Category:E-Mail
MONTHYEARML24250A1062024-09-0606 September 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24234A2772024-08-21021 August 2024 NRR E-mail Capture - Final RAI - Constellation Energy, LLC - Fleet Request - Proposed Alternative Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds (L-2024-LLR-0031) ML24199A1842024-07-15015 July 2024 RAI-LAR for Limerick EPID: L-2024-LLA-0079- Use This Version ML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24176A1292024-06-20020 June 2024 Estimated Completion Schedule Change Email ML24156A0082024-05-31031 May 2024 NRR E-mail Capture - Constellation Energy, LLC - Fleet Request - Acceptance of Proposed Alternative Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds (L-2024-LLR-0031 ML24131A0612024-05-10010 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24107A9192024-05-0808 May 2024 Email to Christian Williams Re Decision on the Limerick Exemption ML24107A9202024-05-0303 May 2024 Email to Christian Williams Re Availability of Environmental Assessment for the Limerick Exemption ML24122C6742024-05-0101 May 2024 Response to a Request from NRC Review of a Draft EA for an Exemption for the Limerick Generating Station ML24122B5072024-05-0101 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-591, Revision 0 ML24122C6702024-04-29029 April 2024 Request from NRC Review of a Draft EA for an Exemption for the Limerick Generating Station ML24051A0652024-02-16016 February 2024 Digital I&C LAR RAIs Re HFE (Email) ML24026A2922024-01-26026 January 2024 – Request for Additional Information Regarding Limerick Digital Instrumentation and Controls License Amendment Request ML23331A0062023-11-22022 November 2023 (External Sender) Supplement - Limerick Security Rule Exemption Request – ISFSI Docket No. Reference ML23311A2412023-11-0707 November 2023 NRR E-mail Capture - NRC Notification to the Commonwealth of Pennsylvania Re. Limerick Generating Station, Units 1 and 2 Amendment - Control Room Ventilation System Technical Specifications ML23304A0192023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Limerick 1 & 2 - Exemption from Security Rule (L-2023-LLE-0026) ML23276B4642023-10-0303 October 2023 NRR E-mail Capture - NRC Request for Additional Information Limerick TSTF-477 LAR ML23255A2872023-09-12012 September 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative to Use the Successive Inspection Requirements of BWRVIP-75-A ML23248A1282023-09-0101 September 2023 NRR E-mail Capture - Action: Opportunity to Review and Comment on a New NRC Information Collection, 10 CFR Part 50.55a, Codes and Standards (3150-XXXX) ML23237B3972023-08-24024 August 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative Request to Use Updated BWRVIP Guidelines ML23208A1942023-07-27027 July 2023 NRR E-mail Capture - Limerick Generating Station - Audit Plan for TSTF-477 LAR Review (L-2022-LLA-0174) ML23202A0682023-07-21021 July 2023 NRR E-mail Capture - NRC Request for Additional Information Re. TSTF-477 LAR ML23201A1262023-07-18018 July 2023 Additional RAIs for Limerick Generation Station, Units 1 and 2 - LAR and Exemption Request for Digital I&C Installation Support ML23173A0632023-06-20020 June 2023 RAIs for Limerick Generation Station, Units 1 and 2 - LAR and Exemption Request for Digital I&C Installation Support ML23102A1642023-04-12012 April 2023 Generation Station, Unit No. 2 – Potential Emergent Relief Request for HPCI IST (EPID L-2023-LLR-0015) - Closure E-mail Dated 4/12/2023 ML23125A0522023-03-31031 March 2023 NRR E-mail Capture - Clean OL Pages for 50.69 LAR ML23089A1602023-03-30030 March 2023 NRR E-mail Capture - NRC Notification to the Commonwealth of Pennsylvania Re. Limerick Generating Station, Units 1 and 2 Amendment - Alternative 10 CFR 50.69 Categorization Approaches ML23086B9282023-03-27027 March 2023 Acceptance of Requested Licensing Action for License Amendment Request to Support Digital Modernization Project Installation ML23086A0822023-03-27027 March 2023 – Acceptance of Requested Licensing Action for Exemption Request to Support Digital Modernization Project Installation ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML23060A1662022-12-20020 December 2022 Acceptance Review: Adopt TSTF-477, Revision 3-Acceptance Letter ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22172A0752022-06-17017 June 2022 Response: Review and Feedback on Draft Limerick Digital License Amendment Request (L-2020-LRM-0041) ML22136A0032022-05-13013 May 2022 NRR E-mail Capture - NRC Request for Additional Information - Limerick License Amendment Request (L-2021-LLA-0042) ML22124A2862022-05-0404 May 2022 Information Needed to Provide Substantive Feedback on Human Factors Engineering Supporting the Planned Limerick Digital I&C License Amendment Request ML22089A1172022-03-30030 March 2022 Additional Comments and Questions on Constellations March 31st Presentation ML22089A1162022-03-28028 March 2022 Comments and Questions on Constellations March 31st Presentation ML22112A2152022-03-28028 March 2022 Limerick_Acceptance Review TS Change to Correct Nonconservative Technical Specification Table 3.3.3-1 ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22034A0142022-02-0202 February 2022 NRR E-mail Capture - Audit Plan Supplement for LIM 50.69 LAR (L-2021-LLA-0042) ML22028A1832022-01-24024 January 2022 NRR E-mail Capture - Audit Plan Supplement for LIM 50.69 LAR (L-2021-LLA-0042) ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML22005A1812022-01-0505 January 2022 NRR E-mail Capture - Staffs Questions Pertaining to Limerick Generating Station Digital Modernization Project LAR Pre-submittal Meeting Slides December 7, 2021 ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21295A0362021-10-20020 October 2021 NRR E-mail Capture - Supplement to Limerick 50.69 Audit Plan Dated October 1, 2021 (L-2021-LLA-0042) ML21286A0302021-10-13013 October 2021 Staffs Questions Pertaining to Limerick Generating Station Digital Modernization Project LAR Pre-submittal Meeting Slides October 20, 2021 ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21252A0482021-09-0707 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 2024-09-06
[Table view] |
Text
LimerickNPEm Resource From: Milano, Patrick Sent: Thursday, November 29, 2012 1:12 PM To: LimerickHearingFile Resource
Subject:
Exelon Letter dated November 6, 2012 Attachments: 11 6 12 - LIM - SER with Open Items re LGS LRA.pdf 1
Hearing Identifier: Limerick_LR_NonPublic Email Number: 1546 Mail Envelope Properties (9C2386A0C0BC584684916F7A0482B6CAB9E9F1FEEF)
Subject:
Exelon Letter dated November 6, 2012 Sent Date: 11/29/2012 1:11:37 PM Received Date: 11/29/2012 1:12:00 PM From: Milano, Patrick Created By: Patrick.Milano@nrc.gov Recipients:
"LimerickHearingFile Resource" <LimerickHearingFile.Resource@nrc.gov>
Tracking Status: None Post Office: HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 3 11/29/2012 1:12:00 PM 11 6 12 - LIM - SER with Open Items re LGS LRA.pdf 577976 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
U.S. Nuclear Regulatory Commission November 6, 2012 Page 2 As stated in the reference 2 letter, Not allowing performing aging management activities in the last refueling outage prior to the PEO has additional undesirable consequences. As a result of this proposed License condition, 2.5 years of opportunity to perform outage related inspections is lost as well as the potential impacts on LGS Aging Management Programs implementation detailed in the following table:
LGS AMP NUREG 1801 (GALL Rev. 2) Basis LGS Impact from proposed License NUREG 1800 (SRP Rev. 2) Basis Condition B.2.1.22 NUREG 1801: With respect to inspection Last Refueling Outage prior to PEO not timing, Specifically, inspections need to be available to perform outage related One-Time completed early enough to ensure that the aging inspections.
Inspection effects that may affect intended functions early in the period of extended operation are appropriately Less time available to allow aging GALL XI. M32 managed. Conversely, inspections need to be effects to develop prior to inspections.
timed to allow the inspected components to attain sufficient age to ensure that the aging effects with Per GALL it is optimal to perform long incubation periods (i.e., those that may affect one-time inspections as late as intended functions near the end of the period of possible to detect aging effects.
extended operation) are identified. Within these constraints, the applicant should schedule the inspection no earlier than 10 years prior to the period of extended operation and in such a way as to minimize the impact on plant operations. As a plant will have operated for at least 30 years before inspections under this program begin, sufficient time will have elapsed for any aging effects to be manifested.
NUREG 1800, Table 3.0-1 FSAR Supplement for Aging Management of Applicable Systems Implementation Schedule: Program should be implemented prior to period of extended operation B.2.1.23 NUREG 1801: The visual inspection and Last Refueling Outage prior to PEO not hardness measurement or other mechanical available to perform outage related Selective examination techniques, such as destructive inspections.
Leaching testing (when the opportunity arises), chipping, or scraping, is a one-time inspection conducted Less time available to allow aging GALL XI. M33 within the last 5 years prior to entering the period effects to develop prior to inspections.
of extended operation. Because selective leaching is a slow acting corrosion process, this Per GALL it is optimal to perform measurement is performed just prior to the period one-time inspections as late as of extended operation. Follow-up of unacceptable possible to detect aging effects.
inspection findings includes an evaluation using the corrective action program and a possible expansion of the inspection sample size and Location.
NUREG 1800, Table 3.0-1 FSAR Supplement for Aging Management of Applicable Systems Implementation Schedule: Program should be implemented prior to period of extended operation
U.S. Nuclear Regulatory Commission November 6, 2012 Page 3 B.2.1.24 NUREG 1801: The one time inspection should be Last Refueling Outage prior to PEO not completed within the six year period prior to the available to perform outage related ASME period of extended operation. inspections.
Code Class 1 Small-Bore NUREG 1800, Table 3.0-1 FSAR Supplement Less time available to allow aging Piping Program for Aging Management of Applicable Systems effects to develop prior to inspections.
Implementation Schedule: Program should be GALL XI. M35 implemented prior to period of extended operation Per GALL it is optimal to perform one-time inspections as late as possible to detect aging effects.
Sample population increased from GALL Rev 1 to GALL Rev 2 so significantly more inspections must be performed during each outage (2 vs. 3 available outages).
A.2.1.40 NUREG 1801: The first tests for license renewal Last Refueling Outage prior to PEO not are to be completed prior to the period of available to perform outage related Inaccessible extended operation with subsequent tests inspections.
Power Cables performed at least every 6 years thereafter.
Not Subject to Less time available to allow aging 10 CFR 50.49 NUREG 1800, Table 3.0-1 FSAR Supplement effects to develop prior to inspections.
Environmental for Aging Management of Applicable Systems Qualification Implementation Schedule: First tests or first Electrical inspections are normally Requirements inspections for license renewal completed prior to spread out over several refuel outages the period of extended operation to coordinate with specific Electrical GALL XI.E3 bus outages in order to minimize outage risk. Loss of one Refuel outage could result in multiple Electrical bus outages in a refuel outage which would increase Refuel Outage risk.
A.2.1.41 NUREG 1801: The first inspection using Last Refueling Outage prior to PEO not thermography or measuring connection resistance available to perform outage related Metal Enclosed is completed prior to the period of extended inspections.
Bus operation and every 10 years thereafter provided visual inspection is not used to inspect bolted Less time available to allow aging GALL XI.E4 connections. effects to develop prior to inspections.
NUREG 1800, Table 3.0-1 FSAR Supplement Electrical inspections are normally for Aging Management of Applicable Systems spread out over several refuel outages Implementation Schedule: First inspection for to coordinate with specific Electrical license renewal completed prior to the period of bus outages in order to minimize extended operation Refuel Outage risk. Loss of one Refuel outage could result in multiple Electrical bus outages in a refuel outage which would increase Refuel Outage risk.
Other potential impacts:
x Any inspection linked to a performance frequency of once every ISI interval could be an issue. For Unit 1, this means that anything scheduled for the last period of the third 10 year interval (outages in 2024 and 2026) would need to be scheduled to be performed in