043 223-16P US 4 1 1 10/26/2002 HD 2-3HD-02 2-3HD-043 223-17E 4 1 1 10/26/2002 Report No. 0700.104-03, Attachment E, Revision 2 Page Attach E-13 of 15
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Line System Subsystem Line Number Component Size F S Install Date HD 2-3HD-02 2-3HD-043 223-17P DS 4 1 1 10/26/2002 HD 2-3HD-02 2-3HD-043 223-17P US 4 1 1 10/26/2002 HD 2-3HD-02 2-3HD-043 223-18E 4 1 1 10/26/2002 HD 2-3HD-02 2-3HD-043 223-18P 4 1 1 10/26/2002 HD 2-3HD-02 2-3HD-043 223-19E 4 1 1 10/26/2002 HD 2-3HD-02 2-3HD-043 223-19P US 4 1 1 10/26/2002 HD 2-5HD-03 2-5HD-061-B 5EXC-27P 8 1 1 2/16/2000 HD 2-2HD-02 2-2HD-023 246-17P DS 2.5 1 2 2/16/2000 HD 2-2HD-02 2-2HD-023 246-18E 2.5 1 2 2/16/2000 HD 2-2HD-02 2-2HD-023 246-19P US 2.5 1 2 2/16/2000 HD 2-2HD-02 2-2HD-023 246-21P DS 2.5 1 2 2/16/2000 HD 2-2HD-02 2-2HD-023 246-22E 2.5 1 2 2/16/2000 HD 2-2HD-02 2-2HD-023 246-23P US 2.5 1 2 2/16/2000 HD 2-2HD-02 2-2HD-023 246-2P 2.5 1 2 2/16/2000 HD 2-2HD-02 2-2HD-023 246-3E 2.5 1 2 2/16/2000 HD 2-2HD-02 2-2HD-023 246-4P DS 2.5 1 2 2/16/2000 HD 2-2HD-02 2-2HD-023 246-5E 2.5 1 2 2/16/2000 HD 2-2HD-02 2-2HD-023 246-6P DS 2.5 1 2 2/16/2000 HD 2-2HD-02 2-2HD-023 246-6P US 2.5 1 2 2/16/2000 HD 2-2HD-02 2-2HD-023 246-7E 2.5 1 2 2/16/2000 HD 2-2HD-02 2-2HD-024 229-10E 2.5 1 2 2/16/2000 HD 2-2HD-02 2-2HD-024 229-10P DS 2.5 1 2 2/16/2000 HD 2-2HD-02 2-2HD-024 229-10P US 2.5 1 2 2/16/2000 HD 2-2HD-02 2-2HD-024 229-11E 2.5 1 2 2/16/2000 HD 2-2HD-02 2-2HD-024 229-11P US 2.5 1 2 2/16/2000 HD 2-2HD-02 2-2HD-024 229-2P DS 2.5 1 2 2/16/2000 HD 2-2HD-02 2-2HD-024 229-3E 2.5 1 2 2/16/2000 HD 2-2HD-02 2-2HD-024 229-3P 2.5 1 2 2/16/2000 HD 2-2HD-02 2-2HD-024 229-4E 2.5 1 2 2/16/2000 HD 2-2HD-02 2-2HD-024 229-6E 2.5 1 2 2/16/2000 HD 2-2HD-02 2-2HD-024 229-6P US 2.5 1 2 2/16/2000 HD 2-2HD-02 2-2HD-024 229-9P DS 2.5 1 2 2/16/2000 SB 2-SB-01 2-SB-030 284-7R 8 N/A N/A 7/1/1997 N/A N/A N/A 4EXA-12P 20 N/A N/A 10/26/2002 N/A N/A N/A 4EXA-14 20 N/A N/A 10/26/2002 N/A N/A N/A 4EXB-13P 20 N/A N/A 10/26/2002 N/A N/A N/A 4EXB-14P 20 N/A N/A 10/26/2002 N/A N/A N/A 4EXB-9P DS 20 N/A N/A 10/26/2002 N/A N/A N/A 4EXB-9P US 20 N/A N/A 10/26/2002 N/A N/A N/A FWH-22C 54.75 N/A N/A 5/8/2000 N/A N/A N/A FWH-23B-1 53.875 N/A N/A 5/8/2000 N/A N/A N/A FWH-23C 1N 53.875 N/A N/A 5/8/2000 N/A N/A N/A FWH-23C 2N 53.875 N/A N/A 5/8/2000 N/A N/A N/A MPSD1 6 N/A N/A 2/14/1986 N/A N/A N/A MPSD10 10 N/A N/A 2/14/1986 N/A N/A N/A MPSD11 10 N/A N/A 2/14/1986 N/A N/A N/A MPSD12 10 N/A N/A 2/14/1986 Report No. 0700.104-03, Attachment E, Revision 2 Page Attach E-14 of 15
CSI TECHNOLOGIES, INC. Indian Point 2 FAC Susceptible Non-Modeled (SNM) Program Line System Subsystem Line Number Component Size F S Install Date N/A N/A N/A MPSD2 6 N/A N/A 2/14/1986 N/A N/A N/A MPSD3 10 N/A N/A 2/14/1986 N/A N/A N/A MPSD4 10 N/A N/A 2/14/1986 N/A N/A N/A MPSD5 10 N/A N/A 2/14/1986 N/A N/A N/A MPSD6 10 N/A N/A 2/14/1986 N/A N/A N/A MPSD7 10 N/A N/A 2/14/1986 N/A N/A N/A MPSD8 10 N/A N/A 2/14/1986 N/A N/A N/A MPSD9 10 N/A N/A 2/14/1986 Report No. 0700.104-03, Attachment E, Revision 2 Page Attach E-15 of 15