Official Exhibit - ENT000004-00-BD01 - Resume of Lori Ann Potts
ML12335A653
Person / Time
Site: Indian Point  
Issue date: 03/28/2012
From: Potts L
Entergy Nuclear Operations, Potts Consulting
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
RAS 22092, 50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01
Download: ML12335A653 (2)


Text

Lori Ann Potts Potts Consulting, Inc.

1910 River Mountain Rd.

Delaware, AR 72835 479-970-2835 loriannpotts@gmail.com March 2012 Page 1 of 2.

EXPERIENCE Over 30 years of experience as a technical professional in the nuclear industry in the areas of safety analysis, probabilistic safety or risk assessment (PSA or PRA), deterministic and probabilistic accident and consequence analysis, materials aging management, reactor engineering, and systems engineering.

January 2008 -

Present Consultant to Entergy Nuclear - NFPA-805 Transition Project Team Development of products and documents associated with the ANO-1 and ANO-2 Fire PRAs.



Plant Boundary Definition, Plant Partitioning, and Fire Ignition Frequencies



Fire PRA Component Selection and Fire-Induced PRA Model



Post-Fire Human Reliability Analysis



Fire Risk Quantification



Fire PRA Peer Reviews Preparation, Execution, and Responses



Risk assessments of Fire Protection non-compliances and issues February 2002 -

Present Consultant to Entergy Nuclear - License Renewal Project Team



Providing guidance on SAMA analyses for Sequoyah Units 1 and 2 and Fermi 2



Coordinating and reviewing evaluation of severe accident mitigation alternatives (SAMA) for ANO-1, ANO-2, Pilgrim, Vermont Yankee, J.A. Fitzpatrick, Indian Point, Cooper and Grand Gulf Environmental Reports



Mechanical Aging Management Reviews and Development of Aging Management Programs for DC Cook, Pilgrim, Vermont Yankee, Palisades, ANO-2, J.A. Fitzpatrick, Indian Point, and Cooper License Renewal Projects



Responding to NRC questions on submitted applications



Peer reviewed SAMA analyses for Columbia and Palo Verde



Developed industry SAMA guideline (NEI 05-01)

July 2007 Consultant to First Energy Peer review of Severe Accident Mitigation Alternatives (SAMA) evaluations for Beaver Valley Power Station Units 1 and 2 January 1994 -

August 2001 Consultant to Entergy Operations - Arkansas Nuclear One (ANO) Nuclear Safety Analysis



Project Manager on ANO-2 PSA Model Update



Risk Analysis of the ANO-2 Power Uprate



Risk Sensitivity Analysis of alternate repair criteria for ANO-1 Steam Generator tubes containing Intergranular Attack



Power Uprate/Steam Generator Replacement modification of ANO-2



Updated Fortran code to calculate time to boil and time to core uncovery upon loss of shutdown cooling



Created ANO PSA Analysts Deskguide



Updated ANO-1 and ANO-2 PSA models and associated analyses ENT000004 Submitted: March 28, 2012 United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of:

Entergy Nuclear Operations, Inc.

(Indian Point Nuclear Generating Units 2 and 3)

ASLBP #: 07-858-03-LR-BD01 Docket #: 05000247 l 05000286 Exhibit #:

Identified:

Admitted:

Withdrawn:

Rejected:

Stricken:

Other:

ENT000004-00-BD01 10/15/2012 10/15/2012

Lori Ann Potts March 2012 Page 2 of 2.

November 1989 -

June 1993 Arkansas Nuclear One (ANO), Entergy Operations, Inc.

Senior Engineer, Nuclear Engineering Design (05/91-06/93)



Lead Engineer for Unit 1 PSA



Responsible for documentation of Design Basis for reactivity related design basis accidents on Unit 2 Reactor Engineer III, System Engineering (11/89 - 05/91)



Responsible for Unit 2 Core Protection Calculators, Core Operating Limits Supervisory System and Excore Nuclear Instrumentation



Defined core offload, shuffle and reload sequence for Unit 2 Cycle 9



Performed Startup Physics Testing and Core Monitoring Surveillances February 1988 -

November 1989 Plant A. W. Vogtle, Georgia Power Company Senior Plant Engineer, Outage Management



Developed Project-2 schedules for Refueling and mid-cycle Outages



Performed Critical Path Analyses, Plots and Reports January 1987 -

August 1987 Consultant to Pilgrim Power Station Senior Systems Specialist, I&C (03/87 - 08/87)



Ensured Neutron Monitoring, Radiation Monitoring, Reactor Water Level, Turbine Generator Protection and Controls, Recirculation System Controls and Communications systems were operational and ready for start-up of the plant from its extended outage



Acted for Lead Systems Specialist, I&C and Electrical in his absence; supervising six engineers NPRDS Administrator (01/87 - 03/87)



Reviewed plant Maintenance Requests, Malfunction Reports and Design Changes for reportable failures and generated failure and out-of-service reports January 1985 -

December 1985 Consultant to Arkansas Nuclear One Principal Engineer



Documented Research and Engineering Evaluation for all components in both units to generate a computerized Component Database



Supervised four technicians and five engineers April 1984 -

December 1984 Clinton Power Station, Illinois Power Company Plant Maintenance Engineer



Resolved abnormal condition reports, commitments and audit findings



Walked-down systems being turned over from Start-Up to Operations



Developed maintenance program for Environmental Qualification of equipment



Developed Computerized Maintenance Management System May 1981 -

March 1984 EG&G Idaho, Inc.

Three Mile Island, I&C and Electrical Program Engineer



Developed test procedures, instructed technicians in use of equipment and directed performance of survivability testing of electrical components and instrumentation within the Unit 2 reactor building



Presented technical reports describing the program status to DOE, NRC and the industry June 1980 -

August 1980 EG&G Idaho, Inc.

Three Mile Island, Intern



Participated in and graphed data from survivability testing of electrical components and instrumentation within the damaged Unit 2 reactor building EDUCATION B.S., Nuclear Engineering, The Pennsylvania State University, 1981